Evaluation of the Multiyear Plan 2000-2003Evaluation of the Multiyear Plan 2000-2003
José Paulo SilveiraMinistry of Planning, Budget and Management
Secretariat for Planning
José Paulo SilveiraMinistry of Planning, Budget and Management
Secretariat for Planning
2
A focused objective A focused objective
To promote the continuous
improvement of the Multiyear Plan
To promote the continuous
improvement of the Multiyear Plan
3
EVALUATIONEVALUATION
Two different targetsTwo different targets
Management
improvement
CONTROLCONTROL
Conformity
verification
4
· PPA Evaluation Manual
· Management Information System
· Training
· PPA Evaluation Manual
· Management Information System
· Training
A compreensive preparationA compreensive preparation
5
TrainingTraining
6
PPA Annual Evaluation Report
An evaluation in three stepsAn evaluation in three steps
Manager Sector Ministry Planning Ministry
• Results
• Program’s design
• Execution
• Results and strategy review
• Macroeconomicscenario
• Strategic objectivesreview
• Managementperformance
7
• Results (3)
• Execution (2)
• Recommendations for improvement (2)
Step 1: Program evaluationStep 1: Program evaluation
Multiple choice questions• Results (3)
• Program´s design (8)
• Execution (27)
Descriptive questions
8
• Program evaluation review
• Program results and strategy matrix
• Recommendations for improvement
• Program evaluation review
• Program results and strategy matrix
• Recommendations for improvement
Step 2: Results and sector strategy reviewStep 2: Results and sector strategy review
9
Program results and strategy matrix
Program results and strategy matrix
SECTOR STRATEGIC OBJECTIVES
SSO1 SSO2 SSO3 SSO4 ...PROGRAMS
Program 1R1R2R3
Program 2R1R2R3 ... Grade: 0 to 4
No contribution = 0 Full contribution = 4
10
• Accountability
• Resource allocation
• Partnership
PPA program conceptPPA program concept
A management unity for:
11
Example
Programa: ERRADICAÇÃO DO TRABALHO INFANTIL Objetivo: Eliminar a prática do trabalho por menores de 16 anos, salvo na condição de aprendiz.
Indicador: Índice mais recente: Índice final PPA: TAXA DE TRABALHO INFANTIL 11,170 5,000
12
Exemplo
Dados Financeiros em R$ milhões: Nacional: N NE SE CO S Total Recursos dos Orçamentos da União 362,0 51,1 611,5 33,4 37,0 0,6 1.095,8 Demais Fontes 0,0 0,0 0,0 0,0 0,0 0,0 0,0 Total 362,0 51,1 611,5 33,4 37,0 0,6 1.095,8
Example
13
Exemplo
Ações: Prod. Unid.Med. Nacional N NE SE CO S Total
Atendimento à criança e ao criança/adolescente em jornada escolar adolescente Unid. 749.323 120.090 1.353.253 62.440 61.164 0 2.346.270ampliada atendido
Concessão de bolsa criança/criança cidadã adolescente Unid. 456.522 62.156 802.343 43.848 55.314 0 1.420.183 atendido
Fiscalização para erradicação criança/do trabalho Infantil adolescente Unid. 0 25.990 30.436 49.152 16.686 12.754 135.018 atendido
Mapeamento dos focos de mapeamentodo trabalho Infantil por realizado Unid. 4 0 0 0 0 0 4Município
Example
14
5agendas
5agendas
388 Programs388 Programs
4 strategic options
28 strategic objectives
Guidelines
4 strategic options
28 strategic objectives
Guidelines
Sectorial Strategy Sectorial Objectives
Sectorial Strategy Sectorial Objectives
PPA strategic basePPA strategic base
15
• Analysis of the macroeconomic scenario
• Management performance survey
• Strategic objectives review
• Programs results and recommendations
• Physical and financial execution report
• Analysis of the macroeconomic scenario
• Management performance survey
• Strategic objectives review
• Programs results and recommendations
• Physical and financial execution report
Step 3: Plan evaluationStep 3: Plan evaluation
16
Report was sent to Congress on April 12, 2001
Available at:
www.planejamento.gov.br
PPA Annual Evaluation ReportPPA Annual Evaluation Report
17
Preparation July/00 to Nov/00
Step 1 Nov/00 to Jan/01
Step 2 Jan/01 to Feb/01
Step 3 Feb/01 to April 12/01
A nine month effortA nine month effort
18
www.abrasil.sociedade.gov.brwww.abrasil.sociedade.gov.br
SIG 2000 Citizen´s moduleSIG 2000 Citizen´s module
19
20
21
22
23
24
2000
2001
AvaluationAvaluation
PL LDO 15.02
15.04
31.08
PL OAP
DC
A
Linkages with in the decision making processLinkages with in the decision making process
25
• PPA revision
• Cooperation with World Bank: International
benchmarking
• Cooperation with IDB: Pilot project for “real
time” evaluation
• PPA revision
• Cooperation with World Bank: International
benchmarking
• Cooperation with IDB: Pilot project for “real
time” evaluation
Next stepsNext steps