workover / completion operations - vibration...

4
Pipe vibration can be quickly applied with very little preparation. Typical job duration is less than one day. Pipe vibration offers a low risk, high reward, first means for your pipe recovery needs. Results are often immediate, substantially reducing time and effort required to solve stuck problems. Workover / Completion Operations Free and Recover Rods, Tubing, Screens, Screen Packers, Liners, Retrievable Packers, Bridge Plugs and Anchors Coil Tubing Operations Recover Stuck Coil and Downhole Members Without Cutting or Damaging the Coil Tubing String

Upload: trinhliem

Post on 08-Mar-2018

279 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Workover / Completion Operations - Vibration Technologyvibrationtechnology.com/pdf/ServiceBrochure2004.pdf · Workover / Completion Operations Free and Recover Rods, Tubing, ... Drilling

Pipe vibration can bequickly applied withvery little preparation

Typical job duration isless than one day

Pipe vibration offers alow risk high rewardfirst means for yourpipe recovery needs

Results are often immediatesubstantially reducingtime and effort requiredto solve stuck problems

Workover Completion OperationsFree and Recover Rods Tubing Screens Screen Packers Liners Retrievable PackersBridge Plugs and Anchors

Coil Tubing OperationsRecover Stuck Coil and Downhole Members Without Cutting or Damaging the Coil Tubing String

Workover ApplicationsAny situation where the axial recip-

rocation of pipe or the use of largetensile compressive or percussiveforces or where the reduction of pipeto wellbore friction is beneficial mayrespond favorably to the use of pipevibration The process is appliedfrom surface generally without anydown hole intervention and oftenprovides immediate results

Figure 1 illustrates these compo-nents in a well setting The eccentricweight mechanical oscillator gener-ates an axial sinusoidal force that actson the work string to create axial vi-bration and the vibrating work stringtransmits and delivers power devel-oped at the oscillator to a regionwhere the stuck member is locatedThe vibrational energy received at thestuck area works to effect the releaseof the stuck member through the ap-plication of large percussive forcesfluidization of granular material di-lation and contraction of the pipebody and a reduction of well borefriction or hole drag

Figure 1 Pipe Vibration System

Oil Field Vibration SystemA resonant vibration system for use

in oil field tubular extraction appli-cations consists of three basic com-ponents a mechanical oscillator withsuspension system for isolating therig structure a work string for trans-mitting vibrational energy and astuck member or ldquofishrdquo to be recov-ered

Figure 2 Tubing and Liner Recovery

Figure 3 Rod and Pump Recovery

STUCK PIPE RECOVERY USINGVIBRATION TECHNOLOGY OSCILLATORS

Figure 2 illustrates a Vibration Tech-nology Oscillator in operation on awell location in Louisiana Pipe vi-bration is generated and applied at sur-face and transmitted by the free por-tion of the pipe string to the stuck pointthat may be thousands of feet belowThe results are quick release from sandor junk stuck situations Rig-up timeis usually less than an hour and resultsare often achieved in minutes On thisrecent job a string of 2-78 EUE tub-ing tubing anchor and sand stucksucker rods inside were recovered si-multaneously thus avoiding an outsidebackoff attempt with the real potentialof leaving the rod string standing in-side the well casing In other typical jobs wirewrapscreens and packers are recoveredfrom gravel pack completionstotally avoiding jarring and washoveroperations

Figure 3 illustrates a Vibration Tech-nology Oscillator in operation recov-ering a 10000 foot scale stuck rodstring On this recent job a combina-tion string of 78 and 34 sucker rodswas recovered thus avoiding a tediousand often time consuming strippingjob with associated risks as well as thepotential for considerable rod damage Vibration Technology providesequipment and services that are highlyeffective in recovering stuck pipe in arange of applications including mudscale salt sand or junk stuckdownhole equipment such as

bull Insert Pumps

bull Submersible Pumps

bull Rods

bull Tubing Anchors

bull Tubing

bull Liners

bull Gravel Pack Screens and Packers

bull Retrievable Packers

bull Bridge Plugs

bull Bottom Hole Assemblies

Advantages of Vibration in Coil Tubing Applications

bull Quickly and Easily Appliedbull No Downhole Interventionbull Reduced Riskbull Simplified Decision Makingbull Demonstrated Results

bull The coil is not cut so that full well control is maintained and associated costsare eliminated

bull The coil is not worked over the gooseneck so coil fatigue damage is mini-mized

bull Wireline services along with the attendant risks are not neededbull The operation is conducted from surface utilizing equipment suspended

above the wellborebull The coil unit remains in place to assist the vibration operation as well as to

immediately recover the coil when it becomes freebull Pipe vibration can be quickly applied with very little preparationbull Typical job duration is less than one daybull Pipe vibration is low risk with respect to further deteriorating the

situationbull Results are often immediate and thus considerable expense and risk can be

eliminated in resolving a stuck tubing situation

Coil Recovery Operations

Well Preparation

Kill the well and stabilize the coilinjector head with support legs

Rig Up and Attachment to Coil

A crane or workover rig is requiredto support and handle the oscillatorand coil string Oscillator to coil at-tachment is accomplished by use offriction clamps

