Professional Experience Summary

Experience / Skill Summary

Working in Supervisory & Project Quality Inspection as an E&I QC Inspector & Site Engineer 14 years experiences in Onshore, Offshore and Subsea Project Construction, Quality and Pre Commissioning field ABROAD as well as NATIONAL in Petrochemical, Oil & Gas Industry, Refinery, Power Plant, Substation and Residential Construction. This experience has covered various works in Electrical & Instrumentation field to Execution, Testing and Pre Commissioning of Panels, Transformer, HV/MV/LV, HPU, WHCP, Power System, Grounding System, Cathodic Protection System, Flow, Level, Pressure, Temperature Transmitter and Switches, Pressure, Temperature Gauge, Hydraulic Tubing, HPU and WHCP.

� To perform Material receiving, Execution, Construction, Inspection and Testing according to IEC, NEC, UL, BS, IEEE, ANSI, ASTM and Company/Client standards (i.e. ARAMCO, PDO, SATORP, RLOC, ZADCO Oryx GTL etc.) Requirements with reference of Area Classification. � To Create and Inspect the RFI (Request for inspection) according to ITP/QCP requirement and sequence. � Inspection and Witness of construction executions and testing according to ITP, Project specification and Standards requirements. � To Analyze and Issue the LBE (Log Book Entry), Surveillance and NCR (Non Conformity Report) against the standard violation and assist in developing corrective action. � Give proactive notifications to construction department about standards to avoid the Re-works, loss of materials and men-hours by verbal/mail/ issuing LBE. � To prepare the weekly & monthly QC reports. � Maintain and aware about PQI (Project Quality Index) percentage. � Attend the client QC MOM (Minutes of meeting). � Attend the Quality audit and Pre commissioning walkthrough. � Understand the single line diagram, P&ID diagrams, Hookup Diagrams, Loop Wiring Diagrams, Switchgear Drawing, Marshalling and other all Panel Drawings, Junction boxes detail Cable and Earthing Layout and Instrument specification/data sheet etc. � Preparation and review of project QCPs (Quality Control Plans), ITPs (Inspection Test Plans) and Method statements and other quality Management system procedures, as built and daily progress reports. � Prepare and review the AS BUILT and RED Markup drawings according to executed works. � Prepare measurement and billing of project as per BOQ (Bill of quantity) and executed works. � Able to communicate and coordinate with client and all levels of the organization personals in polite way, identify problems and propose solutions to improve work practices. � Knowledge in Electrical & Instrumentation field trouble shooting and maintenance background in both construction and pre commissioning. � The wiring method and material installation inspected according to IFC drawings, IEC, NEMA and NEC article: 300

Contact Detail • [email protected][email protected] • Mb: +91 800 2398 325 • Mb: +91 966 1317 775

Education

• Diploma in ELECTRICAL & ELECTRONIC ENGINEERIN from the Board of Technical Education Karnataka in year 2002

• Matriculation passed from B.S.E.B PATNA in year 1998

Eligibility

• Saudi ARAMCO approval for QC E&I Inspector (Ref: WAPIS/L-02/2010)

• SATORP approval for QC Elect. Inspector (Ref: JER-35421-LET-CNVP-TPSA-2011-000395)

• Basic OFFSHORE Safety Induction & Emergency Training (OPITO Approved)- Ref: 0058570004031435906

• Basic H2S Training for OFFSHORE (OPITO Approved)- Ref: 74069014060816163972

• ADMA Offshore OPTIMA No: 558941 • UAE Offshore CINA Pass No: 325389108

HSE Training • HSE Induction • PTW • Heat Stress Awareness • Working at Height Awareness • Confined Space Entry Awareness • LOTO • H2S Entry Permit (PDO) • Behaviour Based Safety (Technip) • BOSIET & H2S (OPITO Approved) • PPE Awareness

Passport Detail Passport no : Z 3742027 Date of issue : 31.05.2016 Date of expiry : 30.05.2026 Place of issue : PATNA

Page 2: 1_CV_E&I- QC Supervisor- JAMAL

Permanent Address, S/o- Mohammad AKHTAR At/Po- Telpur, Via- Harinagar, Dist- West Champaran, BIHAR (INDIA) Pin- 845103

