E2482 v4 TEIAS TURKEY ELECTRICITY TRANSMISSION CORPORATION GENERAL DIRECTORATE 380 kV YENIBOSNA GIS SUBSTATION ENVIRONMENTAL MANAGEMENT PLAN (ISTANBUL) FILE COpy ANKARA-JULY 2009 (Revised) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Upload: truongtuong

Post on 05-Aug-2018

243 views

Category:

Documents


0 download

TRANSCRIPT

E2482 v4

TEIAS TURKEY ELECTRICITY TRANSMISSION

CORPORATION GENERAL DIRECTORATE

380 kV YENIBOSNA GIS SUBSTATION

ENVIRONMENTAL MANAGEMENT PLAN (ISTANBUL)

FILE COpy

ANKARA-JULY 2009 (Revised)

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

TEIAS 380 kV YEMBOSNA GIS SUBSTATION ENVIRONMENTAl_ MANAGEMENTM PLAN I}/'/'

' I / , ­

SECTION -1

GENERAL POLICIES

TEIAS 380 kV YENIBOSNA GIS SUBSTATION ENVIRONMENTAL MANAGEMENTM PI..AN

ENVIRONMENT AL LIABILITIES

According to the Environmental Law with No: 2872 and related regulations, the contractor is required to obey the commitments, defined by the Project Owner, in the Final EIA Report/Final Project Description File of Electric Transmission Plant (overhead line, underground cables, substations etc.) whose "EIA Positive Verdict/EIA Not Necessary Verdict" is obtained from the Ministry of Environment and Forestry or Related Governorate.

Commintments, which should be obeyed by the Contractor in accordance with the Environmental Legislation, are described in the "Mitigation and Monitoring Plans". Environmental Management Plan (EMP) Application Report covering the processes within the scope of EMP is required to be prepared by a firm having received licence from the Ministry of Environment and Forestry as to the "Necessity Certificate Communique" published in the offical gazzette with No:26961 and on the date of 8 August 2008.

Following the signing of the contract and hand-over of the site, until the operational acceptance, the contractor is supposed to submit the EMP Application Reports, which are prepared in a quarterly basis, to the Project Owner to be transmitted to the Ministry of Environment and Forestry/Related Governorate/the World Bank.

The contractor shall be required to present the Application Report to the Project Owner within maximum 7 (seven) days as from the end of the reporting period. If EMP Application Reports is not submitted to the Project Owner in due time, 10000 - TL (Ten Thousand Turkish Liras) is fined from the progress payment of the Contractor.

If it is determined by the Project Owner, Ministry of Environment and Forestry/Governorate or third parties that the commintments within the scope of the Environmental Legislation are not obeyed by the Contractor, all the responsibilities are on the Contractor.

TEIAS 380 kV YENIBOSNA GIS SlJBSTATION ENVIRONMENTAL MANAGEMENTM PLAN

SECTION - 2

MITIGATION PLAN

TEIAS 380 kV YENIBOSNA GIS SUBSTATION ENVIRONMENTAL MANAGEMENTM PLAN

1. MITIGATION PLAN

In this section, feasible and cost-effective mitigations to be taken for the prevention of, reducing to acceptable levels or compensation of the probable adverse impacts of 380 kV Yenibosna GIS Substation Project, which were determined in the Project Description File (PDF), are presented. For ease-of-use, mitigation measures taken in each phase of the project are prefered in a tabular form (Table 2.1). Mitigation plan have been prepared as to cover the following subjects.

TEIAS 380 kV YENlBOSNA GIS SUBSTATION ENVIRONMENTAL MANAGEMENT PLAN

-

Ise Subject

Cultural and Historical Assets

Mitigation Measures"""

In case of coinciding any cultural asset, the construction studies will be stopped immediately and the Cultural and Natural Assets Protection Committee will be informed. Until the response is taken, any action will not be done at the site. After taking the positive response (no cultural assets) the construction studies will continue.

