E2482 v4
TEIAS
TURKEY ELECTRICITY TRANSMISSION
CORPORATION
GENERAL DIRECTORATE
380 kV YENIBOSNA GIS SUBSTATION
ENVIRONMENTAL MANAGEMENT PLAN
(ISTANBUL)
FILE COpy
ANKARA-JULY 2009
(Revised)
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
-
TEIAS 380 kV YEMBOSNA GIS SUBSTATION ENVIRONMENTAl_ MANAGEMENTM PLAN I}/'/'
' I / ,
SECTION -1
GENERAL POLICIES
-
TEIAS 380 kV YENIBOSNA GIS SUBSTATION ENVIRONMENTAL MANAGEMENTM PI..AN
ENVIRONMENT AL LIABILITIES
According to the Environmental Law with No: 2872 and related regulations, the contractor is required to obey the commitments, defined by the Project Owner, in the Final EIA Report/Final Project Description File of Electric Transmission Plant (overhead line, underground cables, substations etc.) whose "EIA Positive Verdict/EIA Not Necessary Verdict" is obtained from the Ministry of Environment and Forestry or Related Governorate.
Commintments, which should be obeyed by the Contractor in accordance with the Environmental Legislation, are described in the "Mitigation and Monitoring Plans". Environmental Management Plan (EMP) Application Report covering the processes within the scope of EMP is required to be prepared by a firm having received licence from the Ministry of Environment and Forestry as to the "Necessity Certificate Communique" published in the offical gazzette with No:26961 and on the date of 8 August 2008.
Following the signing of the contract and hand-over of the site, until the operational acceptance, the contractor is supposed to submit the EMP Application Reports, which are prepared in a quarterly basis, to the Project Owner to be transmitted to the Ministry of Environment and Forestry/Related Governorate/the World Bank.
The contractor shall be required to present the Application Report to the Project Owner within maximum 7 (seven) days as from the end of the reporting period. If EMP Application Reports is not submitted to the Project Owner in due time, 10000 - TL (Ten Thousand Turkish Liras) is fined from the progress payment of the Contractor.
If it is determined by the Project Owner, Ministry of Environment and Forestry/Governorate or third parties that the commintments within the scope of the Environmental Legislation are not obeyed by the Contractor, all the responsibilities are on the Contractor.
-
TEIAS 380 kV YENIBOSNA GIS SlJBSTATION ENVIRONMENTAL MANAGEMENTM PLAN
SECTION - 2
MITIGATION PLAN
-
TEIAS 380 kV YENIBOSNA GIS SUBSTATION ENVIRONMENTAL MANAGEMENTM PLAN
1. MITIGATION PLAN
In this section, feasible and cost-effective mitigations to be taken for the prevention of, reducing to acceptable levels or compensation of the probable adverse impacts of 380 kV Yenibosna GIS Substation Project, which were determined in the Project Description File (PDF), are presented. For ease-of-use, mitigation measures taken in each phase of the project are prefered in a tabular form (Table 2.1). Mitigation plan have been prepared as to cover the following subjects.
-
TEIAS 380 kV YENlBOSNA GIS SUBSTATION ENVIRONMENTAL MANAGEMENT PLAN
-
Ise Subject
Cultural and Historical Assets
•
•
•
Mitigation Measures"""
In case of coinciding any cultural asset, the construction studies will be stopped immediately and the Cultural and Natural Assets Protection Committee will be informed. Until the response is taken, any action will not be done at the site. After taking the positive response (no cultural assets) the construction studies will continue.
Cost
No additional cost
Responsible Institution""
-- ~
Contractor
Start Date Finish Date
Start of Construction Works
Completion of construction works
~.--
:UCTION
Dust - Particulate Matter
.~-
•
• •
•
• •
•
The regulated limit value of Dust/Particulate matter emision being 3 mg/Nm3 (Industrial Air Pollution Control Regulation) is not to be exceeded. Watering will be done in the dry seasons Loading and unloading will be carried out with care and without scettering. In order not to lead to scattering, loading/unloading works will be performed in an area allocated for loading/unloding and water sprays will be used in this area. While loading/unloading, a limit drop height will be applied for the dusty materials. Additionally, the workers are warned being careful. In addition, wind direction and strength will be taken into account while loading and unloading. The trucks will be covered and speed limitation will be applied. Speed limit on trucks is 30 km/hr (at project site) and 50 km/hr (outer of the project site - within the city) Vehicles with emission stickers will be used In the case of storing vegetable soil at the site, it will be ensured to be covered with canvas or with the matter having particle size greater than 10 mm Tires of the trucks will be cleaned where necessary to prevent dirt being carried onto the roads
-- .... ~-.- ....-- ....- .....- .... ~-.- .. ~-.- ...-- ...--------. ....- .... ~-
Not High Contractor
Start of the excavation work
Completion of the excavation works
- ....-
5
-
--
-- - -
--
TEIAS 380 kV YENIBOSNA GIS SUBSTATION ENVIRONMENTAL MANAGEMENT PLAN
Finish Date Start Date ResponsibleSubject Mitigation Measures""" Cost se Institution""
• The continuous work-site noise (day times) will be ensured
to be under 70 dBA (according to the Turkish Evaluation of
Environmental Noise Regulation.
