29 CFR 1926 SUBPART Q

CONCRETE AND MASONRY CONSTRUCTION

Page 2: 1 29 CFR 1926 SUBPART Q CONCRETE AND MASONRY CONSTRUCTION

2

51 killed 170 feet above ground Entire form peeled away from newly

placed concrete

Cooling TowerSt. Mary’s West Virginia 1978

Page 3: 1 29 CFR 1926 SUBPART Q CONCRETE AND MASONRY CONSTRUCTION

3What the St. Mary’s West Virginia tower would have

looked like if it had been completed.

Page 4: 1 29 CFR 1926 SUBPART Q CONCRETE AND MASONRY CONSTRUCTION

4

Jump forms atop the St. Mary’s structure tore loose, pulling work platforms and concrete down inside the tower.

Page 5: 1 29 CFR 1926 SUBPART Q CONCRETE AND MASONRY CONSTRUCTION

5

Wreckage 168 feet below the top of the St. Mary’s tower being picked apart by investigators looking for clues. The state of West Virginia objected to the site

being cleaned before it could make its own full investigation.

Page 6: 1 29 CFR 1926 SUBPART Q CONCRETE AND MASONRY CONSTRUCTION

6

Part 1926 Subpart QConcrete and Masonry Construction

1926.700 - Scope, application, and definitions applicable to this subpart.

1926.701 - General requirements

1926.702 - Requirements for equipment and tools.

1926.703 - Requirements for cast-in-place Concrete.

1926.703 App - General Requirements for Formwork

1926.704 - Requirements for precast concrete.

1926.705 - Requirements for lift-slab operations.

1926.705 App - Lift Slab Operations

1926.706 - Requirements for masonry construction.

Page 7: 1 29 CFR 1926 SUBPART Q CONCRETE AND MASONRY CONSTRUCTION

7

"Bull float" "Formwork" "Lift slab" "Limited access

zone" "Precast concrete"

"Reshoring" "Shore" "Vertical slip

forms" “Jacking

operation”

29 CFR 1926 700 Scope, application, and definitions

applicable to this subpart.

Page 8: 1 29 CFR 1926 SUBPART Q CONCRETE AND MASONRY CONSTRUCTION

8

(a) Construction loads.

(b) Reinforcing steel.

(c) Post-tensioning operations.

(d) Riding concrete buckets.

(e) Working under loads.

(f) Personal protective equipment.

29 CFR 1926.701General requirements

Page 9: 1 29 CFR 1926 SUBPART Q CONCRETE AND MASONRY CONSTRUCTION

9

1926.701(b) All protruding reinforcing steel, onto and into which employees could fall,shall be guarded to eliminate the hazard of impalement.

Page 10: 1 29 CFR 1926 SUBPART Q CONCRETE AND MASONRY CONSTRUCTION

10

Rebar protection

Page 11: 1 29 CFR 1926 SUBPART Q CONCRETE AND MASONRY CONSTRUCTION

11

1926.701(c) - Post-tensioning operations No employee (except those essential to the post-tensioning operations) shall be permitted to be behind the jack during tensioning operations

Page 12: 1 29 CFR 1926 SUBPART Q CONCRETE AND MASONRY CONSTRUCTION

12Jack

Page 13: 1 29 CFR 1926 SUBPART Q CONCRETE AND MASONRY CONSTRUCTION

13

Cutting bars

Page 14: 1 29 CFR 1926 SUBPART Q CONCRETE AND MASONRY CONSTRUCTION

141926.701(d) Riding concrete buckets No employee shall be permitted to ride concrete buckets.

Page 15: 1 29 CFR 1926 SUBPART Q CONCRETE AND MASONRY CONSTRUCTION

15

(a) Bulk cement storage.

(b) Concrete mixers.

(c) Power concrete trowels.

(d) Concrete buggies.

(e) Concrete pumping systems.

(f) Concrete buckets.

(g) Tremies. (h) Bull floats. (i) Masonry saws. (j) Lockout/Tagout

procedures.

