Workshop C NPDES Permitting … Practical &

Cost-Effective Tips for NPDES Permitting & Compliance and the Surface Water Tracking, Reporting

& Electronic Application Management System (STREAMS)

Wednesday, July 19, 2017

1 p.m. to 2:30 p.m.

Page 2: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

Biographical Information

William H. Haak, Founder, Haak Law LLC, 12595 Bentbrook Dr., Cleveland, OH 44026 216.772.3532 [email protected]

William H. Haak is the Founder of Haak Law LLC (www.haaklawllc.com) – an environmental, health & safety legal and consulting firm based in Cleveland, Ohio. He has more than 15 years of experience in occupational safety law and worker safety, and over 20 years of experience in environmental law (including extensive experience in air pollution control law and multi-media environmental compliance). Mr. Haak practices nationally in the United States and consults globally on all matters related to the EHS field (plus security and crisis management).

Mr. Haak graduated from The University of Akron (Business Finance) and Case Western Reserve University School of Law (J.D. with an emphasis on litigation and trial practice). Following law school, he worked as an Assistant Attorney General in the State of Ohio Attorney General’s Environmental Enforcement Section. As counsel to Ohio EPA, Mr. Haak’s practice was focused primarily on civil and administrative air pollution control cases. During his time with the Attorney General’s Office, Mr. Haak resolved civil environmental enforcement actions resulting in civil penalties totaling approximately $4 million.

Prior to forming Haak Law LLC, Mr. Haak was Senior EH&S Counsel for General Electric. He supported GE’s Appliances and Lighting Businesses, and was engaged in complex air permitting issues for other GE businesses nationwide. Mr. Haak has also been Associate General Counsel – EH&S for Hexion Specialty Chemicals in Columbus, Ohio, and Senior Regulatory Law Counsel for Owens Corning in Toledo, Ohio. He served overseas in the former Soviet Union (Ukraine) as an Environmental Enforcement Specialist with the American Bar Association’s Central & East European Law Initiative ("ABA/CEELI").

Haak is a frequent lecturer to attorneys, engineers, and environmental professionals on topics concerning federal and state air pollution law. In addition, he has taught as an adjunct faculty member at the University of Central Florida in Orlando and Columbus State in Columbus, Ohio. Since 2005, Haak has taught classes focusing on Air Pollution Law and Occupational Safety and Health Law at The University of Toledo College of Law as an Adjunct Professor.

Whitney Works, eDMR/STREAMS Administrator, Division of Surface Water Ohio EPA, PO Box 1049, Columbus, OH 43216-1049

614-644-2135 [email protected]

Whitney joined the Information Management Section of the Division of Surface Water in Autumn of 2016. Whitney serves as a liaison between program staff, software developers and the regulated community to streamline Agency online services. Whitney provides technical assistance for the electronic discharge monitoring report (eDMR) online data submittal system and STREAMS (Surface Water Tracking, Reporting, and Electronic Application Management System). Whitney’s nonprofit background brings experience in refining business processes, customer relations, and database management.

Cole Miller, NPDES Environmental Specialist, Ohio EPA, PO Box 1049, Columbus, OH 43216-1049

614-728-3846 [email protected]

Cole graduated from the Ohio State University with a B.S. in Chemical Engineering. He started working for Ohio EPA in 2007 in the Division of Hazardous Waste Management. He became an inspector for the Division of Surface Water Central District Office in August 2010 and transferred to Central Office to focus on NPDES permit writing in March 2017. As an inspector, his primary duties included inspecting facilities with NPDES permits and investigating complaints received from the public

Page 3: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

WhitneyWorkseDMR/STREAMSAdministrator

OhioEPA,DivisionofSurfaceWater

July19,2017

STREAMSSurfaceWaterTracking,Reporting,Electronic

ApplicationManagementSystem

Anoverview

Page 4: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

GoalsforPresentation

• FamiliaritywitheBusinessCenter• HowtosetupaneBiz account• RetrieveaPIN• NOIoverview,delegationandsubmittal• ePay• Nottomemorize,butknowme‐ “guidetoresources”

