August 24, 2015 Lake Nona Relief Middle School Site 52MSE2 Municipal Planning Board Project Narrative Project Description The project site is located within Unincorporated Orange County in Section 03, Township 24 South, Range 31 East Orange County, Florida (Parcel ID# 032431000000005). It is specifically located on Wewahootee Road. The project site is currently bounded by Wewahootee Road on the south and by undeveloped land on the north, east and west. Once complete, the proposed development will be bounded on the north by Innovation Way South Road. This facility is anticipated to serve 1213 students, with 150 staff members and provide a total of 201 parking spots (handicap parking included). The surrounding areas will be developed into residences; therefore, the proposed middle school shall have adequate classroom capacity to accommodate impacts of the new residential development. The proposed facility will ensure safe student access and will serve as a focal point for the community. The project is consistent with the City of Orlando Growth Management Plan. Vehicle Access and Parking: Site access is provided from proposed Innovation Way South at two locations. The first location will be primarily for Bus Access while the second location will be for staff/ Parent pickup parking. Public parking spaces will be provided to the west of the site and are accessible via Innovation Way South through the Bus Access entrance; while staff parking is located to the east. Parking areas are not interconnected per code. Pedestrian and Maintenance of Traffic: Pedestrian access is available from the north side of the project. The Design Team will coordinate pedestrian friendly access that promotes a safe ingress/egress of pedestrians. Stormwater: The project site is located within the jurisdiction of the South Florida Water Management District (SFWMD). A stormwater management system is required to provide water quality treatment and storage for new improvements. Retention/detention systems will be included as part of the new construction. The site is located in Zone X as defined by FEMA (Map Number 12095C0465F) as areas of minimal flood hazard, usually depicted on Flood Insurance Rate Maps as being above the 500year flood level. Water and Wastewater Service: Potable water service is not currently provided to the site. The developer will install new potable water lines on Innovation Way South which will provide domestic and fire water service. A new meter and backflow prevention device sized accordingly to meet the domestic and fire water demands will be provided. Wastewater service is not currently provided to the site. A new Orange County wastewater collection system will be installed in Storey Park to accommodate the proposed school project and would connect to the Orange County wastewater system. Summary: The Lake Nona Middle School will be located in an area of future developments. This location has and will continue to require the need for this facility. The proposed school, with 150 staff members, will serve 1213 students in the area. The design ensures safe student access and will serve as a focal point for the community. This facility is consistent with the City of Orlando Growth Management Plan.

Upload: others

Post on 09-Feb-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

  • August 24, 2015 Lake Nona Relief Middle School ‐ Site 52‐M‐SE‐2  Municipal Planning Board Project Narrative   Project Description The project site is located within Unincorporated Orange County in Section 03, Township 24 South, Range 31 East Orange County, Florida  (Parcel  ID# 03‐24‐31‐0000‐00‐005).    It  is  specifically  located on Wewahootee Road. The project site is currently bounded by Wewahootee Road on the south and by undeveloped land on the north, east and west. Once  complete,  the proposed development will be bounded on  the north by  Innovation Way  South Road. This facility is anticipated to serve 1213 students, with 150 staff members and provide a total of 201 parking spots  (handicap  parking  included).  The  surrounding  areas  will  be  developed  into  residences;  therefore,  the proposed middle school shall have adequate classroom capacity to accommodate  impacts of the new residential development.  The  proposed  facility  will  ensure  safe  student  access  and  will  serve  as  a  focal  point  for  the community. The project is consistent with the City of Orlando Growth Management Plan.   Vehicle Access and Parking:  Site access  is provided from proposed  Innovation Way South at two  locations. The first  location will be primarily for Bus Access while  the  second  location will be  for  staff/ Parent pickup parking. Public parking  spaces will be provided  to  the west of  the site and are accessible via  Innovation Way South  through  the Bus Access entrance; while staff parking is located to the east. Parking areas are not interconnected per code.  Pedestrian and Maintenance of Traffic:  Pedestrian  access  is  available  from  the north  side of  the project.   The Design Team will  coordinate pedestrian friendly access that promotes a safe ingress/egress of pedestrians.   Stormwater:  The project  site  is  located within  the  jurisdiction of  the South  Florida Water Management District  (SFWMD). A stormwater  management  system  is  required  to  provide  water  quality  treatment  and  storage  for  new improvements.  Retention/detention systems will be included as part of the new construction. The site is located in Zone X as defined by FEMA  (Map Number 12095C0465F) as areas of minimal  flood hazard, usually depicted on Flood Insurance Rate Maps as being above the 500‐year flood level.   Water and Wastewater Service:  Potable water service  is not currently provided to the site. The developer will  install new potable water  lines on Innovation Way South which will provide domestic and fire water service. A new meter and backflow prevention device sized accordingly to meet the domestic and fire water demands will be provided. Wastewater service is not currently provided to the site. A new Orange County wastewater collection system will be installed in Storey Park to accommodate the proposed school project and would connect to the Orange County wastewater system.   Summary: The Lake Nona Middle School will be located in an area of future developments. This location has and will continue to require the need for this facility. The proposed school, with 150 staff members, will serve 1213 students in the area. The design ensures  safe  student access  and will  serve  as  a  focal point  for  the  community. This  facility  is consistent with the City of Orlando Growth Management Plan.  

