TRANSCRIPT

  • 7/30/2019 6th Lane CA Ramz

    1/109

    YES NO

    LABOUR

    MATERIALS

    YES NO

    Rs.

    Rs.

    Rs.

    Rs.

    Rs.

    Cost fluctuations

    Adjustments based on formula

    Nuwani - 307 Mn

    RN Construction - 256 Mn

    Number of tender received : 3

    Negotiated

    Continuation

    Serial

    N and A - 234.8 Mn

    Contract period offered by builder :

    Number of tender issued : 3

    Contract sum 234,859,464.25

    Contract particulars :

    Type of contract : Measure and Pay

    Basis of tender :

    Bill of quantities

    Bill of approximate quantities

    Job title : Proposed Mixed Develeopment Project

    Preliminaries 9,909,500.00

    Provisional sums 85,800,944.85

    Prime cost sums

    Contract period stipulated by client : 18 Months

    Open / selected competition

    Tender date : 22nd October 2009

    Market Conditions :

    Competitive tend

    Rs

    Location : No. 02, 6th Lane , Colombo 03, Sri Lanka

    The Project comprises the construction of an eight storey building consisting of Bored Pile

    Foundation, Reinforced Concrete Frame Structure, Brick and Block Walls, Staircases, CalicutTiled Roof, Underground Water sumps, Joinery and Metal Work and Services. The Site is

    located near the Coast. The underlaying soil consist with filled soil and loose sand layers with

    medium dense sand layers. The Ground Water Level is at 4.1m below the existing Ground Level.

    The Contract Comprises with Demolition of existing Structure, Co

    Completion of the New Building. The Type of Contract is MeasurLiability Period is 365 days.

    Schedule of rates

    Contingencies

    DETAILED COST ANALYSIS

    INFORMATION ON TOTAL PROJECT

    Project details & site conditions : Contract :

    Client : Mr. Godfrey Aloysius

  • 7/30/2019 6th Lane CA Ramz

    2/109

    356.00 Design shape

    - m2

    279.00 m2

    Percentage of gross floor area

    139.00 m2

    511.00 m2

    418.00 m2

    356.00 m2

    418.00 m2 a) Below ground floor

    18.00 m2 b) Single storey construction

    28.00 m2

    1.22 c) Two storey construction

    16.00 m2 d) Three storey construction

    418.00 m2

    m2

    166.00 m2 -

    4.47 m

    3.05 m

    Functional unit cost excluding = (Total cost - Externa

    Contract sum Rs. external works Functional unit

    Provisional sums Rs.

    Prime cost sums Rs.

    Preliminaries Rs. 1.95% of remainder of = 70,387.15

    Contingencies Rs. contract sum

    Contract sum less contingencies Rs.

    Amounts for single building analysed

    The project comprises of two Residenece areas, with Ground and First floors having one residence, and Sixth, Seventh and Eighth floors having the other residen

    areas include bedrooms, living areas, kitchen, toilets, maids room, dressing rooms, billiard room, audio visual room and a terrace on the eigth floor. Second floo

    office areas, a bed sitter, Dressing room and toilets. Third, Fourth and Fifth floors comprise with office areas. A mechanical and a Manual car park is installed in

    Storey heights

    Average below ground floor =

    Wall to floor ratio =

    Floor spaces not enclosed

    Usable area

    489,000.00

    Roof area (on plan)

    Ancillary area

    External wall area =

    Gross floor area

    0.00

    ANALYSIS OF SINGLE BUILDING

    Upper floors

    Circular area

    Design shape information

    Accommodation & design features :

    Areas Functional unit - Net useable floor area

    Basement floors

    Ground floors

    Gross floor area

    Gross floor area =

    internal division

    25,057,827.16

    4,595,750.00

    25,057,827.16

    Brief cost information

    Above ground floor =

    0.00

    At ground floor =

  • 7/30/2019 6th Lane CA Ramz

    3/109

    57.43

    42.54

  • 7/30/2019 6th Lane CA Ramz

    4/109

    418.00 m2

    2.F Internal walls and partitions

    Element

    Preliminaries shown separately

    1. Substructure 3,215,165.00 7,691.78 279.00

    Total cost

    of element

    Rs.

    Element unit quantity

    Element

    unit rate

    Rs.

    Total cost of

    11,523.89

    SUMMARY OF ELEMENT COSTS

    Gross floor area : Tender

    Cost per m2 of

    gross floor area

    Rs.

    2,642.82

    Preli

    11948.80

    2.A Frame 1,104,700.00 2,642.82 418.00

    2.B Upper Floors 12663.69

    2. Superstructure

    2.C Roof 1,983,500.00

    1,760,253.00 4,211.13 139.00

    2.G Others

    2.D Stairs 838,700.00 2,006.46

    4,745.22 166.00

    2.E External walls 1,526,895.00 3,652.86 511.00 2988.05

    2.F Windows and external doors

    362,075.00 866.21

    Group element total 7,576,123.00 18,124.70

    1,271,910.00

    3.C Ceiling finishes

    1,502,350.00

    262,350.00

    3. Internal Finishes

    3.A Wall finishes

    3.B Floor finishes

    Group element total

    4. Fittings & Furnishings

    Group element total

    5. Services

    3,824,808.41

    3,472,207.00

    3,472,207.00

    21,124,913.41

    3,443,913.75

    3,036,610.00

    3,824,808.41

    3,594.14

    3,042.85

    627.63

    7,264.62

    Preliminaries

    Group element total

    Group element total

    Sub total excluding external works,

    preliminaries & contingencies

    6. External Works

    50,538.07

    9,150.26

    8,306.72

    3,443,913.75 8,239.03

    9,150.26

    8,306.72

    8,239.03

    489,000.00 1,169.86

    418.00 3594.14

    418.00 3042.85

    279.00 940.32

  • 7/30/2019 6th Lane CA Ramz

    5/109

    25,057,827.16

    25,057,827.16

    0.00

    TOTAL (Less contingencies) 25,057,827.16 59,946.95

  • 7/30/2019 6th Lane CA Ramz

    6/109

    Element and design criteria Total cost of element

    Rs.