• hotcards,businesscard,helpfullinks

Page 5: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

• STREAMS fullydeployedSummer2016• NPDESapps&renewalforms,NOI,NOT,transfers,mods• eReports(ex.annualsludgereport,noncompliance,etc.)• Pre‐populatedfacilityinfofromdatabase• Datavalidationpriortosubmittaltoensureaccuracyandcompletion• ElectronicsignaturesubmittalwithPIN

• ePaymentService• Payallfeesimmediately(orlater)w/creditcardorelectroniccheck

All accessible with one eBusiness Center account

DSWElectronicBusinessServices(eBiz/EBS)

Page 6: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

GeneralNPDESApplications• BulkPetroleumFuelStorageFacilities• CoalSurfaceMiningActivities• ConstructionSiteStormWater‐ Big

DarbyCreekWatershed• ConstructionSiteStormWater‐

OlentangyWatershed• ConstructionSiteStormWater• GeothermalSystemDischarges• HydrostaticTestWater• IndustrialStormWater• MarinaStormWater• Non‐contactCoolingWater• PesticideApplicationDischarges• PetroleumRelatedCorrectiveAction• SmallMS4• SmallSanitaryDischarges(NoBADCT)• SmallSanitaryDischarges• TemporaryWastewaterDischarges• WaterTreatmentPlants

• Co‐permitteePermitApplications• ConstructionandSmallMS4Co‐permit

• OtherApplications• General,NoticeofTermination• TransferofOwnership

• NoExposureApplications• NoExposureCertificationforStorm

WaterPermitting

STREAMSSurfaceWaterTracking,Reporting,ElectronicApplication

ManagementSystem

Substantial time saved for both the regulated community and Ohio EPA/DSW 

Page 7: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

IndividualNPDESApplications• Form1– GeneralInformation(EPA3510‐1)• Form2A– PubliclyOwnedTreatmentWorks(EPA3510‐2B)• Form2B– ConcentratedAnimalFeedingOperations(EPA3510‐2B)• Form2C‐ Manufacturing,Commercial,Mining&Silvicultural

Operations(EPA3510‐2C)• Form2D– DischargeProcessWater(EPA3510‐2D)• Form2E– DoNotDischargeProcessWater(EPA3510‐2E)• Form2F– StormWaterIndustrialActivity(EPA3510‐2F)• Form2S– SewageSludge(Biosolids)Treatment(EPA4497)• ApplicationforModification(EPA4233)• ApplicationforTransfer(EPA4234)• Antidegradation Addendum

PretreatmentApplications• IndirectDischargeApplication(EPA4223)• IndirectPermitTransferApplication(EPA4116)

IndividualPermitApplicationsnew&renewal

Page 8: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

• NPDESNon‐complianceReport• NPDESSanitarySewerOverflowAnnualReport• NPDESComplianceScheduleUpdateReport• NPDESMunicipalSeparateStormSewerSystemAnnualReport(MS4

Report)• NPDESPretreatmentAnnualReport• NPDESPretreatmentIndustrialUsersPeriodicComplianceMonitoring

Report• NPDESPretreatmentGenericBaselineMonitoringReportFor

CategoricalStandards• NPDESBiomonitoringReportFormAcute&ChronicToxicityTest• NPDESPriorityPollutantReport• AnnualSewageSludgeReport

NPDESeREPORTS

Page 9: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

https://ebiz.epa.ohio.gov

Page 10: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

NeweBusinessCenterPINpartnershipwithLexisNexis

• ReducesPINretrievaltominutesfrom7‐10days.• Onlineidentityverification

• Safe&secureauthentication

• Allows3attemptstousetheonlineverification• HardcopyPINprocessinitiatedbysystemifidentityverificationfails

• Ifidentityisverified,PINappearsonscreen• Viewablewhileloggedin• Canbeusedimmediatelyacrossallservices• PINcanbedeactivatedbyaccountholder• NewPINcanbeobtainedifcompromised

Page 11: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

ToobtainaPIN:Login,ClickMYACCOUNT,GetNewPIN

Page 12: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching
Page 13: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching
Page 14: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

• Identityhasbeenverified• PINnowavailable• ClickMYAccount,ViewPIN.

