Telenor-NEC Microwave Quality Standard. 26-May-2008 NEC Islamabad. Name of Documentation ; Telenor-NEC MW Quality Standard. When performing hazardous work or entering potentially hazardous area wear protective equipment, such as safety belt / head or eye protection. - PowerPoint PPT PresentationTRANSCRIPT
NEC Internal Use Only
1
26-May-2008NEC Islamabad
Telenor-NEC Microwave Quality Standard
NEC Internal Use Only
Page 2
NEC Internal Use OnlyNEC Internal Use Only
2
DateDocument Number
Version Number
Creator Approval Sender Send to;
16-OCT-07 TP-NEC-QLS 00 NEC
Kawakubo NEC ISB
Yanagidare GMNEC Kawakubo
Region
Coordinator
22-OCT-07 TP-NEC-QLS 01 NEC
Kawakubo NEC ISB
Yanagidare GMNEC Kawakubo
Region
Coordinator
13-DEC-07 TP-NEC-QLS 02 NEC
Glenn Marciano NEC ISB Kawakubo
NEC Glenn
Marciano Region
Coordinators
09-June-08 TP-NEC-QLS 03
NEC Gulraiz, Shafique, Zulfiqar, Usman, Attaullah
NEC-ISB
H Ishii AttaullahImplementation,QAQC,O&M
Name of Documentation ; Telenor-NEC MW Quality Standard
NEC Internal Use Only
Page 3
NEC Internal Use OnlyNEC Internal Use Only
3
Safety Guidelines for Equipment Installation
When performing hazardous work or entering potentially hazardous area wear protective equipment, such as safety belt / head or eye protection.
Smoking or open flame are prohibited on operation area.
Properly remove and dispose of all unused hazardous materials.
Comply with hazardous material documentation and reporting requirement.
After using power tool or any other equipment, they must be cleaned and put in storage on daily basis.
Keep all tool within designated work area.
When cutting any kind of material safety glasses must be used .
When handling conducting cable, the cable ends must be taped & insulated.
All accidents on-site must be reported to appropriate personal immediately.
NEC Internal Use Only
Page 4
NEC Internal Use OnlyNEC Internal Use Only
4
Indoor Installation Work flow
IDU Installation
Grounding of Equipment
End
IDU Installation
C-node Installation
19" Rack Installation
DDF Installation
Cable layout & Termination
Grounding of Equipment
Labeling of Equipment
DC PDP Installation
Start
End
NEC Internal Use Only
Page 5
NEC Internal Use OnlyNEC Internal Use Only
5
Assemble the 19" rack.
Position the rack as per floor plan.
Mark the four holes with two base plates.
Drill the marked hole.
Fix the Rawal bolts.
Installed the rack (Distance from rear wall at least 200mm).
Check the leveling of the rack.
Install the grounding bus bar at upper rear side of 19" rack.
Install the blind panel in front of grounding bus bar.
Separate grounding of 19" rack should be done in shortest possible route.
19" Transmission Rack
NEC Internal Use Only
Page 6
NEC Internal Use OnlyNEC Internal Use Only
6
19" Transmission Rack
19” rack with installed equipment 19” rack
Site ID on 19” rack
Blind Panel at front of bus bar
Base plate
Improper installation of bus bar
NEC Internal Use Only
Page 7
NEC Internal Use OnlyNEC Internal Use Only
7
• Grounding bus bar at rear of rack
• Grounding for 19" Rack
• Blind panel of grounding bus bar
• Label for IDU
• Label for Power cable
• Link budget
19" Transmission Rack
NEC Internal Use Only
Page 8
NEC Internal Use OnlyNEC Internal Use Only
8
Rack grounding
19" Transmission Rack
NEC Internal Use Only
Page 9
NEC Internal Use OnlyNEC Internal Use Only
9
DC PDB Installation
DC PDB with 10 branch circuit breakers. DC PDB installation with four screws Grounding of DC PDB. Labeling of branch circuit breakers. Power & grounding cables separately routed. Circuit breaker for IDU & C-Node is 6 amperes.
PDB Grounding
0 VDC
-Ve 48V DC
Branch CB labeled with Far end ID
6 Amps circuit breaker for IDU & C-node
DC PDB Inner viewDC PDB Installation in 19’’ rack
NEC Internal Use Only
Page 10
NEC Internal Use OnlyNEC Internal Use Only
10
Rectifier Circuit breakers for NEC Equipment
32 amperes circuit breaker for DC PDB with 5 branch circuit breakers and 60 amperes circuit breaker for DC PDB with 10 branch circuit breakers.
Rectifier CBs for NEC Equipment at out door site Rectifier CBs for NEC Equipment at indoor site
NEC Internal Use Only
Page 11
NEC Internal Use OnlyNEC Internal Use Only
11
Indoor Unit Installation
Before installing IDU in 19" rack ,should be retighten the screws of bracket while correcting two brackets to 90º for IDU mount horizontally.
NEC Internal Use Only
Page 12
NEC Internal Use OnlyNEC Internal Use Only
12
IDU must be installed with four screw, along with washers. All screws must be securely tighten. All screws must be of same size ( M5 ). IDU must be separately grounded with bus bar. Grounding thimble must be properly crimped. IDU must be labeled with far end ID.
Indoor Unit Installation
NEC Internal Use Only
Page 13
NEC Internal Use OnlyNEC Internal Use Only
13
Space between two IDUs
Space between two IDUs must be 1 U* for radiation of heat.
Space between two units will be1 U
*1U = 1.75inches = 44.45mm
NEC Internal Use Only
Page 14
NEC Internal Use OnlyNEC Internal Use Only
14
C-Node Installation Unpack and inspect received equipment for any damage and missing material Site preparation as per define layout. Mount C-node sub rack in 19" rack. Fasten the sub rack to the 19" rack with appropriate (M6) screws. Ensure proper length and routing of fiber/E1s cables. Use Flexible pipe for fiber patch cord when laid out of 19" rack .
C-Node tributary/E1 cables arrangement Fiber patch cord Use Flexible pipe for fiber patch cord when laid out of 19" rack .
NEC Internal Use Only
Page 15
NEC Internal Use OnlyNEC Internal Use Only
15
DDF Installation
The E1 cable is to be stripped with sufficient length to reach DDF, unused wires to be cut and PVC tape must be used at the ends.
The E1 cable must be arranged and neatly run around the 19" rack to the DDF panel.
No extra cable should be left in side the rack. Grounding of DDF/DDP must be ensured. DDF/DDP should be installed at bottom of rack.
Cable arrangement on DDF panel rear view Cable arrangement on DDF panel front view
NEC Internal Use Only
Page 16
NEC Internal Use OnlyNEC Internal Use Only
16
DDF Grounding /Labeling
Ensure Labeling of E1s on the DDF. Hang DDF plan for O&M activity.
E1s patching on DDF
DDF grounding
DDF grounding
NEC Internal Use Only
Page 17
NEC Internal Use OnlyNEC Internal Use Only
17
Cable layout &Termination
E1s cable and DC, AC power cable must be run separately along the cable rack as standard rule for cable management.
Use flexible pipe for power cable/ optical fiber patch cords. Use surge arrestor for IF cable. All grounding cable must be of shortest possible length.
Cable layout Flexible pipe for fiber patch cord
Grounding Cable Surge Arrestors
NEC Internal Use Only
Page 18
NEC Internal Use OnlyNEC Internal Use Only
18
Cable layout/Termination
NMS & E1s Cable layout
IF cable layout
IDU Power cable
NEC Internal Use Only
Page 19
NEC Internal Use OnlyNEC Internal Use Only
19
Cable Color and Size
Application color Dia /size
IDU grounding Yellow - Green 6mm
C-Node grounding Yellow - Green 6mm
DC PDB grounding Yellow - Green 6mm
DDF grounding Yellow - Green 6mm
Surge arrestor grounding Yellow - Green 2.5mm
ODU grounding Yellow - Green 6mm
19“ rack grounding Yellow - Green 10mm
DC PDB Power from rectifier* Red - Black 10mm
IDU DC Power cable Red - Black 1.5mm
C-Node Power cable** Red - Grey 1.5mm
* For sites in MSC the DC PDB power cable is blue, black** Prefabricated power cable with black jacket
NEC Internal Use Only
Page 20
NEC Internal Use OnlyNEC Internal Use Only
20
Grounding of Equipment
NEC Internal Use Only
Page 21
NEC Internal Use OnlyNEC Internal Use Only
21
Common Rule for Equipment Grounding
Yellow-Green color grounding cable. Should be laid with shortest length. Thimbles must be as per cable size. Use proper crimping tool to crimp the thimble. Grounding resistance less than 10 ohm. Ground connections must be securely tighten. No multiple connections with single point / thimble.
In case there is no point available for the grounding, it should be informed to the TP implementation team.
Grounding of surge arrestors.
NEC Internal Use Only
Page 22
NEC Internal Use OnlyNEC Internal Use Only
22
Labeling of equipment
Following equipment labeling is mandatory for effective O&M activity.
19" rack with near end site ID. Each hop with far end site ID. IF cables for main /stand by system. E1s cables . Fiber patch cords for end to end connectivity. Power cables for main/stand by system. Rectifier circuit breaker for NEC equipment. DC PDB branch circuit breaker with far end ID. Surge arrestor for main/stand by system. DC PDB labeling if more than one PDB is installed at the site.
NEC Internal Use Only
Page 23
NEC Internal Use OnlyNEC Internal Use Only
23
Outdoor Installation WorkflowOutdoor Installation Workflow
Start
Antenna Mounting
Antenna Offsetting & Assembling
Side Strut Position
Grounding
Labeling
IF Cable Run & Fixing
End
NEC Internal Use Only
Page 24
NEC Internal Use OnlyNEC Internal Use Only
24
Antenna offsetting
NEC Internal Use Only
Page 25
NEC Internal Use OnlyNEC Internal Use Only
25
Antenna Assembling
Unpack and inspect received equipment for any damage and verify the contents against packing list.
NEC Internal Use Only
Page 26
NEC Internal Use OnlyNEC Internal Use Only
26
Antenna Assembling
Assemble the mounting bracket with the antenna Assemble the mounting bracket with the antenna (Different sizes of antenna requires different mounting (Different sizes of antenna requires different mounting brackets, refer to the manual that comes along with the brackets, refer to the manual that comes along with the antenna for details)antenna for details)
NEC Internal Use Only
Page 27
NEC Internal Use OnlyNEC Internal Use Only
27
Antenna Assembling
Position the antenna to the mounting bracket then Position the antenna to the mounting bracket then place the mounting screws and tightenplace the mounting screws and tighten
NEC Internal Use Only
Page 28
NEC Internal Use OnlyNEC Internal Use Only
28
Antenna AssemblingThere are typical four kind of connection ways There are typical four kind of connection ways
to antennato antenna
1- 1- ODU DirectODU Direct
2- Transducer2- Transducer
3- Flexible 3- Flexible WaveguideWaveguide
4- Hybrid4- Hybrid
NEC Internal Use Only
Page 29
NEC Internal Use OnlyNEC Internal Use Only
29
Antenna Mounting
Use enough man power for lifting Use enough man power for lifting and installation of antenna.and installation of antenna.Use rope and pulley for antenna Use rope and pulley for antenna installation. installation.
Take extra care while lifting the big Take extra care while lifting the big size antenna (1.8m) or lifting the size antenna (1.8m) or lifting the antenna to high points.antenna to high points.
Hold the antenna using Rope from Hold the antenna using Rope from down side during the lifting so that down side during the lifting so that antenna do not touch the tower by the antenna do not touch the tower by the wind.wind.
Use proper PPE (Personal Protective Use proper PPE (Personal Protective Equipment) when lifting the antenna.Equipment) when lifting the antenna.
NEC Internal Use Only
Page 30
NEC Internal Use OnlyNEC Internal Use Only
30
Take out the ODU from the box, inspect it carefully for any damage.Take out the ODU from the box, inspect it carefully for any damage.
Antenna Mounting with ODU Direct
NEC Internal Use Only
Page 31
NEC Internal Use OnlyNEC Internal Use Only
31
Antenna Mounting with ODU Direct
Fix the ODU to the bracket with four screws (tightening torque is 4.0 Fix the ODU to the bracket with four screws (tightening torque is 4.0 N.m +/- 10% recommendation). N.m +/- 10% recommendation). Be careful not to damage the O-ring (Antenna). Be careful not to damage the O-ring (Antenna). Polarization should be according to link plan.Polarization should be according to link plan.
NEC Internal Use Only
Page 32
NEC Internal Use OnlyNEC Internal Use Only
32
Antenna Mounting with Transducer
Assemble the antenna, fix the ODU to the bracket by tightening the M6 screws Assemble the antenna, fix the ODU to the bracket by tightening the M6 screws (four locations) & ensure it is firmly fixed. IF connector should be sealed (four locations) & ensure it is firmly fixed. IF connector should be sealed according to standard both from ODU & antenna (Transducer) side.according to standard both from ODU & antenna (Transducer) side.
NEC Internal Use Only
Page 33
NEC Internal Use OnlyNEC Internal Use Only
33
Antenna Mounting with Flexible Waveguide
Assemble the antenna, fix the ODU to the bracket by tightening the M6 Assemble the antenna, fix the ODU to the bracket by tightening the M6 screws (four locations) & ensure it is firmly fixed. Waveguide should be screws (four locations) & ensure it is firmly fixed. Waveguide should be sealed according to standard both from ODU & antenna side.sealed according to standard both from ODU & antenna side.