    Cost of element

    per m2 of gross

    floor area

    Rs.

    Element unit

    quantity

    Element unit

    rate Rs.

    1.A SUBSTRUCTURE Area of lowestfloor measured

    as for gross

    internal

    Permissible soil loading .kN/m2 floor area,

    (m2).

    (kilonewtons per square metre)

    Nature of soil ..

    .

    (metres)

    Site levels

    Water table depth .m

    (metres)

    Average pile

    Preliminaries ..% of remainder of

    AMPLIFIED ANALYSIS

    Note

    1. Where lowest floor constructio

    2. Stanchions and columns (wi

    Specific

    3. Cost of piling and driving sha

    4. The cost of external enclosin

  • 7/30/2019 6th Lane CA Ramz

    7/109

    Element and design criteria Total cost of element

    Rs.

    Cost of element

    per m2 of gross

    floor area

    Rs.

    Element unit

    quantity

    Element unit

    rate Rs.

    AMPLIFIED ANALYSIS

    Specific

    2.A FRAME

    Grid pattern should be stated, giving centres of

    Area of floors

    floor area

    (m2).

    Preliminaries ..% of remainder of

    3. In unframed buildings roof and f

    Upper floors (2.B) or R

    4. If the Stair structure (

    1. Structural walls which

    loadbearing framework sh

    Internal walls and partitio

    2. Beams which form an i

    which cannot be segregate

    Notes:

    Loadbearing framework of concrete

    beams, ties and roof trusses of fram

  • 7/30/2019 6th Lane CA Ramz

    8/109

    Element and design criteria Total cost of element

    Rs.

    Cost of element

    per m2 of gross

    floor area

    Rs.

    Element unit

    quantity

    Element unit

    rate Rs.

    AMPLIFIED ANALYSIS

    Specific

    2.B UPPER FLOORS

    Design loads should be stated in kilonewtons per

    Total are of

    floors, (m2).

    Preliminaries ..% of remainder of Upper floors

    (access and private balconies each

    Notes:

    2. Beams which form an i

    1. Where floor constructio

    platform the flooring surf

    Upper floors, continuous access f

    or in basements stated separately.

    3. If the Stair structure (

  • 7/30/2019 6th Lane CA Ramz

    9/109

    Element and design criteria Total cost of element

    Rs.

    Cost of element

    per m2 of gross

    floor area

    Rs.

    Element unit

    quantity

    Element unit

    rate Rs.

    AMPLIFIED ANALYSIS

    Specific

    2.C ROOF

    Design loads should be stated in kilonewtons per

    square metre (kN/m2) and spans given in metres

    Area measured

    overall roof

    The angle of pitch of sloping roofs shall be stated.

    Preliminaries ..% of remainder of Roof

    2.C.4 Roof lights

    Roof lights, opening gear, f rame, k

    Roof screeds and f inishings. Batten

    like. Flashings and trims. Insulation

    2.C.3 Roof drainage

    2. Roof housings (eg lift m

    2.C.2 Roof coverings

    Gutters where not integral with roo

    roof outlets. (Rainwater downpipes

    2.C.1 Roof structure

    Construction, including eaves and

    gable ends, internal walls and chim

    Notes:

    1. Beams which form an i

  • 7/30/2019 6th Lane CA Ramz

    10/109

    Element and design criteria Total cost of element

    Rs.

    Cost of element

    per m2 of gross

    floor area

    Rs.

    Element unit

    quantity

    Element unit

    rate Rs.

    AMPLIFIED ANALYSIS

    Specific

    2.C.1 Roof structure

    2.C.2 Roof coverings

    2.C.3 Roof drainage

    2.C.4 Roof lights

    2.D STAIRS 2.D.1 Stair structure

    The total vertical height of each staircase and its Construction of ramps,

    Notes:

    1. The cost of external

    2. If the staircase

    Frame (2.A) or

    2.D.2 Stair finishes

    Finishes to treads,

    2.D.3 Stair

    Balustrades and

  • 7/30/2019 6th Lane CA Ramz

    11/109

    Element and design criteria Total cost of element

    Rs.

    Cost of element

    per m2 of gross

    floor area

    Rs.

    Element unit

    quantity

    Element unit

    rate Rs.

    AMPLIFIED ANALYSIS

    Specificat

    Preliminaries ..% of remainder of

    2.E EXTERNAL WALLS External enclosing walls including th

    included with Roof structure (2.3.1

  • 7/30/2019 6th Lane CA Ramz

    12/109

    Element and design criteria Total cost of element

    Rs.

    Cost of element

    per m2 of gross

    floor area

    Rs.

    Element unit

    quantity

    Element unit

    rate Rs.

    AMPLIFIED ANALYSIS

    Specifi

    External walls = m2

    Gross floor area m2 Area of

    measured on

    =

    Basement walls = m2

    Gross floor area m2

    =

    The approximate value of thermal conductivity

    If calculated loadbearing brickwork, give indication

    Preliminaries ..% of remainder of External walls

    2.F WINDOWS AND EXTERNAL

    DOORS

    Total area

    Windows = m2 of windows

    Gross floor area m2 (m2).

    #NAME?

    Gross floor area m2

    #NAME?

    opening lights =

    Lintels, sills, cavity damp-proof co

    2.F.2 External doors Doors, fanli

    Lintels, thresholds, cavity damp-pr

    openings.

    Notes:

    Shop fronts.

    3. If walls are self-finished on inte

    Chimneys forming part of external

    Vertical tanking. Insulation.

    Applied external finishes.

    1. The cost of structural w

    important part of the load

    2. Basement walls shall b

    2.F.1 Windows

    Sashes, frames, linings and trims. I

  • 7/30/2019 6th Lane CA Ramz

    13/109

    Element and design criteria Total cost of element

    Rs.

    Cost of element

    per m2 of gross

    floor area

    Rs.

    Element unit

    quantity

    Element unit

    rate Rs.

    AMPLIFIED ANALYSIS

    Specific

    to windows m2

    Preliminaries ..% of remainder of Windows and

    2.F.1 Windows

    2.F.2 External doors

    2.G INTERNAL WALLS AND

    PARTITIONS

    Internal walls Total area of

    and partitions = m2 openings),

    Gross floor area m2

    =

    4. If design is cross-wall c

    Notes:

    1. The cost of structural w

    important part of the load

    2. The cost of proprietary

    separately stating if self-f

    installed.

    3. The cost of proprietary

    Internal walls, partitions and insula

    Chimneys forming part of internal

    Internal balustrades excluding item

    Stair balustrades and handrails (2

    Moveable space-dividing partition

  • 7/30/2019 6th Lane CA Ramz

    14/109

    Element and design criteria Total cost of element

    Rs.

    Cost of element

    per m2 of gross

    floor area

    Rs.

    Element unit

    quantity

    Element unit

    rate Rs.

    AMPLIFIED ANALYSIS

    Specificati

    Preliminaries ..% of remainder of Internal walls and

  • 7/30/2019 6th Lane CA Ramz

    15/109

    Element and design criteria Total cost of element

    Rs.

    Cost of element

    per m2 of gross

    floor area

    Rs.

    Element unit

    quantity

    Element unit

    rate Rs.

    AMPLIFIED ANALYSIS

    Specificat

    2.H INTERNAL DOORS Area of

    internal doors

    Lintels, thresholds, and work to reve

    Doors, fanlights and sidelights.

    Frames, linings and trims. Ironmonge

    Sliding and folding doors. Hatches.

  • 7/30/2019 6th Lane CA Ramz

    16/109

    Element and design criteria Total cost of element

    Rs.

    Cost of element

    per m2 of gross

    floor area

    Rs.

    Element unit

    quantity

    Element unit

    rate Rs.

    AMPLIFIED ANALYSIS

    Specific

    Preliminaries ..% of remainder of Internal doors

    3.A WALL FINISHES Total area

    of wall

    1. Surfaces which are self-partitions, fair faced work

    2. Insulation which is wall-finishing

    Preparatory work and finishes to sur

    Picture, dado and similar rails.

    Notes:

  • 7/30/2019 6th Lane CA Ramz

    17/109

    Element and design criteria Total cost of element

    Rs.

    Cost of element

    per m2 of gross

    floor area

    Rs.

    Element unit

    quantity

    Element unit

    rate Rs.

    AMPLIFIED ANALYSIS

    Specific

    Preliminaries ..% of remainder of Wall

    3.B. FLOOR FINISHES Total area

    of floor

    Where the floor construction does n

    the flooring surface will be included

    Upper floors (2.B) as appropriate

    Preparatory work, screeds, skirting

    items included with Stair finishes

    Note:

    3. The cost of finishes app

  • 7/30/2019 6th Lane CA Ramz

    18/109

    Element and design criteria Total cost of element

    Rs.

    Cost of element

    per m2 of gross

    floor area

    Rs.

    Element unit

    quantity

    Element unit

    rate Rs.

    AMPLIFIED ANALYSIS

    Specific

    Preliminaries ..% of remainder of Floor

    3.C CEILING FINISHES Total area

    of ceiling

    Construction and finishes of suspen

    Notes:

    3.C.1 Finishes to ceilings

    Preparatory work and finishes to su

    items included with Stair finishes

    soffits of beams not forming part of

    Cornices, coves.

    3.C.2 Suspended ceilings

  • 7/30/2019 6th Lane CA Ramz

    19/109

    Element and design criteria Total cost of element

    Rs.

    Cost of element

    per m2 of gross

    floor area

    Rs.

    Element unit

    quantity

    Element unit

    rate Rs.

    AMPLIFIED ANALYSIS

    Specific

    Preliminaries ..% of remainder of

    Ceiling finishes

    3.C.1 Finishes to

    3.C.2 Suspended

    4.A FITTINGS AND FURNISHINGS 4.A.1 Fittings, fixtures and furnit

    2. The cost of finishes or s

    immediately below roof sh

    1. Where ceilings principa

    artificial lighting or ventila

    with the appropriate Serv

    be stated separately.

  • 7/30/2019 6th Lane CA Ramz

    20/109

    Element and design criteria Total cost of element

    Rs.

    Cost of element

    per m2 of gross

    floor area

    Rs.

    Element unit

    quantity

    Element unit

    rate Rs.

    AMPLIFIED ANALYSIS

    Specific

    Fixed and loose fittings and furnitu

    cupboards, Wardrobes, benches, se

    Blinds, blind boxes, curtain tracks a

    Blackboards, pin-up boards, notice

    and the like. Ironmongery.

    Non-mechanical and non-electrical

    function or need of the building ( eg

    Where items in this element have a

    elements a note should be included

    Note:

    Curtains, loose carpets or similar so

    Works of art if not included in a fin

    4.A.2 Soft furnishings

    4.A.3 Works of art

    4.A.4 Equipment

  • 7/30/2019 6th Lane CA Ramz

    21/109

    Element and design criteria Total cost of element

    Rs.

    Cost of element

    per m2 of gross

    floor area

    Rs.

    Element unit

    quantity

    Element unit

    rate Rs.

    AMPLIFIED ANALYSIS

    Specificat

    Preliminaries ..% of remainder of

    4.A.1 Fittings, fixtures

    4.A.2 Soft furnishings

    4.A.3 Works of art

    Fittings and furnishings Quantity

  • 7/30/2019 6th Lane CA Ramz

    22/109

    Element and design criteria Total cost of element

    Rs.

    Cost of element

    per m2 of gross

    floor area

    Rs.

    Element unit

    quantity

    Element unit

    rate Rs.

    AMPLIFIED ANALYSIS

    Specific

    4.A.4 Equipment

    5.A SANITARY APPLIANCES - -

    Fittings to be noted as grouped or dispersed.

    Preliminaries ..% of remainder of Sanitary Number

    5.B SERVICES EQUIPMENT - -

    mechanical and electrical equipmen

    building.

    Baths, basins, sinks, etc.

    WCs, slop-sinks, urinals and the lik

    rails, etc.

