0192p ag venti - gezelmanpe.com2”-2”-6” min. blocking to underside of sheeting not needed if...

1
2”-2”-6” MIN. BLOCKING TO UNDERSIDE OF SHEETING NOT NEEDED IF SCREWS GO INTO FRAMING SHEET NO: PUBLISHED: SHEET NAME: DRAWN: CHECKED: SB AG COPY RIGHT & INTELLECTUAL PROPERTY NOTICE THIS PLAN SET IS COPY RIGHT PROTECTED AND CONTAINS INTELLECTUAL PROPERTY WHICH BELONGS TO ALLEN GEZELMAN PE FOR BENEFIT OF THE LEVEREDGE. ACCESS IS GIVEN TO THE INFORMATION HEREON SOLELY FOR THE PURPOSE OF COMPLETION OF THE PROJECT FOR WHICH IT IS INTENDED. NO OTHER USE MAY BE MADE OF THE INFORMATION, DRAWINGS, OR IDEAS HEREON WITHOUT THE EXPRESS , WRITTEN, PERMISSION OF ALLEN GEZELMAN PE ENLARGED VIEWING & HYPERLINKS: PRINT VERSION OF THIS PLAN PROVIDES MINIMUM INFORMATION NEEDED BY USERS. ELECTRONIC VERSION (EV) PROVIDES MAGNIFIED VIEWING UP TO 6400%. EV ALSO PROVIDES HYPERLINK ACCESS TO OEM MANUALS AND ABUNDANT OTHER SUPPLEMENTARY INFORMATION.EV MAY BE ACCESSED AT: WWW.GEZELMANPE.COM/PV/ 0192P_AG_Venti.dwg REVISIONS: THIS PLAN IS VOID WITHOUT MY SIGNATURE & RAISED SEAL. THIS PLAN MAY NOT BE PLACED ON FILE FOR PULLING MULTIPLE PERMITS.EACH PERMIT PULLED REQUIRES ITS OWN RAISED SEAL COPY OF THIS PLAN. INSTALLATION OF A S O L A R A T T I C V E N T ANY LOCATION IN FLORIDA ROOF MOUNT DESIGNED PER: ASCE 7-10 APPLICABLE CODE: FLORIDA BUILDING CODE 2010 & CURRENT NATIONAL ELECTRIC CODE EXPOSURE: WIND LOAD: BLDG. IP. CATEGORY: 200 MPH D II 01 SCALE: N.T.S. TYP. INSTALLATION ON ASP SHINGLE ROOF VENTI PV (PHOTO-VOLTAIC) FAN INSTALLATION NOTES: VENTI PV FAN EQUIPMENT HAS A FLORIDA PRODUCT CONTROL APPROVAL (PCA) FL 13509 R-1. VIEWERS MAY REVIEW SAME ON-LINE AT WWW.FLORIDABUILDING.ORG ENGINEER OF RECORD (EOR) IS IN THE PROCESS OF CREATING A REVISION- 2 TO FLORIDA PRODUCT CONTROL APPROVAL (PCA) 13509 R-1. REVISION 2 IS BASED UPON SAME 3RD PARTY TESTING WHICH HAS ALREADY BEEN ACCEPTED BY FLORIDA BUILDING COMMISSION FOR REVISION 1. THE NEW, IN-PROGRESS, REVISION MERELY ADDS SOME COMMON SENSE LOGIC TO THE INTERPRETATION & APPLCIATION OF THAT ORIGINAL 3RD PARTY TESTING. SAID TESTING HAPPENED TO BE ON SHINGLE ROOF MOCK-UPS, BECAUSE SHINGLE ROOFS ARE THE MOST COMMON INSTALLATION. HOWEVER, RECENTLY, ONE AHJ (AUTHORITY HAVING JURISDICTION) HAS MISTAKENLY CLAIMED THAT CIRCUMSTANCE RESTRICTS INSTALLATIONS TO SHINGLE ROOFS. TO