Prof John NGArchitect and PlannerBEAM ProDirector, HKGBCVice Chairman, BEAM Society LimitedChairman, Green Labelling Committee, HKGBC Chairman, Technical Review Committee, BEAM Society LimitedMember, Industrial Standards and Research Committee, HKGBC
25 July 2012
Wrap Up and Mini Mock Examination
The key roles of BEAM Pro are to integrate thegreen building standards and practices intoeveryday building planning, design,construction & operation, and to assist theclients to achieve the desired green buildingrating level.
BEAM Professionals (BEAM Pro)
BEAM Pro are green buildingprofessionalstrained by BEAM Societyand accredited by HKGBC.
BEAM Professionals (BEAM Pro)
Welcome to be
BEAM Assessor A Selection Panel will assess each application. Qualified applicants will be subject to training, professional assessment & interview.
BEAM Assessor
The “Green Building Faculty” (GB Faculty) supportsthe initiatives of green building and sustainableenvironment of the HKGBC and itsGreen Labelling Committee (GLC),Industry Standards and Research Committee (ISRC),Communications and Membership Committee (CMC),as well asTechnical Review Committee (TRC) andProfessional Development Committee (PDC) of theBEAM Society (BSL).
Green Building Faculty
Technical Review Committee (TRC)
The Technical Review Committee (TRC)conducts all matters related to the BEAM ratingtools to specific building assessments, including:
manage the development andupgrade BEAM rating tools,manage a team of BEAM Expert Panels,monitor the quality of assessments.
Technical Review Committee (TRC)
Expert Panel
Site Aspects
Expert Panel
Energy Use
Expert Panel
Innovations and Additions
Expert Panel
Materials Aspects
Expert Panel
Water Use
Expert Panel
Indoor Environmental
Quality
Technical Review Committee (TRC)
Functions:A. Technical and certification •assign assessors to BEAM Plus project assessments•Endorse Provisional and Final assessments for issuing of certificates by HKGBC•Process credit interpretations•Establish rulings to exceptional cases•Undertake the First Appeal
B. Assessor Practices •Monitor and maintain the quality of the assessments by the assessors•Review the performance of assessors
C. Development •Collect information and rulings for future development of BEAM Plus•Update the current BEAM Plus and develop new versions
2010.04.20A milestone started the BEAM Pro initiative in HK …
1st Training 2010.04.20
BEAM Pro Training
1. 2010.04.202. 2010.05.123. 2010.06.09
14. 2011.09.2015. 2011.11.1016. 2012.02.2717. 2012.04.1918. 2012.07.25
BEAM Pro Training Days
BEAM Pro Training
Candidates will receive a notification viaemail regarding the updated trainingmaterials in about one week after thetraining.
Training Materials
BEAM Pro Examination
Hong Kong Examinations & Assessment Authority (HKEAA)Room 505, 17 Tseuk Luk Street, San Po Kong, Kowloon, Hong Kong
Venue
BEAM Pro Examination
2012.08.27(Mon)2012.08.29(Wed)2012.09.03(Mon)2012.09.05(Wed)2011.09.10(Mon)
Dates
BEAM Pro Examination
09:00‐11:0012:00‐14:0015:00‐17:00
Time Slots/ Day
BEAM Pro Examination
Test the understanding ofgreen building principles& the assessment systemunder BEAM Plus Version 1.2
Scope
BEAM Pro Examination
15% IA Innovations + Additions25% SA Site Aspects (NB+EB)10% MA Materials Aspects20% EU Energy Use10% WUWater Use20% IEQ Indoor Environmental Quality
Weighting
BEAM Pro Examination
Open Book
A set of BEAM Plus NB & EB Version 1.2guideline will be provided.Memorizing the credit points, etc.is NOT required.
BEAM Pro Examination
Format
Computer‐based, randomly generated100 multiple choice questions inEnglish, within 2 hours
BEAM Pro Examination
Result
Passing mark:75%Pass / Failure notification immediately after exam. Official result in about 4 weeks time after exam.