Crane Requirements

Crane should have at least 80 tonslift capacity boom working height ofat least 80 feet and be equipped witha weight indicator

Safety Requirements

A personnel basket or lift is requiredin order to allow work at the top ofor above the coil injector head

The Bottom Line

Vibration Technology offers aunique and demonstrated superior ap-proach to resolving a stuck coil situ-ation It is easy to apply can be donevery quickly and oftenproduces instant results The CoilString does not have to be cutin order to apply the vibrationprocess

Pipe vibration is a proven approachfor resolving stuck coil situations Itoffers many advantages to cutting thecoil and proceeding conventionallyBeen there Done that

Vibration Technology hassuccessfully recovered stuck pipe andtools from depths of 100 to 18000 ft

Make Vibration Technology yourfirst call to resolve any stuck pipesituation

SuspensionIsolationSystem

To C

oil Tubing R

eel

To Coil TubingInjector Unit

MechanicalOscillator

Coil TubingBail

PatentPending

Figure 5 Vibration TechnologyCoil Tubing Vibration System

Figure 4 Coil Tubing Recovery withVTrsquos exclusive Coil Tubing Bail

COIL TUBING RECOVERY USINGVIBRATION TECHNOLOGY OSCILLATORS

Vibration Technology a subsidiary of Layne ChristensenCompany specializes in providing pipe vibration services Thecompany operates proprietary equipment designed specificallyfor oilfield use and features compact mobile equipment that iseasily transportable quick to rig-up and highly effective inproviding an efficient oilfield service

Vibration Technologyrsquos equipment has been designed tooperate efficiently within a range of acceptable operationalparameters Our oscillators are designed to induce standingwave resonance that is effective in all down hole situationsOur equipment and methods leverage all aspects of the tech-nology and our innovative coil tubing bail provides for work-ing stuck coil without cutting the coil or causing fatigue weardue to working over the gooseneck

For more information on the application of pipe vibration in youroilfield situation or for more detail about the technologyrsquos principlesplease call us

Vibration Technology IncTelephone (432) 689-3351 Fax (432) 689-33522319 E CR 123 MidlandTX 79706