Cost

No additional cost

Responsible Institution""

-- ­ ~

Contractor

Start Date Finish Date

Start of Construction Works

Completion of construction works

~.--

:UCTION

Dust - Particulate Matter

.~-

• •

• •

The regulated limit value of Dust/Particulate matter emision being 3 mg/Nm3 (Industrial Air Pollution Control Regulation) is not to be exceeded. Watering will be done in the dry seasons Loading and unloading will be carried out with care and without scettering. In order not to lead to scattering, loading/unloading works will be performed in an area allocated for loading/unloding and water sprays will be used in this area. While loading/unloading, a limit drop height will be applied for the dusty materials. Additionally, the workers are warned being careful. In addition, wind direction and strength will be taken into account while loading and unloading. The trucks will be covered and speed limitation will be applied. Speed limit on trucks is 30 km/hr (at project site) and 50 km/hr (outer of the project site - within the city) Vehicles with emission stickers will be used In the case of storing vegetable soil at the site, it will be ensured to be covered with canvas or with the matter having particle size greater than 10 mm Tires of the trucks will be cleaned where necessary to prevent dirt being carried onto the roads

-- ­ .... ~-.- ....-- ­ ....- ­ .....- ­ .... ~-.- .. ~-.- ...-- ­ ...--------. ­ ....- ­ .... ~-

Not High Contractor

Start of the excavation work

Completion of the excavation works

- ­ ....- ­

5

--

-- - -

--

TEIAS 380 kV YENIBOSNA GIS SUBSTATION ENVIRONMENTAL MANAGEMENT PLAN

Finish Date Start Date ResponsibleSubject Mitigation Measures""" Cost se Institution""

• The continuous work-site noise (day times) will be ensured to be under 70 dBA (according to the Turkish Evaluation of Environmental Noise Regulation.

• During the construction, noise measurement will be done and according to the measurement, in the case of exceeding the noise level of 70 dBA, barriers preventing or reducing noise level (sound absorbing barriers) will be placed by the contractor.

• All construction works will be done between 7am and 7pm. If. it is required to work after 7 pm, local authorities and public will be informed about these working hours. No additional

Contractor Start of Construction:UCnON cost Completion of construction works Noise • People, living at the population centers around, will be Works informed about the working durations

• The noise levels of the construction machines change with the power of the machines. Generally, the average noise level generated by the machines at the origin is around 80­100 dB if they are worked altogether at the same time. The machines having less noise level will be preferred as much as possible. Maximum allowable noise level for the machines will be 120 dBA. If the noise limit is not satisfied, contractor will not work all the machines at the same time. When it is not possible or practical to reduce the number of the working machine, sound absorbing barriers will be used.

Contractor Start of ConstructionlUCTION Wastewater Not High Completion of construction works • Wastewaters due to work-site will be given to the sewerage Workssystem of present istanbul Province Sewerage System

6

TEIAS 380 kV YENIBOSNA GIS SUBSTATION ENVIRONMENTAL MANAGEMENT PLAN

lse Subject

I I Excavation, solid and

hazardous wastes due

I to construction

- ­

Mitigation Measures·_·

Excavation wastes will not be dumped illegally other than Istanbul Greater Municipality Taya Kadln Excavation Wastes Disposal Area (40 km away from the city center) Solid wastes and packaging wastes (plastic, paper, glass etc.) will be systematically and separately collected and it will be ensured to be taken by Bahcelievier Municipality or a licensed recycle firm. Organic domestic wastes will be collected separately than the other types of wastes and it will be ensured to be taken by Bahcelievier Municipality and disposed to the Odayeri/GokWrk Solid Waste Landfill of Istanbul No wastes, which could not be broken down biologically, will be left at the construction area. Hazardous wastes such as oil, dye etc. will be collected separately in leak proof, metal and labeled containers and it will be ensured to be taken by a licensed firm ensured by the Contractor

Cost

Not high (changing by depending on municipalities

and/or licensed recovery

plant)

Responsible Institution·­

Contractor

Start Date

Start of Construction Works

Finish Date

Completion of construction works

-- ­

I

Wastes due to vehicle parking

--- ­

Waste oil due to construction machines and vechicles will be collected in rustles barrels and will be sent to a licenced firm by the contractor. The barrels will be placed onto an impermeable ground to protect rain and sun and all necessary precautions against fire will betaken Batteries, tires and similar items due to construction machines and vehicles will be sent to a licenced firm and will be ensured to be disposed

Not High I

Contractor Start of Construction

Works Completion of construction works

'uctlon

Substation Oil

Grounding, Health and Safety, Training

- ­

• •

Substation oil exists in a container and will never be stored at the construction site temporarily. In the case of necessity of storing the oil at the site, it will be placed upon impermeable ground, covered to be prevented from rain and sun and the around of the stored area will be surrounded by placing warning sign. All precautions againts fire will be also taken

All necessary protective equipments(hard hat, safety belt, gloves, protective clothes etc.} will be provided to the workers Proper notification signs will be placed The personal will be trained in first aid and "work health and safety"

Not High

No Additional Cost (as a

part of proj ect budget)

Contractor

Contractor

of the storing substation oil

-- ­

Start of Construction Works

Untill the transportation of substation oil

-- ­

Completion of construction works

7

TEIAS 380 kV YENIBOSNA GIS SUBSTATION ENVIRONMENTAL MANAGEMENT PLAN

Finish Date Start Date ResponsibleSubject Mitigation Measures··· Cost Institution··

• Within the framework of the program prepared by TEIAS Environmental Department, the noise will be measured at certain points around the substation. The measurements are

ional tance

Noise I •

done around the substation (at fences surrounding the substation area, near ihlas Collage, recruiting office) If the measurement results exceed the limit values mentioned in the the Environmental Noise Evaluation and Control Regulation (Ldaytime:60 dBA, Lnighj:50 dBA), the sound absorbing barriers will be used and the levels are kept under the limit values.

• Within the framework of the program prepared by TEIAS Environmental Department, the EMA strenght will be measured at certain points around the substation (fences surrounding the substation area). If the measurement results exceed the limit values mentioned in ICNIRP (5 kV/m for electric field/for public, 1000 mG for magnetic field), substation building, equipments (operation and protection), wall and fence will be grounded. In any case of sign of a failure (such as failure in the operation of an equipment, increasing the contact

No Additional Cost (as a Start of Operational Completion of Operational Acceptance Contractor

part of project Acceptance I budget

Electro-Magnetic Field (EMF)

.

current, electrical arc, local warming etc.)the grounding resistance will be measured and according to the I measurement results the grounding og the ones having the problem will be strengthened by local rehabilitation (rehabilitation of loose, broken, corresioned grounding connection points), maintaining the continuity of the No Additional connections. Cost (as a Start of Operational Completion of Operational Acceptance Contractor

part of project Acceptance• All the equipments of the substation (transformer, disconnector, circuit breaker, surge-arrester, current budget

transformer, voltage transformer etc.) will be taken according ot the IEC and the controls and maintainance will be done in accordance with IEC.

• Electrical and magnetic fields are measured by Electric-Magnetic Field (EMF) Meter. Measurement Units for Electric field (E) Vim while for Magnetic field (H) Aim (EMF can be . explained as Magnetic Field Intensity (B)/Unit: Gauss or Tesla. The measurements done by EMF Meter are done at 1 m above the earth ground. Measurement of electro-magnetic field is possible at any point in global volume by EMF meter.

• The meter is portable. The meter is protectable against other

electro-magnetic Signa~__ _ J

8

TEIAS 380 kV YENIBOSNA GIS SUBSTATION ENVIRONMENTAL MANAGEMENT PLAN

Ise Subject Mitigation Measures ....* Cost

Responsible Institution**

Start Date Finish Date

-- ­

Landscape

• •

The work-site will be reassembled. No hazardous, solid, liquid wastes will be left at the site,

No Additional Cost (as a

part of project budget)

Contractor Start of Operational

Acceptance Completion of Operational Acceptance

ation Health and Safety

The personal will be selected from the people having trained in first aid, electric safety, working at high levels for the maintanace fo the substation. The warning signs and climbing barriers will be placed around the substation

No Additional Cost (as a

part of project budget)

TEIAS Taking the substation into operation

After the completion of the economic life of the substation

'ation Fire Risk

\--­

Electromagnetic field (EMA)