Page 15: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

Login,clickMyAccount,ActivatePIN

Page 16: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching
Page 17: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching
Page 18: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching
Page 19: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching
Page 20: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching
Page 21: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching
Page 22: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

CreatingaNewNOI

ClickCreateNewPermitApplication

Page 23: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching
Page 24: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

40‐characterlimit

Page 25: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching
Page 26: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching
Page 27: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching
Page 28: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching
Page 29: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

DelegatinganApplication

Page 30: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching
Page 31: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

guidanceavailableforsubmittingadelegatedapplication

Page 32: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

ClickRenewPermit

RenewingaPermit

Page 33: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

Guidance

http://epa.ohio.gov/dsw/ebs

Page 34: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching
Page 35: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

• eBizallowsonlinepermitapplicationpaymentsassoonastheapplicationissubmitted….orlaterbyloggingintoyouraccountandclickingthe“PayOhioEPAfees”service.

• Quick,easy,andsecure

• Payinstantlyviacreditcardorelectroniccheck

• DecreasesAgencyreviewtimebyeliminatingthefiscalworkflowofreconcilinghardcopyforms&checks.

ePayment Service

Page 36: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching
Page 37: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

ePaymentServiceOptions

Page 38: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

• CTRL+F5(clearsbrowsercache)

• Planaheadandstartearly

• Workfromyourpermitlist

• UsetheGuidancedocuments

• Saveapplication/report,Exit,Verifythatisindashboard,takenoteofdocumentID#

• Pleasecontactwithtechnicalteamwithcourtesy

HelpfulHints

Page 39: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

eDMR/STREAMS/EBSTechnicalSupport

WhitneyWorkseDMR/STREAMSAdministratorDivisionofSurfaceWater50WTownSt,Ste700

[email protected](614)644‐2135

BUSINESSHOURS:Monday‐ Friday:7:00am– 5:00pm

eBusinessCenter(PINS&Passwords):(877)372‐2499

JamieRobertsDataSystemsAnalystDivisionofSurfaceWater50WTownSt,Ste700

[email protected](614)644‐2054

Page 40: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

NPDES Permitting

Cole MillerNPDES Permit Writer

Ohio EPA, Division of Surface Water

July 19, 2017

Page 41: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

Outline

• Programs• NPDES Program Updates• Inspections

– What to Expect– Notice of Violations / Resolutions

• NPDES permit development 

Page 42: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

What Does Surface Water Oversee?• National Pollutant Discharge Elimination System (NPDES)– Point sources

• Sewage Plants• Industrial Facilities (Non‐Contact Cooling Water)• Other discharge of pollutants reaching state waters

– Storm water• Industrial based on Standard Industrial Classification (SIC) Sectors such as scrap yards.

• Construction sites which disturb more than 1 acre

Page 43: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

Surface Water Regulation 101 (cont.)

• Permits‐to‐Install (PTI)– Mainline sewer lines– Pump stations– Treatment plants or modifications to treatment plants

• Indirect Discharges (industrial wastewater which is directed to centralized sewers)– Some POTWs have approved pretreatment programs that Ohio EPA regulates.

– Other indirect dischargers are regulated directly by Ohio EPA.

Page 44: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

Surface Water Regulation 101 (cont.)

• Wetland and stream modifications– 401 Program– Army Core of Engineer regulates filling of wetlands/streams 

(404 Program)

• Complaint investigations related to surface waters• Others:

– Biosolids– 208 – Regional planning– 319 – Nonpoint Source– CAFOs– Water Quality monitoring

Page 45: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching
Page 46: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

Program Updates

• OAC Chapter 3745‐33 Ohio NPDES Permits Proposed rule– Treatment additive approval

• Federal dental amalgam pretreatment rule– Dental offices submit dental amalgam status– Install treatment technology in 3 years

• Multi‐Sector General Permit Renewed– Removes Comprehensive Site Inspections– Adds incentives for Encouraging Environmental Excellence awarded facilities

Page 47: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

Permit Application Submittals

• Ohio EPA goal is to renew permits by expiration date.• Timely application submittal – 180 days prior to expiration date. Needs:– Complete application– Submitted by responsible official– Flow and 2C data complete?– Correct SIC codes FEGs identified?– Calculations and diagrams complete?– Antidegradation?

Page 48: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

CWA § 316(b) – Intake Structures

• Impingement• Entrainment• Facilities affected

– Existing Facilities• Withdraw > 2 MGD• At least 25% is used for cooling purposes• Permits expiring after July 14, 2018, need to submit full application requirements.

– New facilities

Page 49: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

Impingement and Entrainment

Flow Direction

Impinged = Stuck on screen

Entrained = through screen 

and onto cooling process

Page 50: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

Inspection Process

Page 51: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

How Are Inspections Selected?• USEPA grant commitments

• Minimum of once every 2 years for large permitted facilities• Minimum of once every 5 years for small facilities• Non-compliance will lead to more frequent inspections

• Complaint investigations

• Special inspection initiatives (dry cleaners, salvage yards, storm water controls at construction sites)

Inspections can be scheduled in advance or unannounced per division policy. Most complaint-driven inspections are unannounced.

Page 52: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

Before the inspection, have a plan

• Who will talk to the inspector.

• Have a camera that works.  The inspector may take pictures – you can request copies, too.

• Know how you will describe your operations, wastes, discharges, etc. to the inspector.

• Know where environmental compliance records are kept.

Page 53: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

When the inspector arrives

• Know why the inspection is being done.

• Get inspector’s business card.

• Tell the inspector about safety requirements of your plant.

• Answer the inspector’s questions.  Don’t be confrontational.  Don’t guess or make things up.  If you don’t have an answer, say so.

Page 54: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

Surface Water Inspections• What do we look for?

– Assess compliance with terms and conditions of NPDES permit, indirect discharge permit, PTI, and Ohio law

– Changes or proposed changes in waste streams• More volume?• Change in chemistry?

– Treatment system modifications

• Sampling?– Rarely.

• Problems?– Please Communicate!

Page 55: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

Facility Walk Through

• Expect a process‐based survey – Material use, water use, and wastewater 

generation.– Conveyance systems – Treatment system– Ancillary operations such as sludge 

management.

• Permit records• Sampling procedures• Stormwater management

Page 56: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

Exit Meeting

• Compliance or violations found.• Measures to correct violations.• Areas requiring further information.• Compliance assistance information and pollution prevention opportunities.

Page 57: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

After the InspectionThe company will receive a:

Compliance Letter

• Means the company is meeting the requirements reviewed during the inspection.                     

• This does not mean compliance with all Ohio EPA regulations, just the inspector’s division.

Page 58: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

After the InspectionOr the company will receive:

Notice of Violation (NOV) Letter – A separate inspection letter may be issued as well

• Description of violations.

• What company needs to do to correct violations.

• A timeframe to respond to the violations. Typically 30 days

Page 59: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

Common NPDES Violations• Failure to obtain permit• Failure to submit DMR or provide periodic sample 

results • Exceeding Permit Limits• Failure to provide notification for exceeding permit 

limits • Failure to ensure proper sampling (preservation, type, 

method, records) • Failure to operate/maintain/calibrate wastewater 

treatment equipment • Missing compliance milestones

Page 60: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

NOV ResponseDO contact the inspector if: 

• You have questions about the NOV.  

• The facts in the NOV are wrong.

• You don’t understand what you need to do to correct violations.

• You have questions on the enforcement process or need more time to respond.

Page 61: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

NEW Notice of Resolution Process

• An adequate response to the violations is received by the District.  – Work diligently toward resolving each violation

• GOOD Communication is key. Expect continued follow up by District Staff until the NOV has been RESOLVED.

• Once all of the violations cited in the NOV have been resolved, you will receive a Resolution of Violation (ROV) Letter!

Page 62: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

Enforcement Escalation

• No response to 1st NOV = 2nd NOV• The 2nd NOV will escalate up to Supervisor and/or Manager to contact the facility.

• If there is no response to a 2nd NOV, the facility will be contacted by the District’s Upper Management. 

• We prefer to work towards compliance instead of referring for enforcement.  

Page 63: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

Things You Can Do…

• Good communication is key. Contact us with any questions or concerns.

• If an NOV is issued, respond within the required time frame

• Start resolving violations immediately• Be Proactive not Reactive. • Communicate….Communicate….Communicate 

Page 64: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

Compliance Assistance Resources

• Customer Support Center: http://ohioepa.custhelp.com/app/home

• Office of Compliance Assistance and Pollution Prevention (OCAPP) at (800) 329‐7518 or http://www.epa.ohio.gov/ocapp

• Local district office: http://www.epa.ohio.gov/districts.aspx

Page 65: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

Permit Development

Page 66: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

NPDES  Individual Permit Development

1. Receive Application2. Completeness Review3. Develop TBELs4. Develop WQBELs5. Develop Monitoring 

and Reporting Requirements

6. Develop Special Conditions

7.  Incorporate Standard Conditions8.  Prepare Fact Sheet9.  14‐day Preview Period10.  Public Notice11.  Respond to Public and EPA Comments12.  Issue Final Permit

Page 67: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

Application Form 2C

• Part V‐A: All applicants at all outfalls.

• Part V‐B: All applicants at all outfalls.

• Part V‐C: Primary industries at any outfall with process wastewater.

• Part V‐D: If present in discharge. 

Page 68: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

Develop TBELs• Technology based effluent limits• EPA has developed effluent guidelines for 58 industrial sectors.

• Current list of sectors with effluent guidelines can be found at:

• http://water.epa.gov/scitech/wastetech/guide/industry.cfm 

• 40 CFR 401‐499.• FEGs must be met without the benefit of dilution, and are often included at internal stations.

Page 69: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

Which FEG category applies?

Which category would you expect canmaking to fall under?A.  Aluminum formingB.  Coil coatingC.  Metal finishingD.  Nonferrous metals manufacturing

Page 70: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

Answer: B.  Coil Coating

40 CFR 465: Coil CoatingSubpart A: Steel BasisSubpart B: Galvanized BasisSubpart C: Aluminum BasisSubpart D: Canmaking

Page 71: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

Which level of control applies?• BPT = Best Practicable Control Technology Currently Available.

• BCT = Best Conventional Pollutant Control Technology.

• BAT = Best Available Technology Economically Achievable.

• NSPS = New Source Performance Standards.• PSNS and  PSES are for Indirect Dischargers.

Page 72: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

Develop WQBELs

• Determine WQS• Characterize effluent and receiving water• Calculate parameters with mass balance• Apply Reasonable Potential

Page 73: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

Develop WQBELs ‐ WQS

WQS: Designated Uses• Aquatic Life• Water Supply• Recreation• Numeric and Narrative Criteria

• Antidegradation

Page 74: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

Effluent and Receiving Water Characterization

• Mass balance– Flow rates– Background water quality– Projected Effluent Quality (PEQs)

• Downstream hardness for some metal WQS

Page 75: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

PEQ Example ‐ Barium

• Projected effluent quality (PEQ) – Estimated level of a pollutant in an effluent

