420 outrage - album sample

26
Molding Caption will go here.

Upload: dino-publishing

Post on 29-Jul-2016

225 views

Category:

Documents


1 download

DESCRIPTION

 

TRANSCRIPT

Page 1: 420 Outrage - Album Sample

Molding

Caption will go here.

420 OUTRAGE PHOTO ALBUM

Page 2: 420 Outrage - Album Sample
Page 3: 420 Outrage - Album Sample

on the purchase of your new Boston Whaler 420 Outrage!

And welcome to the next chapter in your boating story, filled with the many incredible experiences a 420 Outrage makes possible.

This album will provide a window into the early, middle and final stages of your boat’s development, documenting its progress through the manufacturing and testing processes. We’ll be sharing regular updates with new photos in place each time, so be sure to flip through to see the very latest.

We’re so glad to have you as part of the Boston Whaler family. Wishing you all the best in your adventures ahead!

Sincerely,

The Boston Whaler team

Congratulations

Page 4: 420 Outrage - Album Sample

Chapter 1M O L D I N G

Page 5: 420 Outrage - Album Sample

Molding

It all starts with a strong foundation...

Page 6: 420 Outrage - Album Sample

Witness the birth of your 420’s hull.

Molding

Page 7: 420 Outrage - Album Sample

Molding

The hull is inverted to allow for lamination.

Page 8: 420 Outrage - Album Sample

A period of “rest” inside the mold allows laminate to set.

Molding

Page 9: 420 Outrage - Album Sample

Molding

Et voila! The mold has been separated from the hull.

Page 10: 420 Outrage - Album Sample

Rough edges have yet to be smoothed, but your hull already glows.

Molding

Page 11: 420 Outrage - Album Sample

Molding

Now entering the trim and grind process...

Page 12: 420 Outrage - Album Sample

Chapter 2T R I M & G R I N D

Page 13: 420 Outrage - Album Sample

Trim & Grind

Technicians remove any excess lamination.

Page 14: 420 Outrage - Album Sample

Every inch gets a thorough polish.

Trim & Grind

Page 15: 420 Outrage - Album Sample

Chapter 3PA R T S I N T E G R AT I O N

Page 16: 420 Outrage - Album Sample

Preparing your 420 to accept the many parts and options you’ve selected.

Parts Integration

Page 17: 420 Outrage - Album Sample

Parts Integration

Holes are added with pinpoint precision to accommodate wiring.

Page 18: 420 Outrage - Album Sample

Your hardtop also gets a thorough buffing and is prepared to receive accessories.

Parts Integration

Page 19: 420 Outrage - Album Sample

Chapter 4S TAT I O N 1 A S S E M B LY

Page 20: 420 Outrage - Album Sample

Heading into Assembly, the base of the cockpit has come together nicely.

Station 1 Assembly

Page 21: 420 Outrage - Album Sample

Station 1 Assembly

In Station 1, components including the bilge, battery stations, fuel tanks, lighting and generators are added.

Page 22: 420 Outrage - Album Sample

Chapter 5S TAT I O N 2 A S S E M B LY

Page 23: 420 Outrage - Album Sample

Station 2 Assembly

Make way for the dive door!

Page 24: 420 Outrage - Album Sample

The European Summer Kitchen installation in progress.

Station 2 Assembly

Page 25: 420 Outrage - Album Sample

Station 2 Assembly

By Stage 2 Assembly, your 420 is ready for its helm console and electrical panels.

Page 26: 420 Outrage - Album Sample

Work continues on the cabin...

Station 2 Assembly