THE CONTRARY!!!! IT SHOULD BE CLEAR TO ALL THAT THE SOLE PURPOSE OF SUCH 3RD PARTY TESTING WAS TO ESTABLISH THE STRENGTH OF THIS FAN APARATUS AND ITS' ATTACHMENT METHODOLOGY & HARDWARE TO STANDARD ICC-COMPLIANT ROOF DECKS & ROOF FRAMING.WHICH STRENGTH HAS BEEN PROVEN TO A HIGH LEVEL OF REDUNDANCY. EOR HEREBY CERTIFIES BY HIS SIGNATURE & SEAL ON THIS PLAN DOCUMENT THAT THE OEM (ORIGINAL EQUIPMENT MANUFACTURER) MOUNTING HARDWARE AND COMPONENTS ARE ELECTRICALLY, STRUCTURALLY, AND MECHANICALLY ADEQUATE FOR INSTALLATIONS MADE IAW (IN ACCORDANCE WITH) THE DETAILS AND SPECIFICATIONS OF THIS PLAN DOCUMENT. THE DETAILS SPECIFIED ON THIS “PAPER” PLAN MEET OR TO EXCEED THE MINIMUM NEEDED BY INSTALLERS AND AHJS . PLAN USERS ARE ENCOURAGED TO VIEW ELECTRONIC VERSION (EV) PLAN ON-LINE. ACTIVE HYPERLINKS ON EV PROVIDE EASY ACCESS TO SUPPLEMENTAL INFORMATION. EV ALSO ALLOWS VIEWER TO STUDY THE PLAN AND OEM DETAILS AT MAGNIFICATIONS OF VIEWER CHOICE UP TO 6400%. IF A CONFLICT SHOULD OCCUR BETWEEN A DRAWING AND/OR SPECIFICATION HEREON AND AN OEM DETAIL, OEM SHALL PREVAIL - EXCEPT THAT EOR SPECIFICATION OF TWO SCREWS ATTACHING INTO ROOF FRAMING, OR BLOCKING “SUPERSEDES” OEM “SHEETING-ONLY” ATTACHMENT SPECIFICATION. OEM PROVIDES A “ONE-SIZE-FITS-ALL” INSTALLATION PACKAGE WHICH IS INTENDED FOR USE EVERYWHERE. THE INSTRUCTIONS PROVIDED THEREIN ARE HEREBY MODIFIED BY THIS WESTERN-HEMISPHERE, PERMIT-READY, ENGINEER-SEALED, GENERIC, PLAN. . THESE INSTRUCTIONS ARE INTENDED TO COVER ALL INSTALLATIONS NOT EXCEEDING THE FOLLOWING CONDITIONS: WIND SPEED VULT 200-MPH, EXPOSURE CATEGORY D, INSTALLATION HEIGHT NGT (NOT GREATER THAN) 30-FT ABOVE SURROUNDING GRADE, ROOF PRESSURE ZONE 1 OR 2 (PZ1 OR PZ2) - NO PZ3. SITE CONDITIONS EXCEEDING PRECEEDING RESTRICTIONS SHALL REQUIRE SITE-SPECIFIC ENGINEERING. THOSE NEEDING SAME ARE ENCOURAGED TO CONTACT EOR DIRECTLY: [email protected] THESE INSTRUCTIONS PROVIDE DETAILS & SPECIFICATIONS FOR SHINGLE, TILE, METAL, AND MEMBRANE ROOF INSTALLATIONS. READERS ARE NOTIFIED THAT THIS PLAN IS WRITTEN FOR PROFESSIONAL INSTALLERS, E.G. EXPERIENCED, LICENSED, TRADE PROFESSIONALS. NOVICE PERSONS SUCH AS HOME OWNERS AND OTHER DO-IT-YOURSELF INSTALLERS ARE DIRECTED TO OEM INSTALLATION INSTRUCTIONS FOR STEP-BY-STEP BASIC INSTRUCTIONS WHICH ARE NOT NEEDED BY PROFESSIONAL INSTALLERS AND