6th lane ca ramz
TRANSCRIPT
-
7/30/2019 6th Lane CA Ramz
1/109
YES NO
LABOUR
MATERIALS
YES NO
Rs.
Rs.
Rs.
Rs.
Rs.
Cost fluctuations
Adjustments based on formula
Nuwani - 307 Mn
RN Construction - 256 Mn
Number of tender received : 3
Negotiated
Continuation
Serial
N and A - 234.8 Mn
Contract period offered by builder :
Number of tender issued : 3
Contract sum 234,859,464.25
Contract particulars :
Type of contract : Measure and Pay
Basis of tender :
Bill of quantities
Bill of approximate quantities
Job title : Proposed Mixed Develeopment Project
Preliminaries 9,909,500.00
Provisional sums 85,800,944.85
Prime cost sums
Contract period stipulated by client : 18 Months
Open / selected competition
Tender date : 22nd October 2009
Market Conditions :
Competitive tend
Rs
Location : No. 02, 6th Lane , Colombo 03, Sri Lanka
The Project comprises the construction of an eight storey building consisting of Bored Pile
Foundation, Reinforced Concrete Frame Structure, Brick and Block Walls, Staircases, CalicutTiled Roof, Underground Water sumps, Joinery and Metal Work and Services. The Site is
located near the Coast. The underlaying soil consist with filled soil and loose sand layers with
medium dense sand layers. The Ground Water Level is at 4.1m below the existing Ground Level.
The Contract Comprises with Demolition of existing Structure, Co
Completion of the New Building. The Type of Contract is MeasurLiability Period is 365 days.
Schedule of rates
Contingencies
DETAILED COST ANALYSIS
INFORMATION ON TOTAL PROJECT
Project details & site conditions : Contract :
Client : Mr. Godfrey Aloysius
-
7/30/2019 6th Lane CA Ramz
2/109
356.00 Design shape
- m2
279.00 m2
Percentage of gross floor area
139.00 m2
511.00 m2
418.00 m2
356.00 m2
418.00 m2 a) Below ground floor
18.00 m2 b) Single storey construction
28.00 m2
1.22 c) Two storey construction
16.00 m2 d) Three storey construction
418.00 m2
m2
166.00 m2 -
4.47 m
3.05 m
Functional unit cost excluding = (Total cost - Externa
Contract sum Rs. external works Functional unit
Provisional sums Rs.
Prime cost sums Rs.
Preliminaries Rs. 1.95% of remainder of = 70,387.15
Contingencies Rs. contract sum
Contract sum less contingencies Rs.
Amounts for single building analysed
The project comprises of two Residenece areas, with Ground and First floors having one residence, and Sixth, Seventh and Eighth floors having the other residen
areas include bedrooms, living areas, kitchen, toilets, maids room, dressing rooms, billiard room, audio visual room and a terrace on the eigth floor. Second floo
office areas, a bed sitter, Dressing room and toilets. Third, Fourth and Fifth floors comprise with office areas. A mechanical and a Manual car park is installed in
Storey heights
Average below ground floor =
Wall to floor ratio =
Floor spaces not enclosed
Usable area
489,000.00
Roof area (on plan)
Ancillary area
External wall area =
Gross floor area
0.00
ANALYSIS OF SINGLE BUILDING
Upper floors
Circular area
Design shape information
Accommodation & design features :
Areas Functional unit - Net useable floor area
Basement floors
Ground floors
Gross floor area
Gross floor area =
internal division
25,057,827.16
4,595,750.00
25,057,827.16
Brief cost information
Above ground floor =
0.00
At ground floor =
-
7/30/2019 6th Lane CA Ramz
3/109
57.43
42.54
-
7/30/2019 6th Lane CA Ramz
4/109
418.00 m2
2.F Internal walls and partitions
Element
Preliminaries shown separately
1. Substructure 3,215,165.00 7,691.78 279.00
Total cost
of element
Rs.
Element unit quantity
Element
unit rate
Rs.
Total cost of
11,523.89
SUMMARY OF ELEMENT COSTS
Gross floor area : Tender
Cost per m2 of
gross floor area
Rs.
2,642.82
Preli
11948.80
2.A Frame 1,104,700.00 2,642.82 418.00
2.B Upper Floors 12663.69
2. Superstructure
2.C Roof 1,983,500.00
1,760,253.00 4,211.13 139.00
2.G Others
2.D Stairs 838,700.00 2,006.46
4,745.22 166.00
2.E External walls 1,526,895.00 3,652.86 511.00 2988.05
2.F Windows and external doors
362,075.00 866.21
Group element total 7,576,123.00 18,124.70
1,271,910.00
3.C Ceiling finishes
1,502,350.00
262,350.00
3. Internal Finishes
3.A Wall finishes
3.B Floor finishes
Group element total
4. Fittings & Furnishings
Group element total
5. Services
3,824,808.41
3,472,207.00
3,472,207.00
21,124,913.41
3,443,913.75
3,036,610.00
3,824,808.41
3,594.14
3,042.85
627.63
7,264.62
Preliminaries
Group element total
Group element total
Sub total excluding external works,
preliminaries & contingencies
6. External Works
50,538.07
9,150.26
8,306.72
3,443,913.75 8,239.03
9,150.26
8,306.72
8,239.03
489,000.00 1,169.86
418.00 3594.14
418.00 3042.85
279.00 940.32
-
7/30/2019 6th Lane CA Ramz
5/109
25,057,827.16
25,057,827.16
0.00
TOTAL (Less contingencies) 25,057,827.16 59,946.95
-
7/30/2019 6th Lane CA Ramz
6/109
Element and design criteria Total cost of element
Rs.
