Page 1: UNC0376S – Increased Choice when applying for NTS Exit Capacity Transmission workgroup - 4 April 2013

UNC0376S – Increased Choice when applying for NTS Exit Capacity

Transmission workgroup - 4 April 2013

Page 2: UNC0376S – Increased Choice when applying for NTS Exit Capacity Transmission workgroup - 4 April 2013

2

Update UNC0376S introduced the following changes:

July Application Window

Capacity start date to be the 1st of any month between October Y+4 and September Y+6

Ad-hoc Application Process

to be extended out from Y+4 to Y+6

reduce the minimum threshold for application from 10GWh/day to 1GWh/day

Gemini System Development fully tested and signed off

Functionality available for the July 2013 Enduring Annual NTS Exit (Flat) Capacity Application Window

Page 3: UNC0376S – Increased Choice when applying for NTS Exit Capacity Transmission workgroup - 4 April 2013

3

Screen-shot 1

Gemini menu path

Page 4: UNC0376S – Increased Choice when applying for NTS Exit Capacity Transmission workgroup - 4 April 2013

4

1st of any month instead of only an October start date.

Screen-shot 2 – Capture Request

Page 5: UNC0376S – Increased Choice when applying for NTS Exit Capacity Transmission workgroup - 4 April 2013

5

Screen-shot 3 – Add Request

Page 6: UNC0376S – Increased Choice when applying for NTS Exit Capacity Transmission workgroup - 4 April 2013

6

Additional Information:

Communicated to the April UK Link Committee meeting as a Class 1 modification.