  • 8/6/2019 123-321 Model 2003

    1/14

    123-321 Model

    2

    2

    21/12/2010 prepared by hari ram

  • 8/6/2019 123-321 Model 2003

    2/14

    21/12/2010 prepared by hari ram

  • 8/6/2019 123-321 Model 2003

    3/14

    Type of product we are using

    1. consuming in 1 day 2. consuming in 3 day

    3. consuming in 7 day

    21/12/2010 prepared by hari ram

  • 8/6/2019 123-321 Model 2003

    4/14

    Product1

    Product2

    product

    Product3

    P roduct categorization

    Consume in one day

    Consume in 3days Consume in 7

    days

    21/12/2010 prepared by hari ram

  • 8/6/2019 123-321 Model 2003

    5/14

    In this categories, take component which is beingconsumed within 1 dayFor example. SA/KY-1G, BRL/EC/G34/NPSM,BRL/KF111/K29/BU2, SA/BN/RBP etc.Remain component material do return back toSTORE-RM next 1 day

    RECOVERY STORE-RM team will monitor these all activities1 day for rejection clearance

    21/12/2010 prepared by hari ram

  • 8/6/2019 123-321 Model 2003

    6/14

    All document submitted to concerned person,if any document not fully prepare then askedabout reason with section incharge signatureDivide parent assembly into sub assembly foreg. SA/G34/N PSM

    SA/HD/G34/N PSSA/HND/KF136/NI

    SA/BRL/EC/G34/BU8

    21/12/2010 prepared by hari ram

  • 8/6/2019 123-321 Model 2003

    7/14

    Consider the component which is being usedin 3 daysFor example. SA/CMP/10, SA/CMP/12,SA/RB/1, SA/RBP/3V etcRemain component material do return back toSTORE-RM next 1 day

    RECOVERY STORE-RM team will monitor these all activities2 day for rejection clearance

    21/12/2010 prepared by hari ram

  • 8/6/2019 123-321 Model 2003

    8/14

    All document submitted to concerned person,if any document not fully prepare then askedabout reason with section incharge signatureDivide parent assembly into sub assembly

    21/12/2010 prepared by hari ram

  • 8/6/2019 123-321 Model 2003

    9/14

    Consider the component which is being usedin 7 daysFor example. SA/G34/NPSM,SA/K45/01B,SA/K45/B, SA/K29C-01G etcRemain component material do return back toSTORE-RM next 3 day

    RECOVERY STORE-RM team will monitor these all activities3 day for rejection clearance

    21/12/2010 prepared by hari ram

  • 8/6/2019 123-321 Model 2003

    10/14

    All document submitted to concerned person,if any document not fully prepare then askedabout reason with section incharge signatureDivide parent assembly into sub assembly

    21/12/2010 prepared by hari ram

  • 8/6/2019 123-321 Model 2003

    11/14

    Recovery STORE-RM Team, 1 incharge with 4subordinateProper monitoring by concerned personDivide parent assembly into sub assemblyIf we occur no of nos rejection on conveyor line soSTORE-RM will provide material in 15 to 20 minWe can start this exercise with any one department atinitial stage, for this we have need 1 incharge with one

    subordinateIf it is successful implemented subsequently we canimplement this model in other department

    21/12/2010 prepared by hari ram

  • 8/6/2019 123-321 Model 2003

    12/14

    Zero inventory in assemblyElimination of internal put away(I PA) andimplementation of pick option in inventory

    Daily basis rejection recognition and rejectionclear on daily basisHelp to maintain 5 smore space availability

    Minimize the chance of mixingsingle piece calculation on daily basisCost saving

    21/12/2010 prepared by hari ram

  • 8/6/2019 123-321 Model 2003

    13/14

    I ncrease productivity Help to Terminate stoke variation

    We can prepare strong productionplanning, help in achieving schedulecompletion

    Help in calculate accurate materialshortage

    21/12/2010 prepared by hari ram

  • 8/6/2019 123-321 Model 2003

    14/14

    Thank Ufor your precious time

    21/12/2010 prepared by hari ram