Contractor: Al-Toukhi Co. for Industry & Trading JIZAN CPS EXTENSION PROJECT 263MW Contract #40621018/00 Testing & Commissioning Report: Client: Saudi Electricity Co. Southern Operation Area Page No. 1/2 TEST PROCEDURE FOR FM200 SYSTEM Manufacture: Protected Area: ______________________________________________________________________ Drawing Reference No.:______________________________________ Number of cylinders: _______________________________________ Sizes and model of nozzles:___________________________________ Number of nozzles: _________________________________________ GENERAL INSTRUCTION S.No . Description Status Remarks a) Advise all personnel working in or near to protected area of possible audible or visual alarms. b) Advice client, of any equipment, which will be switched off during the test. c) Check that the system has been installed in accordance with the drawings or note any changes to the system against the drawings. d) Before carrying out any further checks ensure the extinguisher system is isolated electrically and mechanically, remove all pneumatic actuators if fitted. e) Visually inspect the perimeter of the area any possible leaks.

Upload: ali-salman

Post on 07-Nov-2015

34 views

Category:

Documents


0 download

DESCRIPTION

FM-200

TRANSCRIPT

Contractor:Al-Toukhi Co. for Industry & Trading

JIZAN CPS EXTENSION PROJECT263MW Contract #40621018/00Testing & CommissioningReport:

Client:Saudi Electricity Co. Southern Operation AreaPage No. 1/2

TEST PROCEDURE FOR FM200 SYSTEM

Manufacture: Protected Area: ______________________________________________________________________Drawing Reference No.:______________________________________Number of cylinders: _______________________________________Sizes and model of nozzles:___________________________________GENERAL INSTRUCTION

S.No.DescriptionStatusRemarks

a)Advise all personnel working in or near to protected area of possible audible or visual alarms.

b)Advice client, of any equipment, which will be switched off during the test.

c)Check that the system has been installed in accordance with the drawings or note any changes to the system against the drawings.

d)Before carrying out any further checks ensure the extinguisher system is isolated electrically and mechanically, remove all pneumatic actuators if fitted.

e)Visually inspect the perimeter of the area any possible leaks.

Number of nozzles: _________________________________________

AL-TOUKHIAL-BILAD FFS LTD.CONSULTANT/SEC-SOA

Name:

Signature:

Date: