  • 7/29/2019 107th HSJV Weekly Meeting

    1/26

    2/24/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    P ease Turn o your

    mobile! Or Switch to

    vibration mode!

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Check! Right Now!

  • 7/29/2019 107th HSJV Weekly Meeting

    2/26

    2/24/20

    SCREEN

    Dont Panic11

    Switch Off All Electrical Equipment22

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Dont Run, Walk Fast!33

    Go to the Assembly Point44

    Wait for the Final Instruction55

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 107th HSJV Weekly Meeting

    3/26

    2/24/20

    1. Previous Meeting

    2. HSE Programs

    1. Previous Meeting

    2. HSE Programs

    5. Weekly Inspection

    6. Environmental Issues

    5. Weekly Inspection

    6. Environmental Issues

    3. HSE Statistics

    Performance per Area and Total

    4. HSE Findings Summary

    Findings analysis- cause

    wise, Company, and Area

    3. HSE Statistics

    Performance per Area and Total

    4. HSE Findings Summary

    Findings analysis- cause

    wise, Company, and Area

    7. Action Plans7. Action Plans

    BARAKAH NUCLEAR POWER PLANT PROJECT

    HSE Findings by Company

    Reported Near Miss Evaluation by Findings Score

    HSE Findings by Company

    Reported Near Miss Evaluation by Findings Score

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 107th HSJV Weekly Meeting

    4/26

    2/24/20

    NO.NO. ITEMSITEMS ACTIONACTION PLANSPLANS

    ACTIONACTION

    BYBY

    DUEDUE

    DATEDATE STATUSSTATUS

    Everyone is invited on activity today, all staff are

    advised to oin and su ort the 2013 HSE ObectivesBanner Signing

    by affixing their signature on the banner, and

    demonstrating their commitment in HSE objectives.

    ____ In ormaton

    2Low Submission

    of HSE Findings

    Hwachonalthough on initial phase with their

    construction will promote submission of HSE

    findings and aim to exceed from the total findings

    reported by HSJ V and KEPCO.

    HwachonNext

    Meeting

    3High HSE

    Seobon once again tops HSE findings after ratings

    are applied on all raised issues. The organization willSeobon

    Next

    BARAKAH NUCLEAR POWER PLANT PROJECT

    F n ngs revert back on next meeting on their planned

    countermeasures.

    ee ng

    4EmergencyEvacuationProcedure

    Copy of the emergency evacuation for identifiednon-permit required confined space at Power Block

    will be forwarded to ENEC HSE Mr. Chris. The entry

    access is located through a hole in dense set of

    vertical rebars.

    HSJ V Done

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Descript ionDescript ion ::

    Banner sign ing day last 18 Feb. 2013, 11:30 to 1:30 PM. Staff andBanner sign ing day last 18 Feb. 2013, 11:30 to 1:30 PM. Staff and

    Management participated in the campaign for 2013 HSE Objective. SeniorManagement participated in the campaign for 2013 HSE Objective. Senior

    Management personnel show their commitment for a safe constru ct ion.Management personnel show their commitment for a safe constru ct ion.

  • 7/29/2019 107th HSJV Weekly Meeting

    5/26

    2/24/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Company Installed Stand by

    Seo Yong 0 5

    ADVAN 1 3

    D&I 0 NA

    Total 1 8

    No. of winch (for emergency rescue) : 9 winch is available when emergency situation.

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Descript ionDescript ion ::

    No nNon--permit required conf ined space, retrieval system. Avai lable num ber ofpermit requir ed conf ined sp ace, retrieval system. Avai lable number of

    winch at s i t e that can be used as retrieval of personn el durin g emergency atwinch at s i t e that can be used as retrieval of personn el durin g emergency at

    l imited entry vert ical access conf ined space.l imited entry vert ical access conf ined space.

  • 7/29/2019 107th HSJV Weekly Meeting

    6/26

    2/24/20

    s s e s o es s e s o e

    presented andpresented and

    discussed bydiscussed by

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Team.Team.

