abdelaziz_khodeir elng asset integrity management
DESCRIPTION
Asset IntegrityTRANSCRIPT
1
Process Safety Management of Major
Risks
Technical Integrity Management of Hardware risk
barriers
Asset Integrity The ability of an asset to perform its required
function effectively and efficiently while
safeguarding life and the environment
Asset Performance The ability of an asset to perform its required
function while making an optimum contribution to
the business
Occupational Safety Incidents that primarily affect an individual on
each occurrence (Hi Freq & Lo
Consequences)
C- ELNG AIMS Approach
System Model.
System Concept.
System Components.
System Elements.
Barrier
Hole
Impact
QUANTITATIVE RISK ASSESSMENT
MAJOR HAZARD ACCIDENT SCENARIOS
Design & Build
Integrity
Identify, Create
Barriers ASSET
INTEGRITY
Sustain
Integrity
Maintain
Barriers
Operating Within Safe Operating
Limits
PLANT
HARD- WARE ASPECTS
PEOPLE
OPERATIONAL CAPABILITY
LEADERSHIP
PROCESSES
VALUE ASSURANCE
REVIEW & AUDIT
Emergency Planning Response
Operational Safety Case / Quantitative
Risk assessment
Review Major Hazard
Accident Scenarios
SCE management
Develop List of SCE that covers all categories of “Prevention, Detection, Control, Mitigation and Help in Emergency Response”.
Develop Performance Standards for each SCE.
Develop the M / I / T plan for each SCE based on Failure Modes, MTBF.
SCE Scope of Study
SIL
RC
M
RB
I
M/I/T
Compliance
CMMS SCE Assets Spares
Technical Competency
Maintaining Integrity
Design a set of Asset Integrity Leading & lagging
Indicators
E-1)Asset integrity Leading KPI’s
Design & Build
Integrity
Identify, Create
Barriers ASSET
INTEGRITY
Sustain
Integrity
Maintain Barriers
Operating Within Safe Operating Limits
Design a set of Asset Integrity Leading & lagging
Indicators
E-2)Asset integrity Leading KPI’s
Design & Build
Integrity
Identify, Create
Barriers ASSET
INTEGRITY
Sustain
Integrity
Maintain Barriers
Operating Within Safe Operating Limits
KPI: SCE Testing Failure Rate
COMPONENT PLANT EQUIPMENT
CATEGORY PREVENTION, DETECTION, CONTROL, OR MITIGATION
ELEMENT INSPECTION & TESTING
“Percentage of safety devices that fail to function on first test (based on asset’s approved performance criteria standards)”
KPI Traffic Light
GREEN <=1
1< AMBER <= 2
RED > 2
0.9
1%
2%
KPI: SCE Testing Failure Rate
COMPONENT PLANT EQUIPMENT
CATEGORY PREVENTION, DETECTION, CONTROL, OR MITIGATION
ELEMENT INSPECTION & TESTING
“Percentage of safety devices that fail to function on first test (based on asset’s approved performance criteria standards)”
KPI CALCULATION & TRENDING
0%
1%
2%
3%
Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12
SCE Testing Failure Rate
Jan-12 Feb-12 Mar-12 Apr-12
May-12 Jun-12 Jul-12 Aug-12
KPI: SCE Testing Failure Rate
COMPONENT PLANT EQUIPMENT
CATEGORY PREVENTION, DETECTION, CONTROL, OR MITIGATION
ELEMENT INSPECTION & TESTING
“Percentage of safety devices that fail to function on first test (based on asset’s approved performance criteria standards)”
0.00% 2.05%
0.00%
20.00%
8.45% 7.69%
0.00% 0.00%
17.39% 10.00% 10.00%
100.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0%
20%
40%
60%
80%
100%
120%
KPI ANALYSIS & REASON FOR FAILURES
Partial Stroke Test
PSV Test
F&G Test
Thank You For Your Attention