yaun advocacy project overview
DESCRIPTION
TRANSCRIPT
7
Yaun PD Proposalfor…Paul Laurence Dunbar High School
PROJECT DESTINY
7Metamorphosis
A transformation (as if by magic)
Are you willing to be a part of change?
MAKE a DIFFERENCE for our ELL population beginning NOW…
Do you ever feel like…
Schools in the year 2012 will replace all teachers with circus performers…
PROJECT DESTINYRationale
PROJECT DESTINYTraining in four phases
PROJECT DESTINYAction plan
Action Steps(What specific steps should we follow to complete this phase?)
Person(s) Responsible(Who will be responsible to assure
the completion of each step?)
Assessment(How will we know we have
been successful?)
Timeline(When? How
long?)
Resources(What financial or
other resources will we need?)
Conduct Project Destiny “What is Culture? What if it were me?”*
Cathy Yaun, ESL Teacher ESL Team Members
Participation rate (100%)
Scenario Reflections Exit Slips = Outcomes
Aug '10 1 hr Employee time
Book for each participant through PD funds: “Crossing Cultures in the Language Classroom”
Conduct Project Destiny “Cultural Values/Societal Roles: Can I see through their eyes?”*
Cathy Yaun, ESL Teacher ESL Team Members
Participation rate (100%)
Scenario Reflections Exit Slips = Outcomes
Aug '10 1 hr Employee time
Book for each participant through PD funds: “Crossing Cultures in the Language Classroom”
Conduct Project Destiny “Culture Shock: Anxiety and Achievement”*
Cathy Yaun, ESL Teacher Special Guest Speaker
Participation rate (100%)
Scenario Reflections Exit Slips = Outcomes
Aug '10 1 hr Employee time
Book for each participant through PD funds: “Crossing Cultures in the Language Classroom”
PD Funds for Stipend for Guest
Phase 1: Create an ESL learning team with an awareness and appreciation of culture
PROJECT DESTINYAction plan
Action Steps(What specific steps should we follow to
complete this phase?)
Person(s) Responsible(Who will be responsible to assure the
completion of each step?)
Assessment(How will we know we have been
successful?)
Timeline(When? How long?)
Resources(What financial or
other resources will we need?)
Conduct Project Destiny “Starting off on the right foot: Resources for strong school-to-home communication”*
Cathy Yaun, ESL Teacher Participation rate (100%) Syllabus/parent letter
documentation in applicable native language PRIOR to start of school
Aug '10 30 min Employee chooses time from home or work to view and participate in screen cast
Web link added to staff portal for Communication Resource PD
Conduct Project Destiny “It’s not always about what you say: The impact of non-verbal communication”*
Cathy Yaun, ESL Teacher ESL Team Members
Participation rate (100%) Exit Slips = Outcomes
Aug '10 30 min Faculty Meeting Agenda time needed
Phase 2: Provide ESL learning team with resources to enhance school-to-home and school-to-student communication.
PROJECT DESTINYAction plan
Action Steps(What specific steps should we follow
to complete this phase?)
Person(s) Responsible(Who will be responsible to assure the
completion of each step?)
Assessment(How will we know we have been
successful?)
Timeline(When? How long?)
Resources(What financial or
other resources will we need?)
Conduct Project Destiny “Using LEP Data to Drive Instruction: An Introduction to TESOL, WIDA, and the Can-Do Descriptors”*
Cathy Yaun, ESL Teacher Lisa Hillenbrand, IAKSS Middle and
High School Content Specialist
Participation rate (100%) Exit Slips = Outcomes Walk-through evidence Post-Pd Survey Results
Sept '10 1.5 hr Employee time Faculty Meeting
Mandated
Conduct Project Destiny “Content-Based Instruction: SIOP & Strategies/Collaboration is Key”*
Cathy Yaun, ESL Teacher Special Guest Speaker
Participation rate (100%) Exit Slips = Outcomes Walk-through evidence Post-Pd Survey Results
Oct '10 1 hr Employee time PD Funds for
Guest Speaker Stipend
Conduct Project Destiny “Scaffolding and Differentiation in Mixed-Ability Classes: What do I do now?”*
Cathy Yaun, ESL Teacher Special Guest Speaker
Participation rate (100%) Exit Slips = Outcomes Walk-through evidence Post-Pd Survey Results
Nov '10 1 hr Employee time PD Funds for
Guest Speaker Stipend
Phase 3: Develop an ESL learning team confident in knowledge and strategies of ESL pedagogy.
PROJECT DESTINYAction plan
Action Steps(What specific steps should we follow to
complete this phase?)
Person(s) Responsible(Who will be responsible to assure the
completion of each step?)
Assessment(How will we know we have been
successful?)
Timeline(When? How long?)
Resources(What financial or other
resources will we need?)
Conduct small-group student conferences monthly during ESL teacher planning periods and resource blocks for grade conferencing, student concerns, goal setting, and sharing of community resources for ELL families.
All ESL Teachers Participation rate (100%) Checklist documentation of
conferencing
BeginsAug '10
Monthly Per student
Community information pertinent to ESL families (To be determined by need)
Build relationships that offer adult guidance by assigning 1 faculty or staff volunteer to each ESL student;
Provide mentoring with bi-monthly ESL Destiny assemblies which will provide a relevant, successful community leader with whom students identify.
All ESL Teachers Faculty and Staff Volunteers Guest Speakers (volunteer basis)
100% of ESL students receive monthly contact from adult mentor
Destiny assemblies are consistent/positive student feedback
BeginsAug '10
MonthlyBi-
Monthly
Volunteers’ time Approval for
community volunteers as guest speakers
Phase 4: Provide ESL students with academic counseling, mentoring, motivation, and adult guidance which will minimize negative affective variables and maximize
cognitive and academic performance. NOTE: This phase occurs simultaneously with other phases and begins the second week of school.
Sample PD Handouts
Remember…
Through YOU A Change is coming A Metamorphosis A Transformation What does it take? Just INFORMATION.
PROJECT DESTINY, here we come!