,------ ­

Substation oil

, •

• •

The substation will be establihed as to the fire safety elements in the "Electric Intensive Current Plant Regulation" For the operation of the substation there is a standard yearly maintenance/operation and test program, The program will be followed during the operation of the substation, If there is a sign of failure unexpectedly (arc, local warming, decrease in the level of isolation, instability of current/voltage etc,) the enegy will be ceased and the trained operational personel working at the substation will provide technical support to solve the problem,

It will be under the limit values determined in ICNIRP, For this purpose, substation building, equipments (operation and protection), wall and fence will be grounded, In any case of sign of a failure (such as failure in the operation of an equipment, increasing the contact current, electrical arc, local warming etc,)the grounding resistance will be measured and according to the measurement results the grounding og the ones having the problem will be strengthened by local rehabilitation (rehabilitation of loose, broken, corresioned grounding connection points), maintaining the continuity of the connections. All the equipments of the substation (transformer, disconnector, circuit breaker, surge-arrester, current transformer, voltage transformer etc.) will be taken according ot the IEC and the controls and maintainance will be done in accordance with IEC,

Substation oil will be analyzed physically and chemically. When the oil completes its economic life, it will be replaced with new one and disposal of it will be ensured by conducting required test (to determine the category of the oil) and applying proper disposal method as to the category test results,

No Additional Cost (as a

part of project budget)

Not High

No additional cost

TEIAS

TEIAS

TEIAS

Taking the substation into operation

- ­

Taking the substation into operation

- ­

Taking the substation into operation

After the completion of the economic life of the substation

-

After the completion of the economic life of the substation

After the completion of the economic life of the substation

I

9

TEIAS 380 kV YENIBOSNA GIS SUBSTATION ENVIRONMENTAL MANAGEMENT PLAN

--­

lse Subject Mitigation Measures*** Cost Responsible Institution""

Start Date Finish Date

I

Solid-liquid and Hazardous Wastes

Solid wastes, junk materials and construction wastes will be collected seperately and they will be ensured to be taken by the municipality or a licenced firm No wastes which can not be broken down biologically will be left at the site. Wastes which can not be broken down biologically will be collected in a container and taken by the Bah<;elievler municipality. TEIAS ensures that wastes will be taken by the municipality controlling. Wastes such as oil, dye will be collected in separate. impermeable. metal and labeled containers and will be ensured to be taken by a licenced recycle firm

~----

Not High (changing by depending on municipalities

and/or licensed recovery

plant)

TEIAS ITaking the substation into operation

,

After the completion of the economic life of the substation

Dust - Particulate Matter

- -­

It is expected an amount of dust generation during the demolishing of the substation period.

All the mitigations (watering, covering the truks. speed limitation etc) listed in the construction phase of dust-

particulate matter are also valid in this phase.

Not High Contractor

After the completion of the economic life of the

substation

--­

Until the completion of decommissioning works

--­ -

isloning

Noise

• The continuous work-site noise (day times) will be ensured to be under 70 dBA (according to the Turkish Environmental

Noise Evaluation and Control Regulation.

• All construction works will be done between 7am and 7pm

• People, living at the population centers around, will be informed about the working durations

• Sound absorbing barriers will be used in case of increasing noise level.

No Additional Cost (as a

part of project budget

Contractor

TEIAS

After the completion of the economic life of the

substation

Until the completion of decommissioning works

--

Isionlng I Solid and Hazardous Wastes

Solid wastes. junk materials and construction wastes will be collected seperately and they will be ensured to be taken by

the municipality or a licenced firm No wastes which can not be broken down biologically will be

left at the site

• The contractor will control the collection of the wastes separately and ensure them to be taken by the municipality

and the firms.