THEREFORE OMITTED HERE. PRINTED OEM INSTALLATION INSTRUCTIONS ARE SHIPPED WITH EACH VENTI PV FAN. . WHEN DEALING WITH SHINGLES, TILE, METAL, & MEMBRANE, CONTRACTOR SHALL FOLLOW OEM INSTALLATION INSTRUCTIONS EXCEPT REGARDS HOLD-DOWN ATTACHMENTS. USE OEM SCREWS AND WATER-PROOFING. HOWEVER, OEM SHEETING-ONLY ATTACHMENT SPECIFICATION IS NOT ADEQUATE FOR VULT 120-MPH OR GREATER WIND SPEEDS. THERE SHALL BE TWO DIAGONALLY OPPOSITE SCREWS INTO ROOF FRAMING OR INTO 2” X 4” X 6”MINIMUM BLOCKING. BLOCKING SHALL SANDWICH THE ROOF SHEETING AND ROOF MEMBRANE BETWEEN THE BLOCKING AND THE FAN WITH ITS' OEM WATER-PROOFING. WHEN DEALING WITH TILE CONTRACTOR SHALL: 1. USE EXTREME CARE WHEN REMOVING TILE FOR THE FAN INSTALLION. IT IS ESSENTIAL TO AVOID DAMAGE TO ROOF MEMBRANE OUTSIDE OF THE AREA TO BE CUT OUT FOR THE VENT AND TO REPAIR SUCH DAMAGE IF IT OCCURS. 2. CAREFULLY CLEAN THE ROOF SURFACE TO WHICH THE OEM WATER-PROOFING WILL SEAL THE FAN BASE. 3. AVOID OBSTRUCTING FAN EXHAUST WHEN REPLACING TILE. WHETHER SHINGLE, TILE, METAL, OR MEMBRANE, THE REALLY CRUCIAL DETAILS OF THIS INSTALLATION PLAN ARE: 1. KEEP OUT OF PZ3. 2. CONTRARY TO STANDARD OEM INSTRUCTIONS, WHICH RELIES UPON SHEETING-ONLY HOLD-DOWN ANCHORAGE, VENTI PV FAN MUST EITHER STRADDLE AND SCREW INTO ROOF FRAMING OR SCREW INTO TWO DIAGONALLY OPPOSITE PIECES OF WOOD BLOCKING -MINIMUM 2” X 4” X 6”. THIS REQUIREMENT IS NECESSARY TO PROVIDE THE NEEDED UPLIFT RESISTANCE FOR HIGH WINDS IN GENERAL AND THE FLORIDA HIGH VELOCITY HURRICANE ZONE IN PARTICULAR. 3. MAKE SURE THAT TWO DIAGONALLY OPPOSITE FASTENERS HIT THE CENTER OF ROOF FRAMING, OR 2” X 4” X 6” (MINIMUM) BLOCKING. 4. BALANCE OF FASTENERS INTO SHEETING IS ACCEPTABLE. 5. BE CAREFUL NOT TO CUT ROOF FRAMING. 6. FOLLOW APPLICABLE BUILDING CODE ROOFING & WATER-PROOFING PROVISIONS AND APPROPRIATE PRACTICES OF NRCA ROOFING & WATERPROOFING MANUAL. STRUCTURAL : GRAVITY LOAD FROM SOLAR EQUIPMENT LESS THAN WIND FORCES: ASCE 7 PRESSURE ZONE DIAGRAM (PAGE 5 AT 1ST LINK) MAY BE VIEWED AT THE FOLLOWING LINKS: 20 LB TOTAL VARIES OWNER: HIGH VELOCITY HURRICANE ZONE FLORIDA John Doe AHJ: UTILITY: N/A LEGAL DESCRIPTION: PARCEL ID: ANY PROPERTY IN FLORIDA PCA – NOA EQUIVALENCY HTTP://WWW.FLORIDABUILDING.ORG/FBC/PUBLICATIONS/BENNETT_LETTER.PDF HTTP://WWW.FLORIDABUILDING.ORG/FBC/PUBLICATIONS/MIAMI_NOA_MEMO.PDF 02 SCALE: N.T.S. ALTERNATIVE APPLICABLE ROOF MATERIALS THIS PLAN AVAILABLE ONLINE FOR REVIEW @: HTTP://WWW.GEZELMANPE.COM/PV/0192P_AG_VENTI.PDF 04 SCALE: 1" = 1'-0" DETAILS, ADDITIONAL ENGINEERING REQUIREMENTS EXCEEDING OEM LITERATURE, ANCHORAGE APPLICABLE TO SHNGLE, MEMBRANE & TILE ROOFS 03 SCALE: NTS OEM INSTALLATION INSTRUCTIONS ALLEN GEZELMAN 16502 HANNA RD. LUTZ, FLORIDA 33549 PH. 813 650 7246 FX. 866 397 9050 Allen@Gezelman PE.COM www.GezelmanPE.com I CERTIFY THAT THIS DESIGN & SPECIFICATIONS MEET THE 2010 FBC W/ CURRENT NEC ALL AFFIDAVITS, DESIGNS, OPINIONS, CALCULATIONS & OTHER ENGINEERING SERVICES PROVIDED BY ALLEN GEZELMAN PE AND HIS ASSOCIATES ON ANY AND ALL PROJECTS ARE SUBJECT TO THE PROVISIONS OF EJCDC C-700 (ENGINEERS JOINT CONSTRUCTION DOCUMENT COMMITTEE - STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT) CURRENT AT THE TIME. THOSE OBJECTING TO SAID EJCDC C-700 OR PROVISIONS THEREOF ARE DIRECTED NOT TO USE THE AFFIDAVIT, DESIGN, OPINION, CALCULATION OR OTHER ENGINEERING SERVICE OFFERED BY ALLEN GEZELMAN PE AND HIS ASSOCIATES ON THE PROJECT. EJCDC C-700 MAY BE VIEWED AT: HTTP://GEZELMANPE.COM/REFERENCE/AG/C-700.PDF VENTI PV FAN AND OEM INSTALLATION COMPONENTS ARE COMPATIBLE WITH ALL KNOWN ROOFING TILE MATERIAL TYPES, ALL SHAPE PROFILES, AND ALL INSTALLATION METHODS. INSTALLATION METHOD COMPATIBILITY INCLUDES BUT IS NOT LIMITED TO SCREW DOWN, FOAM SET, MUD SET, BATTENS, ETC. EOR IS AVAILABLE SHOULD THERE BE A PARTICULAR QUESTION. E-MAIL QUERY TO: [email protected]. TILE INSTALLATION SAME AS SHINGLE EXCEPT: 1. TILE REMOVAL & REINSTALL – USE SPECIAL CARE NOT TO DAMAGE ROOF WATERPROOFING MEMBRANE BEYOND THE FAN CUT-OUT. 2. AREA OF WORK LARGER TO ACCOMMODATE OEM TILE FLASHING. 3. REFER TO OEM FLASHING INSTALLATION INSTRUCTIONS WHICH ARE PACKAGED IN THE FLASHING BOX. 05 SCALE: NTS FLORIDA PRODUCT APPROVAL DOCUMENTATION ALT. 01 - 16" C-C ALT. 02 - CENTERED ALT. 03 - BLOCKING PRODUCT APPROVAL #: FL (13509) SAMPLE FLASHING FOR TILE ROOFS SAMPLE FLAT TILE INSTALLATION PHOTO ALTERNATIVE: BARREL OR FLAT TILE ROOF HTTP://GEZELMANPE.COM/REFERENCE/ASCE-7_PRESSUREZONES.PDF PZ3 PROHIBITION APPLIES TO RIDGE GABLE ENDS ONLY, BECAUSE VENTI PV FANS ARE MOUNTED HIGH ON SLOPED-ROOFS - WHICH DO NOT EXIST ON HIP AND LOW-SLOPE. 06 SCALE: NTS ASCE 7-05 WIND PRESSURE ZONE DIAGRAM

Upload: others

Post on 23-Sep-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 0192P AG Venti - gezelmanpe.com2”-2”-6” min. blocking to underside of sheeting not needed if screws go into framing sheet no: published: sheet name: drawn: sb agchecked: copy

2”-2”-6” MIN. BLOCKINGTO UNDERSIDE OF SHEETINGNOT NEEDED IF SCREWS GOINTO FRAMING

SHEET NO:

PUBLISHED:

SHEET NAME:

DRAWN: CHECKED:SB AG

C

OP

Y R

IGH

T &

IN

TE

LLE

CT

UA

L P

RO

PE

RT

Y N

OT

ICE

•T

HIS

PLA

N S

ET

IS

CO

PY

RIG

HT

PR

OT

EC

TE

D A

ND

CO

NT

AIN

S I

NT

ELL

EC

TU

AL

PR

OP

ER

TY

WH

ICH

BE

LON

GS

TO

ALL

EN

GE

ZE

LMA

N P

E F

OR

BE

NE

FIT

OF

TH

E L

EV

ER

ED

GE

.

•A

CC

ES

S I

S G

IVE

N T

O T

HE

IN

FO

RM

AT

ION

HE

RE

ON

SO

LELY

FO

R T

HE

PU

RP

OS

E O

F C

OM

PLE

TIO

N O

F T

HE

PR

OJE

CT

FO

R W

HIC

H I

T I

S I

NT

EN

DE

D.

•N

O O

TH

ER

US

E M

AY

BE

MA

DE

OF

TH

E I

NF

OR

MA

TIO

N,

DR

AW

ING

S,

OR

ID

EA

S H

ER

EO

N W

ITH

OU

T T

HE

EX

PR

ES

S,

WR

ITT

EN,

PE

RM

ISS

ION

OF

ALL

EN

GE

ZE

LMA

N P

E

EN

LAR

GE

D V

IEW

ING

& H

YP

ER

LIN

KS

:P

RIN

T V

ER

SIO

N O

F T

HIS

PLA

N P

RO

VID

ES

MIN

IMU

M I

NF

OR

MA

TIO

N N

EE

DE

D B

Y U

SE

RS

.

ELE

CT

RO

NIC

VE

RS

ION

(E

V)

PR

OV

IDE

S M

AG

NIF

IED

VIE

WIN

G U

P T

O 6

40

0%

. E

V A

LSO

PR

OV

IDE

SH

YP

ER

LIN

K A

CC

ES

S T

O O

EM

MA

NU

ALS

AN

D A

BU

ND

AN

T O

TH

ER

SU

PP

LEM

EN

TA

RY

INF

OR

MA

TIO

N.E

V M

AY

BE

AC

CE

SS

ED

AT

: W

WW

.GE

ZE

LMA

NP

E.C

OM

/PV

/0

19

2P

_A

G_

Ve

nti

.dw

g

REVISIONS:

THIS PLAN IS VOID WITHOUT MYSIGNATURE & RAISED SEAL. THISPLAN MAY NOT BE PLACED ONFILE FOR PULLING MULTIPLEPERMITS.EACH PERMIT PULLEDREQUIRES ITS OWN RAISED SEALCOPY OF THIS PLAN.

INS

TA

LLA

TIO

N O

F A

S O

L A

R

A T

T I

C

V E

N T

AN

Y L

OC

AT

ION

IN

FLO

RID

A

RO

OF

MO

UN

T

DESIGNED PER: ASCE 7-10

APPLICABLE CODE:

FLORIDA BUILDING CODE 2010 &

CURRENT NATIONAL ELECTRIC CODE

EXPOSURE:

WIND LOAD:

BLDG. IP. CATEGORY:

200 MPHD

II

01SCALE: N.T.S.

TYP. INSTALLATION ON ASP SHINGLE ROOF

VENTI PV (PHOTO-VOLTAIC) FAN INSTALLATION NOTES:

VENTI PV FAN EQUIPMENT HAS A FLORIDA PRODUCT CONTROL APPROVAL (PCA) FL 13509 R-1. VIEWERS MAY REVIEW SAME ON-LINE AT WWW.FLORIDABUILDING.ORG ENGINEER OF RECORD (EOR) IS IN THE PROCESS OF CREATING A

REVISION- 2 TO FLORIDA PRODUCT CONTROL APPROVAL (PCA) 13509 R-1. REVISION 2 IS BASED UPON SAME 3RD PARTY TESTING WHICH HAS ALREADY BEEN ACCEPTED BY FLORIDA BUILDING COMMISSION FOR REVISION 1. THE NEW,IN-PROGRESS, REVISION MERELY ADDS SOME COMMON SENSE LOGIC TO THE INTERPRETATION & APPLCIATION OF THAT ORIGINAL 3RD PARTY TESTING. SAID TESTING HAPPENED TO BE ON SHINGLE ROOF MOCK-UPS, BECAUSE SHINGLE

ROOFS ARE THE MOST COMMON INSTALLATION. HOWEVER, RECENTLY, ONE AHJ (AUTHORITY HAVING JURISDICTION) HAS MISTAKENLY CLAIMED THAT CIRCUMSTANCE RESTRICTS INSTALLATIONS TO SHINGLE ROOFS. TO THECONTRARY!!!! IT SHOULD BE CLEAR TO ALL THAT THE SOLE PURPOSE OF SUCH 3RD PARTY TESTING WAS TO ESTABLISH THE STRENGTH OF THIS FAN APARATUS AND ITS' ATTACHMENT METHODOLOGY & HARDWARE TO STANDARDICC-COMPLIANT ROOF DECKS & ROOF FRAMING.WHICH STRENGTH HAS BEEN PROVEN TO A HIGH LEVEL OF REDUNDANCY.