• Two methods of calculation but the target is:– Method A

• PEQ_max = Max_Result * f• PEQ_Ave = (Max_Result * f) * 0.73

– Method B• 95th percentile of the dataset • 95th percentile of the monthly averages

Page 76: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

PEQ Multipliers

Page 77: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

PEQ Example ‐ BariumCase 1 Case 2

# of samples 2 12

Max Result (ug/L) 158 175

F Factor 3.8 1.6

PEQ Max (ug/L) 600 280

PEQ Ave (ug/L) 438 204

WQS_Ave (ug/L) 420 420

% of WQS 104% 49%

Permit Result Limits No limits, monitoring likely

Page 78: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

Develop Monitoring and Reporting Requirements

• Monitoring Conditions‐ Location, frequency, sample collection

• http://epa.ohio.gov/portals/35/guidance/permit2.pdf

Page 79: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

Develop Special Conditions

• Special Studies– Mixing zone, toxicity reduction evaluation (TRE), metal translators

• Best management practices• Compliance schedules

Page 80: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

Standard Conditions

• Part III– Definitions– Non‐compliance notification

• Part II Examples– Outfall signage– Operator requirements– Notification to public water supply operators

Page 81: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

Fact Sheet

• U.S. EPA requirement for issuance of majors• Must include:

– General Facility Information– Administrative Requirement– Summary of Permit Rationale– Detail of Permit Rationale

• 15 to >100 pages

Page 82: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

14 Day Preview Period

• Historically, all parties reviewed a draft permit during the public notice period.

• Now, a 14‐day permittee review period of the draft permit is being offered prior to public notice as a “preview”.

• All communications during this review are included in the public record.

• Responses are prepared for any comments received.

Page 83: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

Public Notice and Beyond• 30 Day Public Notice Period• Plus 15 days to publish • Notice Given to:

– Applicant– US EPA– Interested Parties– Newspaper of Largest Circulation– Weekly Review– Ohio EPA Web

Page 84: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

Administrative Actions after Issuance

• Permit Appeals• Modification• Permit Transfer

Page 85: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

NPDES Permitting & ComplianceThe View From Outside Counsel...

Session CJuly 19, 2017

William H. HaakHaak Law LLC

HAAK LAW LLCEnvironmental, Health & SafetyLegal and Consulting Services

William H. HaakTel: 216.772.3532

[email protected]

Page 86: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

Introduction• What causes NPDES compliance risk?

• Tips on identifying and mitigating risk

• A few final thoughts on inspections and NOVs...

• Your questions

HAAK LAW LLCEnvironmental, Health & SafetyLegal and Consulting Services

William H. HaakTel: 216.772.3532

[email protected]

Page 87: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

The Causes of NPDES Compliance Risk• Corporate climate

• Facility-level culture- Facility leadership- Non-EHS operations personnel- EHS leadership

• Management of Change (MOC) gaps

• Communications issues

• The “cats and dogs” you can’t control...Or, can you?

HAAK LAW LLCEnvironmental, Health & SafetyLegal and Consulting Services

William H. HaakTel: 216.772.3532

[email protected]

Page 88: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

Mitigating NPDES Compliance Risk• Identifying training gaps and lack of understanding

- EHS personnel- Non-EHS personnel (both salaried and hourly)

• Focus on communication- Creates gap awareness- Bolsters MOC process- Communicate cross-functionally

• External communications with regulators (OEPA)

• Managing citizen and NGO-related risks

HAAK LAW LLCEnvironmental, Health & SafetyLegal and Consulting Services

William H. HaakTel: 216.772.3532

[email protected]

Page 89: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

A Few Final Thoughts...

HAAK LAW LLCEnvironmental, Health & SafetyLegal and Consulting Services

William H. HaakTel: 216.772.3532

[email protected]

Page 90: Workshop C - NPDES Permitting - MEC Seminars · PDF filecommunity and Ohio EPA/DSW ... •Industrial Facilities (Non‐Contact Cooling Water) •Other discharge of pollutants reaching

Questions?