5 10 3 3 6 4 13 14 16 7 17 18 20 19 1 2 23 24 27 28 26 22 a b c d f g h i j 1 a Implemented Rs1013 Cr BRT Pilot (2) BRT Phase-I (10) CYG-BRT (12) CYG Link (10) Proposed Prop. Addl Links 19 22 e A 25 A Balewadi Sports Complex Nehru Stadium BRTS & CYG Links Approved Under JNNURM in Pune City Under Implementation completed by March 2009 21 part

Upload: ranjit-gadgil

Post on 09-May-2015

8.282 views

Category:

Business


4 download

DESCRIPTION

Slides related to BRT in the Comprehensive Mobility Plan (CMP) in the presentation made by the Commissioner to the Chief Minister

TRANSCRIPT

Page 1: 062. Comprehensive Mobility Plan   Brt

5

10

3

3 64

13

1416

7

17

1820 19

1

2

23

24

27

28

26

22

a

b

c

d

f

gh

ij

1

a

Implemented

Rs1013 Cr

BRT Pilot (2)

BRT Phase-I (10)

CYG-BRT (12)

CYG Link (10)

Proposed

Prop. Addl Links

19

22

e

A

25

A

Balewadi Sports Complex

Nehru Stadium

BRTS & CYG Links Approved Under JNNURM in Pune CityUnder Implementation completed by March 2009

21 part

Page 2: 062. Comprehensive Mobility Plan   Brt

PIMPRI CHINCHWAD MUNICIPAL CORPORATION BRT CORRIDORS Final Report - Bus Rapid Transit System for PCMC

4 9 ` BRT Corridors

No. Name

5 1 Aundh Ravet

2 NH4

2 3 Telco Road

A 4 Dehu-Alandi

C 5 NH50

6 Hinjewadi to Dehu-Alandi Road B

7 Kalewadi-KSB Chowk-Dehu Alandi Rd

8 Vishrantwadi- 3 Alandi

9 Ravet Punawale to Bhakti Shakti to Talwade

Buses with mixed traffic Feeder Routes Dedicated 6 A Hinjewadi to tata Bus lanes

motors

Feeder routes B Pradhikaran

7 C Road Parallel to

8 Aundh Ravet

1

410

8

.

11

icaM

kiTbaQda janaihtaya

mahanagarpailaka

Page 3: 062. Comprehensive Mobility Plan   Brt

410

8

.

11

icaM

kiTbaQda janaihtaya

mahanagarpailaka

PIMPRI CHINCHWAD MUNICIPAL CORPORATION

Page 4: 062. Comprehensive Mobility Plan   Brt

TYPICAL PLAN FOR 45 M ROW At Grade Bus Stop, ROW - 45 m Final Report - Bus Rapid Transit System for PCMC

POLYCARBONATE ROOF 7.80 7.80

7.20

0.60 3.30 3.30

0.20

BUS STOP BUS STOP PLATFORM PLATFORM

TYPICAL PLAN FOR 45 M ROW

May 2008 NOTE: MAP NOT TO SCALE

410

8

.

11

icaM

kiTbaQda janaihtaya

mahanagarpailaka

Page 5: 062. Comprehensive Mobility Plan   Brt

Project Cost

Corridor Length (km) Width Cost (Rs.

crs)

BRT- 4 Dehu Alandi 14.50 45 203.08

BRT -5 NH-50 12.10 61 631.76

BRT-6 Hinjewadi to Dehu Alandi Road 21.60 45 291.09

BRT- 7 Kalewadi-KSB Chowk -Dehu Alandi Road 13.30 45 302.10

BRT- 8 Vishrantwadi- Alandi 11.60 61 229.73

BRT- 9 Ravet Punawale – Talwade 20.20 30 349.70

Total 93.30 2007.46