Cost of element
per m2 of gross
floor area
Rs.
Element unit
quantity
Element unit
rate Rs.
1.A SUBSTRUCTURE Area of lowestfloor measured
as for gross
internal
Permissible soil loading .kN/m2 floor area,
(m2).
(kilonewtons per square metre)
Nature of soil ..
.
(metres)
Site levels
Water table depth .m
(metres)
Average pile
Preliminaries ..% of remainder of
AMPLIFIED ANALYSIS
Note
1. Where lowest floor constructio
2. Stanchions and columns (wi
Specific
3. Cost of piling and driving sha
4. The cost of external enclosin
-
7/30/2019 6th Lane CA Ramz
7/109
Element and design criteria Total cost of element
Rs.
Cost of element
per m2 of gross
floor area
Rs.
Element unit
quantity
Element unit
rate Rs.
AMPLIFIED ANALYSIS
Specific
2.A FRAME
Grid pattern should be stated, giving centres of
Area of floors
floor area
(m2).
Preliminaries ..% of remainder of
3. In unframed buildings roof and f
Upper floors (2.B) or R
4. If the Stair structure (
1. Structural walls which
loadbearing framework sh
Internal walls and partitio
2. Beams which form an i
which cannot be segregate
Notes:
Loadbearing framework of concrete
beams, ties and roof trusses of fram
-
7/30/2019 6th Lane CA Ramz
8/109
Element and design criteria Total cost of element
Rs.
Cost of element
per m2 of gross
floor area
Rs.
Element unit
quantity
Element unit
rate Rs.
AMPLIFIED ANALYSIS
Specific
2.B UPPER FLOORS
Design loads should be stated in kilonewtons per
Total are of
floors, (m2).
Preliminaries ..% of remainder of Upper floors
(access and private balconies each
Notes:
2. Beams which form an i
1. Where floor constructio
platform the flooring surf
Upper floors, continuous access f
or in basements stated separately.
3. If the Stair structure (
-
7/30/2019 6th Lane CA Ramz
9/109
Element and design criteria Total cost of element
Rs.
Cost of element
per m2 of gross
floor area
Rs.
Element unit
quantity
Element unit
rate Rs.
AMPLIFIED ANALYSIS
Specific
2.C ROOF
Design loads should be stated in kilonewtons per
square metre (kN/m2) and spans given in metres
Area measured
overall roof
The angle of pitch of sloping roofs shall be stated.
Preliminaries ..% of remainder of Roof
2.C.4 Roof lights
Roof lights, opening gear, f rame, k
Roof screeds and f inishings. Batten
like. Flashings and trims. Insulation
2.C.3 Roof drainage
2. Roof housings (eg lift m
2.C.2 Roof coverings
Gutters where not integral with roo
roof outlets. (Rainwater downpipes
2.C.1 Roof structure
Construction, including eaves and
gable ends, internal walls and chim
Notes:
1. Beams which form an i
-
7/30/2019 6th Lane CA Ramz
10/109
Element and design criteria Total cost of element
Rs.
Cost of element
per m2 of gross
floor area
Rs.
Element unit
quantity
Element unit
rate Rs.
AMPLIFIED ANALYSIS
Specific
2.C.1 Roof structure
2.C.2 Roof coverings
2.C.3 Roof drainage
2.C.4 Roof lights
2.D STAIRS 2.D.1 Stair structure
The total vertical height of each staircase and its Construction of ramps,
Notes:
1. The cost of external
2. If the staircase
Frame (2.A) or
2.D.2 Stair finishes
Finishes to treads,
2.D.3 Stair
Balustrades and
-
7/30/2019 6th Lane CA Ramz
11/109
Element and design criteria Total cost of element
Rs.
Cost of element
per m2 of gross
floor area
Rs.
Element unit
quantity
Element unit
rate Rs.
AMPLIFIED ANALYSIS
Specificat
Preliminaries ..% of remainder of
2.E EXTERNAL WALLS External enclosing walls including th
included with Roof structure (2.3.1
-
7/30/2019 6th Lane CA Ramz
12/109
Element and design criteria Total cost of element
Rs.
Cost of element
per m2 of gross
floor area
Rs.
Element unit
quantity
Element unit
rate Rs.
AMPLIFIED ANALYSIS
Specifi
External walls = m2
Gross floor area m2 Area of
measured on
=
Basement walls = m2
Gross floor area m2
=
The approximate value of thermal conductivity
If calculated loadbearing brickwork, give indication
Preliminaries ..% of remainder of External walls
2.F WINDOWS AND EXTERNAL
DOORS
Total area
Windows = m2 of windows
Gross floor area m2 (m2).
#NAME?
Gross floor area m2
#NAME?
opening lights =
Lintels, sills, cavity damp-proof co
2.F.2 External doors Doors, fanli
Lintels, thresholds, cavity damp-pr
openings.
Notes:
Shop fronts.
3. If walls are self-finished on inte
Chimneys forming part of external
Vertical tanking. Insulation.
Applied external finishes.
1. The cost of structural w
important part of the load
2. Basement walls shall b
2.F.1 Windows
Sashes, frames, linings and trims. I
-
7/30/2019 6th Lane CA Ramz
13/109
Element and design criteria Total cost of element
Rs.
Cost of element
per m2 of gross
floor area
Rs.
Element unit
quantity
Element unit
rate Rs.
