1 COR1360 NTS Exit Reform COR1360 NTS Exit Reform (Mod 0195AV) (Mod 0195AV) User Trials Initial Discussion User Trials Initial Discussion 22 22 nd nd February 2010 February 2010

Upload: jasmine-harris

Post on 26-Mar-2015

226 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: 1 COR1360 NTS Exit Reform (Mod 0195AV) User Trials Initial Discussion 22 nd February 2010

1

COR1360 NTS Exit Reform COR1360 NTS Exit Reform (Mod 0195AV)(Mod 0195AV)

User Trials Initial DiscussionUser Trials Initial Discussion

2222ndnd February 2010 February 2010

Page 2: 1 COR1360 NTS Exit Reform (Mod 0195AV) User Trials Initial Discussion 22 nd February 2010

2

Change introduced via Modification 0195AV – Approved 19th Jan 2009 with an implementation of 1st April 2009

The current NTS Offtake arrangements allow Users to procure NTS Exit Capacity for use up to (and inclusive of) 30th September 2012

The reform to the current arrangements will allow Users to make Capacity bookings and apply for increases or decreases to their Enduring Capacity rights from 2009 onwards, such bookings will be effective from 1st October 2012

Background

Page 3: 1 COR1360 NTS Exit Reform (Mod 0195AV) User Trials Initial Discussion 22 nd February 2010

3

Offtake Responsible Parties

CSEPiGTS

(Shipper)

Storage Interconnector

Direct offtake

Reserving

NTS

LDZ

DNs

(Shipper) DM Site

NDM Aggregate

Page 4: 1 COR1360 NTS Exit Reform (Mod 0195AV) User Trials Initial Discussion 22 nd February 2010

4

Exit Reform Phase 1 Plan

24

MARCH APRIL MAY

1 8 15 22 29 5 12 1032619 17

User Acceptance Testing User Trials

Implementation PreparationOperational Acceptance

TestingInfrastructure Build

Implementation on 23rd May 2010

Page 5: 1 COR1360 NTS Exit Reform (Mod 0195AV) User Trials Initial Discussion 22 nd February 2010

5

User Trials - Purpose

The purpose of User Trials is: To allow Users to undertake business process activities introduced by

Modification 0195AV and which are to be delivered in the new NTS Exit Reform system (replacing the 2009 interim process). This will allow users to gain a greater understanding of the steps required to manage their capacity profiles.

To allow Users the opportunity to familiarise themselves with the new NTS Exit Reform system.

To allow Users the opportunity to highlight any potential faults found prior to the system implementation.

To provide xoserve with further assurance that external connection to the solution works as expected and previously tested.

Page 6: 1 COR1360 NTS Exit Reform (Mod 0195AV) User Trials Initial Discussion 22 nd February 2010

6

User Trials - Plan

Page 7: 1 COR1360 NTS Exit Reform (Mod 0195AV) User Trials Initial Discussion 22 nd February 2010

7

User Trials - Products

PRODUCT TYPE DESCRIPTION

SUPPLIED BY SUPPLIED TO

xo NG

T Sh

DN

xo NG

T Sh

DN

1 Determine User access requirements

Activity DNs and Shippers to provide required details for each user who will be participating in User Trials so that they can be granted access to the User Trials environment.

2 User Trials Set up Document

Doc Instructions as to how to access the User Trials environment and check connectivity.

3 User Trials kick off meeting Meeting Exit Reform overview meeting scheduled for first day of Connectivity testing.

4 Connectivity and Data Testing (Parts A and B)

Activity DNs and Shippers to validate access to the User Trials environment and screens within the system.

5 UI Familiarisation Doc A presentation that provides the reader with a basic introduction to the general format of the Gemini/NTS Exit Reform system e.g. screen layout, menu format, navigating between screens.

6 User Trials Training Pack Doc Training materials relating to the processes being executed for User Trials.

7 User Trials Training Activity Training session detailing business processes being executed during User Trials.

Page 8: 1 COR1360 NTS Exit Reform (Mod 0195AV) User Trials Initial Discussion 22 nd February 2010

8

User Trials - Products

PRODUCT TYPE DESCRIPTIONSUPPLIED BY SUPPLIED TO

xo NG Sh DN xo NG Sh DN

8 User Trials Guidelines Doc Document containing key information required for User Trials. Will be part of a set of documents for the execution of User Trials.

9 User Trials Instructions and data sheet

Doc Document containing detailed step by step instructions for the processes to be executed by participants during User Trials. Will include a data sheet detailing data to be entered to the system and expected results.

10 User Trials Schedule Doc Document containing a timetable of activities for each day during the execution of User Trials.

11 User Trials Scenario Document

Doc High level details of the business processes to be executed during User Trials.

Page 9: 1 COR1360 NTS Exit Reform (Mod 0195AV) User Trials Initial Discussion 22 nd February 2010

9

User Trials - Training

The new NTS Exit Reform system is based on the existing Gemini system, in particular the Entry Capacity processes, which Users will already be familiar with. Users will also have completed the new Exit processes as part of the 2009 Off-line process. Hence it is believed that ‘refresher’ training will be sufficient.