copy Copyright 2016 Vibration Technology Inc All rights reserved

Selected Job Results

Vibration Technology

WellLocation Type Sticking Mode Well

GeometryWell Depth Freepoint

Workstring ndashBHA Detail

PriorAction

VibrationResults Subsequent Action

Davis OKHarris County

TXRio Grande City

TXKern County

CAHarrison

County TXFreestone

County TXGregg County

TXSmith County

TXIberia Parish

LAClaiborneParish LA

Kern County CAPanola County

TXMarion County

TXGregg County

TXHendersonCounty TXConcordiaParish LADenton TX

OCSG 2103

Liberal KSLiberal KS

Mobile CountyAL

Cameron ParishLA

Morton CountyKS

Harris CountyTX

Harris CountyTX

Fort BendCounty TX

Webb CountyTX

Victoria CountyTX

Harris CountyTX

Liner

Coil Tubing

Coil Tubing

Liner

Coil Tubing

Completion

Coil Tubing

DrillingScreen and

Washover Pipe

Sucker RodsLiner

Tubing

Coil Tubing

Coil Tubing

Coil TubingTubing with

RodsPacker

Coil TubingTubing and

Submersible PumpTubing

Coil TubingMud Stuck

Tubing

Sucker Rods

Drilling

Screen

Bridge PlugJar and

Washover Pipe

Coil TubingPacker andSand screen

Liner set in shale

Sand stuck coil tubingShale sand due

to clean-out

Gravel Packed ScreenComposite plug and frac

sand due to clean-out4 Perforatinggun in sand

Sand plug clean-out

Hole Collapse

GP sand

SandGP Liner

Sand

Sand

Sand junk

Sand junk

Formation SandShale

Junk

SandSalt

Junk

Mud Stuck

SandShale Centralizer

Friction

Gravel Pack Screen

Sand Scale

Sand Salt

Sand

Gravel Pack

Horizontal

Deviated 20 deg

Vertical

Vertical

Vertical

Vertical

Vertical

Vertical

Vertical

VerticalVertical

Vertical

Vertical

Vertical

Vertical

VerticalVertical

Vertical

VerticalVertical

Vertical

Vertical

Vertical

Vertical

Vertical

Vertical

Vertical

Vertical

Vertical

2370 1844 Ft

10500 8500 Ft

12000 Ft

1500 Ft

9200 Ft

10700 10200 Ft

8700 8100 Ft7132 2900 Ft

top of DC

3000 Ft

10360 Ft~1000 Ft

10000 8000 Ft

9300 8000 Ft

6000 Ft

10500 Ft

3250 Ft6100 Ft

1000 Ft

5000 Ft2000 Ft

18423 Ft 18440 Ft

12300 Ft 7500 Ft

2000 Ft12200

13200 Ft

5200 Ft

112 Ft

9400 Ft

11400 Ft

5200 Ft

3-12 CS Tubing spear1 12 coil with

wash tool - 105001 14 coil with

wash tool - 12000

3-12-1550 drill pipe1 34 CT withmotor and mill2-78 Hyd CS15 Ft perf gun

Mill hipp-tripper1-12 CT

4-12 DP

2-78 PH-634 and 78 combinationSR string in 2-78 tubing

3-12 DP

1-14 Hyd CS

1-12 CT

1-14 CT

1-14 CT

2-78 EUE1-12 IJ with C-1 Packer

1-14 CT2-38 EUE with submersible

pump and REDA cable2-38 EUE

1-14 CT

2-38 Hyd tubing2-38 EUE with

SR inside3-12 amp 2-78 DP

2-78 Liner3-12 EUE Sand Screen

9-58 RetrievableBridge Plug

2-38 EUE

1-14 CT

2-78 EUE N-80

Pulled 120000 lbs3 days working coil

over gooseneck

3 days with CT unit

None1 day working

with coil injector

Jar on fish 2 days1 day working

with coil injector

Using Surface JarWashover andWP twist offWork string

with rigNone

5 days workwith rig

2 days withCT unit

1 day with CT unit

1 day with CT unit2 days working

with rigOne day with rig

1 day with CT unit

One day with rigOne day with rig2 days with CT unitActuated Disconnect

None

NoneAttempt to run linerand stuck for 3 days

noneWork one day

with rig

Jarred for 5 days1 day withCT unit

none

Successful - 4 hoursSuccessful - 30

minutes operationfull recovery

2 hrs operationMoved pipe 40 Ft rig

pulled after that

Successful in lt 1 Hr

Successful in lt4 Hr

Successful in lt 6 HrNo movement3 Hr operationFull Recovery

2 minutes operationParted pump plungerin 1-12 Hr operation

Recovered Liner

Worked freeFull recovery through

1700 of sand

Full recovery

Full recovery lt 30 min

Recovered tubing and rodsFree in lt 1 Hr POOH

Free in lt 1 Hr Pulled outof Coil Connector

Pulled 2 Jts tubing Cableremained in place

Recovered full string next dayFree in lt 2 Hr

CT parted at 18350Moved FP ~ 2000

Ft downhole

Recover RodsRan 2-78 Liner ~1000 Ft to bottom

Recover lt 6minutes operationRecover in lt 30

minutes operationRecover oil jar and

12 Jts Washover Pipe

Broke circulation POOHFull recovery lt 30minutes operation

Reset Liner

Continued washing operation

Put on production

Continued workover operations

Continued washing operation

Continue perforation and fracture

Put well on production

Jar free immediately with Surface Jar

Recomplete

Pull tubing without stripping rodsRecomplete

POOH

POOH

POOH

Continued Cleanout

Test casingRecomplete

POOH Fish Conventional for BHA

Fish ConventionalRecomplete

POOH

Fish Conventional

Fish Conventional for Tubing

Complete Well

Recomplete

Continue workover

Continue Workover

Continue Workover

Recomplete

Page 2: Workover / Completion Operations - Vibration Technologyvibrationtechnology.com/pdf/ServiceBrochure2004.pdf · Workover / Completion Operations Free and Recover Rods, Tubing, ... Drilling

Workover ApplicationsAny situation where the axial recip-

rocation of pipe or the use of largetensile compressive or percussiveforces or where the reduction of pipeto wellbore friction is beneficial mayrespond favorably to the use of pipevibration The process is appliedfrom surface generally without anydown hole intervention and oftenprovides immediate results

Figure 1 illustrates these compo-nents in a well setting The eccentricweight mechanical oscillator gener-ates an axial sinusoidal force that actson the work string to create axial vi-bration and the vibrating work stringtransmits and delivers power devel-oped at the oscillator to a regionwhere the stuck member is locatedThe vibrational energy received at thestuck area works to effect the releaseof the stuck member through the ap-plication of large percussive forcesfluidization of granular material di-lation and contraction of the pipebody and a reduction of well borefriction or hole drag