• During the construction, noise measurement will be done
and according to the measurement, in the case of
exceeding the noise level of 70 dBA, barriers preventing or
reducing noise level (sound absorbing barriers) will be
placed by the contractor.
• All construction works will be done between 7am and 7pm. If.
it is required to work after 7 pm, local authorities and public
will be informed about these working hours. No additional
Contractor Start of Construction:UCnON cost Completion of construction works Noise • People, living at the population centers around, will be Works informed about the working durations
• The noise levels of the construction machines change with
the power of the machines. Generally, the average noise
level generated by the machines at the origin is around 80100 dB if they are worked altogether at the same time. The
machines having less noise level will be preferred as much
as possible. Maximum allowable noise level for the
machines will be 120 dBA. If the noise limit is not satisfied,
contractor will not work all the machines at the same time.
When it is not possible or practical to reduce the number of
the working machine, sound absorbing barriers will be used.
Contractor Start of ConstructionlUCTION Wastewater Not High Completion of construction works • Wastewaters due to work-site will be given to the sewerage Workssystem of present istanbul Province Sewerage System
6
-
TEIAS 380 kV YENIBOSNA GIS SUBSTATION ENVIRONMENTAL MANAGEMENT PLAN
lse Subject
I I Excavation, solid and
hazardous wastes due
I to construction
-
•
•
•
•
•
Mitigation Measures·_·
Excavation wastes will not be dumped illegally other than Istanbul Greater Municipality Taya Kadln Excavation Wastes Disposal Area (40 km away from the city center) Solid wastes and packaging wastes (plastic, paper, glass etc.) will be systematically and separately collected and it will be ensured to be taken by Bahcelievier Municipality or a licensed recycle firm. Organic domestic wastes will be collected separately than the other types of wastes and it will be ensured to be taken by Bahcelievier Municipality and disposed to the Odayeri/GokWrk Solid Waste Landfill of Istanbul No wastes, which could not be broken down biologically, will be left at the construction area. Hazardous wastes such as oil, dye etc. will be collected separately in leak proof, metal and labeled containers and it will be ensured to be taken by a licensed firm ensured by the Contractor
Cost
Not high (changing by depending on municipalities
and/or licensed recovery
plant)
Responsible Institution·
Contractor
Start Date
Start of Construction Works
Finish Date
Completion of construction works
--
I
Wastes due to vehicle parking
---
•
•
•
-
Waste oil due to construction machines and vechicles will be collected in rustles barrels and will be sent to a licenced firm by the contractor. The barrels will be placed onto an impermeable ground to protect rain and sun and all necessary precautions against fire will betaken Batteries, tires and similar items due to construction machines and vehicles will be sent to a licenced firm and will be ensured to be disposed
Not High I
Contractor Start of Construction
Works Completion of construction works
'uctlon
Substation Oil
Grounding, Health and Safety, Training
•
-
•
• •
Substation oil exists in a container and will never be stored at the construction site temporarily. In the case of necessity of storing the oil at the site, it will be placed upon impermeable ground, covered to be prevented from rain and sun and the around of the stored area will be surrounded by placing warning sign. All precautions againts fire will be also taken
All necessary protective equipments(hard hat, safety belt, gloves, protective clothes etc.} will be provided to the workers Proper notification signs will be placed The personal will be trained in first aid and "work health and safety"
Not High
No Additional Cost (as a
part of proj ect budget)
Contractor
Contractor
of the storing substation oil
--
Start of Construction Works
Untill the transportation of substation oil
--
Completion of construction works
7
-
TEIAS 380 kV YENIBOSNA GIS SUBSTATION ENVIRONMENTAL MANAGEMENT PLAN
Finish Date Start Date ResponsibleSubject Mitigation Measures··· Cost Institution··
• Within the framework of the program prepared by TEIAS Environmental Department, the noise will be measured at certain points around the substation. The measurements are
ional tance
Noise I • done around the substation (at fences surrounding the substation area, near ihlas Collage, recruiting office) If the measurement results exceed the limit values mentioned in the the Environmental Noise Evaluation and Control Regulation (Ldaytime:60 dBA, Lnighj:50 dBA), the sound absorbing barriers will be used and the levels are kept under the limit values.