BEAM Pro Examination
Result
BEAM Pro Examination
Re-sit
2012.09or subject to further notice from HKEAA if seats are available
CPD
CPD & Practice15 hours per year
Mock Exam
Which of the following is the building environmental assessment tool recognized by the Hong Kong Green Building Council for certifying existing buildings?
A.BEAM for Existing BuildingsB.BEAM PlusC.BREEAM for EBD.LEED AP
BEAM Pro Mock Exam
01/19
Which of the following is the building environmental assessment tool recognized by the Hong Kong Green Building Council for certifying existing buildings?
A.BEAM for Existing BuildingsB.BEAM PlusC.BREEAM for EBD.LEED AP
BEAM Pro Mock Exam
01/19
A retrofit of public housing estate is assessed under BEAM Plus for NB and awarded a Platinum Certificate in 2013. When will the certificate expire?
A. 2013B. 2015C. 2018D. 2020
BEAM Pro Mock Exam
02/19
A retrofit of public housing estate is assessed under BEAM Plus for NB and awarded a Platinum Certificate in 2013. When will the certificate expire?
A. 2013B. 2015C. 2018D. 2020
BEAM Pro Mock Exam
02/19
What amount of construction & demolition waste reduction will qualify for an additional credit under BEAM Plus NB Innovations and Additions?
A. 20%B. 40%C. 50%D. 90%
BEAM Pro Mock Exam
03/19
What amount of construction & demolition waste reduction will qualify for an additional credit under BEAM Plus NB Innovations and Additions?
A. 20%B. 40%C. 50%D. 90%
BEAM Pro Mock Exam
03/19
Under BEAM Plus NB SA P1, what is the prerequisite for minimum planting area for a three‐hectare hostel site with canteen, car parks and activity rooms?
A. Not applicableB. 10%C. 20%D. 30%
BEAM Pro Mock Exam
04/19
Under BEAM Plus NB SA P1, what is the prerequisite for minimum planting area for a three‐hectare hostel site with canteen, car parks and activity rooms?
A. Not applicableB. 10%C. 20%D. 30%
BEAM Pro Mock Exam
04/19
How many months of training record of operation & maintenance for responsible staff are required in order to obtain a credit under BEAM Plus EB SA 8 Staff and Resources?
A. 3B. 9C. 12D. 36
BEAM Pro Mock Exam
05/19
How many months of training record of operation & maintenance for responsible staff are required in order to obtain a credit under BEAM Plus EB SA 8 Staff and Resources?
A. 3B. 9C. 12D. 36
BEAM Pro Mock Exam
05/19
Which of the following could earn exactly 3 credits under BEAM Plus NB EU 6 Renewable Energy Systems for a building with an annual energy consumption 100,000 kWh and 1,000 m2 building footprint?
A. Wind turbines which generate 1,000 kWh monthlyB. Solar air conditioning system reducing 25,000 kWh every yearC. Geothermal system energy saving equivalent to 300 m2 of PVD. PV covering 550 m2 of roof space plus solar thermal system energy
saving equivalent to 50 m2 of PV
BEAM Pro Mock Exam
06/19
Which of the following could earn exactly 3 credits under BEAM Plus NB EU 6 Renewable Energy Systems for a building with an annual energy consumption 100,000 kWh and 1,000 m2 building footprint?
A. Wind turbines which generate 1,000 kWh monthlyB. Solar air conditioning system reducing 25,000 kWh every yearC. Geothermal system energy saving equivalent to 300 m2 of PVD. PV covering 550 m2 of roof space plus solar thermal system energy
saving equivalent to 50 m2 of PV
BEAM Pro Mock Exam
06/19
What is the default occupancy density for an existing building when the number of occupants is not known under BEAM Plus EB Water Use?
A. 6 m2/personB. 9 m2/personC. 12 m2/personD. 15 m2/person
BEAM Pro Mock Exam
7/19
What is the default occupancy density for an existing building when the number of occupants is not known under BEAM Plus EB Water Use?