    Traps, waste fittings, overflows and

    Kitchen, laundry, hospital and denta

    specialist

  • 7/30/2019 6th Lane CA Ramz

    23/109

    Element and design criteria Total cost of element

    Rs.

    Cost of element

    per m2 of gross

    floor area

    Rs.

    Element unit

    quantity

    Element unit

    rate Rs.

    AMPLIFIED ANALYSIS

    Specific

    Preliminaries ..% of remainder of Number

    5.C DISPOSAL INSTALLATIONS - -

    Number of sanitary appliances and special services

    equipment served should be stated.

    Floor channels and gratings and dra

    within buildings up to

    external face of external walls.

    Note:

    Services

    equipment

    type and

    ualit

    5.C.1 Internal drainage

    Waste pipes to Sanitary appliances

    Services equipment (5.B). Soil, an

    and ventilation pipes. Rainwater do

    Note:

    Local incinerators shall be included

  • 7/30/2019 6th Lane CA Ramz

    24/109

    Element and design criteria Total cost of element

    Rs.

    Cost of element

    per m2 of gross

    floor area

    Rs.

    Element unit

    quantity

    Element unit

    rate Rs.

    AMPLIFIED ANALYSIS

    Specificat

    5.C.2 Refuse disposal

    Refuse ducts, waste disposal (grindin

    and bins. Local incinerators and flue

    Paper shredders and incinerators.

    Rainwater gutters are included in Ro(2.C.3).

  • 7/30/2019 6th Lane CA Ramz

    25/109

    Element and design criteria Total cost of element

    Rs.

    Cost of element

    per m2 of gross

    floor area

    Rs.

    Element unit

    quantity

    Element unit

    rate Rs.

    AMPLIFIED ANALYSIS

    Specific

    Preliminaries ..% of remainder of Total

    Disposal

    5.C.1 Internal drainage

    5.C.2 Refuse disposal

    5.D WATER INSTALLATIONS - -

    Number of cold water draw-off points ...

    Note:

    5.D.2 Cold water service

    Storage tanks, pumps, pressure boo

    pipework to sanitary appliances and

    equipment.

    Valves and taps not included with

    appliances (5.A) and/or

    Services equipment (5.B). Insulat

    5.D.1 Mains supply

    Incoming water main from external

    wall at point of entry into building

    water metres, rising main to (but ex

    tanks and main taps. Insulation

  • 7/30/2019 6th Lane CA Ramz

    26/109

    Element and design criteria Total cost of element

    Rs.

    Cost of element

    per m2 of gross

    floor area

    Rs.

    Element unit

    quantity

    Element unit

    rate Rs.

    AMPLIFIED ANALYSIS

    Specific

    Number of hot water draw-off points .....

    Number of steam and condensate draw-off points

    Steam and condensate pipework in

    connection with space heating or th

    included as appropriate with Heat

    Space heating and air treatment (5

    Services equipment (5.B). Insulat

    5.D.4 Steam and condensate

    Steam distribution and condensate rto and from services equipment wit

    including all valves, fittings, etc. In

    Note:

    Header tanks, cold water supplies,

    systems should be included in Hea

    5.D.3 Hot water service

    Hot water and/or mixed water servi

    Storage cylinders, pumps, calorifie

    water heaters, distribution pipewor

    appliances and services equipment

    not included with Sanitary applian

  • 7/30/2019 6th Lane CA Ramz

    27/109

    Element and design criteria Total cost of element

    Rs.

    Cost of element

    per m2 of gross

    floor area

    Rs.

    Element unit

    quantity

    Element unit

    rate Rs.

    AMPLIFIED ANALYSIS

    Specifica

    Preliminaries ..% of remainder of

    Water Total

    5.D.1 Mains supply

    5.D.2 Cold water

    5.D.3 Hot water service

    5.D.4 Steam or

    Boilers,

    instrumenta

    kW Notes:

    1.

    2. Local he

    3.

    5.E HEAT SOURCE

    Boiler rating in kilowattskW

  • 7/30/2019 6th Lane CA Ramz

    28/109

    Element and design criteria Total cost of element

    Rs.

    Cost of element

    per m2 of gross

    floor area

    Rs.

    Element unit

    quantity

    Element unit

    rate Rs.

    AMPLIFIED ANALYSIS

    Specific

    5.F. SPACE H EATING AND AIR (i) Heatin

    TREATM ENT 5.F.1 Wat

    Heat

    Tm2 * 0 Cube of

    m2 .Tm3 5.F.2 Duc

    Ductwork

    =

    5.F.3

    Cable

    total net area in square

    us compartments Note:

    Electricall

    5.F.4 Loc

    Fireplaces

    5.F.5 Oth

    (ii) Air

    Notes:

    1. SystemAi

    Ai

    Gross floor area duc

    Preliminaries ..% of remainder of contract sum.

  • 7/30/2019 6th Lane CA Ramz

    29/109

    Element and design criteria Total cost of element

    Rs.

    Cost of element

    per m2 of gross

    floor area

    Rs.

    Element unit

    quantity

    Element unit

    rate Rs.

    AMPLIFIED ANALYSIS

    Specific

    * Where Tm2 is the metres of the vario served.

    5.F SPACE HEATING AND AIR

    TREATMENT (contd.)

    5.F.6 Heating with ventilation (ai

    Distribution pipework ducting, gril

    units including heating calorifiers e

    which are part of Heat source (5.

    Instrumentation and control.

    5.F.7 Heating with ventilation (ai

    centrally)

    All work as detailed under (5.F.6) f

    air treated centrally.

    5.F.8 Heating with cooling (air tre

    All work as detailed under (5.F.6) i

    water systems and/or cold or treate

    The whole of the costs of the coolin

    distribution pipework to local cooli

    shown separately.

    Cooling Filtration

    Humidification Pressurisatio

    inlet extract or recirculation

    3. High velocity system shall be id

    Fan coil Induction units 2 pipe Du

    units 3 pipe Reheat Induction units

    Multi-zone Any other system (state

    2. The combination of treatments u

    stated, ie:

    Heating Dehumidification or dryin

  • 7/30/2019 6th Lane CA Ramz

    30/109

    Element and design criteria Total cost of element

    Rs.