• Within the framework of the program prepared by TEIAS Environmental Department, the EMA strenght will be measured at certain points around the substation (fences surrounding the substation area). If the measurement results exceed the limit values mentioned in ICNIRP (5 kV/m for electric field/for public, 1000 mG for magnetic field), substation building, equipments (operation and protection), wall and fence will be grounded. In any case of sign of a failure (such as failure in the operation of an equipment, increasing the contact
No Additional Cost (as a Start of Operational Completion of Operational Acceptance Contractor
part of project Acceptance I budget
Electro-Magnetic Field (EMF)
.
current, electrical arc, local warming etc.)the grounding
resistance will be measured and according to the I measurement results the grounding og the ones having the
problem will be strengthened by local rehabilitation
(rehabilitation of loose, broken, corresioned grounding
connection points), maintaining the continuity of the No Additional
connections. Cost (as a Start of Operational Completion of Operational Acceptance Contractor
part of project Acceptance• All the equipments of the substation (transformer, disconnector, circuit breaker, surge-arrester, current budget
transformer, voltage transformer etc.) will be taken according
ot the IEC and the controls and maintainance will be done in
accordance with IEC.
• Electrical and magnetic fields are measured by Electric-Magnetic Field (EMF) Meter. Measurement Units for Electric field (E) Vim while for Magnetic field (H) Aim (EMF can be . explained as Magnetic Field Intensity (B)/Unit: Gauss or Tesla. The measurements done by EMF Meter are done at 1 m above the earth ground. Measurement of electro-magnetic field is possible at any point in global volume by EMF meter.
• The meter is portable. The meter is protectable against other electro-magnetic Signa~__ _ J
8
-
TEIAS 380 kV YENIBOSNA GIS SUBSTATION ENVIRONMENTAL MANAGEMENT PLAN
Ise Subject Mitigation Measures ....* Cost
Responsible Institution**
Start Date Finish Date
--
Landscape
• •
The work-site will be reassembled. No hazardous, solid, liquid wastes will be left at the site,
No Additional Cost (as a
part of project budget)
Contractor Start of Operational
Acceptance Completion of Operational Acceptance
ation Health and Safety
•
•
The personal will be selected from the people having trained in first aid, electric safety, working at high levels for the maintanace fo the substation. The warning signs and climbing barriers will be placed around the substation
No Additional Cost (as a
part of project budget)
TEIAS Taking the substation into operation
After the completion of the economic life of the substation
'ation Fire Risk
\--
Electromagnetic field (EMA)
,------
Substation oil
, •
•
•
•
• •
The substation will be establihed as to the fire safety elements in the "Electric Intensive Current Plant Regulation" For the operation of the substation there is a standard yearly maintenance/operation and test program, The program will be followed during the operation of the substation, If there is a sign of failure unexpectedly (arc, local warming, decrease in the level of isolation, instability of current/voltage etc,) the enegy will be ceased and the trained operational personel working at the substation will provide technical support to solve the problem,
It will be under the limit values determined in ICNIRP, For this purpose, substation building, equipments (operation and protection), wall and fence will be grounded, In any case of sign of a failure (such as failure in the operation of an equipment, increasing the contact current, electrical arc, local warming etc,)the grounding resistance will be measured and according to the measurement results the grounding og the ones having the problem will be strengthened by local rehabilitation (rehabilitation of loose, broken, corresioned grounding connection points), maintaining the continuity of the connections. All the equipments of the substation (transformer, disconnector, circuit breaker, surge-arrester, current transformer, voltage transformer etc.) will be taken according ot the IEC and the controls and maintainance will be done in accordance with IEC,
Substation oil will be analyzed physically and chemically. When the oil completes its economic life, it will be replaced with new one and disposal of it will be ensured by conducting required test (to determine the category of the oil) and applying proper disposal method as to the category test results,