EOR HEREBY CERTIFIES BY HIS SIGNATURE & SEAL ON THIS PLAN DOCUMENT THAT THE OEM (ORIGINAL EQUIPMENT MANUFACTURER) MOUNTING HARDWARE AND COMPONENTS ARE ELECTRICALLY, STRUCTURALLY, AND

MECHANICALLY ADEQUATE FOR INSTALLATIONS MADE IAW (IN ACCORDANCE WITH) THE DETAILS AND SPECIFICATIONS OF THIS PLAN DOCUMENT. THE DETAILS SPECIFIED ON THIS “PAPER” PLAN MEET OR TO EXCEED THE MINIMUM

NEEDED BY INSTALLERS AND AHJS . PLAN USERS ARE ENCOURAGED TO VIEW ELECTRONIC VERSION (EV) PLAN ON-LINE. ACTIVE HYPERLINKS ON EV PROVIDE EASY ACCESS TO SUPPLEMENTAL INFORMATION. EV ALSO ALLOWS VIEWER TO

STUDY THE PLAN AND OEM DETAILS AT MAGNIFICATIONS OF VIEWER CHOICE UP TO 6400%. IF A CONFLICT SHOULD OCCUR BETWEEN A DRAWING AND/OR SPECIFICATION HEREON AND AN OEM DETAIL, OEM SHALL PREVAIL - EXCEPTTHAT EOR SPECIFICATION OF TWO SCREWS ATTACHING INTO ROOF FRAMING, OR BLOCKING “SUPERSEDES” OEM “SHEETING-ONLY” ATTACHMENT SPECIFICATION. OEM PROVIDES A “ONE-SIZE-FITS-ALL” INSTALLATION PACKAGE WHICH ISINTENDED FOR USE EVERYWHERE. THE INSTRUCTIONS PROVIDED THEREIN ARE HEREBY MODIFIED BY THIS WESTERN-HEMISPHERE, PERMIT-READY, ENGINEER-SEALED, GENERIC, PLAN..THESE INSTRUCTIONS ARE INTENDED TO COVER ALL INSTALLATIONS NOT EXCEEDING THE FOLLOWING CONDITIONS:

WIND SPEED VULT 200-MPH, EXPOSURE CATEGORY D, INSTALLATION HEIGHT NGT (NOT GREATER THAN) 30-FT ABOVE SURROUNDING GRADE, ROOF PRESSURE ZONE 1 OR 2 (PZ1 OR PZ2) - NO PZ3. SITE CONDITIONS EXCEEDINGPRECEEDING RESTRICTIONS SHALL REQUIRE SITE-SPECIFIC ENGINEERING. THOSE NEEDING SAME ARE ENCOURAGED TO CONTACT EOR DIRECTLY: [email protected] INSTRUCTIONS PROVIDE DETAILS & SPECIFICATIONS FOR SHINGLE, TILE, METAL, AND MEMBRANE ROOF INSTALLATIONS. READERS ARE NOTIFIED THAT THIS PLAN IS WRITTEN FOR PROFESSIONAL INSTALLERS, E.G. EXPERIENCED,LICENSED, TRADE PROFESSIONALS. NOVICE PERSONS SUCH AS HOME OWNERS AND OTHER DO-IT-YOURSELF INSTALLERS ARE DIRECTED TO OEM INSTALLATION INSTRUCTIONS FOR STEP-BY-STEP BASIC INSTRUCTIONS WHICH ARE NOTNEEDED BY PROFESSIONAL INSTALLERS AND THEREFORE OMITTED HERE. PRINTED OEM INSTALLATION INSTRUCTIONS ARE SHIPPED WITH EACH VENTI PV FAN..WHEN DEALING WITH SHINGLES, TILE, METAL, & MEMBRANE, CONTRACTOR SHALL FOLLOW OEM INSTALLATION INSTRUCTIONS EXCEPT REGARDS HOLD-DOWN ATTACHMENTS. USE OEM SCREWS AND WATER-PROOFING. HOWEVER,OEM SHEETING-ONLY ATTACHMENT SPECIFICATION IS NOT ADEQUATE FOR VULT 120-MPH OR GREATER WIND SPEEDS. THERE SHALL BE TWO DIAGONALLY OPPOSITE SCREWS INTO ROOF FRAMING OR INTO 2” X 4” X 6”MINIMUMBLOCKING. BLOCKING SHALL SANDWICH THE ROOF SHEETING AND ROOF MEMBRANE BETWEEN THE BLOCKING AND THE FAN WITH ITS' OEM WATER-PROOFING.WHEN DEALING WITH TILE CONTRACTOR SHALL:1. USE EXTREME CARE WHEN REMOVING TILE FOR THE FAN INSTALLION. IT IS ESSENTIAL TO AVOID DAMAGE TO ROOF MEMBRANE OUTSIDE OF THE AREA TO BE CUT OUT FOR THE VENT AND TO REPAIR SUCH DAMAGE IF IT OCCURS.2. CAREFULLY CLEAN THE ROOF SURFACE TO WHICH THE OEM WATER-PROOFING WILL SEAL THE FAN BASE.3. AVOID OBSTRUCTING FAN EXHAUST WHEN REPLACING TILE.WHETHER SHINGLE, TILE, METAL, OR MEMBRANE, THE REALLY CRUCIAL DETAILS OF THIS INSTALLATION PLAN ARE:1. KEEP OUT OF PZ3.2. CONTRARY TO STANDARD OEM INSTRUCTIONS, WHICH RELIES UPON SHEETING-ONLY HOLD-DOWN ANCHORAGE, VENTI PV FAN MUST EITHER STRADDLE AND SCREW INTO ROOF FRAMING OR SCREW INTO TWO DIAGONALLY OPPOSITEPIECES OF WOOD BLOCKING -MINIMUM 2” X 4” X 6”. THIS REQUIREMENT IS NECESSARY TO PROVIDE THE NEEDED UPLIFT RESISTANCE FOR HIGH WINDS IN GENERAL AND THE FLORIDA HIGH VELOCITY HURRICANE ZONE IN PARTICULAR.

3. MAKE SURE THAT TWO DIAGONALLY OPPOSITE FASTENERS HIT THE CENTER OF ROOF FRAMING, OR 2” X 4” X 6” (MINIMUM) BLOCKING.4. BALANCE OF FASTENERS INTO SHEETING IS ACCEPTABLE.5. BE CAREFUL NOT TO CUT ROOF FRAMING.6. FOLLOW APPLICABLE BUILDING CODE ROOFING & WATER-PROOFING PROVISIONS AND APPROPRIATE PRACTICES OF NRCA ROOFING & WATERPROOFING MANUAL.

STRUCTURAL: GRAVITY LOAD FROM SOLAR EQUIPMENT LESS THANWIND FORCES:

ASCE 7 PRESSURE ZONE DIAGRAM (PAGE 5 AT 1ST LINK) MAY BE VIEWED AT THE FOLLOWING LINKS:

20 LB TOTALVARIES

OWNER:

HIGH VELOCITY HURRICANE ZONE FLORIDA

John Doe

AHJ:

UTILITY:N/A

LEGAL DESCRIPTION:PARCEL ID: ANY PROPERTY IN FLORIDA

PCA – NOA EQUIVALENCYHTTP://WWW.FLORIDABUILDING.ORG/FBC/PUBLICATIONS/BENNETT_LETTER.PDF

HTTP://WWW.FLORIDABUILDING.ORG/FBC/PUBLICATIONS/MIAMI_NOA_MEMO.PDF

02SCALE: N.T.S.

