ZPC Group ProfileHospitality, Commercial and Retail Construction

Professional & Construction Services

Page 2: ZPC Group Presentation - Turn Key 13062016

WHO WE ARE

• A Design, Development and Construction Group of Companies

The ZPC GROUP is proudly South African design, development and constructiongroup of companies, who have competently executed projects throughout Africa,locally in South Africa and cross border into sub Saharan African regions all withinthe construction industry for the past twenty years.

OUR BUSINESS

• Large retail, commercial and hospitality projects• Limitless capacity• Timeous and cost effective

The ZPC Group specialises in large hospitality and retail projects. Our full turnkeysolution ensures functional and aesthetically pleasing buildings, within budgetand on time. We boast efficiency from initial consultation to key handover.

Page 3: ZPC Group Presentation - Turn Key 13062016

We offer a in-depth expertise in each segment of the construction industry, to meet the client’s objectives, on-time and to-cost with zero defect.

TURNKEY SOLUTION – Professional services

PROFESSIONAL SERVICES – In house consultants

Construction team and the client team is supported by an in house office based professional team.

• Project Coordination and Planning• Project programming • Risk monitoring & planning • Professional Interior Design • Professional Architect • Structural engineering• Mechanical engineering• Electrical engineering• Fire detection / Fire prevention engineering• Wet services engineering• ICT engineering• Health and Safety • Project Management documentation• Hand over documentation• Cost Control• Procurement & logistics planning / management• FF&E / OS&E Procurement

Page 4: ZPC Group Presentation - Turn Key 13062016

TURNKEY SOLUTION – Construction services

• Structure and Civil• Renovation & new build of Hotel Centres• Renovation & new build of Retail Centres• Mechanical, Electrical Installations• Wet Service Installations• Fire Protection Services• Fire Detection Services• ICT Technologies• Specialised Trades (Partially outsourced)• Furniture, Fixtures & Equipment• Joinery Manufacture and Install• Maintenance & Service agreements• Procurement, supply & installation of FF&E• Services – Plumbing, HVAC, Fire detection,

Electrical, ICT• FFE supply and install

Page 5: ZPC Group Presentation - Turn Key 13062016

TURNKEY SOLUTION – ZPC owned sub contractors

Clients benefits

ZPC PROVIDE A SINGLE POINT OF RESPONSIBILITY FOR THE CLIENT, ENSURING;

• That the team executes the project scope with the same objectives and responsibilities

• Are equally accountable to the project and the client.

• ZPC focuses only on a handful of projects at a time, thereby giving every client our full attention.

• Consistent health and safety practices and documentation.

• Project risk address is globally addressed throughout

• Simplified management of subcontract agreements• Simplified overall management of retentions• Simplified overall management defects analysis

ADVANTAGES OF TURNKEY CONTRACTOR WITH IN HOUSE SPECIALISED CONTRACTOR SOLUTION:

• Single point of communication • Single point of responsibility• Holistic approach to client requirements• Possible to accelerate construction process• Client can obtain definite cost more rapidly• Simplified change control management • Fewer disputes likely to occur, if they do, will be easier to resolve• Controlled & ensured quality• On time completion• Mitigate normal construction delays• Coordinated programming & planning• Minimal use of outsourced trades and resources• Reduced overall project overheads

Page 6: ZPC Group Presentation - Turn Key 13062016

TURNKEY SOLUTION – ZPC strategy to operate cross border

ZPC’s STRATERGY TO OPERATE WITHIN THE AFRICAN REGIONS

• Audit & fact finding before commencement• Registration of local ZPC company &establish an office• Engage with local authorities • Partnership with local medium size contractors• Legally employ local resources through a labour broker• All departments & trades equipped with sufficient translators• Plant & tools – Minimal plant imported. Local contractor to assist with local procurement• All expatriate management and skilled resources to be accommodated on or close to the site• All staff on site to be served 3 meals per day • All working permits and visas are obtained for all expatriate and skilled resources• Relationship with RSA & other foreign embassy’s• Establish relationship with local import clearing agents• Expatriate team only works cross border with individual 3 monthly rotations (only 10 days off site)• Skills transfer program with local resources• Regular site visits by company directors• Regular site visits by company MEFP professionals

