  • 7/28/2019 3. API 653-Pt2

    1/65

    API 653API 653

    Section 7, MaterialsSection 7, Materials

    Section 11, WeldingSection 11, Welding

  • 7/28/2019 3. API 653-Pt2

    2/65

    API 653API 653MaterialsMaterials

    This section provides generalThis section provides generalrequirements for the selection ofrequirements for the selection of

    materials for the repair, alteration, andmaterials for the repair, alteration, and

    reconstruction of existing tanks.reconstruction of existing tanks.

    Specific requirements for repairs andSpecific requirements for repairs and

    alterations are covered in Section 9.alterations are covered in Section 9.

  • 7/28/2019 3. API 653-Pt2

    3/65

    API 653API 653 Section 7, MaterialsSection 7, Materials

    New MaterialsNew Materials

    All new materials used forAll new materials used forrepair, alterations, orrepair, alterations, or

    reconstruction shall conform toreconstruction shall conform tocurrent applicable tankcurrent applicable tank

    standards.standards.

  • 7/28/2019 3. API 653-Pt2

    4/65

    API 653API 653 Section 7, MaterialsSection 7, MaterialsShell And Bottom Plates Welded To TheShell And Bottom Plates Welded To The

    ShellShell

    All shell plate materials and bottom platesAll shell plate materials and bottom plates

    welded to the shell shall be identified.welded to the shell shall be identified.

    Materials identified by original contractMaterials identified by original contract

    drawings, API name plates, or other suitabledrawings, API name plates, or other suitable

    documentation do not require furtherdocumentation do not require further

    identification.identification.

  • 7/28/2019 3. API 653-Pt2

    5/65

    API 653API 653 Section 7, MaterialsSection 7, Materials

    Shell And Bottom Plates Welded ToShell And Bottom Plates Welded ToThe ShellThe Shell

    Material not identified shall be tested andMaterial not identified shall be tested andidentified by the requirements as outlined inidentified by the requirements as outlined in

    7.3.1.2.7.3.1.2.

    After identification, determination shall beAfter identification, determination shall be

    made as to suitability of the material formade as to suitability of the material forintended service.intended service.

  • 7/28/2019 3. API 653-Pt2

    6/65

    API 653API 653 Section 7, MaterialsSection 7, MaterialsStructuralStructural

    Existing rolled structural shapes that are toExisting rolled structural shapes that are to

    be reused shall meet the requirements ofbe reused shall meet the requirements of

    ASTM A7 as a minimum.ASTM A7 as a minimum.

    New structural material shall meet theNew structural material shall meet the

    requirements of ASTM A36or A 992 as arequirements of ASTM A36or A 992 as a

    minimumminimum

  • 7/28/2019 3. API 653-Pt2

    7/65

    API 653API 653 Section 7, MaterialsSection 7, Materials

    Roof, Bottom, and Plate WindgirdersRoof, Bottom, and Plate Windgirders

    If existing plates are to be used to reconstructIf existing plates are to be used to reconstruct

    the tank, they shall be checked for excessivethe tank, they shall be checked for excessivecorrosion and pitting. (See Sections 4 and 6.)corrosion and pitting. (See Sections 4 and 6.)

  • 7/28/2019 3. API 653-Pt2

    8/65

    API 653API 653 Section 7, MaterialsSection 7, Materials

    Welding ConsumablesWelding Consumables

    Welding consumables shall conform to theWelding consumables shall conform to theAmerican Welding Society (AWS) classificationAmerican Welding Society (AWS) classification

    that is applicable to the intended use.that is applicable to the intended use.