A. 6 m2/personB. 9 m2/personC. 12 m2/personD. 15 m2/person
BEAM Pro Mock Exam
7/19
How can a project, which was registered previously under BEAM 4/04 (but not yet completed the certification process), be switched to BEAM Plus?
A.Not possibleB.Can process both versions simultaneouslyC.Only if the applicant terminates the project registration of BEAM 4/04 and re‐registers the project under BEAM PlusD.None of the above
BEAM Pro Mock Exam
8/19
BEAM Pro Mock Exam
8/19
How can a project, which was registered previously under BEAM 4/04 (but not yet completed the certification process), be switched to BEAM Plus?
A.Not possibleB.Can process both versions simultaneouslyC.Only if the applicant terminates the project registration of BEAM 4/04 and re‐registers the project under BEAM PlusD.None of the above
(i) The assessment will be undertaken by the assessor anonymously. (ii) The assessor will visit the site to verify certain criteria and conditions.(iii)The applicant must submit all necessary evidence such as documents
or photographic records to demonstrate compliance with relevant criteria to the satisfaction of the assessor.
A. (i) & (ii) only B. (ii) & (iii) only C. (i) & (iii) only D. None of the above
BEAM Pro Mock Exam
A project will be assessed under BEAM Plus EB. Which of the following statements are correct:
9/19
(i) The assessment will be undertaken by the assessor anonymously. (ii) The assessor will visit the site to verify certain criteria and conditions.(iii)The applicant must submit all necessary evidence such as documents
or photographic records to demonstrate compliance with relevant criteria to the satisfaction of the assessor.
A. (i) & (ii) only B. (ii) & (iii) only C. (i) & (iii) onlyD. None of the above
BEAM Pro Mock Exam
A project will be assessed under BEAM Plus EB. Which of the following statements are correct:
9/19
Which of the following are defined as non‐occupied spaces under BEAM Plus NB IEQ 16 Interior Lighting in Normally Occupied Area?
A. Janitorial roomsB. HallwaysC. StairwellsD. Restrooms
BEAM Pro Mock Exam
10/19
Which of the following are defined as non‐occupied spaces under BEAM Plus NB IEQ 16 Interior Lighting in Normally Occupied Area?
A.Janitorial roomsB.HallwaysC.StairwellsD.Restrooms
BEAM Pro Mock Exam
10/19
Under BEAM Plus NB SA 5 Ecological Impact, which of the following is encouraged in building development?
A. Brownfield siteB. Greenfield siteC. Reclaimed siteD. Arable site
BEAM Pro Mock Exam
11/19
Under BEAM Plus NB SA 5 Ecological Impact, which of the following is encouraged in building development?
A. Brownfield siteB. Greenfield siteC. Reclaimed siteD. Arable site
BEAM Pro Mock Exam
11/19
Which of the following should be included in the Environmental Guidelines for Tenants?
A. Vertical daylight factor on building facadesB. List of neighbourhood amenitiesC. Hazardous waste managementD. No. of trees removed during construction
BEAM Pro Mock Exam
12/19
Which of the following should be included in the Environmental Guidelines for Tenants?
A. Vertical daylight factor on building facadesB. List of neighbourhood amenitiesC. Hazardous waste managementD. No. of trees removed during construction
BEAM Pro Mock Exam
12/19
An existing school in Wan Chai would like to apply for BEAM Plus Certification. Which of the following is NOT a potential strategy for attaining credit under BEAM Plus EU5 Renewable Energy System?
A. Install building integrated photovoltaic panelsB. Provide solar hot water systemsC. Consider wind turbine installation on the roofD. Construct green roof
BEAM Pro Mock Exam
13/19
An existing school in Wan Chai would like to apply for BEAM Plus Certification. Which of the following is NOT a potential strategy for attaining credit under BEAM Plus EU5 Renewable Energy System?