702 Equipment and Tools.

Page 16: 1 29 CFR 1926 SUBPART Q CONCRETE AND MASONRY CONSTRUCTION

16

1926.702 (b) Concrete mixers with one cubic yard or larger loading shall be equipped with:• A mechanical device to clear the skip of materials • Guardrails installed on each side of the skip

Page 17: 1 29 CFR 1926 SUBPART Q CONCRETE AND MASONRY CONSTRUCTION

17

1926.702(e)(1) Concrete pumping systems shall be provided with pipe supports designed for 100 percent overload.

(2) Air hoses shall be provided with positive fail-safe joint connectors.

Pumping System

Page 18: 1 29 CFR 1926 SUBPART Q CONCRETE AND MASONRY CONSTRUCTION

18

1926.702(g) Tremies. Sections of tremies and similar concrete conveyances shall be secured with wire rope (or equivalent materials) in addition to the regular couplings or connections.

Page 19: 1 29 CFR 1926 SUBPART Q CONCRETE AND MASONRY CONSTRUCTION

19

Concrete piping systemconnection point

Page 20: 1 29 CFR 1926 SUBPART Q CONCRETE AND MASONRY CONSTRUCTION

20

1926.702 (f) Concrete buckets(1) Concrete buckets equipped with pneumatic gates shall have positive safety latches or similar safety devices installed to prevent premature or accidental dumping.

(2) Concrete buckets shall be designed to prevent concrete from hanging up on top and the sides.

Page 21: 1 29 CFR 1926 SUBPART Q CONCRETE AND MASONRY CONSTRUCTION

21

1926.702 Power-concrete trowels Shall be equipped with a control switch that will automatically shut off the power whenever the hands of the operator are removed from the equipment handle.

Page 22: 1 29 CFR 1926 SUBPART Q CONCRETE AND MASONRY CONSTRUCTION

22

1926.702(d) Concrete buggy handles shall not extend beyond the wheels on either side of the buggy

Page 23: 1 29 CFR 1926 SUBPART Q CONCRETE AND MASONRY CONSTRUCTION

23

1926.702(i) (1)Masonry saws shall be guarded with a semicircular enclosure over the blade

(2)A method of retaining blade fragments shall be incorporated in the design of the semicircular enclosure.

Page 24: 1 29 CFR 1926 SUBPART Q CONCRETE AND MASONRY CONSTRUCTION

24

1926.702(h) Bull floats - Electrocution - Handles

Page 25: 1 29 CFR 1926 SUBPART Q CONCRETE AND MASONRY CONSTRUCTION

25

(a) General requirements for formwork.

(b) Shoring and reshoring.

(c) Vertical slip forms.

(d) Reinforcing steel.

(e) Removal of formwork.

29 CFR 1926.703 Cast-in-place Concrete.

Page 26: 1 29 CFR 1926 SUBPART Q CONCRETE AND MASONRY CONSTRUCTION

26

Form work operations fall protection

Page 27: 1 29 CFR 1926 SUBPART Q CONCRETE AND MASONRY CONSTRUCTION

27

Cast in-place concrete work

Page 28: 1 29 CFR 1926 SUBPART Q CONCRETE AND MASONRY CONSTRUCTION

28

Form work

Page 29: 1 29 CFR 1926 SUBPART Q CONCRETE AND MASONRY CONSTRUCTION

Form work

Page 30: 1 29 CFR 1926 SUBPART Q CONCRETE AND MASONRY CONSTRUCTION

Form work

Page 31: 1 29 CFR 1926 SUBPART Q CONCRETE AND MASONRY CONSTRUCTION

31

1926.703 Shoring & re-shoring•Inspected prior to erection•Damaged equipment shall not be used•Inspected immediately prior to, during, and immediately after concrete placement.

Page 32: 1 29 CFR 1926 SUBPART Q CONCRETE AND MASONRY CONSTRUCTION

32

1926.703 (b) Shoring & re-shoring

•Equipment found to be damaged or weakened, shall be immediately reinforced.•Sills shall be sound, rigid, and capable of carrying maximum intended load.