  • 7/28/2019 3. API 653-Pt2

    9/65

    99

    API 653API 653

    WeldingWelding

    Section 11Section 11

  • 7/28/2019 3. API 653-Pt2

    10/65

    WeldingWelding

    Qualified per ASME Section IXQualified per ASME Section IX Welding Procedure Specifications (WPS)Welding Procedure Specifications (WPS)

    Procedure Qualification Records (PQR)Procedure Qualification Records (PQR)

    Welders / Welding OperatorsWelders / Welding Operators

  • 7/28/2019 3. API 653-Pt2

    11/65

    WeldingWelding

    Must also meet additional requirements ofMust also meet additional requirements ofAPIAPI--650, Section 7650, Section 7 unstated hereunstated here

    WeldabilityWeldability of steel must be verifiedof steel must be verified

    If material is unknown, must use plateIf material is unknown, must use platesample for WPS/PQRsample for WPS/PQR

  • 7/28/2019 3. API 653-Pt2

    12/65

    Additional WPS/PQR WeldingAdditional WPS/PQR Welding

    Requirements of APIRequirements of API--650650

    API-650 is the Referencing Code Section API-650, Section 7.2 Qualification of Welding

    Procedures

    specifies impact testing requirements supplementary essential variable in ASME IX

    based of DMT

    protective coatings addressed as an essential variable all other requirements are same as ASME IX

  • 7/28/2019 3. API 653-Pt2

    13/65

    Additional WPS/PQR WeldingAdditional WPS/PQR Welding

    Requirements of APIRequirements of API--650650 contcont

    Impact test HAZ if base metal impact tested andImpact test HAZ if base metal impact tested andwelded by auto or semiwelded by auto or semi--auto processauto process

    Impact test for vertical seams if DMT < 50FImpact test for vertical seams if DMT < 50F

    impact test weld metalimpact test weld metal

    include HAZ if auto or semiinclude HAZ if auto or semi--auto processauto process

    Impact test for all seams if DMT

  • 7/28/2019 3. API 653-Pt2

    14/65

    Identification and Records 9.2Identification and Records 9.2

    For each welder / welding operatorFor each welder / welding operator must have identification number, letter, etcmust have identification number, letter, etc

    identification number must be recordedidentification number must be recorded

    WPQ available to AIWPQ available to AI

    welder ID markwelder ID mark

    applied to work at interval or 3 ftapplied to work at interval or 3 ft or recordedor recorded record (rollrecord (roll--out maps?) available to AIout maps?) available to AI

    not required on roof plates or flangenot required on roof plates or flange--toto--neck weldsneck welds

  • 7/28/2019 3. API 653-Pt2

    15/65

    1515

    API 653API 653

    Examination and TestingExamination and Testing

    Section 12Section 12

  • 7/28/2019 3. API 653-Pt2

    16/65

    GeneralGeneral

    The following shall be in accordance with API Std 650The following shall be in accordance with API Std 650 NDENDE

    NDE PersonnelNDE Personnel

    Acceptance criteriaAcceptance criteria

    Plus any additional requirements given in API 653Plus any additional requirements given in API 653

    Appendix F, NDE Requirements SummaryAppendix F, NDE Requirements Summary

  • 7/28/2019 3. API 653-Pt2

    17/65

    Shell PenetrationsShell Penetrations

    UT examination of shell plate forUT examination of shell plate forlaminationslaminations

    Adding a reinforcing plate to an existingAdding a reinforcing plate to an existing

    unreinforced penetrationunreinforced penetration

    Adding a hot tap connectionAdding a hot tap connection

  • 7/28/2019 3. API 653-Pt2

    18/65

    Shell PenetrationsShell Penetrations

    Cavities resulting from gouging or grindingCavities resulting from gouging or grindingto remove attachment welds of existingto remove attachment welds of existing

    reinforcing plates shall be examined by:reinforcing plates shall be examined by:

    VisualVisual

    MT or PTMT or PT

  • 7/28/2019 3. API 653-Pt2

    19/65

    Shell PenetrationsShell Penetrations

    Completed welds shall be examinedCompleted welds shall be examined

    MT or PTMT or PT

    Consider additional examination for plates ofConsider additional examination for plates of

    unknown toughnessunknown toughness

  • 7/28/2019 3. API 653-Pt2

    20/65

    Shell PenetrationsShell Penetrations

    Stress relieved assemblies shall beStress relieved assemblies shall beinspected by MT or PTinspected by MT or PT

    After Stress reliefAfter Stress relief

    Before hydrostatic testBefore hydrostatic test

  • 7/28/2019 3. API 653-Pt2

    21/65

    Repaired Weld FlawsRepaired Weld Flaws

    Cavities from gouging or grinding toCavities from gouging or grinding toremove a weld defectremove a weld defect

    VisualVisual

    MT or PTMT or PT

  • 7/28/2019 3. API 653-Pt2

    22/65

    Repaired Weld FlawsRepaired Weld Flaws

    Completed repairs of buttCompleted repairs of butt--welds shall bewelds shall beexamined radiographic or ultrasonicexamined radiographic or ultrasonic

    methodsmethods

    Repairs of fillet welds shall be examinedRepairs of fillet welds shall be examinedby the appropriate NDE methodby the appropriate NDE method

  • 7/28/2019 3. API 653-Pt2

    23/65

    Temporary & PermanentTemporary & Permanent

    Attachments to Shell PlatesAttachments to Shell Plates

    Visual examination of permanentVisual examination of permanentattachments and areas where temporaryattachments and areas where temporary

    attachments are removed.attachments are removed.

    Group IV, IV4, V, or VI materials shall alsoGroup IV, IV4, V, or VI materials shall also

    include MT or PTinclude MT or PT

  • 7/28/2019 3. API 653-Pt2

    24/65

    Shell Plate to Shell Plate WeldsShell Plate to Shell Plate Welds

    Existing Shell Plate to New orExisting Shell Plate to New orExisting Shell Plate WeldsExisting Shell Plate Welds

    VTVT

    RTRT

    Additionally if Shell Plate > 1 inchAdditionally if Shell Plate > 1 inch

    BackBack--gouged surface of root and finalgouged surface of root and finalpass (each side) examined by MT or PTpass (each side) examined by MT or PT

  • 7/28/2019 3. API 653-Pt2

    25/65

    ShellShell--ToTo--Bottom WeldBottom Weld

    New welding shall be inspectedNew welding shall be inspected RightRight--angle vacuum boxangle vacuum box

    Diesel test opposite side after first weld passDiesel test opposite side after first weld pass

    AlternativelyAlternatively

    11stst weld pass examined visuallyweld pass examined visually

    Pressure interstice to 15 PSIPressure interstice to 15 PSIgg

    Apply solution film to both weldsApply solution film to both welds

  • 7/28/2019 3. API 653-Pt2

    26/65

  • 7/28/2019 3. API 653-Pt2

    27/65

    ShellShell--ToTo--Bottom WeldBottom Weld

    WeldWeld--on Patch Plateson Patch PlatesVT and MT or PT existing weldVT and MT or PT existing weld

    Full length of pad + 6 in either sideFull length of pad + 6 in either side

  • 7/28/2019 3. API 653-Pt2

    28/65

    BottomsBottoms

    VT all new welds for entire lengthVT all new welds for entire lengthAttention to sumps, dents, gouges, 3Attention to sumps, dents, gouges, 3--plateplate

    laps, breakdowns, arc strikes, attachmentslaps, breakdowns, arc strikes, attachments

    One of the methods listed in API Std 650,One of the methods listed in API Std 650,

    5.3.35.3.3

    Vacuum boxVacuum box

    Tracer gasTracer gas

    Water floodWater flood

  • 7/28/2019 3. API 653-Pt2

    29/65

  • 7/28/2019 3. API 653-Pt2

    30/65

    BottomsBottoms Additionally Patch plates in the criticalAdditionally Patch plates in the critical

    zonezone

    VTVT

    MT or PTMT or PT

    Bottom plates restored by weldingBottom plates restored by welding

    VTVT

    MT or PTMT or PT

  • 7/28/2019 3. API 653-Pt2

    31/65

    Shell PlatesShell Plates

    Weld Metal DepositWeld Metal DepositVTVT

    MT or PTMT or PT

    Lap Welded PatchesLap Welded Patches

    VTVT MT or PTMT or PT

  • 7/28/2019 3. API 653-Pt2

    32/65

    RoofsRoofs

    Newly welded roof joints and repairs shallNewly welded roof joints and repairs shallbe examined in accordance with API Stdbe examined in accordance with API Std