NEC Internal Use Only
Page 34
NEC Internal Use OnlyNEC Internal Use Only
34
Antenna Mounting with Hybrid
Assemble the antenna with Hybrid, fix the ODU to the bracket by tightening the Assemble the antenna with Hybrid, fix the ODU to the bracket by tightening the M6 screws (four locations) & ensure it is firmly fixed. IF connector should be M6 screws (four locations) & ensure it is firmly fixed. IF connector should be sealed according to standard both from ODU & antenna (Hybrid) side.sealed according to standard both from ODU & antenna (Hybrid) side.
NEC Internal Use Only
Page 35
NEC Internal Use OnlyNEC Internal Use Only
35
Side Strut Position
Antenna Offsetting & Side Strut should be positioned in such a way that there should Antenna Offsetting & Side Strut should be positioned in such a way that there should be a suitable bending radius of IF cable/Waveguide, also the antenna should be free be a suitable bending radius of IF cable/Waveguide, also the antenna should be free to move 25 degrees (Left Offset) or 25 degrees (Right Offset) if requiredto move 25 degrees (Left Offset) or 25 degrees (Right Offset) if required
NEC Internal Use Only
Page 36
NEC Internal Use OnlyNEC Internal Use Only
36
IF Cable Run and Fixing
Black UV protect tie-wrap (310×4.3 mm) used to fix IF cable by cross tightens for vertical and horizontal cable run at 1.2m intervals.
The IF cable not to be over tightened to avoid any deformation to IF cable.
1.2m1.2m
NEC Internal Use Only
Page 37
NEC Internal Use OnlyNEC Internal Use Only
37
IF Cable Run and Fixing
IF cables installed on horizontal rack; silicon applied at porthole to ensure no water seepage
NEC Internal Use Only
Page 38
NEC Internal Use OnlyNEC Internal Use Only
38
IF Cable Run and Fixing
2 meter IF cable loop on tower behind antenna
NEC Internal Use Only
Page 39
NEC Internal Use OnlyNEC Internal Use Only
39
Water proofing of WG and IF cable at ODU end
Water proofing with self bonding and again with Plastic (PVC) tape
three layers each.
NEC Internal Use Only
Page 40
NEC Internal Use OnlyNEC Internal Use Only
40
Grounding Separate grounding point used for each cable, If no space available at bus bar
then both side of grounding bus bar can be used for two groundings only.
Single point ground termination Two groundings with single point termination
NEC Internal Use Only
Page 41
NEC Internal Use OnlyNEC Internal Use Only
41
ODU Grounding
ODU With Separate groundingsODU With Separate groundings
ODU must be separately Grounded with grounding clamp on tower.
Thimbles must be crimped with proper crimping tool.
Up to 0.6m antenna the Cable length will be at least 0.8 meter.Up to 0.6m antenna the Cable length will be at least 0.8 meter.
Ground terminations must be securely tighten at both ends.
Separate clamp for both ODUsSeparate clamp for both ODUs
Up to 1.2m antenna the Cable length will be at least 1meter.Up to 1.2m antenna the Cable length will be at least 1meter.
Thimble Crimping tool
The ODU grounding cable should be as short as possible.The ODU grounding cable should be as short as possible.
NEC Internal Use Only
Page 42
NEC Internal Use OnlyNEC Internal Use Only
42
IF Cable Grounding
At Horizontal cable TrayAt Horizontal cable TrayAt vertical cable TrayAt vertical cable Tray
IF cable grounding depends on the height of tower for more than 20 meter height; First grounding will be at vertical cable tray and second will be on horizontal cable tray prior to enter into Roxtec porthole .For less than 20 meter IF grounding will one time on vertical or horizontal cable tray depending on availability of grounding bus bar.
NEC Internal Use Only
Page 43
NEC Internal Use OnlyNEC Internal Use Only
43
IF Cable Grounding
Grounding kits must be properly terminated with each IF cable.
Separate grounding point of bus bar should be used for each IF cable.
Water proofing with self bonding followed by PVC tape three layers each time.
Thimble must be crimped with proper crimping tool and securely tighten with grounding bus bar
Black UV protect tie-wrap (310×4.3 mm) used at both ends of grounding kit for each IF cable.
Half of each turn must cover previous turn of tape while wrapping tape on the grounding kits
PVC tape wrappingSelf bonding tape wrapping PVC tape wrapping and black tie on both ends
NEC Internal Use Only
Page 44
NEC Internal Use OnlyNEC Internal Use Only
44
Labeling
Antenna Direction Label with Far end Site IDAntenna Direction Label with Far end Site ID
NEC Internal Use Only
Page 45
NEC Internal Use OnlyNEC Internal Use Only
45
Labeling
ODU metal label and Direction Tag tied with IF cableODU metal label and Direction Tag tied with IF cable
NEC Internal Use Only
Page 46
NEC Internal Use OnlyNEC Internal Use Only
46