1926.703(b)(6) All base plates, shore heads, extension devices, and adjustment screws shall be in firm contact, and secured when necessary, with the foundation and form.

Page 33: 1 29 CFR 1926 SUBPART Q CONCRETE AND MASONRY CONSTRUCTION

33

1926.703(b)(8)Single post shores

•Design prepared by qualified designer

•Vertically aligned

•Spliced to prevent movement

•Braced in two mutually perpendicular directions at splice level

•Each tier diagonally braced in the same two directions

Page 34: 1 29 CFR 1926 SUBPART Q CONCRETE AND MASONRY CONSTRUCTION

34

Ellis shoringsystem

Page 35: 1 29 CFR 1926 SUBPART Q CONCRETE AND MASONRY CONSTRUCTION

1926.703(c) Vertical slip forms

Jack rod

Jack

Yoke assembly

Working deck

Wales

Bracing for Wales

Slight batter of sheathingSheathing

Splash board

Thin pipe aroundjack rod

Page 36: 1 29 CFR 1926 SUBPART Q CONCRETE AND MASONRY CONSTRUCTION

36

Vertical slip-form operation

Page 37: 1 29 CFR 1926 SUBPART Q CONCRETE AND MASONRY CONSTRUCTION

37

1926.703(d)Vertical slip form Steel rods or pipes on which jacks climb shall be designed for that purpose and adequately braced when not encased in concrete.

Designed to prevent excessive distortion during jacking

Provided with scaffolds or work platform whereemployees required to pass

Jacks and lifting devicesprovided with mechanical dogs or other automatic holding devices

Form structure maintained within all design tolerances - for plumpness during jacking operations

Page 38: 1 29 CFR 1926 SUBPART Q CONCRETE AND MASONRY CONSTRUCTION

38

1926.703 (e) Removal of formwork

Shall not be removed until employer determines concrete has gained sufficient strength to support its weight and super imposed loads:

Plans and specifications which stipulate conditions for removal of forms and shores; Concrete had been properly tested.

Page 39: 1 29 CFR 1926 SUBPART Q CONCRETE AND MASONRY CONSTRUCTION

39

Flying forms

Page 40: 1 29 CFR 1926 SUBPART Q CONCRETE AND MASONRY CONSTRUCTION

40

Page 41: 1 29 CFR 1926 SUBPART Q CONCRETE AND MASONRY CONSTRUCTION

41

(a) Adequate support of wall units, structural framing, and tilt-up panels

(b) Capability of inserts

(c) Imbedded inserts (d) Lifting hardware

(e) No employee under pre-cast concrete members being lifted or tilted into position except those employees required for the erection of those members

1926.704 Pre-cast Concrete.

Page 42: 1 29 CFR 1926 SUBPART Q CONCRETE AND MASONRY CONSTRUCTION

42

Pre-cast concrete operation

Page 43: 1 29 CFR 1926 SUBPART Q CONCRETE AND MASONRY CONSTRUCTION

43

Page 44: 1 29 CFR 1926 SUBPART Q CONCRETE AND MASONRY CONSTRUCTION

44

Un pre-stressed slab

Prestressed slab - unloaded

Prestressed slab - loaded

Page 45: 1 29 CFR 1926 SUBPART Q CONCRETE AND MASONRY CONSTRUCTION

45

29 CFR 1926.705 lift-slab operations.

Page 46: 1 29 CFR 1926 SUBPART Q CONCRETE AND MASONRY CONSTRUCTION

46

(a) Lift-slab operations shall be designed and planned by a registered professional engineer