No Additional Cost (as a
part of project budget)
Not High
No additional cost
TEIAS
TEIAS
TEIAS
Taking the substation into operation
-
Taking the substation into operation
-
Taking the substation into operation
After the completion of the economic life of the substation
-
After the completion of the economic life of the substation
After the completion of the economic life of the substation
I
9
-
TEIAS 380 kV YENIBOSNA GIS SUBSTATION ENVIRONMENTAL MANAGEMENT PLAN
--
lse Subject Mitigation Measures*** Cost Responsible Institution""
-
Start Date Finish Date
I
Solid-liquid and Hazardous Wastes
•
•
•
Solid wastes, junk materials and construction wastes will be collected seperately and they will be ensured to be taken by the municipality or a licenced firm No wastes which can not be broken down biologically will be left at the site. Wastes which can not be broken down biologically will be collected in a container and taken by the Bah
-
TEIAS 380 kV YENIBOSNA GIS SUBSTATION ENVIRONMENTAL MANAGEMENT PLAN
• Decommisioning Phase, has been evaluated in the face of the completion of facility's economic life and the demolishing the substation come to order. After the completion of economic life of the substation, in case of taking decision on the continuation of the facility, studies will be conducted for the new substation in accordance with the subjects determined with the scope of EIA Regulation •• Valid in the case of handing over of the proposed works to subcontractors. Otherwise, responsibilities defined for contractor will belong to TEIAS ••• While taking the proposed measures, compliance with all related regulations (Air Quality Evaluation and Control Regulation, Water Pollution Control Regulation, Environmental Noise Evaluation and Control Regulation, Solid Waste Control Regulation, Soil Pollution Control Excavation, Construction and Demolishion Wastes Control Regulation, Hazardous Waste Control Regulation, Package and Packaging Waste Control Regulation, Grounding in Power Installations Regulation, Work Health and Safety Regulation, Health and Safety Conditions on Usage of Work Equipments Regulation) will be complied
11
-
TEIAS 380 kV YENIBOSNA GIS SUBSTATION ENVIRONMENTAL MANAGEMENT PLAN
SECTION - 3
MONITORING PLAN
-
TEIAS 380 kV YENIBOSNA GIS SUBSTATION ENVIRONMENTAL MANAGEMENT PLAN
3. MONITORING PLAN
Environmental monitoring provides information about key environmental issues, especially about the efficiency ofmeasures taken and environmental impacts of the project, at the implementation phase of the project. This information enables project owner and audit mechanism to evaluate the effectiveness ofthe mitigation and to allow correct actions to be taken in the case of necessity. Therefore, EMP describes the aims and the types of monitoring by relating the impact assessments defined in PDF and the mitigation measures defined in EMP.
-
---
---
TEIAS 380 kV YENIBOSNA GIS SUBSTATION ENVIRONMENTAL MANAGEMENT PLAN
Phase Subject
Cultural and Historical Assets '
What are the parameters,
which would be monitored?
Cultural assets at the site
Dust Formation due to the
Movement and Exhaust of the Construction Machinery
Complaints from public
Whe I would
he
parameters be How would the mon tored·Where would parameters be
frequ sncyofthe monltoredityp heparameters be es ofthe
me as Irementmonitored? monitoring s/co Itinuousequipment me as Irement
?
In :ase of coin ciding a Construction
Visual cultu ral assetsite
conti lously by an a leogolist
Visual observations Du ing the
exc9vationConstruction Talking to the weekiIy I in the
site local people c Ise of near the site co nplaint
~ ...
Why would the parameters be
monitored?
Obeying the Cultural
and Natural Assets
Protection Law
Industrial Air
Pollution Control
Regulation
Cost
Not high if no cultural assets are damaged
No additional cost (within the project
budget)
The Institute that controls frequency of the control
Provincial
Culture and
Museum
Directorate
(Controlled in
case of
coinciding a
cultural asset)
TEIAS
Provincial
Directorates of
MoEF
Start Date
Start of the cunstruction
works
Start of construction
works
Finish Date
Completion of
construction works
Completion of
construction works
-
TEIAS 380 kV YENIBOSNA GIS SUBSTATION ENVIRONMENTAL MANAGEMENT PLAN
onstruct ion
Subject
Noise
What a param
whichw monit,
Noise
re the tters, )uld be Ired?
Level
Where would the
parameters be monitored?
Construction site
Ihlas Collage, recruiting Office
around the substation
How would the parameters be monitoredltyp
e50fthe monitoring equipment
Interviews to be conducted in
near residential areas
Noise level measurement with portable
sound pressure measurement
device
When would the
parameters be monitored
frequency of the
measurement s I continuous measurement
?
Weekly observation of noise (tracking)
Near residential areas, in the
case of complaint
Why would the parameters be
monitored?
Environmental Noise Evaluation and
Control Regulation
Cost
Not High
The Institute that controls frequency of the control
TEiAS
Provincial Directorate of Environment and Forestry
Start Date
Start of the cunstruction
works
Finish Date
Completion of
construction
I works
-- --
15
-
---------
TEIAS
What are the parameters,Phase I Subject which would be monitored?
-+
Wastewater due to construction sites
and washing water
Contamination (oil, ~onstruct I Wastewater Iturbidity) in the soil ion
and water around the project site
Odor generated at the project site
Where would the
parameters be monitored?
Sewerage system
(Wastewater generated by
the workers will be given to the sewer system of the city. The connection to
the sewer system and whether any
wastewater is discharged to
soil, water or to any receiving
body except the permitted one
will be observed and
controlled" )
How would the parameters be monitored/typ
es of the monitoring equipment
Visual
When would the
parameters be monitored
frequency of the
measurement s I continuous measurement
?
Weekly
380 kV YENIBOSNA GIS SUBSTATION ENVIRONMENTAL MANAGEMENT PLAN
The Institute Why would the
that controls - I Start Date parameters be Cost frequency of monitored? the control
In accordence with Completion
the Water Pollution No additional TEiAS Start of the ofControl Regulation cost (within the cunstruction
and Soil Pollution project budget) works works
Control Regulation Municipality
LL_'L
16
-
TEIAS
Phase
-
Subject
--
Constru ction
Excavation, Solid 3nd Hazardous
Wastes
Wastes due to lehicle Parking
What are the parameters,
which would be monitored?
The disposal ofthe excavation wastes
Seperation of solid wastes for
recycle/recovery/re use, disposal at the
Municipality's landfill
Collection of hazardous wastes
seperately in conteiners and disposal by a licenced firm
Waste oils, automobile
batteries,used tires and junk materials
Where would the
parameters be monitored?
Construction site and
disposal site
At the vehicle parking area
How would the parameters be mon Itoredltyp
es of the monitoring equipment
Visual
In the case of failure I periodic
maintenance (half yearly)
When would the
parameters be monitored
frequency of Why would the the parameters be
measurement monitored? s I continuous measurement
?
During Compliance with
excavation Conservation of
works Habitat Regulation,
Solid Waste Control
Regulation and Soil
Pollution Control
Regulation
I Achievement of the Weekly disposal of hazardous
wastes, which are collected seperately from the other types
of wastes, by complying Hazardous
Waste Control Regulation
requirementsMonthly
During the Achievement of the failure and disposal of the wastes
regular compliance with maintanence Waste Oil Control
Regulation, Waste Battery and
~m""to" eoot'olRegulation, End-of
tires Control Regulation
380 kV YENIBOSNA GIS SUBSTATION ENVIRONMENT AL MANAGEMENT PLAN
Cost
The Institute that controls Finish Date Start Date frequency of
the control
Not High
(I hanging by
d pending on
TElA:;>IT nicipalities
an lor licensed
recovery plant) Completion
Municipality Start of the of
cunstructionNot High constructionProvincial works(! hanging by works
Directorate ofd pending on
Environmentlicensed
and Forestry re overy plant)
I
Not High
(! hanging by
d pending on
licensed Start of the Completion
re overy plant) cunstruction of
works construction works
Contractor
-~
17
-
--
--
--- ---
--
--
--
--
-----
I TEIAS 380 kV YENIBOSNA GIS SUBSTATION
ENVIRONMENTAL MANAGEMENT PLAN
-
[~
Cons
etlo
perat
al
Acce
'~r=pce FieldJ:om"o."
J I
Subject
Substation Oil
Grounding, Health and
Safety--1 Noise
em
What are the parameters,
which would be monitored?
-
Leakages from the barrels containing
substation oil, used barrels (where they are stored and how
to sent to the related firms) and
the propriety of the impermeable
ground
Documents related to workers health
and safety training, equipments used
by the worker during working for construction (hard
hot. "".'. "f.~belt etc.)