• Wastes such as oil, dye will be collected in separate, impermeable, metal and labeled conteyners and will be

ensured to be taken by a licenced recycle firm

Not High (changing by depending on municipalities

and/or licensed recovery

plant)

Contractor After the completion of the

economic life of the substation

Until the completion of decommissioning works

-­ ~-

10

TEIAS 380 kV YENIBOSNA GIS SUBSTATION ENVIRONMENTAL MANAGEMENT PLAN

• Decommisioning Phase, has been evaluated in the face of the completion of facility's economic life and the demolishing the substation come to order. After the completion of economic life of the substation, in case of taking decision on the continuation of the facility, studies will be conducted for the new substation in accordance with the subjects determined with the scope of EIA Regulation •• Valid in the case of handing over of the proposed works to subcontractors. Otherwise, responsibilities defined for contractor will belong to TEIAS ••• While taking the proposed measures, compliance with all related regulations (Air Quality Evaluation and Control Regulation, Water Pollution Control Regulation, Environmental Noise Evaluation and Control Regulation, Solid Waste Control Regulation, Soil Pollution Control Excavation, Construction and Demolishion Wastes Control Regulation, Hazardous Waste Control Regulation, Package and Packaging Waste Control Regulation, Grounding in Power Installations Regulation, Work Health and Safety Regulation, Health and Safety Conditions on Usage of Work Equipments Regulation) will be complied

11

TEIAS 380 kV YENIBOSNA GIS SUBSTATION ENVIRONMENTAL MANAGEMENT PLAN

SECTION - 3

MONITORING PLAN

TEIAS 380 kV YENIBOSNA GIS SUBSTATION ENVIRONMENTAL MANAGEMENT PLAN

3. MONITORING PLAN

Environmental monitoring provides information about key environmental issues, especially about the efficiency ofmeasures taken and environmental impacts of the project, at the implementation phase of the project. This information enables project owner and audit mechanism to evaluate the effectiveness ofthe mitigation and to allow correct actions to be taken in the case of necessity. Therefore, EMP describes the aims and the types of monitoring by relating the impact assessments defined in PDF and the mitigation measures defined in EMP.

---

---

TEIAS 380 kV YENIBOSNA GIS SUBSTATION ENVIRONMENTAL MANAGEMENT PLAN

Phase Subject

Cultural and Historical Assets '

What are the parameters,

which would be monitored?

Cultural assets at the site

Dust Formation due to the

Movement and Exhaust of the Construction Machinery

Complaints from public

Whe I would he

parameters be How would the mon tored·Where would parameters be

frequ sncyofthe monltoredityp heparameters be es ofthe

me as Irementmonitored? monitoring s/co Itinuousequipment me as Irement

?

In :ase of coin ciding a Construction

Visual cultu ral assetsite

conti lously by an a leogolist

Visual observations Du ing the

exc9vationConstruction Talking to the weekiIy I in the

site local people c Ise of near the site co nplaint

~ ... ­

Why would the parameters be

monitored?

Obeying the Cultural and Natural Assets

Protection Law

Industrial Air Pollution Control

Regulation

Cost

Not high if no cultural assets are damaged

No additional cost (within the project

budget)

The Institute that controls ­frequency of the control

Provincial Culture and

Museum Directorate

(Controlled in case of

coinciding a cultural asset)

TEIAS

Provincial Directorates of

MoEF

Start Date

Start of the cunstruction

works

Start of construction

works

Finish Date

Completion of

construction works

Completion of

construction works

TEIAS 380 kV YENIBOSNA GIS SUBSTATION ENVIRONMENTAL MANAGEMENT PLAN

onstruct ion

Subject

Noise

What a param

whichw monit,

Noise

re the tters, )uld be Ired?

Level

Where would the

parameters be monitored?

Construction site

Ihlas Collage, recruiting Office

around the substation

How would the parameters be monitoredltyp

e50fthe monitoring equipment

Interviews to be conducted in

near residential areas

Noise level measurement with portable

sound pressure measurement

device

When would the

parameters be monitored ­

frequency of the

measurement s I continuous measurement

?

Weekly observation of noise (tracking)

Near residential areas, in the

case of complaint

Why would the parameters be

monitored?

Environmental Noise Evaluation and

Control Regulation

Cost

Not High

The Institute that controls ­frequency of the control

TEiAS

Provincial Directorate of Environment and Forestry

Start Date

Start of the cunstruction

works

Finish Date

Completion of

construction

I works

-- ­ -- ­

15

---------

TEIAS

What are the parameters,Phase I Subject

which would be monitored?