(b) Jacks/lifting units shall be marked

(c) Jacks/lifting units shall not be loaded beyond their rated capacity

(d) Jacking equipment shall not be overloaded

(e) Design and installation of jack lifting units

29 CFR 1926.705 lift-slab operations.

Page 47: 1 29 CFR 1926 SUBPART Q CONCRETE AND MASONRY CONSTRUCTION

47

(f) Jacks/lifting units shall have a safety device installed

(g) Jacking operations shall be synchronized

(h) Automatic controlled leveling

(i) Manually controlled leveling

(j) Maximum number of manually controlled jacks/lifting units

(k) Number of employees allowed in the building

29 CFR 1926.705 lift-slab operations. (continued)

Page 48: 1 29 CFR 1926 SUBPART Q CONCRETE AND MASONRY CONSTRUCTION

48

(l) Temporary connections

(m) Welding on temporary and permanent connections

(n) Load transfer from jacks/lifting units to building columns

(o) Securing Jacks/lifting units

(p) Prevention of components from disengaging during lifting operations.

29 CFR 1926.705 lift-slab operations. (continued)

Page 49: 1 29 CFR 1926 SUBPART Q CONCRETE AND MASONRY CONSTRUCTION

49

Jack rod

Lifting angle

Seal block

Spearhead framecast in floor slab

Wedge

Wedge block

Page 50: 1 29 CFR 1926 SUBPART Q CONCRETE AND MASONRY CONSTRUCTION

50

1926.705(a) Lift-slab operations shall be designed by a registered professional engineer who has

experience in lift-slab construction.

Page 51: 1 29 CFR 1926 SUBPART Q CONCRETE AND MASONRY CONSTRUCTION

Lift slab operation

Page 52: 1 29 CFR 1926 SUBPART Q CONCRETE AND MASONRY CONSTRUCTION

52

1926.705 Jack lifting unit

(b) Marked to indicate rated capacity

(c) Not loaded beyond capacity

(d) Two and 1/2 times the load

(e) Designed so they neither lift

nor continue to lift when they are

loaded in excess to rated capacity

(f) Synchronized lifting to ensure

uniform lifting

(g) Leveling device installed ( all

points 1/2 inch tolerance)

(h) Stop device (exceeds 1/2 inch

tolerance)

(i) Manual controls located in central

location - attended by competent

person (must be experienced)

(j) Maximum number of annually

controlled units

Page 53: 1 29 CFR 1926 SUBPART Q CONCRETE AND MASONRY CONSTRUCTION

53

Closure strip

Page 54: 1 29 CFR 1926 SUBPART Q CONCRETE AND MASONRY CONSTRUCTION

54

1926.705 (k) No employee permitted in the building structure while jacking operation taking place -

unless reinforced sufficiently to ensure integrity during erection

Page 55: 1 29 CFR 1926 SUBPART Q CONCRETE AND MASONRY CONSTRUCTION

55

1926.705(K)(2) Under no circumstance, shall any employee who is not essential to the jacking operation be

permitted immediately beneath a slab being lifted

Page 56: 1 29 CFR 1926 SUBPART Q CONCRETE AND MASONRY CONSTRUCTION

56

1926.705(i) Manual lifting controls shall be centrally located

Page 57: 1 29 CFR 1926 SUBPART Q CONCRETE AND MASONRY CONSTRUCTION

57

29 CFR 1926.706 Masonry construction.

Page 58: 1 29 CFR 1926 SUBPART Q CONCRETE AND MASONRY CONSTRUCTION

58

a) Limited access zone• prior to the start of

construction of the wall

• equal to the height of the wall to reconstructed plus four feet, and shall run the entire length of the wall

• on the side of the wall which will be un-scaffolded

• restricted to entry by employees actively engaged in constructing the wall

• shall remain in place until the wall is adequately supported

(b) All masonry walls over eight feet in height shall be adequately braced

29 CFR 1926.706 Masonry construction.

Page 59: 1 29 CFR 1926 SUBPART Q CONCRETE AND MASONRY CONSTRUCTION

59

1926.706(a) Limited access zone

•Established prior to the start of construction•Equal to the height of the wall plus four feet•Unscaffolded side of wall •Remain until adequately supported•Masonry walls over 8 feet adequately braced