    Cost of element

    per m2 of gross

    floor area

    Rs.

    Element unit

    quantity

    Element unit

    rate Rs.

    AMPLIFIED ANALYSIS

    Specifica

    5.F.9 Heating with cooling (air trea

    All work detailed under (5.F.8) for sy

    treated centrally.

    Note:

    Where more than one system is used

    specification notes and costs should

    each.

  • 7/30/2019 6th Lane CA Ramz

    31/109

    Element and design criteria Total cost of element

    Rs.

    Cost of element

    per m2 of gross

    floor area

    Rs.

    Element unit

    quantity

    Element unit

    rate Rs.

    AMPLIFIED ANALYSIS

    Specific

    Preliminaries ..% of remainder of

    Space

    Total

    5.F.1 Water and/or

    5.F.2 Ducted warm air

    5.F.3 Electricity

    5.F.4 Local heating

    5.F.5 Other heating

    5.F.6 Heating with

    5.F.7 Heating with

    5.F.8 Heating with

    5.F.9 Heating with

    5.G VENTILA TING SYSTEM Cube of

    treated space

    as defined

    Tm2 * 0 .Tm3

    m2

    Mechanic

    incorpora

    installatio

    extraction

    extract faninstrumen

  • 7/30/2019 6th Lane CA Ramz

    32/109

    Element and design criteria Total cost of element

    Rs.

    Cost of element

    per m2 of gross

    floor area

    Rs.

    Element unit

    quantity

    Element unit

    rate Rs.

    AMPLIFIED ANALYSIS

    Specific

    =

    total net area in square

    us compartments

    Gross floor area ..% of remainder of

    * Where Tm2 is the metres of the vario served.

    Preliminaries

    contract sum.

    All work f

    up to and i

    boards inc

    and sub-m

    factor corr

    equipment

    Notes:

    1. I

    (bu

    inc

    2. The cos

    stated sep

    Total electric load in kilowatts

    .kW (tabulate illumination levels

    5.H.1 Elec

    by principle functions)

    5.H. ELECTRICAL INSTALLATIONS

  • 7/30/2019 6th Lane CA Ramz

    33/109

    Element and design criteria Total cost of element

    Rs.

    Cost of element

    per m2 of gross

    floor area

    Rs.

    Element unit

    quantity

    Element unit

    rate Rs.

    AMPLIFIED ANALYSIS

    Specifica

    5.H.2 Elect

    All wiring,

    from local d

    including o

    Total number of power outlets ...

  • 7/30/2019 6th Lane CA Ramz

    34/109

    Element and design criteria Total cost of element

    Rs.

    Cost of element

    per m2 of gross

    floor area

    Rs.

    Element unit

    quantity

    Element unit

    rate Rs.

    AMPLIFIED ANALYSIS

    Specific

    General

    Services

    Space

    Gas

    Lift and

    5.H ELECTRICAL INSTALLATIONS - -(cont.d) Total number of lighting points

    ..

    Illumination in lux lx

    All wiring, cables, conduits, switch

    local distribution boards and fitting

    including outlet points.

    5.H.4 Electric lighting fittings

    Lighting fittings including fixing.

    Where lighting fittings supplied dire

    should be stated.

    5.H.3 Electric lighting

    Note:

    The cost p

    installation

    shown sep

  • 7/30/2019 6th Lane CA Ramz

    35/109

    Element and design criteria Total cost of element

    Rs.

    Cost of element

    per m2 of gross

    floor area

    Rs.

    Element unit

    quantity

    Element unit

    rate Rs.

    AMPLIFIED ANALYSIS

    Specific

    Light Number

    Preliminaries ..% of remainder of

    Electrical Total

    5.H.1 Electric source

    5.H.2 Electric power

    5.H.3 Electric lighting

    5.H.4 Electric lighting

    5.I GAS INSTALLATIONS

    Number of

    draw-off points

    Number of draw-off points .....

    is no individual meter: distribution p

    appliances and equipment.

    Town and natural gas services from

    point of entry where there

  • 7/30/2019 6th Lane CA Ramz

    36/109

    Element and design criteria Total cost of element

    Rs.

    Cost of element

    per m2 of gross

    floor area

    Rs.

    Element unit

    quantity

    Element unit

    rate Rs.

    AMPLIFIED ANALYSIS

    Specific

    Preliminaries ..% of remainder of

    5.J LIFT AND CONVEYOR - -

    INSTALLATIONS

    The number of rush period passengers for

    which the installation has been designed should be

    Lifts

    The number, capacity, speed, number of stops,

    Escalators

    Rise and travel of escalators should be stated.

    As detailed under 5.J.1

    5.J.2 Escalators

    As detailed under 5.J.1

    5.J.3 Conveyors

    The complete installation including

    trolleys, blocks, hooks and ropes, d

    pendant controls and electrical wor

    including isolator.

    Notes:1. The cost of special structu

    walls, lift motor rooms, etc.

    in the appropriate structural

    2. Remaining electrical work

    included with Electric powe

    3. The cost of each type of lift or ho

    stated separately.

    5.J.1 Lifts and hoists

  • 7/30/2019 6th Lane CA Ramz

    37/109

    Element and design criteria Total cost of element

    Rs.

    Cost of element

    per m2 of gross

    floor area

    Rs.

    Element unit

    quantity

    Element unit

    rate Rs.

    AMPLIFIED ANALYSIS

    Specificati

    Preliminaries ..% of remainder of

    Lift and Total

  • 7/30/2019 6th Lane CA Ramz

    38/109

    Element and design criteria Total cost of element

    Rs.

    Cost of element

    per m2 of gross

    floor area

    Rs.

    Element unit

    quantity

    Element unit

    rate Rs.

    AMPLIFIED ANALYSIS

    Specific

    5.J.1 Lifts and hoists

    5.J.2 Escalators

    5.J.3 Conveyors

    nd design criteria

    Cost of element per m2 of gross floor area

    Element unit quantity

    Element unit rate

    Specification

    5.K

    PROTECTIVE INSTALLATIONS 5.K.1 Sprinkler installations

    Sprinklers the number of outlets, control The complete sprinkler i including tanks control mechanism, etc.