    650 5.3.2.2 and 5.3.6650 5.3.2.2 and 5.3.6

    VTVT

    GastightGastight

    Internal PressureInternal PressureVacuum BoxVacuum Box

    Non gastightNon gastight

    VTVT

  • 7/28/2019 3. API 653-Pt2

    33/65

    RadiographsRadiographs

    The number and location of radiographsThe number and location of radiographs

    shall be in accordance with API Std 650shall be in accordance with API Std 650

    and the following additional requirementsand the following additional requirements

  • 7/28/2019 3. API 653-Pt2

    34/65

    RadiographsRadiographs

    For Vertical JointsFor Vertical Joints

    New to NewNew to New no additionalno additional

    requirementsrequirements

    New to ExistingNew to Existing 1 extra in each joint1 extra in each joint

    ExistingExisting 1 extra in each joint1 extra in each joint

  • 7/28/2019 3. API 653-Pt2

    35/65

    RadiographsRadiographs

    For Horizontal JointsFor Horizontal Joints

    New to NewNew to New no additional requirementsno additional requirements

    New to ExistingNew to Existing 1 extra for each 50 ft of1 extra for each 50 ft of

    weldweld

    ExistingExisting 1 extra for each 50 ft of weld1 extra for each 50 ft of weld

  • 7/28/2019 3. API 653-Pt2

    36/65

    RadiographsRadiographs

    For Intersections of Vertical and HorizontalFor Intersections of Vertical and HorizontalJointsJoints

    New to NewNew to New no additional requirementsno additional requirements

    New to ExistingNew to Existing Each intersection shall beEach intersection shall be

    radiographerradiographer ExistingExisting Each intersection shall beEach intersection shall be

    radiographerradiographer

  • 7/28/2019 3. API 653-Pt2

    37/65

    RadiographsRadiographs

    For Reconstructed TanksFor Reconstructed Tanks Each buttEach butt--welded annular platewelded annular plate

    25% of all junctions of new welds over25% of all junctions of new welds over

    existing seamsexisting seams

    The owner/operator and contractor shallThe owner/operator and contractor shalldetermine extent of further inspectionsdetermine extent of further inspections

  • 7/28/2019 3. API 653-Pt2

    38/65

    RadiographsRadiographs

    Shell Plate Inserts / Door SheetsShell Plate Inserts / Door Sheets

    CircularCircular

    1 radiograph regardless of thickness1 radiograph regardless of thickness

    Square or rectangularSquare or rectangular 1 in a vertical joint1 in a vertical joint

    1 in a horizontal joint1 in a horizontal joint

    Each cornerEach corner

    All junctions between new and old weldsAll junctions between new and old welds

    If defects found, 100% of repaired weldIf defects found, 100% of repaired weld

  • 7/28/2019 3. API 653-Pt2

    39/65

    RadiographsRadiographs

    The minimum diagnostic length is 6The minimum diagnostic length is 6inchesinches

    Penetrations installed using insert plates,Penetrations installed using insert plates,

    100% of butt100% of butt--weld shall be RTweld shall be RT

  • 7/28/2019 3. API 653-Pt2

    40/65

    RadiographsRadiographs

    Acceptance criteria shall be based on theAcceptance criteria shall be based on the

    current standard.current standard.

    Existing welds can be judged on theExisting welds can be judged on the

    original standard of constructionoriginal standard of construction

    d i iH d i T i

  • 7/28/2019 3. API 653-Pt2

    41/65

    Hydrostatic TestingHydrostatic Testing

    When a Hydrostatic Test is RequiredWhen a Hydrostatic Test is Required

    A full hydrostatic test, held for 24 hoursA full hydrostatic test, held for 24 hoursshall be performed on:shall be performed on:

    Reconstructed TankReconstructed Tank

    Any tank that has undergone major or majorAny tank that has undergone major or major

    alterations, unless exempted by 12.3.2alterations, unless exempted by 12.3.2

    A tank where an engineering evaluationA tank where an engineering evaluation

    indicates the need for a hydrostatic test.indicates the need for a hydrostatic test.

    H d i T iH d t ti T ti

  • 7/28/2019 3. API 653-Pt2

    42/65

    Hydrostatic TestingHydrostatic Testing

    When a Hydrostatic Test is RequiredWhen a Hydrostatic Test is Required

    Major repair or major alteration refer toMajor repair or major alteration refer tooperations that require cutting, addition,operations that require cutting, addition,

    removal and/or replacement ofremoval and/or replacement of

    The annular plate ringThe annular plate ring

    The shellThe shell--toto--bottom weldbottom weld

    A sizeable portion of the shellA sizeable portion of the shell

    H d t ti T tiH d t ti T ti

  • 7/28/2019 3. API 653-Pt2

    43/65

    Hydrostatic TestingHydrostatic Testing

    When a Hydrostatic Test is RequiredWhen a Hydrostatic Test is Required

    Major repair or major alteration includes:Major repair or major alteration includes:

    The installation of any shell penetrationThe installation of any shell penetration

    beneath the design liquid level larger than 12beneath the design liquid level larger than 12inches NPS, or any bottom penetrationinches NPS, or any bottom penetration

    located within 12 inches of the shelllocated within 12 inches of the shell

    H d t ti T tiH d t ti T ti

  • 7/28/2019 3. API 653-Pt2

    44/65

    Hydrostatic TestingHydrostatic Testing

    When a Hydrostatic Test is RequiredWhen a Hydrostatic Test is Required

    Major repair or major alterationMajor repair or major alterationincludes:includes:

    The removal and replacement or addition ofThe removal and replacement or addition ofany shell plate beneath the design liquidany shell plate beneath the design liquid

    level, or any annular plate ring materiallevel, or any annular plate ring material

    where the longest dimension of thewhere the longest dimension of the

    replacement plate exceeds 12 inches.replacement plate exceeds 12 inches.

    H d t ti T tiH d o t ti Te ti

  • 7/28/2019 3. API 653-Pt2

    45/65

    Hydrostatic TestingHydrostatic Testing

    When a Hydrostatic Test is RequiredWhen a Hydrostatic Test is Required

    Major repair or major alteration includes:Major repair or major alteration includes:

    The complete or partial (more than oneThe complete or partial (more than one--halfhalf

    of the weld thickness) removal andof the weld thickness) removal and

    replacement of more than 12 inches ofreplacement of more than 12 inches of

    vertical weld joining shell plates, or radialvertical weld joining shell plates, or radial

    weld joining the annular plate ring.weld joining the annular plate ring.

    H d t ti T tiHydrostatic Testing

  • 7/28/2019 3. API 653-Pt2

    46/65

    Hydrostatic TestingHydrostatic Testing

    When a Hydrostatic Test is RequiredWhen a Hydrostatic Test is Required

    Major repair or major alteration includes:Major repair or major alteration includes:

    The installation of a new bottom. This does not includeThe installation of a new bottom. This does not include

    new bottoms in tanks where the foundation under thenew bottoms in tanks where the foundation under the

    new bottom is not disturbed and either condition 1) ornew bottom is not disturbed and either condition 1) or

    2) are met below:2) are met below:

    1)1) For tanks with annular rings, the annular ringFor tanks with annular rings, the annular ring

    remains intact.remains intact.

    2)2) For tanks without annular rings, the repair does notFor tanks without annular rings, the repair does notresult in welding on the existing bottom within theresult in welding on the existing bottom within the

    critical zone.critical zone.

    Hydrostatic TestingHydrostatic Testing

  • 7/28/2019 3. API 653-Pt2

    47/65

    Hydrostatic TestingHydrostatic Testing

    When a Hydrostatic Test is RequiredWhen a Hydrostatic Test is Required

    Major repair or major alterationMajor repair or major alterationincludes:includes:

    The removal and replacement of any partThe removal and replacement of any partof the weld attaching the shell to theof the weld attaching the shell to the

    bottom or to the annular plate ring.bottom or to the annular plate ring.