AMPLIFIED ANALYSIS
Specific
to windows m2
Preliminaries ..% of remainder of Windows and
2.F.1 Windows
2.F.2 External doors
2.G INTERNAL WALLS AND
PARTITIONS
Internal walls Total area of
and partitions = m2 openings),
Gross floor area m2
=
4. If design is cross-wall c
Notes:
1. The cost of structural w
important part of the load
2. The cost of proprietary
separately stating if self-f
installed.
3. The cost of proprietary
Internal walls, partitions and insula
Chimneys forming part of internal
Internal balustrades excluding item
Stair balustrades and handrails (2
Moveable space-dividing partition
-
7/30/2019 6th Lane CA Ramz
14/109
Element and design criteria Total cost of element
Rs.
Cost of element
per m2 of gross
floor area
Rs.
Element unit
quantity
Element unit
rate Rs.
AMPLIFIED ANALYSIS
Specificati
Preliminaries ..% of remainder of Internal walls and
-
7/30/2019 6th Lane CA Ramz
15/109
Element and design criteria Total cost of element
Rs.
Cost of element
per m2 of gross
floor area
Rs.
Element unit
quantity
Element unit
rate Rs.
AMPLIFIED ANALYSIS
Specificat
2.H INTERNAL DOORS Area of
internal doors
Lintels, thresholds, and work to reve
Doors, fanlights and sidelights.
Frames, linings and trims. Ironmonge
Sliding and folding doors. Hatches.
-
7/30/2019 6th Lane CA Ramz
16/109
Element and design criteria Total cost of element
Rs.
Cost of element
per m2 of gross
floor area
Rs.
Element unit
quantity
Element unit
rate Rs.
AMPLIFIED ANALYSIS
Specific
Preliminaries ..% of remainder of Internal doors
3.A WALL FINISHES Total area
of wall
1. Surfaces which are self-partitions, fair faced work
2. Insulation which is wall-finishing
Preparatory work and finishes to sur
Picture, dado and similar rails.
Notes:
-
7/30/2019 6th Lane CA Ramz
17/109
Element and design criteria Total cost of element
Rs.
Cost of element
per m2 of gross
floor area
Rs.
Element unit
quantity
Element unit
rate Rs.
AMPLIFIED ANALYSIS
Specific
Preliminaries ..% of remainder of Wall
3.B. FLOOR FINISHES Total area
of floor
Where the floor construction does n
the flooring surface will be included
Upper floors (2.B) as appropriate
Preparatory work, screeds, skirting
items included with Stair finishes
Note:
3. The cost of finishes app
-
7/30/2019 6th Lane CA Ramz
18/109
Element and design criteria Total cost of element
Rs.
Cost of element
per m2 of gross
floor area
Rs.
Element unit
quantity
Element unit
rate Rs.
AMPLIFIED ANALYSIS
Specific
Preliminaries ..% of remainder of Floor
3.C CEILING FINISHES Total area
of ceiling
Construction and finishes of suspen
Notes:
3.C.1 Finishes to ceilings
Preparatory work and finishes to su
items included with Stair finishes
soffits of beams not forming part of
Cornices, coves.
3.C.2 Suspended ceilings
-
7/30/2019 6th Lane CA Ramz
19/109
Element and design criteria Total cost of element
Rs.
Cost of element
per m2 of gross
floor area
Rs.
Element unit
quantity
Element unit
rate Rs.
AMPLIFIED ANALYSIS
Specific
Preliminaries ..% of remainder of
Ceiling finishes
3.C.1 Finishes to
3.C.2 Suspended
4.A FITTINGS AND FURNISHINGS 4.A.1 Fittings, fixtures and furnit
2. The cost of finishes or s
immediately below roof sh
1. Where ceilings principa
artificial lighting or ventila
with the appropriate Serv
be stated separately.
-
7/30/2019 6th Lane CA Ramz
20/109
Element and design criteria Total cost of element
Rs.
Cost of element
per m2 of gross
floor area
Rs.
Element unit
quantity
Element unit
rate Rs.
AMPLIFIED ANALYSIS
Specific
Fixed and loose fittings and furnitu
cupboards, Wardrobes, benches, se
Blinds, blind boxes, curtain tracks a
Blackboards, pin-up boards, notice
and the like. Ironmongery.
Non-mechanical and non-electrical
function or need of the building ( eg
Where items in this element have a
elements a note should be included
Note:
Curtains, loose carpets or similar so
Works of art if not included in a fin
4.A.2 Soft furnishings
4.A.3 Works of art
4.A.4 Equipment
-
7/30/2019 6th Lane CA Ramz
21/109
Element and design criteria Total cost of element
Rs.
Cost of element
per m2 of gross
floor area
Rs.
Element unit
quantity
Element unit
rate Rs.
AMPLIFIED ANALYSIS
Specificat
Preliminaries ..% of remainder of
4.A.1 Fittings, fixtures
4.A.2 Soft furnishings
4.A.3 Works of art
Fittings and furnishings Quantity
-
7/30/2019 6th Lane CA Ramz
22/109
Element and design criteria Total cost of element
Rs.
Cost of element
per m2 of gross
floor area
Rs.
Element unit
quantity
Element unit
rate Rs.
AMPLIFIED ANALYSIS
Specific
4.A.4 Equipment
5.A SANITARY APPLIANCES - -
Fittings to be noted as grouped or dispersed.
Preliminaries ..% of remainder of Sanitary Number
5.B SERVICES EQUIPMENT - -
mechanical and electrical equipmen
building.
Baths, basins, sinks, etc.
WCs, slop-sinks, urinals and the lik
rails, etc.
Traps, waste fittings, overflows and
Kitchen, laundry, hospital and denta
specialist
-
7/30/2019 6th Lane CA Ramz
23/109
Element and design criteria Total cost of element
Rs.
Cost of element
per m2 of gross
floor area
Rs.
Element unit
quantity
Element unit
rate Rs.
AMPLIFIED ANALYSIS
Specific
Preliminaries ..% of remainder of Number
5.C DISPOSAL INSTALLATIONS - -
Number of sanitary appliances and special services
equipment served should be stated.
Floor channels and gratings and dra
within buildings up to
external face of external walls.
Note:
Services
equipment
type and
ualit
5.C.1 Internal drainage
Waste pipes to Sanitary appliances
Services equipment (5.B). Soil, an
and ventilation pipes. Rainwater do
Note:
Local incinerators shall be included
-
7/30/2019 6th Lane CA Ramz
24/109
Element and design criteria Total cost of element
Rs.
Cost of element
per m2 of gross
floor area
Rs.
Element unit
quantity
Element unit
rate Rs.
AMPLIFIED ANALYSIS
Specificat
5.C.2 Refuse disposal
Refuse ducts, waste disposal (grindin
and bins. Local incinerators and flue
Paper shredders and incinerators.
Rainwater gutters are included in Ro(2.C.3).
-
7/30/2019 6th Lane CA Ramz
25/109
Element and design criteria Total cost of element
Rs.
Cost of element
per m2 of gross
floor area
Rs.
Element unit
quantity
Element unit
rate Rs.
AMPLIFIED ANALYSIS
Specific
Preliminaries ..% of remainder of Total
Disposal
5.C.1 Internal drainage
5.C.2 Refuse disposal
5.D WATER INSTALLATIONS - -
Number of cold water draw-off points ...
Note:
5.D.2 Cold water service
Storage tanks, pumps, pressure boo
pipework to sanitary appliances and
equipment.
Valves and taps not included with
appliances (5.A) and/or
Services equipment (5.B). Insulat
5.D.1 Mains supply
Incoming water main from external
wall at point of entry into building
water metres, rising main to (but ex
tanks and main taps. Insulation
-
7/30/2019 6th Lane CA Ramz
26/109
Element and design criteria Total cost of element
Rs.
Cost of element
per m2 of gross
floor area
Rs.
Element unit
quantity
Element unit
rate Rs.
AMPLIFIED ANALYSIS
Specific
Number of hot water draw-off points .....
Number of steam and condensate draw-off points
Steam and condensate pipework in
connection with space heating or th
included as appropriate with Heat
Space heating and air treatment (5
Services equipment (5.B). Insulat
5.D.4 Steam and condensate
Steam distribution and condensate rto and from services equipment wit
including all valves, fittings, etc. In
Note:
Header tanks, cold water supplies,
systems should be included in Hea
5.D.3 Hot water service
Hot water and/or mixed water servi
Storage cylinders, pumps, calorifie
water heaters, distribution pipewor
appliances and services equipment
not included with Sanitary applian
-
7/30/2019 6th Lane CA Ramz
27/109
Element and design criteria Total cost of element
Rs.
Cost of element
per m2 of gross
floor area
Rs.
Element unit
quantity
Element unit
rate Rs.
AMPLIFIED ANALYSIS
Specifica
Preliminaries ..% of remainder of
Water Total
5.D.1 Mains supply
5.D.2 Cold water
5.D.3 Hot water service
5.D.4 Steam or
Boilers,
instrumenta
kW Notes:
1.
2. Local he
3.
5.E HEAT SOURCE
Boiler rating in kilowattskW
-
7/30/2019 6th Lane CA Ramz
28/109
Element and design criteria Total cost of element
Rs.
Cost of element
per m2 of gross
floor area
Rs.
Element unit
quantity
Element unit
rate Rs.
AMPLIFIED ANALYSIS
Specific
5.F. SPACE H EATING AND AIR (i) Heatin
TREATM ENT 5.F.1 Wat
Heat
Tm2 * 0 Cube of
m2 .Tm3 5.F.2 Duc
Ductwork
=
5.F.3
Cable
total net area in square
us compartments Note:
Electricall
5.F.4 Loc
Fireplaces
5.F.5 Oth
(ii) Air
Notes:
1. SystemAi
Ai
Gross floor area duc
Preliminaries ..% of remainder of contract sum.
-
7/30/2019 6th Lane CA Ramz
29/109
Element and design criteria Total cost of element
Rs.
Cost of element
per m2 of gross
floor area
Rs.
Element unit
quantity
Element unit
rate Rs.
AMPLIFIED ANALYSIS
Specific
* Where Tm2 is the metres of the vario served.
5.F SPACE HEATING AND AIR
TREATMENT (contd.)
5.F.6 Heating with ventilation (ai
Distribution pipework ducting, gril
units including heating calorifiers e
which are part of Heat source (5.
Instrumentation and control.
5.F.7 Heating with ventilation (ai
centrally)
All work as detailed under (5.F.6) f
air treated centrally.
5.F.8 Heating with cooling (air tre
All work as detailed under (5.F.6) i
water systems and/or cold or treate
The whole of the costs of the coolin
distribution pipework to local cooli
shown separately.
Cooling Filtration
Humidification Pressurisatio
inlet extract or recirculation
3. High velocity system shall be id
Fan coil Induction units 2 pipe Du
units 3 pipe Reheat Induction units
Multi-zone Any other system (state
2. The combination of treatments u
stated, ie:
Heating Dehumidification or dryin
-
7/30/2019 6th Lane CA Ramz
30/109
Element and design criteria Total cost of element
Rs.
Cost of element
per m2 of gross
floor area
Rs.
Element unit
quantity
Element unit
rate Rs.
AMPLIFIED ANALYSIS
Specifica
5.F.9 Heating with cooling (air trea
All work detailed under (5.F.8) for sy
treated centrally.
Note:
Where more than one system is used
specification notes and costs should
each.
-
7/30/2019 6th Lane CA Ramz
31/109
Element and design criteria Total cost of element
Rs.
Cost of element
per m2 of gross
floor area
Rs.
Element unit
quantity
Element unit
rate Rs.
AMPLIFIED ANALYSIS
Specific
Preliminaries ..% of remainder of
Space
Total
5.F.1 Water and/or
5.F.2 Ducted warm air
5.F.3 Electricity
5.F.4 Local heating
5.F.5 Other heating
5.F.6 Heating with
5.F.7 Heating with
5.F.8 Heating with
5.F.9 Heating with
5.G VENTILA TING SYSTEM Cube of
treated space
as defined
Tm2 * 0 .Tm3
m2
Mechanic
incorpora
installatio
extraction
extract faninstrumen
-
7/30/2019 6th Lane CA Ramz
32/109
Element and design criteria Total cost of element
Rs.
Cost of element
per m2 of gross
floor area
Rs.
Element unit
quantity
Element unit
rate Rs.
AMPLIFIED ANALYSIS
Specific
=
total net area in square
us compartments
Gross floor area ..% of remainder of
* Where Tm2 is the metres of the vario served.
Preliminaries
contract sum.
All work f
up to and i
boards inc
and sub-m
factor corr
equipment
Notes:
1. I
(bu
inc
2. The cos
stated sep
Total electric load in kilowatts
.kW (tabulate illumination levels
5.H.1 Elec
by principle functions)
5.H. ELECTRICAL INSTALLATIONS
-
7/30/2019 6th Lane CA Ramz
33/109
Element and design criteria Total cost of element
Rs.
Cost of element
per m2 of gross
floor area
Rs.
Element unit
quantity
Element unit
rate Rs.
AMPLIFIED ANALYSIS
Specifica
5.H.2 Elect
All wiring,
from local d
including o
Total number of power outlets ...
-
7/30/2019 6th Lane CA Ramz
34/109
Element and design criteria Total cost of element
Rs.
Cost of element
per m2 of gross
floor area
Rs.
Element unit
quantity
Element unit
rate Rs.
AMPLIFIED ANALYSIS
Specific
General
Services
Space
Gas
Lift and
5.H ELECTRICAL INSTALLATIONS - -(cont.d) Total number of lighting points
..
Illumination in lux lx
All wiring, cables, conduits, switch
local distribution boards and fitting
including outlet points.
5.H.4 Electric lighting fittings
Lighting fittings including fixing.
Where lighting fittings supplied dire
should be stated.
5.H.3 Electric lighting
Note:
The cost p
installation
shown sep
-
7/30/2019 6th Lane CA Ramz
35/109
Element and design criteria Total cost of element
Rs.
Cost of element
per m2 of gross
floor area
Rs.
Element unit
quantity
Element unit
rate Rs.
AMPLIFIED ANALYSIS
Specific
Light Number
Preliminaries ..% of remainder of
Electrical Total
5.H.1 Electric source
5.H.2 Electric power
5.H.3 Electric lighting
5.H.4 Electric lighting
5.I GAS INSTALLATIONS
Number of
draw-off points
Number of draw-off points .....
is no individual meter: distribution p
appliances and equipment.
Town and natural gas services from
point of entry where there
-
7/30/2019 6th Lane CA Ramz
36/109
Element and design criteria Total cost of element
Rs.
Cost of element
per m2 of gross
floor area
Rs.
Element unit
quantity
Element unit
rate Rs.
AMPLIFIED ANALYSIS
Specific
Preliminaries ..% of remainder of
5.J LIFT AND CONVEYOR - -
INSTALLATIONS
The number of rush period passengers for
which the installation has been designed should be
Lifts
The number, capacity, speed, number of stops,
Escalators
Rise and travel of escalators should be stated.
As detailed under 5.J.1
5.J.2 Escalators
As detailed under 5.J.1
5.J.3 Conveyors
The complete installation including
trolleys, blocks, hooks and ropes, d
pendant controls and electrical wor
including isolator.
Notes:1. The cost of special structu
walls, lift motor rooms, etc.
in the appropriate structural
2. Remaining electrical work
included with Electric powe
3. The cost of each type of lift or ho
stated separately.
5.J.1 Lifts and hoists
-
7/30/2019 6th Lane CA Ramz
37/109
Element and design criteria Total cost of element
Rs.
Cost of element
per m2 of gross
floor area
Rs.
Element unit
quantity
Element unit
rate Rs.
AMPLIFIED ANALYSIS
Specificati
Preliminaries ..% of remainder of
Lift and Total
-
7/30/2019 6th Lane CA Ramz
38/109
Element and design criteria Total cost of element
Rs.
Cost of element
per m2 of gross
floor area
Rs.
Element unit
quantity
Element unit
rate Rs.
AMPLIFIED ANALYSIS
Specific
5.J.1 Lifts and hoists
5.J.2 Escalators
5.J.3 Conveyors
nd design criteria
Cost of element per m2 of gross floor area
Element unit quantity
Element unit rate
Specification
5.K
PROTECTIVE INSTALLATIONS 5.K.1 Sprinkler installations
Sprinklers the number of outlets, control The complete sprinkler i including tanks control mechanism, etc.
