y1 tclarke may portfolio

Upload: tommy-clarke

Post on 05-Apr-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/31/2019 Y1 TClarke May Portfolio

    1/25

  • 7/31/2019 Y1 TClarke May Portfolio

    2/25

  • 7/31/2019 Y1 TClarke May Portfolio

    3/25

    Introduction

    The Following Portfolio is to be read in conjunction with the Design Realisation

    Report. It completes the design realisation and concludes the City and

    Landscape, Professional Studies and Design Detail.

    This Document is a continuation gives an overview off all these reports with

    additional information to support Design and Detail and as such should be

    read along side these and the January Portfolio.

  • 7/31/2019 Y1 TClarke May Portfolio

    4/25

    st

  • 7/31/2019 Y1 TClarke May Portfolio

    5/25

    General Arrangement Plans

    Basement Plan

    6.7.

    8.

    9.

    10.

    11. 12.

    13.

  • 7/31/2019 Y1 TClarke May Portfolio

    6/25

  • 7/31/2019 Y1 TClarke May Portfolio

    7/25

    General Arrangement Plans

    Ground Floor

    1.

    2.

    5.

  • 7/31/2019 Y1 TClarke May Portfolio

    8/25

  • 7/31/2019 Y1 TClarke May Portfolio

    9/25

    General Arrangement Plans

    First Floor

    Void

    1. 1. 1.

    1.1.

    1.

    1.

  • 7/31/2019 Y1 TClarke May Portfolio

    10/25

  • 7/31/2019 Y1 TClarke May Portfolio

    11/25

    Void

    1. 1. 1.

    1. 1.

    1.

    1.

    General Arrangement Plans

    Second Floor

  • 7/31/2019 Y1 TClarke May Portfolio

    12/25

  • 7/31/2019 Y1 TClarke May Portfolio

    13/25

    2.

    8.

    3.

    General Arrangement Plans

    Third Floor

  • 7/31/2019 Y1 TClarke May Portfolio

    14/25

  • 7/31/2019 Y1 TClarke May Portfolio

    15/25

    General Arrangement Plans

    Section AA

  • 7/31/2019 Y1 TClarke May Portfolio

    16/25

    General Arrangement Plans

    Section

  • 7/31/2019 Y1 TClarke May Portfolio

    17/25

    Sequence of Construction

    Demolition and Basement excavation, new pylons to

    support the structure are bored and poured along with

    the ground source hear pump.

    Construction of Lift shaft a

    and important role in the str

    side lift shaft.

  • 7/31/2019 Y1 TClarke May Portfolio

    18/25

    Facade works become more apparent. Second oor structure goes in

    The bracing to the facade str

    facade to the super structure

  • 7/31/2019 Y1 TClarke May Portfolio

    19/25

    Axonometric views

  • 7/31/2019 Y1 TClarke May Portfolio

    20/25

  • 7/31/2019 Y1 TClarke May Portfolio

    21/25

    Entrance Visual

  • 7/31/2019 Y1 TClarke May Portfolio

    22/25

    Exhibition Space

  • 7/31/2019 Y1 TClarke May Portfolio

    23/25

    Market

  • 7/31/2019 Y1 TClarke May Portfolio

    24/25

    Bar Area Third Floor

  • 7/31/2019 Y1 TClarke May Portfolio

    25/25