    Jacking of a tank shellJacking of a tank shell

    H d ostatic TestingHydrostatic Testing

  • 7/28/2019 3. API 653-Pt2

    48/65

    Hydrostatic TestingHydrostatic Testing

    When a Hydrostatic Test is Not RequiredWhen a Hydrostatic Test is Not Required

    A hydrostatic test is not required when:A hydrostatic test is not required when:

    The repair has been reviewed and approved byThe repair has been reviewed and approved by

    an engineer and the engineer must concur inan engineer and the engineer must concur in

    writing.writing. The owner/operator has authorized theThe owner/operator has authorized the

    exemption in writing.exemption in writing.

    And Sections 12.3.2.2 through 12.3.2.5 orAnd Sections 12.3.2.2 through 12.3.2.5 or

    12.3.2.6 are met.12.3.2.6 are met.

  • 7/28/2019 3. API 653-Pt2

    49/65

    Shell RepairShell Repair Welding ProceduresWelding Procedures

    Based on existing material chemistryBased on existing material chemistry

    Qualified with existing or similar materialQualified with existing or similar material

    Include impact testingInclude impact testing

    New Material meet current API Std 650New Material meet current API Std 650requirementsrequirements

  • 7/28/2019 3. API 653-Pt2

    50/65

    Shell RepairShell Repair Existing Material shall meet at least one ofExisting Material shall meet at least one of

    the following:the following:

    API Std 650 requirements (7API Std 650 requirements (7thth edition oredition orlater)later)

    Fall within the safe to use area ofFall within the safe to use area ofFigure 5Figure 5--22

    Stress in the repair area shall notStress in the repair area shall notexceed 7,000 PSIexceed 7,000 PSI

    t

    HDGS

    6.2=

  • 7/28/2019 3. API 653-Pt2

    51/65

    Shell RepairShell Repair

    New vertical and horizontal shell buttNew vertical and horizontal shell butt--welds shall have complete penetrationwelds shall have complete penetration

    and fusionand fusion Root Pass shall be examinedRoot Pass shall be examined

    100% Radiography100% Radiography

  • 7/28/2019 3. API 653-Pt2

    52/65

    Shell RepairShell Repair

    The root pass of nozzle attachment weldsThe root pass of nozzle attachment welds

    shall be backshall be back--gouged and examined bygouged and examined by

    MT or PT and by UTMT or PT and by UT

    Door sheets shall not intersect theDoor sheets shall not intersect the

    bottombottom--toto--shell jointshell joint

  • 7/28/2019 3. API 653-Pt2

    53/65

    Bottom Repair Within the Critical ZoneBottom Repair Within the Critical Zone

    Examined visually prior to weldingExamined visually prior to welding

    Examined after the root pass & finalExamined after the root pass & final

    pass by VT and MT or PTpass by VT and MT or PT

    Annular Plate buttAnnular Plate butt--welds examinedwelds examined

    by UTby UT

  • 7/28/2019 3. API 653-Pt2

    54/65

    ShellShell--ToTo--Bottom RepairBottom Repair A portion may be removed an replaced providedA portion may be removed an replaced provided

    that:that:

    No more than 50% of the required weld crossNo more than 50% of the required weld cross

    required sectional area is removedrequired sectional area is removed

    100% not exceeding 12 inches and spacing100% not exceeding 12 inches and spacing

    between repairs is at least 12 inches apartbetween repairs is at least 12 inches apart

    VT and MT or PT of root pass and final weldVT and MT or PT of root pass and final weld

  • 7/28/2019 3. API 653-Pt2

    55/65

    Minor Shell JackingMinor Shell Jacking Tank Shell and critical zone materials shallTank Shell and critical zone materials shall

    meet requirements of 12.3.2.2.3meet requirements of 12.3.2.2.3

    Engineering evaluation consideringEngineering evaluation considering

    pertinent variables.pertinent variables.