Page 7: ZPC Group Presentation - Turn Key 13062016

Hospitality - Projects executed with accelerated programmes

Beacon Island Lifestyle Resort – Tsogo Sun• Refurbishment of 200 guest rooms • Limited public areas• Limited MEFP

Executed & handed over in 77 days, hotel opened the day after completion to 100% guest occupancy

Umghlanga Sands Hotel – Tsogo Sun• Refurbishment of 217 Guest rooms

Executed & handed over in 60 days

Cabana Beach Lifestyle Resort – Tsogo Sun• Refurbishment of 217 guest apartments• 28 different bathroom modules• Limited public areas

Executed & handed over in 77 days, hotel opened day after completion to 100% guest occupancy

Page 8: ZPC Group Presentation - Turn Key 13062016

Retail - Projects executed with accelerated programmes

Mimosa Mall - Broll Properties – R135MPhase 1 – R35M• Refurbishment of retail areas• Conversion of checkers to Woolworths including line

shops• Undertaken in a live operational environment• 24hrs shift workExecuted & handed over in 6 months on time

Phase 2 – R55M• Full multi level mall refurbishment• New retail shopfronts and fit out in• Undertaken in a live operational environment• 24 hour shift workExecuted & handed over in 6 months on time

Phase 3 – R45M• Refurbishment of the food court• Replacement of the food court roof structure• 24 hour shift work• Undertaken in a live environment.Executed in 6 months, handed over on time.

Dihlabeng Mall Phase 2 – R55M• Construction of additional areas and refurbishment of

existing facilities.Executed and handed over in 10 months, 4 weeks early

Page 9: ZPC Group Presentation - Turn Key 13062016

Entertainment - Projects executed with accelerated

programmes

Sun City Cabanas – R95M• Complete refurbishment of 380 guest rooms, internal

public areas & restaurantExecuted in 11 months

Sun City Vacation club – R197M• Complete refurbishment of 581 guest apartments,

including structural modifications.Executed in 10 Months

Sun city Vacation club asphalt resurfacing – R1.1M• Rehabilitation and resurfacing of parking and road way.• Undertaken in a live environmentExecuted in 18 days, 13 days early

Sun City Brew Monkey / pub food court – R35M• Refurbishment of food court and speciality breweryExecuted in 3 months

Sun City Valley of the waves – Boomerango slide – R7M• New water slide including specialised trades.Executed in 2,5months, 3 months ahead of program.

Dihlabeng Mall Phase 2 – R55MConstruction of additional areas and refurbishment of existing facilities.• Contract completed 3 weeks early

Sun city – The Palace – Villa Palazzo gambling area & Grill room – R1M• Refurbishment and new branding of VIP gambling area • Refurbishment and upgrade of speciality restaurant• Undertaken in a live environment.Executed in 1.5months, 1 month ahead of program

Sun city Legends restaurant – R13MRefurbishment of speciality restaurant in entertainment area.• Undertaken in a live environmentExecuted in months, handed over on time

Sun City Valley of the waves – R2M• Upgrade and enlargement of the beach and bathing

area.Executed in 1,5months, 2 months ahead of program

Page 10: ZPC Group Presentation - Turn Key 13062016

Project: Renaissance Hotel, Ikeja, Nigeria.Budget: USD 1,4MScope of Work: Design supply and installation of HVAC system for 147 room Marriot hotel Programme: 6 monthsZPC Involvement: Design Supply mechanical contractor

Page 11: ZPC Group Presentation - Turn Key 13062016

Project: Mimosa MallBudget: ZAR 135MScope of Work: Refurbishment of retail line shops and main food court area.Undertaken in a live operating Mall Programme: 6 months per phase, total 12 monthsZPC Involvement: Main contractor