-
7/30/2019 6th Lane CA Ramz
39/109
Element and design criteria Total cost of element
Rs.
Cost of element
per m2 of gross
floor area
Rs.
Element unit
quantity
Element unit
rate Rs.
AMPLIFIED ANALYSIS
Specifi
mechanism should be given.
Note:
Tm2 * = m2 Electrical work shall be included with Electric power su
Gross floor area m2
5.K.2 Fire-fighting installations
=
Hosereels, hand extinguishers, asbestos blankets, water and sand buckets,
foam inlets, dry risers (and wet risers where only serving fire fighting
* Where Tm2 is the total net area in square equipment). metres of the various compartments treated or
served. 5.K.3 Lightning protection
The complete lightning protection installation foam finials conductor tapes, to and including earthing.
Note:
The cost of lightning protection to boiler and vent stacks shall be stated separately.
Cost per m2
Protective installations Total of gross
floor area
5.K.1 Sprinkler installations
5.K.2 Fire-fighting installations
5.K.3 Lightning protection
-
7/30/2019 6th Lane CA Ramz
40/109
Element and design criteria Total cost of element
Rs.
Cost of element
per m2 of gross
floor area
Rs.
Element unit
quantity
Element unit
rate Rs.
AMPLIFIED ANALYSIS
Specificati
Preliminaries ..% of remainder of contract sum.
5.L COMMUNICATION
INSTALLATIONS
- - The following installations shall be in
-
7/30/2019 6th Lane CA Ramz
41/109
Element and design criteria Total cost of element
Rs.
Cost of element
per m2 of gross
floor area
Rs.
Element unit
quantity
Element unit
rate Rs.
AMPLIFIED ANALYSIS
Specific
Preliminaries ..% of remainder of Communica
Total
Warning installations
Burglar and security
Fire alarms
Visual and audio
Door signals Timed
Pneumatic message
5.M SPECIAL INSTALLATIONS
which have not been included elsew
Chemical gases; Medical gases; VaWindow cleaning equipment and c
Compressed air; Treated water; Re
Notes:
1. The cost of each installati
separately if possible along w
of the specification.
2. The cost of the work in co
electrical supply shall be inc
Electric power supplies (5
All other mechanical and/or electri
(separately identifiable)
-
7/30/2019 6th Lane CA Ramz
42/109
Element and design criteria Total cost of element
Rs.
Cost of element
per m2 of gross
floor area
Rs.
Element unit
quantity
Element unit
rate Rs.
AMPLIFIED ANALYSIS
Specific
Preliminaries ..% of remainder of
Cost of
Total cost of element element per m2 Element unit Element unit
Element and design criteria of gross floor
Specification
Notes:
1. The cost of each installati
possible, be shown separatel
indication of the specificatio
2. Items deemed to be includ
Refrigerated stores compri
required to provide refrigera
cooling towers, compressors
and controls, cold room therm
and vapour sealing, cold roo
cold rooms, refrigerated stor
other than that required for
-
7/30/2019 6th Lane CA Ramz
43/109
Element and design criteria Total cost of element
Rs.
Cost of element
per m2 of gross
floor area
Rs.
Element unit
quantity
Element unit
rate Rs.
AMPLIFIED ANALYSIS
Specific
5.N BUILDERS WORK IN
CONNECTION WITH SERVICES
1. The cost of builders work in
each of the services elements shall
be shown separately.
2. Where tank rooms, housings
included in the gross floor area,
parts shall be analysed in de
appropriate elements. Where this is
cost of such items shall be included
- - Builders work in connection with m
electrical services.
Notes:
-
7/30/2019 6th Lane CA Ramz
44/109
Element and design criteria Total cost of element
Rs.
Cost of element
per m2 of gross
floor area
Rs.
Element unit
quantity
Element unit
rate Rs.
AMPLIFIED ANALYSIS
Specificat
Preliminaries ..% of remainder of
Services
5.A Sanitary appliances
5.B Services equipment
5.C Disposal
-
7/30/2019 6th Lane CA Ramz
45/109
Element and design criteria Total cost of element
Rs.
Cost of element
per m2 of gross
floor area
Rs.
Element unit
quantity
Element unit
rate Rs.
AMPLIFIED ANALYSIS
Specifica
5.D Water installations
5.E Heat source
5.F Space heating and
5.G Ventilating system
5.H Electrical
5.I Gas installations
5.J Lift and conveyor
5.K Protective
5.L Communication
5.L Special installations
5.O BUILDERS PROFIT AND
ATTENDANCE ON SERVICES
Note:
Builders profit and attendance in co
mechanical and electrical
services.
-
7/30/2019 6th Lane CA Ramz
46/109
Element and design criteria Total cost of element
Rs.
Cost of element
per m2 of gross
floor area
Rs.
Element unit
quantity
Element unit
rate Rs.
AMPLIFIED ANALYSIS
Specificati
The cost of profit and attendance in coeach of the services elements shall, w
be shown separately.
-
7/30/2019 6th Lane CA Ramz
47/109
Element and design criteria Total cost of element
Rs.
Cost of element
per m2 of gross
floor area
Rs.
Element unit
quantity
Element unit
rate Rs.
AMPLIFIED ANALYSIS
Specifica
Preliminaries ..% of remainder of
Services
5.A Sanitary appliances
5.B Services equipment
5.C Disposal
5.D Water installations
5.E Heat source
5.F Space heating and
5.G Ventilating system
-
7/30/2019 6th Lane CA Ramz
48/109
Element and design criteria Total cost of element
Rs.
Cost of element
per m2 of gross
floor area
Rs.
Element unit
quantity
Element unit
rate Rs.
AMPLIFIED ANALYSIS
Specific
5.H Electrical
5.I Gas installations
5.J Lift and conveyor
5.K Protective
5.L Communication
5.L Special installations
Sub-total excluding External works,
Total cost Cost of Element Element
Element and design criteria of element Specification sub-element unit quantity unit rate
6.A SITE WORKS 6.A.1 Site
Clearance and ) m2
Cost per m2 gross floor area Preparatory earth )
6.A.2 Surface
The cost of theVehicle parks
Paths and paved
Games courts )
)
-
7/30/2019 6th Lane CA Ramz
49/109
Element and design criteria Total cost of element
Rs.
Cost of element
per m2 of gross
floor area
Rs.
Element unit
quantity
Element unit
rate Rs.
AMPLIFIED ANALYSIS
Specific
6.A.3 Site )
)
Gates and ) m2
Fencing, walling )
)
6.A.4 Fittings )
)
Notice boards,
) m
)
number
Preliminaries ..% of remainder of
6.B DRAINAGE Surface water
Foul drainage
Cost per m2 gross floor area Sewage
Note:
To include all
- -
-
7/30/2019 6th Lane CA Ramz
50/109
Element and design criteria Total cost of element
Rs.
Cost of element
per m2 of gross
floor area
Rs.
Element unit
quantity
Element unit
rate Rs.
AMPLIFIED ANALYSIS
Specific
Preliminaries ..% of remainder of
6.C EXTERNAL SERVICES 6.C.1 Water
Main from - -
Cost per m2 gross floor area
6.C.2 Fire
Main from - -
6.C.3 Heating
Main from - -
6.C.4 Gas mains
Main from - -
6.C.5 Electric
Main from - -
6.C.6 Site
Distribution, - -
6.C.7 Other
Mains relating to - -
6.C.8 Builders
Builders work
6.C.1 - -
6.C.2
-
7/30/2019 6th Lane CA Ramz
51/109
Element and design criteria Total cost of element
Rs.
Cost of element
per m2 of gross
floor area
Rs.
Element unit
quantity
Element unit
rate Rs.
AMPLIFIED ANALYSIS
Specificat
6.C.3
6.C.4
6.C.5
6.C.6
6.C.7
Note:
The cost of the
(6.C.1) to
6.C
6.C.1
6.C.2
6.C.3 - -
6.C.4
6.C.5
6.C.6
6.C.7
Note:
The cost of
(6.C.1) to
Preliminaries ..% of remainder of
-
7/30/2019 6th Lane CA Ramz
52/109
-
7/30/2019 6th Lane CA Ramz
53/109
-
7/30/2019 6th Lane CA Ramz
54/109
-
7/30/2019 6th Lane CA Ramz
55/109
-
7/30/2019 6th Lane CA Ramz
56/109
-
7/30/2019 6th Lane CA Ramz
57/109
-
7/30/2019 6th Lane CA Ramz
58/109
-
7/30/2019 6th Lane CA Ramz
59/109
-
7/30/2019 6th Lane CA Ramz
60/109
-
7/30/2019 6th Lane CA Ramz
61/109
-
7/30/2019 6th Lane CA Ramz
62/109
-
7/30/2019 6th Lane CA Ramz
63/109
-
7/30/2019 6th Lane CA Ramz
64/109
-
7/30/2019 6th Lane CA Ramz
65/109
-
7/30/2019 6th Lane CA Ramz
66/109
-
7/30/2019 6th Lane CA Ramz
67/109
-
7/30/2019 6th Lane CA Ramz
68/109
-
7/30/2019 6th Lane CA Ramz
69/109
-
7/30/2019 6th Lane CA Ramz
70/109
-
7/30/2019 6th Lane CA Ramz
71/109
-
7/30/2019 6th Lane CA Ramz
72/109
-
7/30/2019 6th Lane CA Ramz
73/109
-
7/30/2019 6th Lane CA Ramz
74/109
-
7/30/2019 6th Lane CA Ramz
75/109
-
7/30/2019 6th Lane CA Ramz
76/109
-
7/30/2019 6th Lane CA Ramz
77/109
-
7/30/2019 6th Lane CA Ramz
78/109
-
7/30/2019 6th Lane CA Ramz
79/109
-
7/30/2019 6th Lane CA Ramz
80/109
-
7/30/2019 6th Lane CA Ramz
81/109
-
7/30/2019 6th Lane CA Ramz
82/109
-
7/30/2019 6th Lane CA Ramz
83/109
-
7/30/2019 6th Lane CA Ramz
84/109
-
7/30/2019 6th Lane CA Ramz
85/109
-
7/30/2019 6th Lane CA Ramz
86/109
-
7/30/2019 6th Lane CA Ramz
87/109
-
7/30/2019 6th Lane CA Ramz
88/109
-
7/30/2019 6th Lane CA Ramz
89/109
-
7/30/2019 6th Lane CA Ramz
90/109
-
7/30/2019 6th Lane CA Ramz
91/109
-
7/30/2019 6th Lane CA Ramz
92/109
-
7/30/2019 6th Lane CA Ramz
93/109
-
7/30/2019 6th Lane CA Ramz
94/109
-
7/30/2019 6th Lane CA Ramz
95/109
-
7/30/2019 6th Lane CA Ramz
96/109
-
7/30/2019 6th Lane CA Ramz
97/109
-
7/30/2019 6th Lane CA Ramz
98/109
Areas
Gross Floor Area
Usable Living Area 33.630852 m
Guest bed room 18.000 m
Circulation Service walk way 41.766 m
Pedestrian walk way+Lift loby+ main Stair 55.819 m