    Careful consideration shall be given toCareful consideration shall be given to

    potential stresses and damage that maypotential stresses and damage that may

    result from jacking.result from jacking.

  • 7/28/2019 3. API 653-Pt2

    56/65

    FitnessFitness--ForFor--Service EvaluationService Evaluation The owner/operator may utilize fitnessThe owner/operator may utilize fitness--forfor--

    service or other appropriate evaluationservice or other appropriate evaluationmethodologies based on established principlesmethodologies based on established principles

    and practices.and practices.

    The analysis shall be performed by an Engineer.The analysis shall be performed by an Engineer.

    The procedures and acceptance criteria are notThe procedures and acceptance criteria are not

    included in API Std 653.included in API Std 653.

  • 7/28/2019 3. API 653-Pt2

    57/65

    Leak TestsLeak Tests

    New or altered reinforcingNew or altered reinforcing

    plates or shell penetrationsplates or shell penetrationsshall be given a leak test.shall be given a leak test.

  • 7/28/2019 3. API 653-Pt2

    58/65

    Settlement SurveySettlement Survey When settlement is anticipated, a tankWhen settlement is anticipated, a tank

    receiving a hydrostatic test shall have thereceiving a hydrostatic test shall have thefoundation checked for settlement.foundation checked for settlement.

    Surveyed emptySurveyed empty

    During fillingDuring filling

    At 100% test levelAt 100% test level

    Appendix B used for acceptance criteriaAppendix B used for acceptance criteria

  • 7/28/2019 3. API 653-Pt2

    59/65

    5959

    API 653API 653

    Marking and RecordkeepingMarking and Recordkeeping

    Section 13Section 13

  • 7/28/2019 3. API 653-Pt2

    60/65

    NameplatesNameplates Required for reconstructed tanks onlyRequired for reconstructed tanks only

    attached adjacent to existing nameplateattached adjacent to existing nameplate

    Fig 13Fig 13--11 required nameplate informationrequired nameplate information

    existing nameplate remains in placeexisting nameplate remains in place

  • 7/28/2019 3. API 653-Pt2

    61/65

    RecordkeepingRecordkeeping Records are required forRecords are required for

    evaluationevaluation repair and alterationrepair and alteration

    reconstructionreconstruction

    RecallRecall Per 6.8Per 6.8 three types of recordsthree types of records

    constructionconstruction

    inspectioninspection

    repair and alterationrepair and alteration

  • 7/28/2019 3. API 653-Pt2

    62/65

    RecordkeepingRecordkeeping Calculations required forCalculations required for

    component integrity, including brittle fracturecomponent integrity, including brittle fracture

    reratingrerating

    repair and alteration considerationsrepair and alteration considerations

    Construction drawingsConstruction drawings

    Repair drawingsRepair drawings

  • 7/28/2019 3. API 653-Pt2

    63/65

    RecordkeepingRecordkeeping Inspection data, UTMsInspection data, UTMs

    MTRsMTRs & certifications tests& certifications tests

    Radiographs (1 year)Radiographs (1 year)

    Brittle fracture issuesBrittle fracture issues

    Construction dataConstruction data

    Location & ID numberLocation & ID number

    Tank descriptionTank description

    Tank serviceTank service

    Design conditionsDesign conditions

    ShellShell matmatll & thickness& thickness

    Tank elevationsTank elevations

    Construction recordsConstruction records

    Basis ofBasis ofhydrotesthydrotestexemptionexemption

  • 7/28/2019 3. API 653-Pt2

    64/65

    CertificationCertification Documentation of reconstructionDocumentation of reconstruction

    Certifications required forCertifications required for

    DesignDesign

    ReconstructionReconstruction Inspection and testingInspection and testing

    Figure 13Figure 13--22

    Certification for Tank Reconstructed to APICertification for Tank Reconstructed to API--653653

    Certification for Tank Designed to APICertification for Tank Designed to API--653653

    Appendix AAppendix A

  • 7/28/2019 3. API 653-Pt2

    65/65

    Appendix AAppendix A