ALTERNATIVE APPLICABLE ROOF MATERIALS

THIS PLAN AVAILABLE ONLINE FOR REVIEW @: HTTP://WWW.GEZELMANPE.COM/PV/0192P_AG_VENTI.PDF

04SCALE: 1" = 1'-0"

DETAILS, ADDITIONAL ENGINEERING REQUIREMENTS EXCEEDING OEM LITERATURE, ANCHORAGE APPLICABLE TO SHNGLE, MEMBRANE & TILE ROOFS

03SCALE: NTS

OEM INSTALLATION INSTRUCTIONS

ALLEN GEZELMAN16502 HANNA RD.LUTZ, FLORIDA 33549

PH. 813 650 7246FX. 866 397 9050Allen@Gezelman PE.COM

www.GezelmanPE.com

I CERTIFY THAT THIS DESIGN &SPECIFICATIONS MEET THE 2010 FBC

W/ CURRENT NEC

ALL AFFIDAVITS, DESIGNS, OPINIONS, CALCULATIONS & OTHER ENGINEERING SERVICES PROVIDED BY ALLEN GEZELMAN PE AND HIS ASSOCIATES ON ANY AND ALL

PROJECTS ARE SUBJECT TO THE PROVISIONS OF EJCDC C-700 (ENGINEERS JOINT CONSTRUCTION DOCUMENT COMMITTEE - STANDARD GENERAL CONDITIONS OF THE

CONSTRUCTION CONTRACT) CURRENT AT THE TIME. THOSE OBJECTING TO SAID EJCDC C-700 OR PROVISIONS THEREOF ARE DIRECTED NOT TO USE THE AFFIDAVIT,DESIGN, OPINION, CALCULATION OR OTHER ENGINEERING SERVICE OFFERED BY ALLEN GEZELMAN PE AND HIS ASSOCIATES ON THE PROJECT. EJCDC C-700 MAY BE

VIEWED AT: HTTP://GEZELMANPE.COM/REFERENCE/AG/C-700.PDF

VENTI PV FAN AND OEM INSTALLATION COMPONENTS ARE COMPATIBLE WITH ALL KNOWN ROOFING TILE MATERIALTYPES, ALL SHAPE PROFILES, AND ALL INSTALLATION METHODS. INSTALLATION METHOD COMPATIBILITY INCLUDESBUT IS NOT LIMITED TO SCREW DOWN, FOAM SET, MUD SET, BATTENS, ETC. EOR IS AVAILABLE SHOULD THERE BE APARTICULAR QUESTION. E-MAIL QUERY TO: [email protected].

TILE INSTALLATION SAME AS SHINGLE EXCEPT:

1. TILE REMOVAL & REINSTALL – USE SPECIAL CARE NOT TO DAMAGE ROOF WATERPROOFING MEMBRANE BEYOND THE FAN CUT-OUT.

2. AREA OF WORK LARGER TO ACCOMMODATE OEM TILE FLASHING.

3. REFER TO OEM FLASHING INSTALLATION INSTRUCTIONS WHICH ARE PACKAGED IN THE FLASHING BOX.

05SCALE: NTS

FLORIDA PRODUCT APPROVAL DOCUMENTATION ALT. 01 - 16" C-C ALT. 02 - CENTERED ALT. 03 - BLOCKING

PRODUCT APPROVAL #:

FL (13509)

SAMPLE FLASHING FOR TILE ROOFS SAMPLE FLAT TILE INSTALLATION PHOTO

ALTERNATIVE: BARREL OR FLAT TILE ROOF

HTTP://GEZELMANPE.COM/REFERENCE/ASCE-7_PRESSUREZONES.PDF

PZ3 PROHIBITION APPLIES TO RIDGE GABLE ENDS ONLY, BECAUSE VENTI PV FANS ARE MOUNTEDHIGH ON SLOPED-ROOFS - WHICH DO NOT EXIST ON HIP AND LOW-SLOPE.

06SCALE: NTS

ASCE 7-05 WIND PRESSURE ZONE DIAGRAM

Siggi
Snapshot
Siggi
Callout
PZ3 PROHIBITION
Siggi
Callout
PZ3 PROHIBITION
Siggi
Text Box
INSTALLATION INSTRUCTIONS
Siggi
Image
Siggi
Text Box
MANUFACTURED BY:
Siggi
Text Box
DISTRIBUTED BY:
Siggi
Image
Siggi
Text Box
1423 Gunn Highway Odessa, Florida 33556 813-403-5100 www.theleveredge.com
Siggi
Image
Siggi
Snapshot
Siggi
Snapshot
Siggi
Snapshot
Siggi
Text Box
June 23rd 2013
Siggi
Image
Siggi
Image
Siggi
Image
Siggi
Snapshot