The planned Training is to cover the processes that will be executed as part of the User Trials and is expected to take place w/c 22nd March 2010.

Three options have been identified with regards to the delivery method:a) Classroom based training (at 31 Homer Road, Solihull or other agreed location).b) Remote training (via Live Meeting).c) Self study

The Training materials will be developed in response to the chosen option.

It has been recognised that some users will be new to the Gemini system. Therefore a familiarisation presentation will be made available. This gives an introduction to the layout of the system, menus etc.

Q. Is there a preference as to how the Training will be delivered?

Page 10: 1 COR1360 NTS Exit Reform (Mod 0195AV) User Trials Initial Discussion 22 nd February 2010

10

User Trials – Connectivity Testing

User Trials will be executed in a dedicated environment that will mirror the production system. In order to access this environment each participant will need to be granted access.

It is envisaged that participants will execute User Trials from their workplace therefore Connectivity Testing is planned to ensure there are no issues accessing the environment ahead of User Trials commencing.

Part AScheduled for w/c 15th March 2010. Participants are expected to log on via Citrix. A Set up document will be provided that details instructions on how to do this. If successful, each participant will be able to reach a screen displaying the Gemini icon.

Part BScheduled for w/c 29th March 2010. Participants are expected to log on via Citrix and then access the system. The Set up document also details instructions on how to do this. If successful, each participant will be able to log on via Citrix, click on the Gemini icon, reach the Gemini log on screen where they then enter their unique username and password. This will take the user to a screen with two options – one to enter the current Gemini system and one to enter the new NTS Exit Reform system. By selecting the NTS Exit Reform option they will be able to enter the new system. Please note during User Trials the Gemini database will not be accessible.

Page 11: 1 COR1360 NTS Exit Reform (Mod 0195AV) User Trials Initial Discussion 22 nd February 2010

11

User Trials - Data

The User Trials environment will be refreshed with production data. In addition to this the data from the NTS Exit 2009 Offline process will be migrated into the environment.

The data to be loaded by Users as part of User Trials will be provided by xoserve and provided to each user along with the associated expected results.

Page 12: 1 COR1360 NTS Exit Reform (Mod 0195AV) User Trials Initial Discussion 22 nd February 2010

12

User Trials – Execution

The execution of User Trials is scheduled for w/c 5th April 2010 (please note the 5th April is a Bank Holiday).

High level schedule:

Day 1 Tuesday 6th April 1) Submit requests for Enduring annual NTS Exit Flat Capacity Application

2) DN adjustments (DNs only)

Day 2 Wednesday 7th April Capacity Allocations

Day 3 Thursday 8th April Publication of results & reports verification

Day 4 Friday 9th April Contingency day

Day 5 Monday 12th April Submit Requests for Enduring Ad hoc NTS Exit Flat Capacity Increase Application

Day 6 Tuesday 13th April Capacity Allocation

Day 7 Wednesday 14th April Accept/Reject Adhoc Offers

Day 8 Thursday 15th April Publication of results & reports verification

Day 9 Friday 16th April Contingency day

Based on the above schedule User activities are planned for Days 1, 3, 5 and 8. Any changes that are necessary to the schedule will be communicated. The system will be available for the duration of User Trials, however, we request that data is only input as per the schedule.

Page 13: 1 COR1360 NTS Exit Reform (Mod 0195AV) User Trials Initial Discussion 22 nd February 2010

13

User Trials – Execution

In advance of this each participant will be provided with the following:a) User Trials Guidelinesb) User Trials Schedulec) User Trials Scenariosd) User Trials Instructions

Due to the limited time available we recommend that activities are executed in the morning. This will ensure maximum time is made available and should anyone experience any difficulties there will be more time available to resolve these.

During User Trials the project team will provide technical and process support and will be in regular contact with participants.

Page 14: 1 COR1360 NTS Exit Reform (Mod 0195AV) User Trials Initial Discussion 22 nd February 2010

14

User Trials - Communications

Further teleconferences are planned so that all parties can be updated on progress.

Monday 1st March 2010 – Progress t-conMonday 15th March 2010 – Progress t-conMonday 29th March 2010 – User Trials Kick off t-con

In addition to the above a short t-con will be arranged for each day during the execution of User Trials. This is expected to start at 9.30am and should last approximately 15 minutes.

Outside of these if you have any questions these can be emailed to the box account: [email protected]

Alternatively you can contact a member of the project team:Andy Simpson 0121 623 2655Hannah Reddy 0121 623 2652

Page 15: 1 COR1360 NTS Exit Reform (Mod 0195AV) User Trials Initial Discussion 22 nd February 2010

15

User Trials – Next Steps

Users are requested to:

• Provide preference as to Training delivery method.• Provide confirmation as to who will be participating in the User Trials and so executing the

user activities.• Provide User Details in order to be provided with access to the User Trials environment

Where the user already has access to Gemini we will use this as a template for creating your account within the User Trials environment therefore please provide your Gemini User ID.

Where the user does not already have access to Gemini we can use a colleagues account as a template for creating your account within the User Trials environment therefore please provide the User ID for a colleague who does have access to Gemini.

If the user or a colleague does not already have access to Gemini then in order to create your account you need to provide your name, organisation and Shipper Short Code.