-+­

Wastewater due to construction sites

and washing water

Contamination (oil, ~onstruct I Wastewater Iturbidity) in the soil ion

and water around the project site

Odor generated at the project site

Where would the

parameters be monitored?

Sewerage system

(Wastewater generated by

the workers will be given to the sewer system of the city. The connection to

the sewer system and whether any

wastewater is discharged to

soil, water or to any receiving

body except the permitted one

will be observed and

controlled" )

How would the parameters be monitored/typ

es of the monitoring equipment

Visual

When would the

parameters be monitored ­

frequency of the

measurement s I continuous measurement

?

Weekly

380 kV YENIBOSNA GIS SUBSTATION ENVIRONMENTAL MANAGEMENT PLAN

The Institute Why would the

that controls - I Start Date parameters be Cost frequency of monitored? the control

In accordence with Completion

the Water Pollution No additional TEiAS Start of the ofControl Regulation cost (within the cunstruction

and Soil Pollution project budget) works works

Control Regulation Municipality

LL_'L

16

TEIAS

Phase

-

Subject

--

Constru ction

Excavation, Solid 3nd Hazardous

Wastes

Wastes due to lehicle Parking

What are the parameters,

which would be monitored?

The disposal ofthe excavation wastes

Seperation of solid wastes for

recycle/recovery/re use, disposal at the

Municipality's landfill

Collection of hazardous wastes

seperately in conteiners and disposal by a licenced firm

Waste oils, automobile

batteries,used tires and junk materials

Where would the

parameters be monitored?

Construction site and

disposal site

At the vehicle parking area

How would the parameters be mon Itoredltyp

es of the monitoring equipment

Visual

In the case of failure I periodic

maintenance (half yearly)

When would the

parameters be monitored ­

frequency of Why would the the parameters be

measurement monitored? s I continuous measurement

?

During Compliance with

excavation Conservation of

works Habitat Regulation, Solid Waste Control Regulation and Soil

Pollution Control Regulation

I Achievement of the Weekly disposal of hazardous

wastes, which are collected seperately from the other types

of wastes, by complying Hazardous

Waste Control Regulation

requirementsMonthly

During the Achievement of the failure and disposal of the wastes

regular compliance with maintanence Waste Oil Control

Regulation, Waste Battery and

~m""to" eoot'olRegulation, End-of­

tires Control Regulation

380 kV YENIBOSNA GIS SUBSTATION ENVIRONMENT AL MANAGEMENT PLAN

Cost

The Institute that controls ­ Finish Date Start Date frequency of the control

Not High (I hanging by d pending on

TElA:;>IT nicipalities

an lor licensed recovery plant) Completion

Municipality Start of the of

cunstructionNot High constructionProvincial works(! hanging by works

Directorate ofd pending on

Environmentlicensed

and Forestry re overy plant)

I

Not High (! hanging by d pending on

licensed Start of the Completion re overy plant) cunstruction of

works construction works

Contractor

-~

17

--

--

--- ---

--

--

--

--

-----

I TEIAS 380 kV YENIBOSNA GIS SUBSTATION

ENVIRONMENTAL MANAGEMENT PLAN

-

[~

Cons etlo

perat al

Acce

'~r=pce

FieldJ:om"o."

J I

Subject

Substation Oil

Grounding, Health and

Safety--1 Noise

em

What are the parameters,

which would be monitored?

-

Leakages from the barrels containing

substation oil, used barrels (where they are stored and how

to sent to the related firms) and

the propriety of the impermeable

ground

Documents related to workers health

and safety training, equipments used

by the worker during working for construction (hard

hot. "".'. "f.~belt etc.)

Noise level

-

Electric and magnetic fields

vectors

Where would the

parameters be monitored?

In the case of storing, at the storage area

Construction sites

Open and close switchyard and at the entrance

and exit the lines of the substation

At switchyard and under the entrance and

exit the lines of the substation

How would the parameters be monitoredltyp

es of the monitoring equipment

Visual

Visual

Sound level meter

EMF M.,.,

-

When would the

parameters be monitored·

frequency of the

measurement s I continuous measurement

?

During storage

Daily

Operational Acceptance

Phase

OperationalI "''''p''''''Phase

-

Why would the parameters be

monitored?