  • LED FULL COLORDISPLAY, CHANGEABLE

    BY REMOTE ACCESS

    10025

    OF (Total):

    DRAWN:

    CHECKED:

    DATE: SCALE:

    OCPS DRAWING FILE NAME:

    SHEET NUMBER:

    DESIGN

    &CONSTRUCTION

    FACILITIESSERVICES

    BLDG.200,6501MAGIC

    WAY

    ORLANDO,FLORIDA32809

    REVISIONS

    DATE

    BY

    DE

    SIG

    NO

    FF

    ICE

    :36

    60M

    AG

    UIR

    EB

    LVD

    .,S

    TE

    .10

    1,O

    RLA

    ND

    O,

    FL

    3280

    3A

    AC

    00

    011

    9w

    ww

    .Ha

    rva

    rdJo

    lly.

    com

    XR-ELEVATIONS 24x36

  • OF (Total):

    DRAWN:

    CHECKED:

    DATE: SCALE:

    OCPS DRAWING FILE NAME:

    SHEET NUMBER:

    DESIGN

    &CONSTRUCTION

    FACILITIESSERVICES

    BLDG.200,6501MAGIC

    WAY

    ORLANDO,FLORIDA32809

    REVISIONS

    DATE

    BY

    DE

    SIG

    NO

    FF

    ICE

    :36

    60M

    AG

    UIR

    EB

    LVD

    .,S

    TE

    .10

    1,O

    RLA

    ND

    O,

    FL

    3280

    3A

    AC

    00

    011

    9w

    ww

    .Ha

    rvar

    dJo

    lly.c

    om

    XR-ELEVATIONS 24x36

  • OF (Total):

    DRAWN:

    CHECKED:

    DATE: SCALE:

    OCPS DRAWING FILE NAME:

    SHEET NUMBER:

    DESIGN

    &CONSTRUCTION

    FACILITIESSERVICES

    BLDG.200,6501MAGIC

    WAY

    ORLANDO,FLORIDA32809

    REVISIONS

    DATE

    BY

    DE

    SIG

    NO

    FF

    ICE

    :36

    60M

    AG

    UIR

    EB

    LVD

    .,S

    TE

    .10

    1,O

    RLA

    ND

    O,

    FL

    3280

    3A

    AC

    00

    011

    9w

    ww

    .Ha

    rva

    rdJo

    lly.

    com

    XR-ELEVATIONS 24x36

  • OF (Total):

    DRAWN:

    CHECKED:

    DATE: SCALE:

    OCPS DRAWING FILE NAME:

    SHEET NUMBER:

    DESIGN

    &CONSTRUCTION

    FACILITIESSERVICES

    BLDG.200,6501MAGIC

    WAY

    ORLANDO,FLORIDA32809

    REVISIONS

    DATE

    BY

    DE

    SIG

    NO

    FF

    ICE

    :36

    60M

    AG

    UIR

    EB

    LVD

    .,S

    TE

    .10

    1,O

    RLA

    ND

    O,

    FL

    3280

    3A

    AC

    00

    011

    9w

    ww

    .Ha

    rva

    rdJo

    lly.

    com

    XR-ELEVATIONS 24x36

  • OF (Total):

    DRAWN:

    CHECKED:

    DATE: SCALE:

    OCPS DRAWING FILE NAME:

    SHEET NUMBER:

    DESIGN

    &CONSTRUCTION

    FACILITIESSERVICES

    BLDG.200,6501MAGIC

    WAY

    ORLANDO,FLORIDA32809

    REVISIONS

    DATE

    BY

    DE

    SIG

    NO

    FF

    ICE

    :36

    60M

    AG

    UIR

    EB

    LVD

    .,S

    TE

    .10

    1,O

    RLA

    ND

    O,

    FL

    3280

    3A

    AC

    00

    011

    9w

    ww

    .Ha

    rva

    rdJo

    lly.

    com

    XR-ELEVATIONS 24x36

  • 2015-08-21 MPB MASTER PLAN SUBMITTAL.pdfSheets and ViewsS0060_C100-ModelPLOT

    S0060_C200-ModelPLOT

    S0060_C201-ModelPLOT

    S0060_C300-ModelPLOT

    S0060_C301-ModelPLOT

    S0060_C400-ModelPLOT

    S0060_C401-ModelPLOT

    S0060_C402-ModelPLOT

    S0060_C403-ModelPLOT

    S0060_C500-ModelPLOT

    S0060_C501-ModelPLOT

    ARCHITECTURAL.pdfXR-ELEVATIONS 24x36Sign & Building 1Building 2Building 3Building 4 & 5Perspectives

    2015-08-21 MPB MASTER PLAN SUBMITTAL.pdfSheets and ViewsS0060_C100-ModelPLOT

    S0060_C200-ModelPLOT

    S0060_C201-ModelPLOT

    S0060_C300-ModelPLOT

    S0060_C301-ModelPLOT

    S0060_C400-ModelPLOT

    S0060_C401-ModelPLOT

    S0060_C402-ModelPLOT

    S0060_C403-ModelPLOT

    S0060_C500-ModelPLOT

    S0060_C501-ModelPLOT

    ARCHITECTURAL.pdfXR-ELEVATIONS 24x36Sign & Building 1Building 2Building 3Building 4 & 5Perspectives