A. Install building integrated photovoltaic panelsB. Provide solar hot water systemsC. Consider wind turbine installation on the roofD. Construct green roof
BEAM Pro Mock Exam
13/19
What percentage level of compliance of applicable security measures and facilities for a building is required under BEAM Plus NB IEQ 1?
A. 65%B. 70%C. 75%D. 80%
BEAM Pro Mock Exam
14/19
What percentage level of compliance of applicable security measures and facilities for a building is required under BEAM Plus NB IEQ 1?
A. 65%B. 70%C. 75%D. 80%
BEAM Pro Mock Exam
14/19
The GFA concession for new developments will require BEAM Plus certification issued by HKGBC. What is the minimum rating requirement by BD?
A. GoldB. SilverC. BronzeD. None of the above
BEAM Pro Mock Exam
15/19
BEAM Pro Mock Exam
The GFA concession for new developments will require BEAM Plus certification issued by HKGBC. What is the minimum rating requirement by BD?
A. GoldB. SilverC. BronzeD. None of the above
15/19
What is/are the benefit(s) of having a BEAM Pro for BEAM Plus submission?
A. Mandatory requirement according to the BEAM Plus Certification Procedures Manual
B. Shorter assessment period by BEAM AssessorC. One bonus credit under SA
D. One credit under IA and advice for project submission
BEAM Pro Mock Exam
16/19
What is the benefit of having a project BEAM Pro for BEAM Plus project?
A. Mandatory requirement according to the BEAM Plus Certification Procedures Manual
B. Shorter assessment period by BEAM AssessorC. One bonus credit under SAD. One credit under IA and advice for project submission
BEAM Pro Mock Exam
16/19
Which of the following standards is NOT relevant to BEAM Plus NB IEQ 9 Increased Ventilation?
A.ASHRAE Standard 62.1‐2007B.ASHRAE Standard 111C.ASHRAE Standard 140D.ASTM E741
BEAM Pro Mock Exam
17/19
Which of the following standards is NOT relevant to BEAM Plus NB IEQ 9 Increased Ventilation?
A.ASHRAE Standard 62.1‐2007B.ASHRAE Standard 111C.ASHRAE Standard 140D.ASTM E741
BEAM Pro Mock Exam
17/19
How many credit(s) will be awarded for an existing building which is completely refurbished with all its non‐structural partitions demolished and re‐installed with new ones for a flexible office layout?
A.0B.1C.2D.3
BEAM Pro Mock Exam
18/19
How many credit(s) will be awarded for an existing building which is completely refurbished with all its non‐structural partitions demolished and re‐installed with new ones for a flexible office layout?
A.0B.1C.2D.3
BEAM Pro Mock Exam
18/19
A project will include a tennis court for residents only. A publicswimming pool and shaded seating area are within 500m walkingdistance of the project site. Other services within 500m walkingdistance of the site include: (i) restaurant A (ii) restaurant B (iii)Automated Teller Machine (iv) a medical clinic (v) pharmacy (vi) aconvenience store (vii) post office (viii) school (ix) laundry (x) place ofworship. How many credit(s) will the project achieve for BEAM Plus NBSA 3 Neighbourhood Amenities?
A.0B.1C.2D.3
BEAM Pro Mock Exam
19/19
A project will include a tennis court for residents only. A publicswimming pool and shaded seating area are within 500m walkingdistance of the project site. Other services within 500m walkingdistance of the site include: (i) restaurant A (ii) restaurant B (iii)Automated Teller Machine (iv) a medical clinic (v) pharmacy (vi) aconvenience store (vii) post office (viii) school (ix) laundry (x) place ofworship. How many credit(s) will the project achieve for BEAM Plus NBSA 3 Neighbourhood Amenities?
A.0B.1C.2D.3
BEAM Pro Mock Exam
19/19
Feedback & Confidentiality FormPlease Sign!
T +852 3610 5700
F +852 3996 9108
www.beamsociety.org.hk
1/F Jockey Club Environmental Building,
77 Tat Chee Road, Kowloon, Hong Kong香港九龍塘達之路77號賽馬會環保樓1樓