  • 8/3/2019 3) Primary Cementing Overview

    1/21

    Primary Cementing

    Overview

  • 8/3/2019 3) Primary Cementing Overview

    2/21

    2

    Primary Cementing

    The introduction of a cementacious material into

    the annulus between casing and open hole to :

    Provide zonal isolation

    Support axial load of casing strings and strings to be run

    later

    Provide casing support and protection

    Support the borehole

  • 8/3/2019 3) Primary Cementing Overview

    3/21

    3

    Types of Casings

    Conductor

    Surface

    Intermediate

    Production

    Liner

  • 8/3/2019 3) Primary Cementing Overview

    4/21

    4

    Conductor

    Purpose

    Prevents washing out under the rig

    Provides elevation for flow nipple

    Common sizes and depths:

    30 - 20 Welded

    20 - 16Threaded

    30 - 200 (< 100 common)

  • 8/3/2019 3) Primary Cementing Overview

    5/21

    5

    Conductor

    Other Remarks:

    Plugs not used

    Careful pumping practices

    Large excess required

    Thru-drill pipe cementing common

    BOPs not unusually connected

    Common Cements

    Accelerated Neat

  • 8/3/2019 3) Primary Cementing Overview

    6/21

    6

    Thru-Drill Pipe Cementing

    Key Points:

    Cement contamination

    Channelling

    Displacement

    Pump until cement to surface

  • 8/3/2019 3) Primary Cementing Overview

    7/21

    7

    Outside Cementing

    Purpose

    Bring cement to surface

    Macaroni tubing used

    Max. depth 250-300 ft

    High friction pressures

    Non-standard connections

    Tubing movedduring job

  • 8/3/2019 3) Primary Cementing Overview

    8/21

    8

    Surface

    Purposes:

    Protects surface fresh water formations

    Cases off unconsolidated or lost circulation areas

    Supports subsequent casing strings

    Provides primary pressure control (BOP support)

    Common sizes and depths:

    20 - 9 5/8 threaded

    100 - 3000 (or more)

  • 8/3/2019 3) Primary Cementing Overview

    9/21

    9

    Surface Cementing

    Excess of 100% plus not uncommon

    Recommend thru-drill pipe method to save

    Cement

    Rig time

    Common cements:

    Lead light weight slurries with high yields

    Neat tail slurries with good compressive strength

    Reduce WOC to a minimum with accelerators

  • 8/3/2019 3) Primary Cementing Overview

    10/21

    10

    BOP

    Rotary tableRig Floor

    Choke Line

    Mud Outlet

    Annular Preventor

    BLIND RAMS

    SHEARRAMS

    PIPE RAMS

    Conductor pipe

    Cement

    Surface Casing Head

    Surface Casing

  • 8/3/2019 3) Primary Cementing Overview

    11/21

    11

    Intermediate (Also called Protection)

    Purposes:

    Separates hole into workable sections

    Lost Circulation

    Salt Section

    Overpressured Zones

    Heaving Shales

    Common sizes and depths:

    133/8, 103/4, 9 5/8

    3000 to 10,000

  • 8/3/2019 3) Primary Cementing Overview

    12/21

    12

    Intermediate Casings

    Cemented to surface or to previous casing shoe

    Two stage jobs common

    Plugs, casing equipment, casing accessories usual

    Good cementing practices are required

    Large cement volumes

    Common Cements:

    Typically filler slurries followed by high compressive tail

    Specialised (light, heavy, salt - saturated, etc)

  • 8/3/2019 3) Primary Cementing Overview

    13/21

    13

    Two Stage Cementing

    Key Points: Separation and

    isolation of zones

    Reduces hydrostatic Can leave zone in

    the annulus

    uncemented (cement

    at TD and surface) 1st Stage

    Stage

    Collar

    2ndStage

  • 8/3/2019 3) Primary Cementing Overview

    14/21

    14

    Production

    Purposes: Isolates the pay zone from other formations and the fluids

    in them.

    Protective housing for production equipment.

    Subsurface artificial lift

    Multiple zone completion

    Screens for sand control

    Covers worn or damaged intermediate string.

    Common sizes:

    4 1/2,5,7, & 9 5/8

  • 8/3/2019 3) Primary Cementing Overview

    15/21

    15

    Liners

    Liner Wiper

    Plug

    Drill pipe

    Wiper Plug

    Liner

    HangerRunning

    Tool

    Shear

    Pin

    Key Points:

    Requires less casing

    Deeper wells

    Small annular clearance

    Specialized equipment

  • 8/3/2019 3) Primary Cementing Overview

    16/21

    16

    Casing API Casing Specs

    OD 9 5/8

    Weight 53.5 lbs/ft (determines ID)

    Grade C75 (yield point allowable tension)

    Burst pressure 7430 PSI

    Collapse pressure 6380 PSI Thread Buttress

    Tapered string used to minimize well cost.

    Casing program for well based on :

    Burst Pressure

    Collapse Pressure

    Tensile Load

  • 8/3/2019 3) Primary Cementing Overview

    17/21

    17

    Thread Types 8 Round

    Seals on threads

    Use of couplings

    Buttress Seals on threads

    Use of couplings

    VAM Seals on threads &

    shoulder

    Use of couplings

    Hydrill Seals on threads &

    shoulder

    Integral

    2 sets of threads

  • 8/3/2019 3) Primary Cementing Overview

    18/21

    18

    Running Casing

    Inspection of Casing Tuboscope

    Pipe tally

    Hole Preparation

    Mud condition Clearance

    Running

    Casing crews

    Too fast

    Landing Casing

    Nippling up

  • 8/3/2019 3) Primary Cementing Overview

    19/21

    19

    Job Procedures

    Pre Job: Check calculations with co-man

    Rig up

    Stem 1 on equipment

    Check materials

    Safety and organisation meeting

    Prepare mix fluids, spacers and washes

  • 8/3/2019 3) Primary Cementing Overview

    20/21

    20

    Job Procedures

    The Job: Test lines

    Load plugs

    Pump Washes / Spacers

    Drop bottom plug

    Mix and pump cement

    Drop top plug

    Displace Bump plug and check returns

  • 8/3/2019 3) Primary Cementing Overview

    21/21

    21

    Job Procedures

    Post Job: Wash up

    Rig down

    Stem equipment Paper work