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 107th HSJV Weekly Meeting

    7/26

    2/24/20

    Methods of Communicat ionMethods of Communicat ion ::

    1.1 . Safe ty A ler tsSafety Alerts

    ..

    3.3 . Notice boardsNotice boards

    4.4. Meet i ngsMeetings--

    dai ly, weekly, month lydai ly, weekly, month ly

    5.5 . Incident repor tsIncident reports

    6.6. Ot her sOthers

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Descript ionDescript ion ::

    The manner HSE issues are commun icated from site. Site Manager o fThe manner HSE issues are commun icated from site. Site Manager o f

    Subcontractor sh ould lead in the transfer of info rmation. Al l HSE issues andSubcontractor sh ould lead in the transfer of info rmation. Al l HSE issues and

    instru ct ions sho uld reach workers and understands the message correct ly.instru ct ions sho uld reach workers and understands the message correct ly.

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 107th HSJV Weekly Meeting

    8/26

    2/24/20

    Item

    Ancil lary Ar ea Camp Area Offic e Area Power Blo ck Village 1 Village 2 HSJV Total NMDC Total

    For theWeek

    CumFor theWeek

    CumFor theWeek

    CumFor theWeek

    CumFor theWeek

    CumFor theWeek

    CumFor theWeek

    CumFor theWeek

    Cum

    Near Misses 0 0 0 0 0 2 0 5 0 0 0 0 0 7 0 0

    Over speeding 0 0 0 0 0 0 0 0 0 1 0 0 0 1 0 0

    (This Week From Feb 16 Feb 22, 2013)

    First Aid Cases(FA) 0 1 0 0 0 0 2 4 0 2 0 2 2 9 0 0

    MedicalTreatment Cases

    (MTC)0 0 0 0 0 2 1 3 0 0 0 0 1 5 0 0

    Restricted Work

    Cases (RWC) 1 1 0 1 0 0 0 1 0 0 0 0 1 3 0 0

    LTIs 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    Property/Vehicle

    Accid ents 0 1 0 1 0 1 2 3 0 1 1 2 3 9 0 0

    Environmental0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Legend : Ancill ary Rebar Shop, Batch Plant, Paint Shop, Heavy Equipm ent Shop

    Power Block Cut Off Wall, Wharf Area, Concrete Block Area

    * : 41 cases (Oc t- Dec. 2011), 64 cases (2012), 4 (2013)

    e ease

    Forthisweek Cumulative

    OneStrike Policy 0 109*

    Source: CAR, Near Miss, Observation Cards and Walkthrough

    AreaNo. of No. of KEPCO

    SUBCON

    (This Week From Feb 16 Feb 22 , 2013)

    KEPCO&HSJV SUBCON

    Anc il lary

    Area5 52 8 44

    Camp

    Area4 20 16 4

    Office

    Area5 74 5 69

    Power

    150

    200

    250

    300

    350

    267

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Block 5 318 51 267

    Village 1 5 77 6 71

    Village 2 5 16 0 16

    Total Findings 557

    0

    50

    100

    Ancillary

    Area

    Camp

    Area

    Office

    Area

    Power

    Block

    Village1 Village2

    816

    5

    51

    6 0

    44

    4

    69 71

    16

  • 7/29/2019 107th HSJV Weekly Meeting

    9/26

    2/24/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    (This Week From Feb 16 Feb 22 , 2013)

    Issued

    NearMissNearMiss

    CARCAR

    0 0 0 0

    3 43 177 223

    Findings TotalKE

    P

    C

    O

    H

    S

    J

    V

    S

    U

    B

    C

    O

    N

    Open Closed

    KEPCO HSJV Subcon KEPCO SubconHSJV

    0 0 0 0 0 0

    3 0 0 0 43 177

    BARAKAH NUCLEAR POWER PLANT PROJECT

    TOTALTOTAL

    OC&

    WFOC

    &

    WF 0 40 294 334

    3 83 471 557

    0 0 0 0 40 294

    3 0 0 0 83 471

  • 7/29/2019 107th HSJV Weekly Meeting

    10/26

    2/24/20

    for the Period

    Company

    Feb16 Feb22,2013

    CCAP CAR/NM

    Geumhwa 1 0

    HSJV 1 0

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Total 3 0

    (This Week From Feb 16 Feb 22, 2013)