Noise level
-
Electric and magnetic fields
vectors
Where would the
parameters be monitored?
In the case of storing, at the storage area
Construction sites
Open and close switchyard and at the entrance
and exit the lines of the substation
At switchyard and under the entrance and
exit the lines of the substation
How would the parameters be monitoredltyp
es of the monitoring equipment
Visual
Visual
Sound level meter
EMF M.,.,
-
When would the
parameters be monitored·
frequency of the
measurement s I continuous measurement
?
During storage
Daily
Operational
Acceptance
Phase
OperationalI "''''p''''''Phase
-
Why would the parameters be
monitored?
To prevent the
leakage of the
storage area of the
substation oil
In accordance with
Work Health and
Safety Regulation
Control of the limit
values determined in
the related regulation
Control of satisfying
the national and
international
referance values
The Institute that controls Start DateCost frequency of
the control
Start of the Not High TEiAS
storage
--+ No additional I Start of the
cost (within the TEIAS cunstruction roject budget) works~
Fin!sh Date
Com pletion of slmage
Con pletion
of
cons ruction
Vi orks
Start of Corr pletion of Not High TEiAS Op, rationalOperational
Acceptance Ac( eptance
Start of Corr pletion of TEAlsNot High Operational Op' rational
Acceptance Ac( eptance
18
-
--
TEIAS
Phase
peration al
Accepta nce
peration
380 kV YENIBOSNA GIS SUBSTATION ENVIRONMENTAL MANAGEMENT PLAN
How would the What are the Where would parameters be
Subject parameters, which would be
the parameters be
monltoredltyp es of the
monitored? monitored? monitoring equipment
When would the
parameters be Imonitored· The Institute Why would the frequency of that controls - Fil Ish DateStart Date parameters be Costthe frequency of
monitored?measurement the control s I continuous measurement
?
Whether any wastes
(construction, SOlid, hazardous, liquid) are left at the site, The substation
Landscape the excavated
Visual area
areas/soil, roads
Operational Acceptance
Phase
Compliance with Environmental Law
and Regulations
No additional cost (within the project budget)
TEIAS Start of
Operational Acceptance
Cc 0 A
mpletion of erational ceptance
are reassembled is monitored, controlled.
Technical trainning in terms of
maintenance, operation and .
Health and technical IThe substation V· I Safety area Isua
~'''dOlh'' and use ~
Maintanace works - semi
annually / in the case of
necessary
Compliance with related health and safety regulation
No additional cost (within the
operation budget)
TEiAS Taking the
substation into operation
co thE
I
~
.fter the pletion of economic e of the
"la'''" I _ Safety equipment __ _ I I
19
-
TRIAS 380 kV YRNIBOSNA GIS SUBSTA nON ENVIRONMENTAL MANAGEMENT PLAN
Phase Subject
Fire Risk
peration
~-~
Ele :tromagnetic Field
Substation Oil
-~
What are the parameters,
which would be monitored?
-~
SF6 gas pressure
Isolation oil
Cable ends, isolators, cable
connection points.
Electric and magnetic field
vectors
Oil characteristic parameters
(density, acidity, viscosity, corrosive sulfide, flash point,
PCB, color)
How would the Where would parameters be
the monltored/typ parameters be es of the
monitored? monitoring equipment
Visual observation of
pressureI manometers, emergency
~ warning and
Substation
Substation area
Transformers
signs
Daily/weekly/m onthly
electrical, chemical and physical tests
and gas analysis
Visual observation with thermo
vision devices
Magnetic field test
Test Method (physical, chemical analysis)
When would the
parameters be monitored·
frequency of the
measurement s I continuous measurement
?
~-
semi-annually / in the case of
necessary
~-~
In the case of complaints
Bi yearly
Why would the parameters be
monitored?
-
Due to fire risk
To comply Electric Intence Current
Plants Regulation requirements related
to fire safety, to repair the worn, broken parts, to
minimize the risk of accident and to
prevent the outage
Reducing/preventing the risk of affecting people due to EMA
Quality control of the substation oil
The Institute that controls
Cost frequency of the control
-
No additional cost (within the TEiAS
operation budget)
No additional cost (within the TEiAS
operation budget)
Not high (within operation TEIAS budget) l
~-
Start Date Fin sh Date
-~
I~ fter the Taking the pletion of substation into
operation
Taking the substation into
operation
-~
Taking the substation into
operation
the economic iii'e of the su
can the
iiI su
can the
lif su
bstation
After the pletion of economic 'e of the bstation
After the pletion of economic 'e of the bstation
20
-
-- --
--
TEIAS
Phase Subject
Solid-Liquid and
Hazardous
Wastes':>peration (automobile accumulator, substation oil)
$I] Dustt-ml Particulate Matter
When would the
How would the parameters be
What are the parameters,
which would be monitored?