Figure 1 Pipe Vibration System

Oil Field Vibration SystemA resonant vibration system for use

in oil field tubular extraction appli-cations consists of three basic com-ponents a mechanical oscillator withsuspension system for isolating therig structure a work string for trans-mitting vibrational energy and astuck member or ldquofishrdquo to be recov-ered

Figure 2 Tubing and Liner Recovery

Figure 3 Rod and Pump Recovery

STUCK PIPE RECOVERY USINGVIBRATION TECHNOLOGY OSCILLATORS

Figure 2 illustrates a Vibration Tech-nology Oscillator in operation on awell location in Louisiana Pipe vi-bration is generated and applied at sur-face and transmitted by the free por-tion of the pipe string to the stuck pointthat may be thousands of feet belowThe results are quick release from sandor junk stuck situations Rig-up timeis usually less than an hour and resultsare often achieved in minutes On thisrecent job a string of 2-78 EUE tub-ing tubing anchor and sand stucksucker rods inside were recovered si-multaneously thus avoiding an outsidebackoff attempt with the real potentialof leaving the rod string standing in-side the well casing In other typical jobs wirewrapscreens and packers are recoveredfrom gravel pack completionstotally avoiding jarring and washoveroperations

Figure 3 illustrates a Vibration Tech-nology Oscillator in operation recov-ering a 10000 foot scale stuck rodstring On this recent job a combina-tion string of 78 and 34 sucker rodswas recovered thus avoiding a tediousand often time consuming strippingjob with associated risks as well as thepotential for considerable rod damage Vibration Technology providesequipment and services that are highlyeffective in recovering stuck pipe in arange of applications including mudscale salt sand or junk stuckdownhole equipment such as

bull Insert Pumps

bull Submersible Pumps

bull Rods

bull Tubing Anchors

bull Tubing

bull Liners

bull Gravel Pack Screens and Packers

bull Retrievable Packers

bull Bridge Plugs

bull Bottom Hole Assemblies

Advantages of Vibration in Coil Tubing Applications

bull Quickly and Easily Appliedbull No Downhole Interventionbull Reduced Riskbull Simplified Decision Makingbull Demonstrated Results

bull The coil is not cut so that full well control is maintained and associated costsare eliminated

bull The coil is not worked over the gooseneck so coil fatigue damage is mini-mized

bull Wireline services along with the attendant risks are not neededbull The operation is conducted from surface utilizing equipment suspended

above the wellborebull The coil unit remains in place to assist the vibration operation as well as to

immediately recover the coil when it becomes freebull Pipe vibration can be quickly applied with very little preparationbull Typical job duration is less than one daybull Pipe vibration is low risk with respect to further deteriorating the

situationbull Results are often immediate and thus considerable expense and risk can be

eliminated in resolving a stuck tubing situation

Coil Recovery Operations

Well Preparation

Kill the well and stabilize the coilinjector head with support legs

Rig Up and Attachment to Coil

A crane or workover rig is requiredto support and handle the oscillatorand coil string Oscillator to coil at-tachment is accomplished by use offriction clamps

Crane Requirements

Crane should have at least 80 tonslift capacity boom working height ofat least 80 feet and be equipped witha weight indicator

Safety Requirements

A personnel basket or lift is requiredin order to allow work at the top ofor above the coil injector head

The Bottom Line

Vibration Technology offers aunique and demonstrated superior ap-proach to resolving a stuck coil situ-ation It is easy to apply can be donevery quickly and oftenproduces instant results The CoilString does not have to be cutin order to apply the vibrationprocess

Pipe vibration is a proven approachfor resolving stuck coil situations Itoffers many advantages to cutting thecoil and proceeding conventionallyBeen there Done that

Vibration Technology hassuccessfully recovered stuck pipe andtools from depths of 100 to 18000 ft

Make Vibration Technology yourfirst call to resolve any stuck pipesituation

SuspensionIsolationSystem

To C

oil Tubing R

eel

To Coil TubingInjector Unit

MechanicalOscillator

Coil TubingBail

PatentPending

Figure 5 Vibration TechnologyCoil Tubing Vibration System

Figure 4 Coil Tubing Recovery withVTrsquos exclusive Coil Tubing Bail

COIL TUBING RECOVERY USINGVIBRATION TECHNOLOGY OSCILLATORS

Vibration Technology a subsidiary of Layne ChristensenCompany specializes in providing pipe vibration services Thecompany operates proprietary equipment designed specificallyfor oilfield use and features compact mobile equipment that iseasily transportable quick to rig-up and highly effective inproviding an efficient oilfield service