To prevent the leakage of the

storage area of the substation oil

In accordance with Work Health and Safety Regulation

Control of the limit values determined in the related regulation

Control of satisfying the national and

international referance values

The Institute that controls ­ Start DateCost frequency of

the control

Start of the Not High TEiAS

storage

--+ No additional I Start of the

cost (within the TEIAS cunstruction roject budget) works~

Fin!sh Date

Com pletion of slmage

Con pletion of

cons ruction Vi orks

Start of Corr pletion of Not High TEiAS Op, rationalOperational

Acceptance Ac( eptance

Start of Corr pletion of TEAlsNot High Operational Op' rational

Acceptance Ac( eptance

18

--

TEIAS

Phase

peration al

Accepta nce

peration

380 kV YENIBOSNA GIS SUBSTATION ENVIRONMENTAL MANAGEMENT PLAN

How would the What are the Where would parameters be

Subject parameters, which would be

the parameters be

monltoredltyp es of the

monitored? monitored? monitoring equipment

When would the

parameters be Imonitored· The Institute Why would the frequency of that controls - Fil Ish DateStart Date parameters be Costthe frequency of

monitored?measurement the control s I continuous measurement

?

Whether any wastes

(construction, SOlid, hazardous, liquid) are left at the site, The substation

Landscape the excavated

Visual area

areas/soil, roads

Operational Acceptance

Phase

Compliance with Environmental Law

and Regulations

No additional cost (within the project budget)

TEIAS Start of

Operational Acceptance

Cc 0 A

mpletion of erational ceptance

are reassembled is monitored, controlled.

Technical trainning in terms of

maintenance, operation and .

Health and technical IThe substation V· I Safety area Isua

~'''dOlh'' and use ~

Maintanace works - semi­

annually / in the case of

necessary

Compliance with related health and safety regulation

No additional cost (within the

operation budget)

TEiAS Taking the

substation into operation

co thE

I

~

.fter the pletion of economic e of the

"la'''" I _ Safety equipment __ _ I I

19

TRIAS 380 kV YRNIBOSNA GIS SUBSTA nON ENVIRONMENTAL MANAGEMENT PLAN

Phase Subject

Fire Risk

peration

~-~

Ele :tromagnetic Field

Substation Oil

-~

What are the parameters,

which would be monitored?

-~

SF6 gas pressure

Isolation oil

Cable ends, isolators, cable

connection points.

Electric and magnetic field

vectors

Oil characteristic parameters

(density, acidity, viscosity, corrosive sulfide, flash point,

PCB, color)

How would the Where would parameters be

the monltored/typ parameters be es of the

monitored? monitoring equipment

Visual observation of

pressureI manometers, emergency

~ warning and

Substation

Substation area

Transformers

signs

Daily/weekly/m onthly

electrical, chemical and physical tests

and gas analysis

Visual observation with thermo­

vision devices

Magnetic field test

Test Method (physical, chemical analysis)

When would the

parameters be monitored·

frequency of the

measurement s I continuous measurement

?

~-

semi-annually / in the case of

necessary

~-~

In the case of complaints

Bi yearly

Why would the parameters be

monitored?

-

Due to fire risk

To comply Electric Intence Current

Plants Regulation requirements related

to fire safety, to repair the worn, broken parts, to

minimize the risk of accident and to

prevent the outage

Reducing/preventing the risk of affecting people due to EMA

Quality control of the substation oil

The Institute that controls ­

Cost frequency of the control

-

No additional cost (within the TEiAS

operation budget)

No additional cost (within the TEiAS

operation budget)

Not high (within operation TEIAS budget) l

~-

Start Date Fin sh Date

-~

I~ fter the Taking the pletion of

substation into operation

Taking the substation into

operation

-~

Taking the substation into

operation

the economic iii'e of the su

can the

iiI su

can the

lif su

bstation

After the pletion of economic 'e of the bstation

After the pletion of economic 'e of the bstation

20

-- --

--

TEIAS

Phase Subject

Solid-Liquid and Hazardous

Wastes':>peration (automobile accumulator, substation oil)

$I] Dustt-ml

Particulate Matter

When would the

How would the parameters be

What are the parameters,

which would be monitored?