Page 2 of 6 Z3742027

R E S U M E

JAMAL AKHTAR E&I- QA/QC Supervisor

� Material Receiving, Handling, Execution & Inspection of cable Trays and all type of supports installation according to IFC Drawings, IEC 61537, NEMA VE1 & 2 and NEC article: 392 � Material receiving, Handling, Execution & Inspection of Conduits and all type of supports installation according to IFC Drawings, IEC 61386, UL, ANSI C80 and NEC article: 314 � Material Receiving, Handling, Execution & Inspection of Grounding & Bonding installation according to IFC Drawings, IEC, IEEE, UL and NEC article: 250 and testing of Grounding grid and Earth rods. � Material receiving, Handling, Execution Illumination checking & Inspection of Lighting system according to IFC Drawings, IEC, NEC and IESNA for the Area, Street, Substation/Building, Perimeter etc. lighting systems. � Material receiving, Handling, Execution & Inspection of Panels, JBs, LCS, ELCS and Receptacles and there supports installation according to IFC Drawings, IEC, NEMA, NEC and check the IP rating & Area classification. � To perform the FAT (Factory Acceptance Test) for LV Panels. � Material receiving, Handling and Installation Inspection of substation equipment’s like Transformers, Switchgear, Control gear, AFD, DCS, MCC etc. according to IFC Drawings, NMR (Non Material Requirement) IEC, NEC, NEMA, IEEE and company/client Standards. � UPS and DC System material receiving, Handling, Installation & Inspection according to drawings, NMR, Manufacturer Recommendation, IEC, NEC, IEEE and company/client standards. � Rotating Electrical Machinery like Motors and Generator Material receiving, Handling, Installation & inspection according to Drawings, datasheets, NMR, Area Classification, IP rating, NMR, IEC, NEC, IEEE, NEMA and company/client standards. � Material receiving, Handling, Execution, Testing & Inspection of Cathodic Protection (CP) according to IFC Drawings, API 651, API RP1632, IEC, NEC � Material receiving, Handling, Execution, Testing & Inspection of Lightning System according to IFC Drawings, IEC, NEC (NFPA780), UL96. � Material receiving, Handling, Execution, Testing & Inspection of electrical scope of HVAC (Heating, ventilating & Air conditioning) according to IFC Drawings, IEC and NEC article: 440 � Material receiving, Handling, Execution, Testing & Inspection of Fire & Gas System- Push Button, Horn & Beacon and Fire Detection according to IFC Drawings, IEC and NEC. � Testing & Witness of LV Power, Control, Tried, Signal Cables Insulation Resistance/Megger and continuity test. � Testing & Witness of HV/MV Cables Insulation Resistance/Megger, Hi-pot and Continuity test. � Testing & Witness of LV & MV/HV Motors Insulation Resistance/Megger, Continuity test and resistance measure. � Testing Witness of Switchgear, Control gear, AFD, Transformers, UPS, DC System, etc. � Testing & Calibration Witness of Instrumentations like PT, FT, TT, Control valves, Gauges, etc. � Prepared, Review and Perform the Motors Solo Run and Loop Test. � Mechanical completion certificate (MCC/PMCC), Punch listing, Processing and Updating of QC documentation, QC Dossier and implementing the QC plan. � Prepare the SQ/TQ according to site requirement. � Prepare the QA/QC Dossiers. � Knowledge of prepare the Method Statements. � Mobilization of manpower with toolbox talk (as per JHA). � Work execution and inspection in existing project for Shutdown Job � Work execution and inspection in existing project for Subsea Cable Pulling

Page 3: 1_CV_E&I- QC Supervisor- JAMAL

Permanent Address, S/o- Mohammad AKHTAR At/Po- Telpur, Via- Harinagar, Dist- West Champaran, BIHAR (INDIA) Pin- 845103

Page 3 of 6 Z3742027

R E S U M E

JAMAL AKHTAR E&I- QA/QC Supervisor

Detailed Career History E&I/Telecom QC Inspector & Supervisor (2016) TECHNIP France, QATAR

Job title: E&I/Telecom QC Inspector & Supervisor

Department: QC & Construction

Time Duration: 06.08.2016 to 27.08.2016

Site Location: FMB Offshore- Qatar Petroleum, Rass Laffan Industrial City, Qatar

Scope of E&I Work: Execution & Inspection of SUBSEA Cables (FO & Power), it’s include laying, end cutting, OTDR, Continuity & IR Test, End Cap & Pull-in head installation, monito the tension on the cables during pulling, J-Tube seal with Bend Resistor Installation and Hang Off assembly installation. Monitor the ROV survey machine & work executed by Saturated Dividers.