Vibration Technologyrsquos equipment has been designed tooperate efficiently within a range of acceptable operationalparameters Our oscillators are designed to induce standingwave resonance that is effective in all down hole situationsOur equipment and methods leverage all aspects of the tech-nology and our innovative coil tubing bail provides for work-ing stuck coil without cutting the coil or causing fatigue weardue to working over the gooseneck

For more information on the application of pipe vibration in youroilfield situation or for more detail about the technologyrsquos principlesplease call us

Vibration Technology IncTelephone (432) 689-3351 Fax (432) 689-33522319 E CR 123 MidlandTX 79706

copy Copyright 2016 Vibration Technology Inc All rights reserved

Selected Job Results

Vibration Technology

WellLocation Type Sticking Mode Well

GeometryWell Depth Freepoint

Workstring ndashBHA Detail

PriorAction

VibrationResults Subsequent Action

Davis OKHarris County

TXRio Grande City

TXKern County

CAHarrison

County TXFreestone

County TXGregg County

TXSmith County

TXIberia Parish

LAClaiborneParish LA

Kern County CAPanola County

TXMarion County

TXGregg County

TXHendersonCounty TXConcordiaParish LADenton TX

OCSG 2103

Liberal KSLiberal KS

Mobile CountyAL

Cameron ParishLA

Morton CountyKS

Harris CountyTX

Harris CountyTX

Fort BendCounty TX

Webb CountyTX

Victoria CountyTX

Harris CountyTX

Liner

Coil Tubing

Coil Tubing

Liner

Coil Tubing

Completion

Coil Tubing

DrillingScreen and

Washover Pipe

Sucker RodsLiner

Tubing

Coil Tubing

Coil Tubing

Coil TubingTubing with

RodsPacker

Coil TubingTubing and

Submersible PumpTubing

Coil TubingMud Stuck

Tubing

Sucker Rods

Drilling

Screen

Bridge PlugJar and

Washover Pipe

Coil TubingPacker andSand screen

Liner set in shale

Sand stuck coil tubingShale sand due

to clean-out

Gravel Packed ScreenComposite plug and frac

sand due to clean-out4 Perforatinggun in sand

Sand plug clean-out

Hole Collapse

GP sand

SandGP Liner

Sand

Sand

Sand junk

Sand junk

Formation SandShale

Junk

SandSalt

Junk

Mud Stuck

SandShale Centralizer

Friction

Gravel Pack Screen

Sand Scale

Sand Salt

Sand

Gravel Pack

Horizontal

Deviated 20 deg

Vertical

Vertical

Vertical

Vertical

Vertical

Vertical

Vertical

VerticalVertical

Vertical

Vertical

Vertical

Vertical

VerticalVertical

Vertical

VerticalVertical

Vertical

Vertical

Vertical

Vertical

Vertical

Vertical

Vertical

Vertical

Vertical

2370 1844 Ft

10500 8500 Ft

12000 Ft

1500 Ft

9200 Ft

10700 10200 Ft

8700 8100 Ft7132 2900 Ft

top of DC

3000 Ft

10360 Ft~1000 Ft

10000 8000 Ft

9300 8000 Ft

6000 Ft

10500 Ft

3250 Ft6100 Ft

1000 Ft

5000 Ft2000 Ft

18423 Ft 18440 Ft

12300 Ft 7500 Ft

2000 Ft12200

13200 Ft

5200 Ft

112 Ft

9400 Ft

11400 Ft

5200 Ft

3-12 CS Tubing spear1 12 coil with

wash tool - 105001 14 coil with

wash tool - 12000

3-12-1550 drill pipe1 34 CT withmotor and mill2-78 Hyd CS15 Ft perf gun

Mill hipp-tripper1-12 CT

4-12 DP

2-78 PH-634 and 78 combinationSR string in 2-78 tubing

3-12 DP

1-14 Hyd CS

1-12 CT

1-14 CT

1-14 CT

2-78 EUE1-12 IJ with C-1 Packer

1-14 CT2-38 EUE with submersible

pump and REDA cable2-38 EUE

1-14 CT

2-38 Hyd tubing2-38 EUE with

SR inside3-12 amp 2-78 DP

2-78 Liner3-12 EUE Sand Screen

9-58 RetrievableBridge Plug

2-38 EUE

1-14 CT

2-78 EUE N-80

Pulled 120000 lbs3 days working coil

over gooseneck

3 days with CT unit

None1 day working

with coil injector

Jar on fish 2 days1 day working

with coil injector

Using Surface JarWashover andWP twist offWork string

with rigNone

5 days workwith rig

2 days withCT unit

1 day with CT unit

1 day with CT unit2 days working

with rigOne day with rig

1 day with CT unit

One day with rigOne day with rig2 days with CT unitActuated Disconnect

None

NoneAttempt to run linerand stuck for 3 days

noneWork one day

with rig

Jarred for 5 days1 day withCT unit

none

Successful - 4 hoursSuccessful - 30

minutes operationfull recovery

2 hrs operationMoved pipe 40 Ft rig

pulled after that

Successful in lt 1 Hr

Successful in lt4 Hr

Successful in lt 6 HrNo movement3 Hr operationFull Recovery

2 minutes operationParted pump plungerin 1-12 Hr operation

Recovered Liner

Worked freeFull recovery through

1700 of sand

Full recovery

Full recovery lt 30 min

Recovered tubing and rodsFree in lt 1 Hr POOH

Free in lt 1 Hr Pulled outof Coil Connector

Pulled 2 Jts tubing Cableremained in place

Recovered full string next dayFree in lt 2 Hr

CT parted at 18350Moved FP ~ 2000

Ft downhole

Recover RodsRan 2-78 Liner ~1000 Ft to bottom

Recover lt 6minutes operationRecover in lt 30

minutes operationRecover oil jar and

12 Jts Washover Pipe

Broke circulation POOHFull recovery lt 30minutes operation

Reset Liner

Continued washing operation

Put on production

Continued workover operations

Continued washing operation

Continue perforation and fracture

Put well on production

Jar free immediately with Surface Jar

Recomplete

Pull tubing without stripping rodsRecomplete

POOH

POOH

POOH

Continued Cleanout

Test casingRecomplete

POOH Fish Conventional for BHA

Fish ConventionalRecomplete

POOH

Fish Conventional

Fish Conventional for Tubing

Complete Well

Recomplete

Continue workover

Continue Workover

Continue Workover

Recomplete

Page 3: Workover / Completion Operations - Vibration Technologyvibrationtechnology.com/pdf/ServiceBrochure2004.pdf · Workover / Completion Operations Free and Recover Rods, Tubing, ... Drilling

Advantages of Vibration in Coil Tubing Applications

bull Quickly and Easily Appliedbull No Downhole Interventionbull Reduced Riskbull Simplified Decision Makingbull Demonstrated Results

bull The coil is not cut so that full well control is maintained and associated costsare eliminated

bull The coil is not worked over the gooseneck so coil fatigue damage is mini-mized

bull Wireline services along with the attendant risks are not neededbull The operation is conducted from surface utilizing equipment suspended

above the wellborebull The coil unit remains in place to assist the vibration operation as well as to

immediately recover the coil when it becomes freebull Pipe vibration can be quickly applied with very little preparationbull Typical job duration is less than one daybull Pipe vibration is low risk with respect to further deteriorating the

situationbull Results are often immediate and thus considerable expense and risk can be

eliminated in resolving a stuck tubing situation

Coil Recovery Operations

Well Preparation

Kill the well and stabilize the coilinjector head with support legs

Rig Up and Attachment to Coil

A crane or workover rig is requiredto support and handle the oscillatorand coil string Oscillator to coil at-tachment is accomplished by use offriction clamps

Crane Requirements

Crane should have at least 80 tonslift capacity boom working height ofat least 80 feet and be equipped witha weight indicator

Safety Requirements

A personnel basket or lift is requiredin order to allow work at the top ofor above the coil injector head

The Bottom Line

Vibration Technology offers aunique and demonstrated superior ap-proach to resolving a stuck coil situ-ation It is easy to apply can be donevery quickly and oftenproduces instant results The CoilString does not have to be cutin order to apply the vibrationprocess

Pipe vibration is a proven approachfor resolving stuck coil situations Itoffers many advantages to cutting thecoil and proceeding conventionallyBeen there Done that

Vibration Technology hassuccessfully recovered stuck pipe andtools from depths of 100 to 18000 ft

Make Vibration Technology yourfirst call to resolve any stuck pipesituation

SuspensionIsolationSystem

To C

oil Tubing R

eel

To Coil TubingInjector Unit

MechanicalOscillator

Coil TubingBail

PatentPending

Figure 5 Vibration TechnologyCoil Tubing Vibration System

Figure 4 Coil Tubing Recovery withVTrsquos exclusive Coil Tubing Bail

COIL TUBING RECOVERY USINGVIBRATION TECHNOLOGY OSCILLATORS

Vibration Technology a subsidiary of Layne ChristensenCompany specializes in providing pipe vibration services Thecompany operates proprietary equipment designed specificallyfor oilfield use and features compact mobile equipment that iseasily transportable quick to rig-up and highly effective inproviding an efficient oilfield service

Vibration Technologyrsquos equipment has been designed tooperate efficiently within a range of acceptable operationalparameters Our oscillators are designed to induce standingwave resonance that is effective in all down hole situationsOur equipment and methods leverage all aspects of the tech-nology and our innovative coil tubing bail provides for work-ing stuck coil without cutting the coil or causing fatigue weardue to working over the gooseneck

For more information on the application of pipe vibration in youroilfield situation or for more detail about the technologyrsquos principlesplease call us

Vibration Technology IncTelephone (432) 689-3351 Fax (432) 689-33522319 E CR 123 MidlandTX 79706

copy Copyright 2016 Vibration Technology Inc All rights reserved

Selected Job Results

Vibration Technology

WellLocation Type Sticking Mode Well

GeometryWell Depth Freepoint

Workstring ndashBHA Detail

PriorAction

VibrationResults Subsequent Action

Davis OKHarris County

TXRio Grande City

TXKern County

CAHarrison

County TXFreestone

County TXGregg County

TXSmith County

TXIberia Parish

LAClaiborneParish LA

Kern County CAPanola County

TXMarion County

TXGregg County

TXHendersonCounty TXConcordiaParish LADenton TX

OCSG 2103

Liberal KSLiberal KS

Mobile CountyAL

Cameron ParishLA

Morton CountyKS

Harris CountyTX

Harris CountyTX

Fort BendCounty TX

Webb CountyTX

Victoria CountyTX

Harris CountyTX

Liner

Coil Tubing

Coil Tubing

Liner

Coil Tubing

Completion

Coil Tubing

DrillingScreen and

Washover Pipe

Sucker RodsLiner

Tubing

Coil Tubing

Coil Tubing

Coil TubingTubing with

RodsPacker

Coil TubingTubing and

Submersible PumpTubing

Coil TubingMud Stuck

Tubing

Sucker Rods

Drilling

Screen

Bridge PlugJar and

Washover Pipe

Coil TubingPacker andSand screen

Liner set in shale

Sand stuck coil tubingShale sand due

to clean-out

Gravel Packed ScreenComposite plug and frac

sand due to clean-out4 Perforatinggun in sand

Sand plug clean-out

Hole Collapse

GP sand

SandGP Liner

Sand

Sand

Sand junk

Sand junk

Formation SandShale

Junk

SandSalt

Junk

Mud Stuck

SandShale Centralizer

Friction

Gravel Pack Screen

Sand Scale

Sand Salt

Sand

Gravel Pack

Horizontal

Deviated 20 deg

Vertical

Vertical

Vertical

Vertical

Vertical

Vertical

Vertical

VerticalVertical

Vertical

Vertical

Vertical

Vertical

VerticalVertical

Vertical

VerticalVertical

Vertical

Vertical

Vertical

Vertical

Vertical

Vertical

Vertical

Vertical

Vertical

2370 1844 Ft

10500 8500 Ft

12000 Ft

1500 Ft

9200 Ft

10700 10200 Ft

8700 8100 Ft7132 2900 Ft

top of DC

3000 Ft

10360 Ft~1000 Ft

10000 8000 Ft

9300 8000 Ft

6000 Ft

10500 Ft

3250 Ft6100 Ft

1000 Ft

5000 Ft2000 Ft

18423 Ft 18440 Ft

12300 Ft 7500 Ft

2000 Ft12200

13200 Ft

5200 Ft

112 Ft

9400 Ft

11400 Ft

5200 Ft

3-12 CS Tubing spear1 12 coil with

wash tool - 105001 14 coil with

wash tool - 12000

3-12-1550 drill pipe1 34 CT withmotor and mill2-78 Hyd CS15 Ft perf gun

Mill hipp-tripper1-12 CT

4-12 DP

2-78 PH-634 and 78 combinationSR string in 2-78 tubing

3-12 DP

1-14 Hyd CS

1-12 CT

1-14 CT

1-14 CT

2-78 EUE1-12 IJ with C-1 Packer

1-14 CT2-38 EUE with submersible

pump and REDA cable2-38 EUE

1-14 CT

2-38 Hyd tubing2-38 EUE with

SR inside3-12 amp 2-78 DP

2-78 Liner3-12 EUE Sand Screen

9-58 RetrievableBridge Plug

2-38 EUE

1-14 CT

2-78 EUE N-80

Pulled 120000 lbs3 days working coil

over gooseneck

3 days with CT unit

None1 day working

with coil injector

Jar on fish 2 days1 day working

with coil injector

Using Surface JarWashover andWP twist offWork string

with rigNone

5 days workwith rig

2 days withCT unit

1 day with CT unit

1 day with CT unit2 days working

with rigOne day with rig

1 day with CT unit

One day with rigOne day with rig2 days with CT unitActuated Disconnect

None

NoneAttempt to run linerand stuck for 3 days

noneWork one day

with rig

Jarred for 5 days1 day withCT unit

none

Successful - 4 hoursSuccessful - 30

minutes operationfull recovery

2 hrs operationMoved pipe 40 Ft rig

pulled after that

Successful in lt 1 Hr

Successful in lt4 Hr

Successful in lt 6 HrNo movement3 Hr operationFull Recovery

2 minutes operationParted pump plungerin 1-12 Hr operation

Recovered Liner

Worked freeFull recovery through

1700 of sand

Full recovery