Where would the

parameters be monitored?

parameters be monltoredltyp

es of the monitoring equipment

monitored· frequency of

the measurement s Jcontinuous measurement

Why would the parameters be

monitored?

?

Compliance with Weekly Conservation of

Habitat Regulation, Seperation of solid Solid Waste Control

wastes, junk Visual Regulation and Soil materials for Pollution Control

recyclelrecovery/re Regulation use and disposal at the Municipality's

landfill Achievement of the Monthly disposal of hazardous

wastes, which are Collection of Substat on area I ooll.ot.d "p"'''''Y

hazardous wastes from the other types separately in of wastes, by

conteiners and , complying Hazardous disposal by a Waste Control licensed firm Regulation

requirements

Waste substation Test Method Completion of Compliance with oil the economic Waste Oil Control

life of the Regulation substation oil

-~~-I

Dust During the Dust due to the IMeasurements/' demolishment

movement of the ",,,,'ruotloo momhly of ,"b"allOOJ Comp""'" wllh Ih. construction (demolishing) excavation Air Quality Evaluation

machines and site ! Interviews to be works monthly and Control demolihing works 00",,'''''' ooa, I R'9"a'oo

residential In the case of areas complaint

-_._....... _-_ ....... ­

Start Date I Finish Date

After Takir 9 the completion of

substa opel

on into the economic ation life of the

substation

AftE rthe

Cost

Not high (changing by depending on municipalities

and/or licensed recovery plant)

Not high (changing by

. depending licensed

recovery plant)

Not high (depending on

the firmllaboratory conducting the

analysis)

I N ddt· I

°t '( 'tlhlont~ cos ;Ib I~ :)

P'~" "

380 kV YENlBOSNA GIS SUBST A nON ENVIRONMENTAL MANAGEMENT PLAN

The Institute that controls ­frequency of the control

TEIAS

Municipality

I Provincial Directorate of

,Environment and Forestry ,

TEiAS

tion of Until the compl onomic completion of the ec

Provincial ,f the decommissionilife IDirectorate of

sub~ ati~WorksEnvironment and Forestry

21

TEIAS 380 kV YENIBOSNA GIS SUBSTATION ENVIRONMENTAL MANAGEMENT PLAN

Phase Subject

What are the parameters,

which would be monitored?

Where would the

parameters be monitored?

How would the parameters be mon itored/typ

es ofthe monitoring equipment

When would the

parameters be monitored· frequency of

the measurement s I continuous measurement

?

Whywo parame

monitc

uld the ers be red?

Cost

The Institute that controls ­frequency of the control

Start Date Finish Date

Noise NOise Level

Residential areas and

"',,",ct;oo(demolishing)

site

Noise level measurement with portable

sound pressure measurement

device

I Interviews to be

conducted in near residential

areas

Construction (demolishing period) site,

Weekly

In the case of complaints of

public

Environmer tal Noise nand gulation

Evaluati( Control Re

Not High

TEIAS

Provincial Directorate of Environment and Forestry

After the completion of the economic

life of the substation

Until the completion of

decommissioni ng works

'8 S

commi ioning

Solid and Hazardous

Wastes

Seperation of solid wastes, junk materials for

recycle/recovery/re use, and disposal ,

at the Municipality's landfill

Collection of hazardous wastes

seperately in conteiners and disposal by a licenced firm

Demolishing area

Visual

Weekly

Monthly

~--~~-

Complial Conserv

Habitat RE Solid Was' Regulatior

Pollution Regul

Achievem disposal of

wastes, ~ collected ~ from the 01

of was 1 complying I

Waste ( Regul

require

ce with lion of gulation, ~e Control and Soil Control tion

nt of the azardous

hich are eperately her types s,by azardous ontrol tion

ments

Not High (changing by depending on municipalities

and/or licensed recovery plant)

Not High (changing by depending on

licensed recovery plant) ,

TEIAS

Municipality

Provincial Directorate of Environment and Forestry

After the completion of the economic

life of the substation

Until the completion of

decommissioni ng works