건설 용어_부분7

1
86 PEFS Process Engineering Flow Scheme 87 PFS Process Flow Scheme 88 E/R Engineering Requisition (= Material Requisition) 89 MSD Material Selection Diagram (MM Preparation, PR Review) 90 매출의 산정기준 (직접비+ 사업관리 인건비/경비) * 95%(?) 로 가 매출액개념 91 PMSA Progress Measuring System Application 92 Project Tool P3, PMSA (MS Acess), Project Space(EDMS), 엑셀 입찰 Project ITB 접수 -> 배포 -> 현장설명회 -> KOM (Launch Meeting) -> 금액확정 -> 용역계약서 작 성 -> PD Sign 초기 Work Flow -> 사업코드 부여 -> 예산편성 -> 외주 수의 계약 품의 (10일 이내, 선착수로 시간단축 의미) (실행 M/H 제출, 사업수행계획서(Project Highlight 품의)) 94 P-code 용역 계약서 체결이전 프로젝트 코드 95 용역계약서 내용 M/H 비용(PM), 외주비(부서 접수), 설계경비 96 Work package Cost Breakdown Structure ( 자산관리시 기준, 보험기준) 97 Insulation(LIM) Insulation Limit 98 EDIS Engineering Data Information System 6Package구성 99 LDM Line Data Management 100 NDM Nozzle Data Management 101 ELM Equipment List Management 102 ELD Equipment Loading Data 계약 기술문서 숙지 PD, PM PE임명되신 분께서는 원계약서, ITB 제반 계약기술문서의 전반을 숙지하여 (BBJN 지시사항) 어떠한 문서가 있는지, (Where-What) 문서의 목적과 내용이 어떠한지, (Purpose, Contents) 무엇을 강조하고 있는지, (Emphasis) 안전 배치계획상의 요구조건이 무엇인지, (Safty, Layout - Requirement) 등을 파악하시기 바랍니다. 전체 계약기술문서 (20 binders 기준)2내에 숙독하고, 프로젝트 착수후 2개월내에 2숙독을 하시기 바랍니다. 104 BEDD Basic Engineering Design Data 105 Engineering Portion 총공사비의 3~5%(??) 106 NPC Notification of P&ID Change 107 NEC Notification of ELP Change 108 DCN/FCN Design/Field Change Notice 109 MDR Master Document Register (설계 성과품? : 도면 및 설계문서) 110 IFA Issued for Approval (승인용으로 발행) 111 IFC Issued for Construction 112 As Built 준공용 113 설계기본도면 P&ID, Equipment Layout Plan(ELP), Underground(U/G) Composite Drawing 114 내부검토용 Preliminary (Pre.) : 개정번호 PA, PB, --- 설계스케치, 개념도, 예비 설계도면 등 115 참조용 Issued for Information (IFI) : A, B, C, --- 승인후 "IFI" or "AFC" 개정번호 "0" 116 검토용 Issued for Review (IFR) : A, B, C, --- 승인후 "IFI" or "AFC" 개정번호 "0" 117 승인용 Issued for Approval (IFA) : A, B, C, --- 승인후 "IFI" or "AFC" 개정번호 "0" 118 설계 승인용 Approved for Design (AFD) : 0, 1, 2, --- P&ID, EQ list, Process Data Sheet, etc. 119 시공용 Issued for Construction or Approved for Construction (IFC or AFC) : 0, 1, 2, --- 120 구매용 Issued for Purchase or Approved for Purchase (IFP or AFP) : 0, 1, 2, --- 121 제작용 Issued for Fabrication or Approved for Fabrication (IFF or AFF) : 0, 1, 2, --- 93 103

Upload: jaeup-you

Post on 25-Nov-2015

90 views

Category:

Documents


4 download

DESCRIPTION

건설 용어_부분7

TRANSCRIPT

  • 86 PEFS Process Engineering Flow Scheme

    87 PFS Process Flow Scheme

    88 E/R Engineering Requisition (= Material Requisition)

    89 MSD Material Selection Diagram (MM Preparation, PR Review)

    90 (+ /) * 95%(?)

    91 PMSA Progress Measuring System Application

    92 Project Tool P3, PMSA (MS Acess), Project Space(EDMS),

    Project ITB -> -> -> KOM (Launch Meeting) -> -> -> PD Sign Work Flow -> -> -> (10 , )

    ( M/H , (Project Highlight ))

    94 P-code

    95 M/H (PM), ( ),

    96 Work package Cost Breakdown Structure ( , )

    97 Insulation(LIM) Insulation Limit

    98 EDIS Engineering Data Information System 6 Package

    99 LDM Line Data Management

    100 NDM Nozzle Data Management

    101 ELM Equipment List Management

    102 ELD Equipment Loading Data

    PD, PM PE , ITB

    (BBJN ) , (Where-What)

    , (Purpose, Contents)

    , (Emphasis)

    , (Safty, Layout - Requirement)

    .

    (20 binders ) 2 ,

    2 2 .

    104 BEDD Basic Engineering Design Data

    105 Engineering Portion 3~5%(??)

    106 NPC Notification of P&ID Change

    107 NEC Notification of ELP Change

    108 DCN/FCN Design/Field Change Notice

    109 MDR Master Document Register ( ? : )

    110 IFA Issued for Approval ( )

    111 IFC Issued for Construction

    112 As Built

    113 P&ID, Equipment Layout Plan(ELP), Underground(U/G) Composite Drawing

    114 Preliminary (Pre.) : PA, PB, --- , ,

    115 Issued for Information (IFI) : A, B, C, --- "IFI" or "AFC" "0"

    116 Issued for Review (IFR) : A, B, C, --- "IFI" or "AFC" "0"

    117 Issued for Approval (IFA) : A, B, C, --- "IFI" or "AFC" "0"

    118 Approved for Design (AFD) : 0, 1, 2, --- P&ID, EQ list, Process Data Sheet,etc.119 Issued for Construction or Approved for Construction (IFC or AFC) : 0, 1, 2, ---

    120 Issued for Purchase or Approved for Purchase (IFP or AFP) : 0, 1, 2, ---

    121 Issued for Fabrication or Approved for Fabrication (IFF or AFF) : 0, 1, 2, ---

    93