aaa realizations wasserfallen 2012 english

8
hospitality 10 years 2002-2012 7 000 trained managers Ten years of teaching and practice of design hotels as professor of technical planning, restaurant concepts, design and facility management at EHL (Ecole hôtelière de Lausanne, 2002-2012, www.ehl.ch) were used to develop a general planning theory of large and small hotel projects. The hotel seen as a system requires an approach to its suitability to the market (the type of customer) to the destination (the site of implantation), its life cycle (sustainable development) and financial characteristics (a value real estate investment flexibility or functional retraining, its evolution). During these ten years of teaching and consulting at all levels (learning courses bachelor, master courses, dissertations, and expertise with the company Lausanne Hospitality Consulting), hundreds of hotels construction case studies have been addressed and resolved. Porto Alegre (Brazil), 400 rooms, 10 ha  Full redesign of the  front sea, with a mall multi hotel convention center, restaurants, bars, night clubs and shops use. Integral approach and project operations. Holistic operations concept  Facility manage ment scheme includes all the costs of hotel facilities: energy, water, maintenance, security, etc.. Contributing approaches Group of learners work together in hospitality and construction  professionals solutio n  projects. Fle xible sizes of addressed cases (0.1 million to 200 million sfr.). Owner consulting  Study groups examine  projects betwe en hospitality students, architects and clients (here a family office wanting to build a  Motel).

Upload: pankaj-sampat

Post on 03-Jun-2018

225 views

Category:

Documents


0 download

TRANSCRIPT

8/12/2019 Aaa Realizations Wasserfallen 2012 English

http://slidepdf.com/reader/full/aaa-realizations-wasserfallen-2012-english 1/8

hospitality

• 10 years 2002-2012

• 7 000 trained managers

Ten years of teaching and practice of design hotels as professor of technical planning, restaurant concepts, design

and facility management at EHL (Ecole hôtelière de Lausanne, 2002-2012, www.ehl.ch) were used to develop a

general planning theory of large and small hotel projects. The hotel seen as a system requires an approach to its

suitability to the market (the type of customer) to the destination (the site of implantation), its life cycle (sustainable

development) and financial characteristics (a value real estate investment flexibility or functional retraining, its

evolution). During these ten years of teaching and consulting at all levels (learning courses bachelor, master courses,

dissertations, and expertise with the company Lausanne Hospitality Consulting), hundreds of hotels construction

case studies have been addressed and resolved.

Porto Alegre(Brazil), 400rooms, 10 ha

 Full redesign of the

 front sea, with a mallmulti hotel convention

center, restaurants,

bars, night clubs and

shops use. Integral

approach and project

operations.

Holisticoperationsconcept

 Facility management

scheme includes all thecosts of hotel facilities:

energy, water,

maintenance, security,

etc..

Contributingapproaches

Group of learners

work together in

hospitality and

construction

 professionals solution

 projects. Flexible sizes

of addressed cases (0.1

million to 200 million

sfr.).

Owner consulting

 Study groups examine

 projects between

hospitality students,

architects and clients

(here a family office

wanting to build a

 Motel).

8/12/2019 Aaa Realizations Wasserfallen 2012 English

http://slidepdf.com/reader/full/aaa-realizations-wasserfallen-2012-english 2/8

largeprojects

Working with general contractors reform the position of the architect. Agents of change become actors in the

creative solutions in the planning and construction process. Openness, meeting deadlines, addressing synthesis

 problems and progressive spirit in mastering the complex project. This is a new business in the Swiss planning

and construction industry.

Works in progress now (2013).

Around ahundreddwellings...

140 meters of housingin length along the Lausanne area peripheral Highway. Purpose: to protectnoise as dike towards asilent south side withview to Geneva lake,and South balconies.

at Mont-sur-Lausanne (VD)

 Project 2009-2011,new anti-noise façade

reflecting verticallynoise soundwaves(active wings) diffsingroad vibrations andengine rumorsvertically, and nottowards neighbours.40 millions sfr.. Réalization 2012-2015. Family office project.

Hôtel &Shopping,Lausanne West

 Project developed with

one of the largestgeneral contractors in

 Switzerland. Several

iterations and

successive common

choice with a Family

office (25 million sfr.).

Motel Poliez-Pittet (VD)

 A point of sale hotel

 first element of anetwork of Lausanne

area motels, 4 million

 francs, building

 permits in 2012,

2013-14 construciton.

 Family office project.

8/12/2019 Aaa Realizations Wasserfallen 2012 English

http://slidepdf.com/reader/full/aaa-realizations-wasserfallen-2012-english 3/8

industryservices

Good design in a work structure must minimize the effort and facilitate productive activity. Flexible schemes, they

must also include modularity, and an evolutionary factors. Whether it is in an industrial park or intensive services

such as catering, this new vision generates efficiency. Finally the simplest constructive choices are the best.

 Lightweight roof, carrying long-range structure, use of existing spaces in the production process or imagine next

steps of buildings life cycles or renovations.

Bipole Yverdon-les-Bains

 Designed and built

opposite to the Science

and simultaneously to

the foundation of

Technology Park of

Yverdon-les-Bains,

1988-1990, 7 millions

sfr.

An eye catcher atYverdon Highwayexit

The structure used is a

roof airport developed

in Central Europe. This

is the first application

in Switzerland of this

innovative lightweight

roof and gives a

distinctive silhouette.

Restaurant 200seats, Vevey

The reuse of the former

 post hotel between the

Trois Couronnes

 Palace Hotel and the

historic former

headquarters of Nestlé

 features a new outlet

 for restoration.

Geneva LakeTerrasses

This new restaurant is

designed as a meeting

 place and conviviality.

The project is

 promoted by a Berne

 family office. Cost

approx. 1 million sfr.

 Project, 2010-13.

8/12/2019 Aaa Realizations Wasserfallen 2012 English

http://slidepdf.com/reader/full/aaa-realizations-wasserfallen-2012-english 4/8

siteplanning

The square of the success invented by Antoine Wasserfallen and published in his PhD thesis in 1999 features exactly

the synergic combination of interests. No government: no framework conditions, investors without any

infrastructure funding. And one must always ask who are the customers of the proposed project. Those angles

arranged one after the other, allow the correct implementation of such projects.

 More than one hundred planned hectares in Western Switzerland.

Landfill stonequarry St.-Triphon (VD)

 Economic feasibility

study (70 million francs)and verification of legal

 feasibility (planning,constructability) by slagrecycling plant for wasteincineration neighboring

 SATOM, covered withgrassy mantle.1994-2020, 10 Ha.

Cable factoryCossonay (VD)

 Esplanade SA Development with Itten +

 Brechbühl SA, concept by A. Wasserfallenredevelopment andredesign of the layout ofthe entire site map (20ha) of cable factoryCossonay Penthalaz

 Station (1998-2002). Previous assignment by Nexans (Alcatelsubsidiary), 2013 plan bythird parties.

Industrial Village,Vallée de Joux

 Rethinking industrial

areas for the future of the

great centers of the Swiss plateau is important, but

taking care of the

watchmaking luxury

cluster is also a priority

in the Jura, 1991-1994. In

that case economic and

concept planning

(including regulating the

area) only.

Invent, launchY-Parc SA

1st Science Parc in

 Switzerland: feasibility Study (1986), then seed

capital raised (about 3

millions sfr.), A.

Wasserfallen is

shareholder and member

of the 1st Board of

 Directors (1986-1992). 50

hectares.

8/12/2019 Aaa Realizations Wasserfallen 2012 English

http://slidepdf.com/reader/full/aaa-realizations-wasserfallen-2012-english 5/8

renovationsancientvillas

 Interventions in existing buildings: in Switzerland many families possess houses that need to be renovated. For

members of teaching staff, it is difficult to find an architect who holds a trustful dialogue with them before taking

decisions. This dialogue is very important, and alternate schemes are all carefully evaluated before the ultimate

decisions are made, particularly in a family context; hence this process that needs to be strong may seem long in

the relationship between the client (owner) and the architect. The architectural results are also very good, level of

 publication in a professional journals of architecture.

Villa ChefBeerens

 Housing and

apartments for rent

(400 m2) of the EHL

head chef of the

gourmet restaurant

(1990-2011) of the

 Hotel School of

 Lausanne, Epalinges,

2006-2009 realization.

 Approx. 0,7 million sfr.

TransparentStructure

The intention was to

maintain the original

aspect of the old barn

and to keep some wood

and some

transparency. The

middle slab is

suspended from the

roof.

Villa ProfesseurVautravers

 Ancient villa of 300 m2

in the vineyards of the

Vaud Coast. Completeoverhaul of all interior

spaces, new kitchen

(Bulthaup), new space

in the living room 8 x 8

m, from 2008 to 2012,

about 0.6 million

 francs.

Structure 100%revisited

The main structural

beams (1st image on

left) in the living Professor Vautravers

were implemented by a

team of railway

engineering and fully

integrated into the

thickness of the wood

 frame: we do not see

them any more!