Where would the
parameters be monitored?
parameters be monltoredltyp
es of the monitoring equipment
monitored· frequency of
the measurement s Jcontinuous measurement
Why would the parameters be
monitored?
?
Compliance with Weekly Conservation of
Habitat Regulation, Seperation of solid Solid Waste Control
wastes, junk Visual Regulation and Soil materials for Pollution Control
recyclelrecovery/re Regulation use and disposal at the Municipality's
landfill Achievement of the Monthly disposal of hazardous
wastes, which are Collection of Substat on area I ooll.ot.d "p"'''''Y
hazardous wastes from the other types separately in of wastes, by
conteiners and , complying Hazardous disposal by a Waste Control licensed firm Regulation
requirements
Waste substation Test Method Completion of Compliance with oil the economic Waste Oil Control
life of the Regulation substation oil
-~~-I
Dust During the Dust due to the IMeasurements/' demolishment
movement of the ",,,,'ruotloo momhly of ,"b"allOOJ Comp""'" wllh Ih. construction (demolishing) excavation Air Quality Evaluation
machines and site ! Interviews to be works monthly and Control demolihing works 00",,'''''' ooa, I R'9"a'oo
residential In the case of areas complaint
-_._....... _-_ .......
Start Date I Finish Date
After Takir 9 the completion of
substa opel
on into the economic ation life of the
substation
AftE rthe
Cost
Not high (changing by depending on municipalities
and/or licensed recovery plant)
Not high (changing by
. depending licensed
recovery plant)
Not high (depending on
the firmllaboratory conducting the
analysis)
I N ddt· I
°t '( 'tlhlont~ cos ;Ib I~ :) P'~" "
380 kV YENlBOSNA GIS SUBST A nON
ENVIRONMENTAL MANAGEMENT PLAN
The Institute
that controls frequency of
the control
TEIAS
Municipality
I Provincial Directorate of
,Environment and Forestry ,
TEiAS
tion of Until the compl onomic completion of the ec
Provincial ,f the decommissionilife IDirectorate of
sub~ ati~WorksEnvironment
and Forestry
21
-
TEIAS 380 kV YENIBOSNA GIS SUBSTATION ENVIRONMENTAL MANAGEMENT PLAN
Phase Subject
What are the parameters,
which would be monitored?
Where would the
parameters be monitored?
How would the parameters be mon itored/typ
es ofthe monitoring equipment
When would the
parameters be monitored· frequency of
the measurement s I continuous measurement
?
Whywo parame
monitc
uld the ers be red?
Cost
The Institute that controls frequency of the control
Start Date Finish Date
Noise NOise Level
Residential areas and
"',,",ct;oo(demolishing)
site
Noise level measurement with portable
sound pressure measurement
device
I Interviews to be
conducted in near residential
areas
Construction (demolishing period) site,
Weekly
In the case of complaints of
public
Environmer tal Noise nand gulation
Evaluati( Control Re
Not High
TEIAS
Provincial Directorate of Environment and Forestry
After the completion of the economic
life of the substation
Until the completion of
decommissioni ng works
'8 S
commi ioning
Solid and Hazardous
Wastes
Seperation of solid wastes, junk materials for
recycle/recovery/re use, and disposal ,
at the Municipality's landfill
Collection of hazardous wastes
seperately in conteiners and disposal by a licenced firm
Demolishing area
Visual
Weekly
Monthly
~--~~-
Complial Conserv
Habitat RE Solid Was' Regulatior
Pollution Regul
Achievem disposal of
wastes, ~ collected ~ from the 01
of was 1 complying I
Waste ( Regul
require
ce with lion of gulation, ~e Control and Soil Control tion
nt of the azardous
hich are eperately her types s,by azardous ontrol tion
ments
Not High (changing by depending on municipalities
and/or licensed recovery plant)
Not High (changing by depending on
licensed recovery plant) ,
TEIAS
Municipality
Provincial Directorate of Environment and Forestry
After the completion of the economic
life of the substation
Until the completion of
decommissioni ng works
22