    4552

    59

    PPE

    MaterialManagement

    Access&Egress

    Signs,Barriers&barricades

    1111

    1320

    2122

    2425

    2932

    34

    Hand&PowerTools

    Documents

    Environmental

    Health&Welfare

    WasteManagement

    ColorCoding

    Lifting

    Scaffolding

    WorkingatHeight

    Plant&Equipment

    ElectricalSafety

    FirePrevention

    BARAKAH NUCLEAR POWER PLANT PROJECT

    15

    688

    9

    0 10 20 30 40 50 60 70

    ConfinedSpace

    PTW

    PoorIllumination

    HotWorks

    FallProtection

    Training

    Source: CAR, Near Miss, Walkthrough and Observation Card

  • 7/29/2019 107th HSJV Weekly Meeting

    11/26

    2/24/20

    Install barricade on open

    excavation ( RCB, Al Raeel) Surplus electrical cable Erect access way for

    personnel working at height

    1 32

    Provide details, warning

    signs on electrical

    distribution panel (PowerBlock, Gusan)

    Provide warning si gnage, and

    barricade on pipelines under

    hydro test (TGB, Younch ang

    PB)

    place (ADB, Seobon)

    Water proofi ng materials must

    not be left in the work ing area.

    (TGB1, Isam Kabbani)

    Initiate arrangement of

    storage area at steel

    fabrication ex. A place forplywood (Ancillary, Yooa)

    (RCB, Advan)

    Removal of obstruc tion on

    access to substation

    (STC, Jongh ap)

    Ensure ladder is secured as

    per industry practices

    (RCB, Seoyong PB)

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Lifting works should beenclosed by barricade

    (Village 1, Hyundai C&I)

    Signs, & Barricades Material Management

    Perform material arrangement

    in the area. (TGB, D&I)

    Access and Egress

    Clearing entrance of build ing

    from portable tools (Village

    1, Eunmin)

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 107th HSJV Weekly Meeting

    12/26

    2/24/20

    700

    800

    70

    80KEPCO/HSJV

    SUBCON

    (This Week From Feb 16 Feb 22, 2013)

    100

    200

    300

    400

    500

    600

    10

    20

    30

    40

    50

    60 Manpower

    BARAKAH NUCLEAR POWER PLANT PROJECT

    00

    Seoyo

    ng

    Seoyong(PB)

    TowersTech

    Gusan

    Gusan(PB)

    Eunm

    in

    Jongh

    ap

    Jonghap(PB)

    YounCha

    ng

    YounChang(PB)

    Hwach

    on

    W

    BG

    Hila

    lco

    Advan

    Hanlim

    Uw

    ell

    YooA

    HyundaiC&I

    Sam

    jin

    Euge

    ne

    Daemyu

    ng

    Seob

    on

    D

    &I

    AlRa

    eel

    DO

    W

    Sam

    ho

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 107th HSJV Weekly Meeting

    13/26

    2/24/20

    9.010.0

    FindingsScore=NumberofCausalxRisk(FactorScore)FindingsScore=NumberofCausalxRisk(FactorScore)

    Source: CAR, Near Miss, Walkthroughand Observation Card reported by

    KEPCO & HSJV

    0.01.02.03.04.05.06.07.0

    .

    3.8

    6.0

    3.6 4.1

    2.1 2.2

    0.20.9

    .

    1.5 1.5

    0.2

    2.93.6

    1.0

    BARAKAH NUCLEAR POWER PLANT PROJECT

    ActionPlanActionPlan forCompanyrequiringassistanceandsupportfromthesystemforCompanyrequiringassistanceandsupportfromthesystem

    1.JointInspection willbecarriedoutbyAreaManagementTeam.

    2.SpotTrainingwillbegiven toworkersaboutmajorfindings

    3.Actionplanwillbe submittedtoHSJVHSETeamdevelopby ADVAN

    Legend : (I) Infra, (PB) Power Block

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 107th HSJV Weekly Meeting

    14/26

    2/24/20

    Total No. of Findings: 55 Access&Egress,11

    Hand&PowerTools,1

    Health&Welfare,

    1

    Environmental,1Material

    Management,1HotWorks,1

    Signs,Barriers&Barricades,

    1 ColorCoding,1

    Cause Nos

    Access&Egress 11

    Housekeeping 9

    Control Measure Due Date

    Laddershouldbefixedby

    suitable part,accessmust

    beclearedofobstruction

    Alw ays

    Scaffolding,4

    FallProtection,2PPE,2

    WasteManagement,2

    ectr ca a ety,1

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Improvearrangement cables

    lyingontheground.

    Observehousekeeping

    at

    all

    times

    Alw ays

    Housekeeping,9FirePrevention,6

    Lifting,6Workingat

    Height,5

    Source: CAR, Near Miss, Walkthrough and Observation Card

    Top Hazards

    Total No. of Findings: 41

    Housekeeping,9

    PPE,2

    Scaffolding,1Supervision,1 ColorCoding,1

    ElectricalSafety,1

    Cause Nos

    Housekeeping 9

    Signs,Barriers&Barricades 5

    Control Measure Due Date

    Removalofexcessconcrete

    intimelymanner.

    ArrangementofcablesAlw ays

    Plant&

    Hand&PowerTools,2

    Health&Welfare,2

    Training,2

    BARAKAH NUCLEAR POWER PLANT PROJECT

    .

    Install barricadeonopen

    excavation.Scaffolding

    surplusmaterialsshouldbe

    boundedbybarricade.

    Alw ays

    Signs,Barriers&Barricades,5Workingat

    Height,4FirePrevention,3

    Access&Egress,3

    MaterialManagement,3

    Equipment,2

    Source: CAR, Near Miss, Walkthrough and Observation Card

  • 7/29/2019 107th HSJV Weekly Meeting

    15/26

    2/24/20

    Top Hazards

    Cause Nos

    Housekeeping 6

    Total No. of Findings : 37 Access&Egress,1 ColorCoding,1

    ElectricalSafety,2

    FirePrevention,1Waste

    Management,1

    Material

    Management,3 Training,1

    Signs, Barriers,&Barricades 6

    Control Measure Due Date

    Managementof

    housekeepingat

    constructionsite,and

    insidecamp

    Alw ays

    Complete barricadeof

    Health&

    Welfare,3

    Housekeeping,6

    Signs,Barriers&

    Barricades,6

    superv s on,

    BARAKAH NUCLEAR POWER PLANT PROJECT

    excavation, construction

    materialandstationary

    equipment.

    Alw ays

    Source: CAR, Near Miss, Walkthrough and Observation Card

    Lifting,2Plant&

    Equipment, 4

    ,

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 107th HSJV Weekly Meeting

    16/26

    2/24/20

    AREAAREA : Power B lock (: Power Block (AdvanAdvan) February 19,2013) February 19,2013

    CORRECTIVE ACTION:CORRECTIVE ACTION:

    BARAKAH NUCLEAR POWER PLANT PROJECT

    PLANNED SUPERVISOR PREVENTIVE ACTIONPLANNED SUPERVISOR PREVENTIVE ACTION

    AREAAREA :: Village 2 (AlVillage 2 (Al RaeelRaeel) February 19,2013) February 19,2013

    CORRECTIVE ACTION:CORRECTIVE ACTION:

    BARAKAH NUCLEAR POWER PLANT PROJECT

    PLANNED SUPERVISOR PREVENTIVE ACTIONPLANNED SUPERVISOR PREVENTIVE ACTION

  • 7/29/2019 107th HSJV Weekly Meeting

    17/26

    2/24/20

    AREAAREA : Pow er Bl ock (RCB/AB) (: Power Block (RCB/AB) (SeoyongSeoyong) Feb. 21, 2013) Feb. 21, 2013

    CORRECTIVE ACTION:CORRECTIVE ACTION:

    BARAKAH NUCLEAR POWER PLANT PROJECT

    PLANNED SUPERVISOR PREVENTIVE ACTIONPLANNED SUPERVISOR PREVENTIVE ACTION

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 107th HSJV Weekly Meeting

    18/26

    2/24/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    InspectionInspection DateDate AttendeesAtt endees RemarkRemarkCommit tee Inspec tion 2013-02-19 HSJV, KEPCO, HSE Managemen t Team 8 Find ings

    Weekly Inspection 2013-02-20 HSJV HSE Team 16 Findings

    3

    4

    5

    FindingsperCompany Total

    6NoPPE

    FindingsperCausal

    2

    1 1

    2 2

    4

    1 1

    2

    0

    1

    2

    Advan Geumhwa Hanlim Samjin Seobon Seoyong(PB) Uwell YounChang YounChang(PB)

    BARAKAH NUCLEAR POWER PLANT PROJECT

    1

    1

    1

    2

    2

    3

    0 1 2 3 4 5 6 7

    NoWorkPermit

    LacksSafetyControl

    PoorGrounding

    ImproperEquipment

    Lacks Training

    LacksFirePreventionEquipment

    Key item : Welding & Hot Works

  • 7/29/2019 107th HSJV Weekly Meeting

    19/26

    2/24/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    No.Source of

    InjuryArea Descr ip tion

    Immediate

    Act ion

    Planned Supervisor

    Preventive Act ion

    1 Backpain

    Hilal Co.

    SteelFixer

    Powerblock

    (laydown

    area

    Theabovementioned

    employeewashelpingto

    unloadsteelembeddedplate

    fromtheloadingbodyofpick

    up.Duringthetime,oneplate

    wasstackedwiththeother

    platethenheappliedmore

    pressureandhisbackgot

    Consult

    Oral

    analgesic

    givenfor

    pain

    BARAKAH NUCLEAR POWER PLANT PROJECT

    16022013

    11:20

    suspec e gamen spra n. e

    plateweightwasaround25kg

    andhandledbytwopersons

  • 7/29/2019 107th HSJV Weekly Meeting

    20/26

    2/24/20

    No. Source ofInjury

    Area Descr iption ImmediateAct ion

    Planned SupervisorPreventive Act ion

    2Pain,Right

    knee

    HSJV

    Workshop

    TowerCrane

    Operator

    PowerBlock

    Workersrightknee

    washitbyaslow

    movingcrane

    trolley.

    Analgesicspray

    applied

    Elasticbandage

    applied

    Icecompress

    done

    Oralanalgesic

    BARAKAH NUCLEAR POWER PLANT PROJECT

    17:00

    Mefenamic Acid

    No.Source of

    InjuryArea Descr iption

    Immediate

    Act ion

    Planned Supervisor

    Preventive Act ion

    3

    Hitting his

    rightlower

    back

    portionof

    hisear

    Seoyong

    Surveyor

    PowerBlock

    RCB/ABArea

    Hewasdoinghis

    surveyactivitieson

    thegroundlevel

    A&Bareawhen

    suddenlyahand

    cutterfellfromthe

    groundhittinghis

    DoctorReferral

    tooutsidefor

    further

    treatmentina

    Hospital.

    BARAKAH NUCLEAR POWER PLANT PROJECT

    10:00

    rightlower

    back

    portionofear.

  • 7/29/2019 107th HSJV Weekly Meeting

    21/26

    2/24/20

    No.Source of

    InjuryArea Descr ip tion

    ImmediateAct ion

    Planned SupervisorPreventive Act ion

    4

    Pain, Rt

    Ring&

    Smallfinger

    Swelling

    YooA

    Welder

    Ancillary,

    Steel

    Fabrication

    Shop

    Whilehesteppedonthe

    cabinsstair,hislegslipped

    andhelosthisbalance

    andfelldownwith

    weldingmachine.Hisright

    handring&smallfingers

    trappedinbetween

    Elastic

    Bandageapply

    withsplint

    Referralto

    Hospitalfor

    further

    evaluation

    BARAKAH NUCLEAR POWER PLANT PROJECT

    15:40

    ground.CheckXray.

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 107th HSJV Weekly Meeting

    22/26

    2/24/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Location PetrolStation

    Description Fuelleakagehappenedatconnectionpart duringfillingafueltank

    Actiontaken Imperviousdriptrayplacedonthechargingpointofthepetrolstation

    Status CLOSED

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Location Intersectionbetweenrebarshopandwarehouseinancillaryarea

    Description Allcontrolvalvesareexposedtopotentialaccident/incidentswithoutfenceandsignagearoundtheSTPFacility

    Actiontaken Installthefenceandpropersignagetopreventaccessofunauthorizedpersonnel

    Status OPEN

  • 7/29/2019 107th HSJV Weekly Meeting

    23/26

    2/24/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Location AroundRCB Unit2inpowerblock

    Description ObservedminorhydraulicoilleakagefromADVANconcretepumptruck#BNPP1987

    Theconnecting

    hose

    was

    damaged

    and

    temporary

    wrapped

    by

    gloves

    and

    tapes.

    Actiontaken Theconnectinghosewasrepaired andreplacedwithaproperjointvolt

    Status CLOSED

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Location GIBareainpowerblock

    Description Observedminorhydraulicoilleakagefromstationarydiesel generatorequipmentACM84

    Actiontaken Cleanedupcontaminatedsoilandprovideddriptraytocontainoilleakage

    Status CLOSED

  • 7/29/2019 107th HSJV Weekly Meeting

    24/26

    2/24/20

    INo.0 Date

    c i on y

    CompanyDescription Status

    osing

    Date

    xpiraion

    DateR ef . N o. M ai n Ar ea S ub -A re a I ss ued By

    Issuer

    CompanyUA/UC

    1 20Feb13 Hilalco

    StationarydieseloperatedgeneratorequipmentACM84observedminor

    hydraulicoilleakagebeneaththeequipment

    Closed 24Feb13 25Feb13 20130518PowerBlock

    GIBArea HSJVRenatoPonce

    UC

    2 20Feb13 Advan

    Advanconcretepumptrucki.d.#BNPP1987parkatRCBUnit2observed

    minorhydraulic oilleakageontheconcretegroundandthesourceof

    leakage istemporarywrapbyknetted

    Closed 23Feb13 25Feb13 20130524PowerBlock

    RCBUnit2

    HSJVRenatoPonce

    UC

    BARAKAH NUCLEAR POWER PLANT PROJECT

    g oves.

    3 24Feb13HSJVO&M

    Allcontrol

    valves

    are

    exposed

    to

    potentialaccident/incidentwithoutfenceandsignagearoundSTPfacilityin

    Ancillaryarea.

    Open 06Mar13 000000160 Ancillary

    Intersection

    between

    rebarshopand

    warehouse

    KEPCOYang,JiYoung

    UC

    WASTEMANAGEMENTUPDATE

    Week=14/02/2013 20/02/2013

    Thisweek Lastweek

    Collected(m3) Disposal(m3) Recycled(m3) Recycle(%) Collected(m3) Disposal(m3) Recycled(m3) Recycle(%)

    Paper 72 0 0 24 0 0

    Metal 32 0 90 88 0 0

    Construction 120 495 0 96 675 0

    Concrete 0 0 0 0 0 45Wood(Good) 0 0 0 0 0 0Wood(Bad) 192 180 0 280 225 0

    Plastic 72 0 0 104 0 0

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Legend:Collected WastefromSitetoTemporaryStorageAreaDisposal WastefromTemporaryStorageAreatoLandfillArea

    Recycle Treatedwaste(GMET)toRecyclingPlants

    Municipal 0 288 0 0 264 0Hazardous 16 16 0 0 0 0

    TotalSolidWaste 504 979 90 9.19% 592 1164 45 3.86%

  • 7/29/2019 107th HSJV Weekly Meeting

    25/26

    2/24/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 107th HSJV Weekly Meeting

    26/26

    2/24/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    BARAKAH NUCLEAR POWER PLANT PROJECT