workpac - pensar. the infrastructure...

2
34 - Queensland Tenders The department is carrying out slope stabilisation and curve widening works on various sections of Kuranda Range, Kennedy Highway. Location The work will repair 16 sites above and below the range road between the bottom of the range and Koah Road. Four curves will be widened at the same time. Benefits The works will stabilise slopes above and below the road while the curve widening works will improve safety and travel time. The curve widening works were fast-tracked to coincide with the slope stabilisation works to reduce overall delays for motorists, deliver more cost effective improvements and provide a safer stretch of the highway sooner. Supplier Pensar is delivering the works on behalf of the department. About Pensar Civil Pensar is a dynamic construction group with diverse expertise in civil, building and utilities projects. Established in Brisbane in 2000, Pensar has earned an enviable reputation for quality and dependability, building longstanding partnerships with clients and contractors alike. Kuranda Range – Kennedy Highway As construction specialists, Pensar has successfully delivered complex, large-scale projects in local and remote locations. Today, the company has the capacity and specialist expertise to deliver multidisciplinary projects wherever and whenever they’re required. With three distinct yet integrated divisions, Pensar offers the capability and dependability of a large group, with the flexibility and responsiveness of a boutique operation— multiple solutions with a single point of contact. With an unwavering commitment to project objectives, stakeholder requirements and industry standards, Pensar delivers. SAXON DRILLING (07) 4059 1964 (07) 4059 1964 Mobile: Fax: 0427 762 110 (07) 4059 1966 Soil Nailing - Tension Anchors - Grouting - Shotcreting Horizontal Drainage - Scaling - Rockfall Netting Installation Stress Testing - Packer Tests - Piston Sampling Shear Vane Testing (to 40m) - SPT - Test Pits Email: [email protected] Web: www.saxondrilling.com.au Specialists in Difficult Access Sites, Slope Stabilisation and Geotechnical Drilling PLEASE OBEY SIGNS AROUND ROADWORKS PLEASE OBEY SIGNS AROUND ROADWORKS 0427 648 671 Phone

Upload: others

Post on 13-Jul-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: WorkPac - Pensar. The Infrastructure People.pensar.com.au/wp-content/...Group-Kuranda-Range-Qld...• Earthworks excavation and embankment works including the rock armouring of down

34 - Queensland Tenders

The department is carrying out slope stabilisation and curve widening works on various sections of Kuranda Range, Kennedy Highway.

LocationThe work will repair 16 sites above and below the range road between the bottom of the range and Koah Road. Four curves will be widened at the same time.

Benefits The works will stabilise slopes above and below the road while the curve widening works will improve safety and travel time.

The curve widening works were fast-tracked to coincide with the slope stabilisation works to reduce overall delays for motorists, deliver more cost effective improvements and provide a safer stretch of the highway sooner.

Supplier Pensar is delivering the works on behalf of the department.

About Pensar CivilPensar is a dynamic construction group with diverse expertise in civil, building and utilities projects.

Established in Brisbane in 2000, Pensar has earned an enviable reputation for quality and dependability, building longstanding partnerships with clients and contractors alike.

Kuranda Range – Kennedy Highway

As construction specialists, Pensar has successfully delivered complex, large-scale projects in local and remote locations.

Today, the company has the capacity and specialist expertise to deliver multidisciplinary projects wherever and whenever they’re required.

With three distinct yet integrated divisions, Pensar offers the capability and dependability of a large group, with the flexibility and responsiveness of a boutique operation—multiple solutions with a single point of contact.

With an unwavering commitment to project objectives, stakeholder requirements and industry standards, Pensar delivers.

SAXON DRILLING

(07) 4059 1964(07) 4059 1964Mobile: Fax:0427 762 110 (07) 4059 1966

Soil Nailing - Tension Anchors - Grouting - ShotcretingHorizontal Drainage - Scaling - Rockfall Netting Installation

Stress Testing - Packer Tests - Piston SamplingShear Vane Testing (to 40m) - SPT - Test Pits

Email: [email protected] Web: www.saxondrilling.com.au|

Specialists in Difficult Access Sites, Slope Stabilisation and Geotechnical Drilling

PLEASE OBEY SIGNS

AROUND ROADWORKS

PLEASE OBEY SIGNS

AROUND ROADWORKS

0427 648 671Phone

Page 2: WorkPac - Pensar. The Infrastructure People.pensar.com.au/wp-content/...Group-Kuranda-Range-Qld...• Earthworks excavation and embankment works including the rock armouring of down

Queensland Tenders - 35

BONO‛SEXCAVATIONS

“We‛ll move the earth for you”

60-100hp Rubber Tracked BobcatsBobcat Laser Level Grading Machine

Attachments: Auger, Trench Digger, Harley Rake, Ripper, Leveling Bar, Forestery Mulcher, 6 in 1.

5t, 8t, & 14t Excavators

Attachments: Auger, Grab, Trench Digger, Ripper, Flail Mower, Various Bucket sizes, Rock breaker & Roller on Power Tilt.

Trucks, Dog Trailers, Float,Water Truck, 5t & 8t Roller.

Servicing All Areas - Reasonable Rates

Call Dennis 0438 953 757

Ph: 07 4095 8885Fax: 07 4095 8068

[email protected]

It was a pleasure working with

PENSAR CIVILon the Kuranda Range &

Millaa Millaa/Malanda Rd Projects

WorkPacGroup

workpac.com Smarter Recruitment

NEED A CIVIL WORKFORCE? WorkPac can provide flexible, experienced civil construction staff including:• Supervisors&LeadingHands• AllRoundOperators• RollerDrivers• CivilLabourers• SpottersWant great people? Talk to us!Contact the Cairns team today on (07) 4052 2222.

Project Overview• Clearing & Grubbing in a Wet Tropic World Heritage

Area. • Rock Scaling and batter regrading using a long reach

and at times beyond the reach of a long reach. • Earthworks excavation and embankment works including

the rock armouring of down slope batters on a narrow, winding and busy road.

• Traffic management that included contraflow, 24hour lane closures, the use of temporary traffic lights over a 24hr period all in extreme weather conditions.

• Road pavement reconstruction. • Slope Stabilization & Protection Works• Soil Nailing and rock doweling both upslope and down

slope using elevated work platforms and sleds,• Shotcreting both upslope and down slope batters using

fibre and unfibre reinforced Coloured concrete.• The installation of Steel Wire Gabion & Mattress Works

down slope to enable curve widening and out fall structure protection.

• High Tensile Steel and Erosion Netting was installed on both up slope and down slope.

• A Fauna Crossing was constructed.

Project Highlights• This was the first project undertaken by DTMR on the

Kuranda Range to feature 24 hour construction work• Works took place in an environmentally sensitive World

Heritage Tropical area. • Work undertaken in the wet season.• The project survived a Cyclone.

• The project was constructed on time and budget.• There were no lost time injuries.• There were no significant or serious traffic incidents

Subcontractors and SuppliersClient The Department of

Transport and Main Roads Far Northern Region

Saxon Drilling Soil nailingGroundwork Group Gabion wallsNorth Oz Shotcrete Facing PTS Traffic Management Pioneer North Queensland Quarry and ConcreteBono’s Excavations Plant hireMick Newport Plant hireWorkpac Group Labour Hire