Page 12: ZPC Group Presentation - Turn Key 13062016

Project: Cabana Beach Refurbishment, 4 star, DurbanBudget: ZAR 85 milScope of Work: Full gut out & redo – rooms & corridorsProgramme: 84 daysZPC Involvement: Demolitions, builders work, tiling, waterproofing, joinery

Page 13: ZPC Group Presentation - Turn Key 13062016

Project: Beacon Island Refurbishment, 4 star, Plettenberg BayBudget: ZAR 50 milScope of Work: Full gut out & redo – rooms & corridorsProgramme: 77 daysZPC Involvement: Demolitions, builders work, tiling, door installation, FF&E installation

Page 14: ZPC Group Presentation - Turn Key 13062016

Project: Valley of the Waves, Sun CityBudget: ZAR 7 milScope of Work: New SlideProgramme: 56 daysZPC Involvement: Bulk earthworks, mass concrete, slide erection, landscaping, steelworks an fibreglass

Page 15: ZPC Group Presentation - Turn Key 13062016

Project: Brew Monkey Restaurant, Sun CityBudget: ZAR 35milScope of Work: Programme: 13 weeksZPC Involvement: Gut out of existing premises to be refurbished as new restaurant and entertainment area, including all MEFP

Page 16: ZPC Group Presentation - Turn Key 13062016

Project: Legends Restaurant Sun CityBudget: ZAR 13,5 MilScope of Work: New speciality restaurant.Programme: 90 daysZPC Involvement: Complete gut out of existing premises to be refurbished and to include all MEFP installations

Page 17: ZPC Group Presentation - Turn Key 13062016

Project: Maharani North Beach, 4 star DurbanBudget: ZAR 25 milScope of Work: Full RefurbishmentProgramme: 12 monthsZPC Involvement: Gut out and refurbishment of all guest rooms undertaken during live hotel operations.

Page 18: ZPC Group Presentation - Turn Key 13062016

Project: Hotel du Fevrier 5 star +, Lome TogoBudget: ZAR 700 milScope of Work: Full Turnkey RefurbishmentProgramme: 12 monthsZPC Involvement: Full turnkey solution – complete design development & refurbishment package

Page 19: ZPC Group Presentation - Turn Key 13062016

Project: Park Inn 3 star, Libreville GabonBudget: ZAR 105 milScope of Work: Full gut out and redoProgramme: 7 monthsZPC Involvement: Initially builders work – later appointed as full turnkey solution.

Page 20: ZPC Group Presentation - Turn Key 13062016

Project: Radisson Blu 5 star, Libreville GabonBudget: ZAR 175 mil (phase 1) ZAR 225 mil (phase 2)Scope of Work: Full gut out and redoProgramme: 18 monthsZPC Involvement: Full turnkey solution – complete refurbishment package

Page 21: ZPC Group Presentation - Turn Key 13062016

Project: Sun City Vacation Club (Phase 1)Budget: ZAR 197 mil Scope of Work: Full gut out and redoProgramme: 10 monthsZPC Involvement: Complete gut and refurbishment including structural modifications

Page 22: ZPC Group Presentation - Turn Key 13062016

Project: Umghlanga SandsBudget: ZAR 9,6MScope of Work: demo, wet works, tiling ceiling & shop fittings – Guest rooms. Selected public area facilities.Programme: 70 daysZPC Involvement: Demolition, wet works, tiling ceiling & shop fittings – Guest rooms. Selected public area facilities.

Page 23: ZPC Group Presentation - Turn Key 13062016

Project: Sun City CabanasBudget: ZAR 95 mil Scope of Work: Full gut out and redo, 380 keysProgramme: 11 monthsZPC Involvement: Gut out and refurbishment of all guest rooms, public areas and restaurants to be completely refurbished.

Page 24: ZPC Group Presentation - Turn Key 13062016