Stair Internal 6.120 m
Lift well 7.386 m
Zone two Stair 4.527 m
Mechanical Car park 59.786 mManual Car Park 34.506 m
Stair at Living area 1.672 m
Stair from verandha to living 8.933 m
Verandha 31.034 m
Ancillary Toilet outside 2.279 m
Toilet inside 5.878 m
Pantry 19.015 m
Dining 44.517 m
Duct out side 0.930 m
Duct in side 0.225 m
Duct in service walk way 1.232 m
Duct in service walk way 0.891 m
disable toilet 3.702 m
Internal Division 3.430 m2.143 m
1.990 m
2.126 m
0.623 m
1.897 m
2.329 m
1.136 m
Ground
-
7/30/2019 6th Lane CA Ramz
99/109
5.621 m
3.966 m
1.573 m
0.709 m
-
7/30/2019 6th Lane CA Ramz
100/109
2nd 3rd
master Bed Room 50.951 m
Bed room 23.517978 m
Stair Zone 2 8.958 m
Stair inside 5.686 m
corridor around void 20.996 m
Lift well 7.385624 m
Lift Lobby 7.656944 m
Mechanical Car park 48.260018 mFire Stair 16.799538 m
Living 29.208774
Dressing Area 8.320701
Toilet 15.481967
Duct 1.231875
Duct 1.231874
tranformer room 24.446913
Toilet 7.031818
Maids Room 8.342732
Maids Room - Toilet 2.936663
Duct 0.225
Duct 0.30375
Duct 0.929997
Verandha 11.509781
Verandha 3.475273
2.3862.271
1.241
2.319
1.828889
0.883124
0.37125
0.706172
1st
-
7/30/2019 6th Lane CA Ramz
101/109
5.104985
2.40975
2.497498
4.056753
0.094993
3.909954
0.659987
0.681706
0.191249
0.083354
0.443438
-
7/30/2019 6th Lane CA Ramz
102/109
5th
351.478595
Office Area 226.217483
Fire Stair and Cooridor 17.014
Main Stair way mid to 4 7.380 Main Stair way 7.380
Main Stair way 4 to mid 12.417
Lift Shaft above 3.486
Lift Shaft below 3.486
Lift Lobby 12.936
Lady's Toilet 8.278
Men's Toilet 9.822
Duct behind above lift 1.232
Duct behind below lift 1.232
fire cabinet 0.427006
Toilet entrance 1.043205
Duct - 9-B 0.225001
Duct - 13-B 0.202499
Duct - 13-G 1.075312
Duct - 7-G 1.035287
Balcony - 13 0ff 5.654276
Balcony - H 5.776791
Balcony and Flower Trough - 13 5.287603
Flower trough - 6 5.007268
col. 0.179999col. 0.2925
lift lobby glass wall 0.1606
toilet walls 3.814942
Lift and duct below 1.965418
Lift and duct Above 2.698785
Fire Cabinet 0.105061
Stair and Office - 7 1.660823
4th
-
7/30/2019 6th Lane CA Ramz
103/109
office and flower trough - 7 2.540392
office and Balcony - G 1.565694
office and Balcony - 13 2.436389
office and Balcony - 13 off 1.87571
office and Fire Stair - C 3.05191
-
7/30/2019 6th Lane CA Ramz
104/109
6th 7th 8th
-
7/30/2019 6th Lane CA Ramz
105/109
Preliminaries 489,000.00
Roof 1,883,500.00
100,000.00
1,983,500.00
Sub structure
excavation 805,290.00
concrete 1,618,375.00
masonry 791,500.00
3,215,165.00
Swim pool
concrete 454,400.00
masonry 21,250.00
waterproof 75,900.00
finish 134,245.00
P/S 350,000.00
1,035,795.00
Frame concrete 228000
reinforce 613200
formwork 263500
1,104,700.00
Upper floor Slab 1,252,000.00
miscellaneous 508,253.00
1,760,253.00
Staircase concrete 141,000.00
reinforce 264,600.00
-
7/30/2019 6th Lane CA Ramz
106/109
formwork 59,500.00
7,700.00
finishes 233,900.00
metal 132,000.00
838,700.00
External walls masonry 1,093,000.00 qty
finish 352,550.00
painting 26,345.00
55,000.00
1,526,895.00
Internal walls masonry 362,075.00
Finishes
wall 1,502,350.00
floor 1,271,910.00
ceiling 262,350.00
3,036,610.00
Fittings and furnishing carpentry 3,206,457.54
metal 618,350.87
3,824,808.41
Services Plumbing 656,207.00
Electrical 663,500.00
P/S 2,152,500.00
3,472,207.00
External works drain & storm 254,000.00
dayworks 240,468.75
P/S 1,425,000.00
-
7/30/2019 6th Lane CA Ramz
107/109
plant trough 488,650.00
swim pool 1,035,795.00
3,443,913.75
Areas
Gross floor area Ground Usable 230 m
Circulation 18 m
Ancillary 15 m
Internal 16 m
279 m
First Usable 126 m
Circulation
Ancillary 12 m
Internal
139 m
Roof 166 m
External wall area 511.0 m
-
7/30/2019 6th Lane CA Ramz
108/109
-
7/30/2019 6th Lane CA Ramz
109/109
5500 ft
511.0 m