123-321 model 2003
TRANSCRIPT
-
8/6/2019 123-321 Model 2003
1/14
123-321 Model
2
2
21/12/2010 prepared by hari ram
-
8/6/2019 123-321 Model 2003
2/14
21/12/2010 prepared by hari ram
-
8/6/2019 123-321 Model 2003
3/14
Type of product we are using
1. consuming in 1 day 2. consuming in 3 day
3. consuming in 7 day
21/12/2010 prepared by hari ram
-
8/6/2019 123-321 Model 2003
4/14
Product1
Product2
product
Product3
P roduct categorization
Consume in one day
Consume in 3days Consume in 7
days
21/12/2010 prepared by hari ram
-
8/6/2019 123-321 Model 2003
5/14
In this categories, take component which is beingconsumed within 1 dayFor example. SA/KY-1G, BRL/EC/G34/NPSM,BRL/KF111/K29/BU2, SA/BN/RBP etc.Remain component material do return back toSTORE-RM next 1 day
RECOVERY STORE-RM team will monitor these all activities1 day for rejection clearance
21/12/2010 prepared by hari ram
-
8/6/2019 123-321 Model 2003
6/14
All document submitted to concerned person,if any document not fully prepare then askedabout reason with section incharge signatureDivide parent assembly into sub assembly foreg. SA/G34/N PSM
SA/HD/G34/N PSSA/HND/KF136/NI
SA/BRL/EC/G34/BU8
21/12/2010 prepared by hari ram
-
8/6/2019 123-321 Model 2003
7/14
Consider the component which is being usedin 3 daysFor example. SA/CMP/10, SA/CMP/12,SA/RB/1, SA/RBP/3V etcRemain component material do return back toSTORE-RM next 1 day
RECOVERY STORE-RM team will monitor these all activities2 day for rejection clearance
21/12/2010 prepared by hari ram
-
8/6/2019 123-321 Model 2003
8/14
All document submitted to concerned person,if any document not fully prepare then askedabout reason with section incharge signatureDivide parent assembly into sub assembly
21/12/2010 prepared by hari ram
-
8/6/2019 123-321 Model 2003
9/14
Consider the component which is being usedin 7 daysFor example. SA/G34/NPSM,SA/K45/01B,SA/K45/B, SA/K29C-01G etcRemain component material do return back toSTORE-RM next 3 day
RECOVERY STORE-RM team will monitor these all activities3 day for rejection clearance
21/12/2010 prepared by hari ram
-
8/6/2019 123-321 Model 2003
10/14
All document submitted to concerned person,if any document not fully prepare then askedabout reason with section incharge signatureDivide parent assembly into sub assembly
21/12/2010 prepared by hari ram
-
8/6/2019 123-321 Model 2003
11/14
Recovery STORE-RM Team, 1 incharge with 4subordinateProper monitoring by concerned personDivide parent assembly into sub assemblyIf we occur no of nos rejection on conveyor line soSTORE-RM will provide material in 15 to 20 minWe can start this exercise with any one department atinitial stage, for this we have need 1 incharge with one
subordinateIf it is successful implemented subsequently we canimplement this model in other department
21/12/2010 prepared by hari ram
-
8/6/2019 123-321 Model 2003
12/14
Zero inventory in assemblyElimination of internal put away(I PA) andimplementation of pick option in inventory
Daily basis rejection recognition and rejectionclear on daily basisHelp to maintain 5 smore space availability
Minimize the chance of mixingsingle piece calculation on daily basisCost saving
21/12/2010 prepared by hari ram
-
8/6/2019 123-321 Model 2003
13/14
I ncrease productivity Help to Terminate stoke variation
We can prepare strong productionplanning, help in achieving schedulecompletion
Help in calculate accurate materialshortage
21/12/2010 prepared by hari ram
-
8/6/2019 123-321 Model 2003
14/14
Thank Ufor your precious time