  • 7/30/2019 6th Lane CA Ramz

    39/109

    Element and design criteria Total cost of element

    Rs.

    Cost of element

    per m2 of gross

    floor area

    Rs.

    Element unit

    quantity

    Element unit

    rate Rs.

    AMPLIFIED ANALYSIS

    Specifi

    mechanism should be given.

    Note:

    Tm2 * = m2 Electrical work shall be included with Electric power su

    Gross floor area m2

    5.K.2 Fire-fighting installations

    =

    Hosereels, hand extinguishers, asbestos blankets, water and sand buckets,

    foam inlets, dry risers (and wet risers where only serving fire fighting

    * Where Tm2 is the total net area in square equipment). metres of the various compartments treated or

    served. 5.K.3 Lightning protection

    The complete lightning protection installation foam finials conductor tapes, to and including earthing.

    Note:

    The cost of lightning protection to boiler and vent stacks shall be stated separately.

    Cost per m2

    Protective installations Total of gross

    floor area

    5.K.1 Sprinkler installations

    5.K.2 Fire-fighting installations

    5.K.3 Lightning protection

  • 7/30/2019 6th Lane CA Ramz

    40/109

    Element and design criteria Total cost of element

    Rs.

    Cost of element

    per m2 of gross

    floor area

    Rs.

    Element unit

    quantity

    Element unit

    rate Rs.

    AMPLIFIED ANALYSIS

    Specificati

    Preliminaries ..% of remainder of contract sum.

    5.L COMMUNICATION

    INSTALLATIONS

    - - The following installations shall be in

  • 7/30/2019 6th Lane CA Ramz

    41/109

    Element and design criteria Total cost of element

    Rs.

    Cost of element

    per m2 of gross

    floor area

    Rs.

    Element unit

    quantity

    Element unit

    rate Rs.

    AMPLIFIED ANALYSIS

    Specific

    Preliminaries ..% of remainder of Communica

    Total

    Warning installations

    Burglar and security

    Fire alarms

    Visual and audio

    Door signals Timed

    Pneumatic message

    5.M SPECIAL INSTALLATIONS

    which have not been included elsew

    Chemical gases; Medical gases; VaWindow cleaning equipment and c

    Compressed air; Treated water; Re

    Notes:

    1. The cost of each installati

    separately if possible along w

    of the specification.

    2. The cost of the work in co

    electrical supply shall be inc

    Electric power supplies (5

    All other mechanical and/or electri

    (separately identifiable)

  • 7/30/2019 6th Lane CA Ramz

    42/109

    Element and design criteria Total cost of element

    Rs.

    Cost of element

    per m2 of gross

    floor area

    Rs.

    Element unit

    quantity

    Element unit

    rate Rs.

    AMPLIFIED ANALYSIS

    Specific

    Preliminaries ..% of remainder of

    Cost of

    Total cost of element element per m2 Element unit Element unit

    Element and design criteria of gross floor

    Specification

    Notes:

    1. The cost of each installati

    possible, be shown separatel

    indication of the specificatio

    2. Items deemed to be includ

    Refrigerated stores compri

    required to provide refrigera

    cooling towers, compressors

    and controls, cold room therm

    and vapour sealing, cold roo

    cold rooms, refrigerated stor

    other than that required for

  • 7/30/2019 6th Lane CA Ramz

    43/109

    Element and design criteria Total cost of element

    Rs.

    Cost of element

    per m2 of gross

    floor area

    Rs.

    Element unit

    quantity

    Element unit

    rate Rs.

    AMPLIFIED ANALYSIS

    Specific

    5.N BUILDERS WORK IN

    CONNECTION WITH SERVICES

    1. The cost of builders work in

    each of the services elements shall

    be shown separately.

    2. Where tank rooms, housings

    included in the gross floor area,

    parts shall be analysed in de

    appropriate elements. Where this is

    cost of such items shall be included

    - - Builders work in connection with m

    electrical services.

    Notes:

  • 7/30/2019 6th Lane CA Ramz

    44/109

    Element and design criteria Total cost of element

    Rs.

    Cost of element

    per m2 of gross

    floor area

    Rs.

    Element unit

    quantity

    Element unit

    rate Rs.

    AMPLIFIED ANALYSIS

    Specificat

    Preliminaries ..% of remainder of

    Services

    5.A Sanitary appliances

    5.B Services equipment

    5.C Disposal

  • 7/30/2019 6th Lane CA Ramz

    45/109

    Element and design criteria Total cost of element

    Rs.

    Cost of element

    per m2 of gross

    floor area

    Rs.

    Element unit

    quantity

    Element unit

    rate Rs.

    AMPLIFIED ANALYSIS

    Specifica

    5.D Water installations

    5.E Heat source

    5.F Space heating and

    5.G Ventilating system

    5.H Electrical

    5.I Gas installations

    5.J Lift and conveyor

    5.K Protective

    5.L Communication

    5.L Special installations

    5.O BUILDERS PROFIT AND

    ATTENDANCE ON SERVICES

    Note:

    Builders profit and attendance in co

    mechanical and electrical

    services.

  • 7/30/2019 6th Lane CA Ramz

    46/109

    Element and design criteria Total cost of element

    Rs.

    Cost of element

    per m2 of gross

    floor area

    Rs.

    Element unit

    quantity

    Element unit

    rate Rs.

    AMPLIFIED ANALYSIS

    Specificati

    The cost of profit and attendance in coeach of the services elements shall, w

    be shown separately.

  • 7/30/2019 6th Lane CA Ramz

    47/109

    Element and design criteria Total cost of element

    Rs.

    Cost of element

    per m2 of gross

    floor area

    Rs.

    Element unit

    quantity

    Element unit

    rate Rs.

    AMPLIFIED ANALYSIS

    Specifica

    Preliminaries ..% of remainder of

    Services

    5.A Sanitary appliances

    5.B Services equipment

    5.C Disposal

    5.D Water installations

    5.E Heat source

    5.F Space heating and

    5.G Ventilating system

  • 7/30/2019 6th Lane CA Ramz

    48/109

    Element and design criteria Total cost of element

    Rs.

    Cost of element

    per m2 of gross

    floor area

    Rs.

    Element unit

    quantity

    Element unit

    rate Rs.

    AMPLIFIED ANALYSIS

    Specific

    5.H Electrical

    5.I Gas installations

    5.J Lift and conveyor

    5.K Protective

    5.L Communication

    5.L Special installations

    Sub-total excluding External works,

    Total cost Cost of Element Element

    Element and design criteria of element Specification sub-element unit quantity unit rate

    6.A SITE WORKS 6.A.1 Site

    Clearance and ) m2

    Cost per m2 gross floor area Preparatory earth )

    6.A.2 Surface

    The cost of theVehicle parks

    Paths and paved

    Games courts )

    )

  • 7/30/2019 6th Lane CA Ramz

    49/109

    Element and design criteria Total cost of element

    Rs.

    Cost of element

    per m2 of gross

    floor area

    Rs.

    Element unit

    quantity

    Element unit

    rate Rs.

    AMPLIFIED ANALYSIS

    Specific

    6.A.3 Site )

    )

    Gates and ) m2

    Fencing, walling )

    )

    6.A.4 Fittings )

    )

    Notice boards,

    ) m

    )

    number

    Preliminaries ..% of remainder of

    6.B DRAINAGE Surface water

    Foul drainage

    Cost per m2 gross floor area Sewage

    Note:

    To include all

    - -

  • 7/30/2019 6th Lane CA Ramz

    50/109

    Element and design criteria Total cost of element

    Rs.

    Cost of element

    per m2 of gross

    floor area

    Rs.

    Element unit

    quantity

    Element unit

    rate Rs.

    AMPLIFIED ANALYSIS

    Specific

    Preliminaries ..% of remainder of

    6.C EXTERNAL SERVICES 6.C.1 Water

    Main from - -

    Cost per m2 gross floor area

    6.C.2 Fire

    Main from - -

    6.C.3 Heating

    Main from - -

    6.C.4 Gas mains

    Main from - -

    6.C.5 Electric

    Main from - -

    6.C.6 Site

    Distribution, - -

    6.C.7 Other

    Mains relating to - -

    6.C.8 Builders

    Builders work

    6.C.1 - -

    6.C.2

  • 7/30/2019 6th Lane CA Ramz

    51/109

    Element and design criteria Total cost of element

    Rs.

    Cost of element

    per m2 of gross

    floor area

    Rs.

    Element unit

    quantity

    Element unit

    rate Rs.

    AMPLIFIED ANALYSIS

    Specificat

    6.C.3

    6.C.4

    6.C.5

    6.C.6

    6.C.7

    Note:

    The cost of the

    (6.C.1) to

    6.C

    6.C.1

    6.C.2

    6.C.3 - -

    6.C.4

    6.C.5

    6.C.6

    6.C.7

    Note:

    The cost of

    (6.C.1) to

    Preliminaries ..% of remainder of

  • 7/30/2019 6th Lane CA Ramz

    52/109

  • 7/30/2019 6th Lane CA Ramz

    53/109

  • 7/30/2019 6th Lane CA Ramz

    54/109

  • 7/30/2019 6th Lane CA Ramz

    55/109

  • 7/30/2019 6th Lane CA Ramz

    56/109

  • 7/30/2019 6th Lane CA Ramz

    57/109

  • 7/30/2019 6th Lane CA Ramz

    58/109

  • 7/30/2019 6th Lane CA Ramz

    59/109

  • 7/30/2019 6th Lane CA Ramz

    60/109

  • 7/30/2019 6th Lane CA Ramz

    61/109

  • 7/30/2019 6th Lane CA Ramz

    62/109

  • 7/30/2019 6th Lane CA Ramz

    63/109

  • 7/30/2019 6th Lane CA Ramz

    64/109

  • 7/30/2019 6th Lane CA Ramz

    65/109

  • 7/30/2019 6th Lane CA Ramz

    66/109

  • 7/30/2019 6th Lane CA Ramz

    67/109

  • 7/30/2019 6th Lane CA Ramz

    68/109

  • 7/30/2019 6th Lane CA Ramz

    69/109

  • 7/30/2019 6th Lane CA Ramz

    70/109

  • 7/30/2019 6th Lane CA Ramz

    71/109

  • 7/30/2019 6th Lane CA Ramz

    72/109

  • 7/30/2019 6th Lane CA Ramz

    73/109

  • 7/30/2019 6th Lane CA Ramz

    74/109

  • 7/30/2019 6th Lane CA Ramz

    75/109

  • 7/30/2019 6th Lane CA Ramz

    76/109

  • 7/30/2019 6th Lane CA Ramz

    77/109

  • 7/30/2019 6th Lane CA Ramz

    78/109

  • 7/30/2019 6th Lane CA Ramz

    79/109

  • 7/30/2019 6th Lane CA Ramz

    80/109

  • 7/30/2019 6th Lane CA Ramz

    81/109

  • 7/30/2019 6th Lane CA Ramz

    82/109

  • 7/30/2019 6th Lane CA Ramz

    83/109

  • 7/30/2019 6th Lane CA Ramz

    84/109

  • 7/30/2019 6th Lane CA Ramz

    85/109

  • 7/30/2019 6th Lane CA Ramz

    86/109

  • 7/30/2019 6th Lane CA Ramz

    87/109

  • 7/30/2019 6th Lane CA Ramz

    88/109

  • 7/30/2019 6th Lane CA Ramz

    89/109

  • 7/30/2019 6th Lane CA Ramz

    90/109

  • 7/30/2019 6th Lane CA Ramz

    91/109

  • 7/30/2019 6th Lane CA Ramz

    92/109

  • 7/30/2019 6th Lane CA Ramz

    93/109

  • 7/30/2019 6th Lane CA Ramz

    94/109

  • 7/30/2019 6th Lane CA Ramz

    95/109

  • 7/30/2019 6th Lane CA Ramz

    96/109

  • 7/30/2019 6th Lane CA Ramz

    97/109

  • 7/30/2019 6th Lane CA Ramz

    98/109

    Areas

    Gross Floor Area

    Usable Living Area 33.630852 m

    Guest bed room 18.000 m

    Circulation Service walk way 41.766 m

    Pedestrian walk way+Lift loby+ main Stair 55.819 m

    Stair Internal 6.120 m

    Lift well 7.386 m

    Zone two Stair 4.527 m

    Mechanical Car park 59.786 mManual Car Park 34.506 m

    Stair at Living area 1.672 m

    Stair from verandha to living 8.933 m

    Verandha 31.034 m

    Ancillary Toilet outside 2.279 m

    Toilet inside 5.878 m

    Pantry 19.015 m

    Dining 44.517 m

    Duct out side 0.930 m

    Duct in side 0.225 m

    Duct in service walk way 1.232 m

    Duct in service walk way 0.891 m

    disable toilet 3.702 m

    Internal Division 3.430 m2.143 m

    1.990 m

    2.126 m

    0.623 m

    1.897 m

    2.329 m

    1.136 m

    Ground

  • 7/30/2019 6th Lane CA Ramz

    99/109

    5.621 m

    3.966 m

    1.573 m

    0.709 m

  • 7/30/2019 6th Lane CA Ramz

    100/109

    2nd 3rd

    master Bed Room 50.951 m

    Bed room 23.517978 m

    Stair Zone 2 8.958 m

    Stair inside 5.686 m

    corridor around void 20.996 m

    Lift well 7.385624 m

    Lift Lobby 7.656944 m

    Mechanical Car park 48.260018 mFire Stair 16.799538 m

    Living 29.208774

    Dressing Area 8.320701

    Toilet 15.481967

    Duct 1.231875

    Duct 1.231874

    tranformer room 24.446913

    Toilet 7.031818

    Maids Room 8.342732

    Maids Room - Toilet 2.936663

    Duct 0.225

    Duct 0.30375

    Duct 0.929997

    Verandha 11.509781

    Verandha 3.475273

    2.3862.271

    1.241

    2.319

    1.828889

    0.883124

    0.37125

    0.706172

    1st

  • 7/30/2019 6th Lane CA Ramz

    101/109

    5.104985

    2.40975

    2.497498

    4.056753

    0.094993

    3.909954

    0.659987

    0.681706

    0.191249

    0.083354

    0.443438

  • 7/30/2019 6th Lane CA Ramz

    102/109

    5th

    351.478595

    Office Area 226.217483

    Fire Stair and Cooridor 17.014

    Main Stair way mid to 4 7.380 Main Stair way 7.380

    Main Stair way 4 to mid 12.417

    Lift Shaft above 3.486

    Lift Shaft below 3.486

    Lift Lobby 12.936

    Lady's Toilet 8.278

    Men's Toilet 9.822

    Duct behind above lift 1.232

    Duct behind below lift 1.232

    fire cabinet 0.427006

    Toilet entrance 1.043205

    Duct - 9-B 0.225001

    Duct - 13-B 0.202499

    Duct - 13-G 1.075312

    Duct - 7-G 1.035287

    Balcony - 13 0ff 5.654276

    Balcony - H 5.776791

    Balcony and Flower Trough - 13 5.287603

    Flower trough - 6 5.007268

    col. 0.179999col. 0.2925

    lift lobby glass wall 0.1606

    toilet walls 3.814942

    Lift and duct below 1.965418

    Lift and duct Above 2.698785

    Fire Cabinet 0.105061

    Stair and Office - 7 1.660823

    4th

  • 7/30/2019 6th Lane CA Ramz

    103/109

    office and flower trough - 7 2.540392

    office and Balcony - G 1.565694

    office and Balcony - 13 2.436389

    office and Balcony - 13 off 1.87571

    office and Fire Stair - C 3.05191

  • 7/30/2019 6th Lane CA Ramz

    104/109

    6th 7th 8th

  • 7/30/2019 6th Lane CA Ramz

    105/109

    Preliminaries 489,000.00

    Roof 1,883,500.00

    100,000.00

    1,983,500.00

    Sub structure

    excavation 805,290.00

    concrete 1,618,375.00

    masonry 791,500.00

    3,215,165.00

    Swim pool

    concrete 454,400.00

    masonry 21,250.00

    waterproof 75,900.00

    finish 134,245.00

    P/S 350,000.00

    1,035,795.00

    Frame concrete 228000

    reinforce 613200

    formwork 263500

    1,104,700.00

    Upper floor Slab 1,252,000.00

    miscellaneous 508,253.00

    1,760,253.00

    Staircase concrete 141,000.00

    reinforce 264,600.00

  • 7/30/2019 6th Lane CA Ramz

    106/109

    formwork 59,500.00

    7,700.00

    finishes 233,900.00

    metal 132,000.00

    838,700.00

    External walls masonry 1,093,000.00 qty

    finish 352,550.00

    painting 26,345.00

    55,000.00

    1,526,895.00

    Internal walls masonry 362,075.00

    Finishes

    wall 1,502,350.00

    floor 1,271,910.00

    ceiling 262,350.00

    3,036,610.00

    Fittings and furnishing carpentry 3,206,457.54

    metal 618,350.87

    3,824,808.41

    Services Plumbing 656,207.00

    Electrical 663,500.00

    P/S 2,152,500.00

    3,472,207.00

    External works drain & storm 254,000.00

    dayworks 240,468.75

    P/S 1,425,000.00

  • 7/30/2019 6th Lane CA Ramz

    107/109

    plant trough 488,650.00

    swim pool 1,035,795.00

    3,443,913.75

    Areas

    Gross floor area Ground Usable 230 m

    Circulation 18 m

    Ancillary 15 m

    Internal 16 m

    279 m

    First Usable 126 m

    Circulation

    Ancillary 12 m

    Internal

    139 m

    Roof 166 m

    External wall area 511.0 m

  • 7/30/2019 6th Lane CA Ramz

    108/109

  • 7/30/2019 6th Lane CA Ramz

    109/109

    5500 ft

    511.0 m