E&I QC Inspector & Supervisor (2016) TECHNIP Doha, QATAR

Job title: E&I QC Inspector & Supervisor

Department: QC & Construction

Time Duration: 24.02.2016 to 31.04.2016

Site Location: ORYX GTL, Rass Laffan Industrial City, Qatar

Scope of E&I Work: Execution, Inspection & Pre Commissioning in SHUTDOWN Project- Tie in Grounding System including Earth Pits. Process Plant Lighting System modification & installation, Motors & Transformers replacement, LV Switchgear extension, Modification in UPS & Consoles, Demolition & Reinstallation of existing Instruments, Cables, Trays and Tubes.

E&I QC Inspector & Supervisor (2014-2015) TECHNIP France, United Arab Emirates

Job title: E&I QC Inspector & Supervisor

Department: QC & Construction

Time Duration: 22.02.2014 to 20.10.2015

Site Location: EPC1, ZADCO-Offshore, Upper Zakum Field and SATAH Full Fill Development Project-ZADCO Offshore, Zirku Island, Abu Dhabi

Scope of E&I Work: Execution, Inspection & Pre Commissioning- Grounding System including Earth Pits, Grounding Grid, Equipment’s & System Grounding. Process Plant Lighting System, F&G System, PAGA System, Hydraulic Tubing, HPU, WHCP, X-Tree/Well Head Hook Up, PSLL/PSLL Pilot Sensors, Impulse Tubing, Process plant Instruments (PDI, PT,FT, PI, LG), Rotating equipment’s- Motors and TER include Transformers, LV Switchgear, F&G Panels, UPS, HVAC, IRP, Battery Banks. Cable Ladder installation, Electrical, Instrument & FO Cables Pulling, Testing, Termination & Splicing.

Page 4: 1_CV_E&I- QC Supervisor- JAMAL

Permanent Address, S/o- Mohammad AKHTAR At/Po- Telpur, Via- Harinagar, Dist- West Champaran, BIHAR (INDIA) Pin- 845103

Page 4 of 6 Z3742027

R E S U M E

JAMAL AKHTAR E&I- QA/QC Supervisor

E&I QC Inspector (2011-2014) TECHNIP Italy, Kingdom of SAUDI ARABIA

Job title: QC Electrical Inspector

Department: QA / QC

Time Duration: 20.07.2011 to 30.07.2013

Site Location: JER, SATORP, Pkg- 2A, Jubail, KSA

Scope of E&I Work: Inspection & Pre-Commissioning- Grounding System including Earth Pits, Grounding Grid, Equipment’s & System Grounding, Lightening Arrester System, Process Plant Lighting System, Street Lighting, Aviation Lighting, Impulse Tubing, Airline tubing, Process plant Instruments (PT, PDT, FT, TT, LT, PI, PDI, TI, LG), Rotating equipment’s- Motors & Compressors, Substations include Transformers, MV/LV Switchgear, F&G Panels, UPS, HVAC, IRP, Battery Banks. Cable Ladder installation, Above & Under Ground Electrical, Instrument & FO Cables Pulling, Testing, Termination & Splicing.

E&I QC Site Engineer (2010-2011) M.S AL SUWAIDI-SIS, Kingdom of SAUDI ARABIA

Job title: E&I QC Engineer

Department: QA / QC

Time Duration: 11.01.2010 to 07.04.2011

Site Location: ARAMCO Bulk Plant, Turaif, KSA

Scope of E&I Work:

Execution, Inspection & Pre-Commissioning- Grounding System including Earth Pits, Grounding Grid, Equipment’s & System Grounding, Tanks Cathodic Protection System, Process Plant Lighting System, Parameter Lighting, Impulse Tubing, Airline tubing, Process plant Instruments (PT, PDT, FT, TT, Radar-LT, LT, PI, PDI, TI, LG), Rotating equipment’s- Motors, Substations include LV Switchgear. Cable Ladder installation, Above & Under Ground Electrical & Instrument Cables Pulling, Testing, Termination & Splicing. Dismantling of existing substation,

Page 5: 1_CV_E&I- QC Supervisor- JAMAL

Permanent Address, S/o- Mohammad AKHTAR At/Po- Telpur, Via- Harinagar, Dist- West Champaran, BIHAR (INDIA) Pin- 845103

Page 5 of 6 Z3742027

R E S U M E

JAMAL AKHTAR E&I- QA/QC Supervisor

E&I QC Inspector (2008-2009) LAHOUD Engineering Co. Ltd, State of QATAR

Job title: E&I QC Inspector

Department: QA / QC

Time Duration: 11.03.2008 to 05.03.2009

Site Location: Ras Laffan Olefin Project, RLOC with Technip, Qatar

Scope of E&I Work: Inspection & Pre-Commissioning- Grounding System including Earth Pits, Grounding Grid, Equipment’s & System Grounding, Tanks Cathodic protection System, Process Plant Lighting System, Area Lighting, Street Lighting, Parameter Lighting, Impulse Tubing, Airline tubing, Process plant Instruments (PDI, PT,FT, PI, TT, RDT, TI, LT, LG), Rotating equipment’s- Motors, Substations include Transformers, HV/MV/LV Switchgear, F&G Panels. Work in Boilers & Furnaces, Cable Ladder installation, Above & Under Ground Electrical & Instrument Cables Pulling, Testing, Termination & Splicing.

E&I Supervisor and Inspector (2006-2007) Gulf Petrochemical Services & Trading LLC, Sultanate of OMAN

Job title: Electrical Foreman

Department: Construction

Time Duration: 06.02.2006 to 13.12.2007

Site Location: PDO, GGP-Yebal, Oman Refinery-Min Al Fahal, Oman

Scope of E&I Work: Execution, Inspection & Pre-Commissioning- Grounding System including Earth Pits, Grounding Grid, Equipment’s & System Grounding, Cathodic protection System, Process Plant Lighting System, Street Lighting, Parameter Lighting, Impulse Tubing, Airline tubing, Process plant Instruments (PDI, PT,FT, PI, TT, RDT, TI, LT, LG), Rotating equipment’s, Substations include HV/MV/LV Transformers, HV/MV/LV Switchgear, F&G Panels. Work in Compressor, Cable Ladder installation, Above & Under Ground Electrical & Instrument Cables Pulling, Testing & Termination. Splicing of HV Cables

E&I Site Engineer (2003-2005) JASUBHAI Engineering Pvt. Ltd, INDIA

Job title: Site Engineer

Department: Construction

Time Duration: 24.06.2003 to 15.12.2005

Site Location: Tarapur Atomic Power Plant-Mah, Gujrat Refinery-Baroda, Jindal Saw Pipe-Gujrat, INDIA

Scope of E&I Work:

Execution & Inspection- Grounding System including Earth Pits, Grounding Grid, Equipment’s & System Grounding, Process Plant Lighting System, Street Lighting, Impulse Tubing, Airline tubing, Process plant Instruments (PDI, PT,FT, PI, TT, RDT, TI, LT, LG), Rotating equipment’s- Motors & Turbines, Substations include LV Transformers, LV Switchgear. Cable Ladder installation, Above & Under Ground Electrical & Instrument Cables Pulling, Testing & Termination.

Page 6: 1_CV_E&I- QC Supervisor- JAMAL

Permanent Address, S/o- Mohammad AKHTAR At/Po- Telpur, Via- Harinagar, Dist- West Champaran, BIHAR (INDIA) Pin- 845103

Page 6 of 6 Z3742027

R E S U M E

JAMAL AKHTAR E&I- QA/QC Supervisor

E&I Site Engineer (2002-2003) ROHINI Industrial Pvt. Ltd, INDIA

Job title: Site Engineer

Department: Construction

Time Duration: 01.07.2002 to 25.05.2003

Site Location: Birla Copper-Gujrat, DLF-Gurgaon, INDIA

Scope of E&I Work: Execution, Inspection & Commissioning- Grounding System including Earth Pits, Grounding Grid, Equipment’s & System Grounding. Process Plant Lighting System, House Wiring, HVAC System, Lift Installation, Impulse Tubing, Process plant Instruments (PDI, PT,FT, TT, PI), Rotating equipment’s- Motors, Turbines and Transformers, LV Switchgear, HVAC. Cable Ladder installation, Electrical & Instrument Cables Pulling, Testing, Termination & Splicing

License Detail

License to D rive : Motor Cycle & Light Motor Vehicle License no : BR-220090009661 (3629/2009/BTH) Date of issue : 31.08.2009 Date of expiry : 25.01.2022 Place of issue : DTO Bettiah, West Champaran, Bihar, INDIA

Date of Birth

January 26, 1982

Declaration I declare that all above my declaration are best of my knowledge & I am sure that after going through my experience profile in previous pages you will find sincerity in my qualification & experience for above mentioned post.

Current Location

P 67/3, 1st FLR, Gali#4, Near 20 Futta, Batla House, Okhla, ND25 Mb: +91 800 2398 325 LinkedIn: https://ae.linkedin.com/pub/jamal-akhtar/19/b16/678 Date: January 26, 2017

JAMAL Akhtar [email protected]