8/12/2019 Aaa Realizations Wasserfallen 2012 English

http://slidepdf.com/reader/full/aaa-realizations-wasserfallen-2012-english 6/8

historicmansionsrealizations

 Family and heritage are very important issues in Europe and Switzerland. Renovating heritage is a life project in

the long term for a property that has a history in itself and it is far from simple. Architectural strategy must be

carefully calibrated. The balance between family and tactical needs of architectural choices, and assuming the

dialogue with the authorities and services of heritage protection. With heart, the owners and the architect,

contractors must contribute to the history of the life of the building, which will be transmitted to the next home

owner, member of the family or not ...

The  Cottage  Lausanne

 Partial renovation in

the historic homestead

(1612) Vaud near the

center of the city. The

interventions included

technical networks.

1987-9, 150 m2, 0.5

million sfr.

Little Castles  Saint-Aubin (NE)

Complete renovation

 380 m2 (1888) with

the introduction of a

new energy system

(heat pumps and solar

thermal and

 photovoltaic), park

and banks, 1988-9, 2

million sfr.

Tillierstrasse  9  Berne

Contiguous (1906)

house of my sons and

their mother in the

historic district of

 Kirchenfeldbrücke

with recovery of the

entire structure in a

large open ground

 floor space, from 1999

to 2000, 0.5 million

sfr.

The  Burg  6Moudon (VD)

One of two family

homes (1550) I

renovated in the

historic district of the

Village of the medieval

capital city of the State

of Vaud. 2002-3, 0.5

million sfr.

8/12/2019 Aaa Realizations Wasserfallen 2012 English

http://slidepdf.com/reader/full/aaa-realizations-wasserfallen-2012-english 7/8

interdisci-

plinarity

 Antoine Wasserfallen in 2011 was a member of the working group of the National BIM SIA (Swiss Society of

 Engineers and Architects). He was the only Swiss Romand member. Ten years of teaching and practice of facility

management at Ecole hôtelière de Lausanne (EHL) have allowed for him to solve the problem of creation of value

chains and optimization in hospitality buildings. The philosophy and the "modus operandi" of those projects is

based the "systems engineering", that is to say, a collection of macro-modules of expertise re-assembled in order to

realize new ideas. It is an innovative re-configuration of existing knowledge, but impossible to realize or

understand change. So it is easy for others to understand what the innovative proposal covers.

BIM buildinginformationmodeling 7 May2013, Geneva

 New design that keepsdata design andrenovation for useduring the operatingcycle of buildings andinfrastructure. All figures and details ofthe project remain tobe perpetuated.

Newinterdisciplinaryconcepts

The design of buildings

and infrastructure (fof factory of the future)are integrated intotheir facilitymanagement. Theiruse is only easier.Values and operatingcosts are controlled. Aeroground concept isalso a cross paltform for experts in planes.

Numbers control(fp7, euresearch)

The interdepartmental projects, internationalbodies, internationalexperts, are the key issuesof communicationbetween administrativeentities or study.Coordinator fp7 two

 European applications(one on Museums,augmented reality andcommunication spaces).

Resourcessavings(researchproject)

 Development of water production as seriouslythreatened the twenty-

 first century vitalresource. It will beoptimized, saved andthen produced through anew physical-chemicalcycle.

8/12/2019 Aaa Realizations Wasserfallen 2012 English

http://slidepdf.com/reader/full/aaa-realizations-wasserfallen-2012-english 8/8

exhibition

design

The design exhibition was a parallel activity to teaching, either during Ecole Polytechnique Fédérale de Lausanne

(EPFL) or Ecole hôtelière de Lausanne (EHL) activities or in association with professional contexts (cooperative

social IN3 research, Pec artist and creator of Franche-Comté). Projects in 2013 include the integration of

augmented reality in museum settings (do better with existing motivate the public to return to cultural institutions)

or for interactive catalogs & design exhibitions. The new meta-tools IT integrators are used in their most

contemporary forms (automated synthesis, layout and automated forms, use of large databases, working in real

time, changes in real time). Recognition of new businesses in the new century.

expo.02

The Swiss National

 Exhibition was a

tender forinterdisciplinary

teams to plan and

build four sites. Here

coordination Itten +

 Brechbühl Nick

Grimshaw Architects

and Ove Arup.

Catalogue Pec

 How to illustrate forty

years of production of

a polymorphic artist?

What pictures do

matter? How to stage

 pieces of art? How to

compile a rational

inventory? 

EHL designcourse: 7 years

Creation of design

courses for 3000

hoteliers bachelor.

What bases to within

40 hours? Draw or

not? Integrate the

economic feasibility in

the conductor and

value creation over.

Fp7 culture call

The European research

 program requests

contributions tomuseums to reclaim

the public. Developing

a concept and a formal

request,  !  2.5 million

budget.