Full recovery lt 30 min

Recovered tubing and rodsFree in lt 1 Hr POOH

Free in lt 1 Hr Pulled outof Coil Connector

Pulled 2 Jts tubing Cableremained in place

Recovered full string next dayFree in lt 2 Hr

CT parted at 18350Moved FP ~ 2000

Ft downhole

Recover RodsRan 2-78 Liner ~1000 Ft to bottom

Recover lt 6minutes operationRecover in lt 30

minutes operationRecover oil jar and

12 Jts Washover Pipe

Broke circulation POOHFull recovery lt 30minutes operation

Reset Liner

Continued washing operation

Put on production

Continued workover operations

Continued washing operation

Continue perforation and fracture

Put well on production

Jar free immediately with Surface Jar

Recomplete

Pull tubing without stripping rodsRecomplete

POOH

POOH

POOH

Continued Cleanout

Test casingRecomplete

POOH Fish Conventional for BHA

Fish ConventionalRecomplete

POOH

Fish Conventional

Fish Conventional for Tubing

Complete Well

Recomplete

Continue workover

Continue Workover

Continue Workover

Recomplete

Page 4: Workover / Completion Operations - Vibration Technologyvibrationtechnology.com/pdf/ServiceBrochure2004.pdf · Workover / Completion Operations Free and Recover Rods, Tubing, ... Drilling

Vibration Technology a subsidiary of Layne ChristensenCompany specializes in providing pipe vibration services Thecompany operates proprietary equipment designed specificallyfor oilfield use and features compact mobile equipment that iseasily transportable quick to rig-up and highly effective inproviding an efficient oilfield service

Vibration Technologyrsquos equipment has been designed tooperate efficiently within a range of acceptable operationalparameters Our oscillators are designed to induce standingwave resonance that is effective in all down hole situationsOur equipment and methods leverage all aspects of the tech-nology and our innovative coil tubing bail provides for work-ing stuck coil without cutting the coil or causing fatigue weardue to working over the gooseneck

For more information on the application of pipe vibration in youroilfield situation or for more detail about the technologyrsquos principlesplease call us

Vibration Technology IncTelephone (432) 689-3351 Fax (432) 689-33522319 E CR 123 MidlandTX 79706

copy Copyright 2016 Vibration Technology Inc All rights reserved

Selected Job Results

Vibration Technology

WellLocation Type Sticking Mode Well

GeometryWell Depth Freepoint

Workstring ndashBHA Detail

PriorAction

VibrationResults Subsequent Action

Davis OKHarris County

TXRio Grande City

TXKern County

CAHarrison

County TXFreestone

County TXGregg County

TXSmith County

TXIberia Parish

LAClaiborneParish LA

Kern County CAPanola County

TXMarion County

TXGregg County

TXHendersonCounty TXConcordiaParish LADenton TX

OCSG 2103

Liberal KSLiberal KS

Mobile CountyAL

Cameron ParishLA

Morton CountyKS

Harris CountyTX

Harris CountyTX

Fort BendCounty TX

Webb CountyTX

Victoria CountyTX

Harris CountyTX

Liner

Coil Tubing

Coil Tubing

Liner

Coil Tubing

Completion

Coil Tubing

DrillingScreen and

Washover Pipe

Sucker RodsLiner

Tubing

Coil Tubing

Coil Tubing

Coil TubingTubing with

RodsPacker

Coil TubingTubing and

Submersible PumpTubing

Coil TubingMud Stuck

Tubing

Sucker Rods

Drilling

Screen

Bridge PlugJar and

Washover Pipe

Coil TubingPacker andSand screen

Liner set in shale

Sand stuck coil tubingShale sand due

to clean-out

Gravel Packed ScreenComposite plug and frac

sand due to clean-out4 Perforatinggun in sand

Sand plug clean-out

Hole Collapse

GP sand

SandGP Liner

Sand

Sand

Sand junk

Sand junk

Formation SandShale

Junk

SandSalt

Junk

Mud Stuck

SandShale Centralizer

Friction

Gravel Pack Screen

Sand Scale

Sand Salt

Sand

Gravel Pack

Horizontal

Deviated 20 deg

Vertical

Vertical

Vertical

Vertical

Vertical

Vertical

Vertical

VerticalVertical

Vertical

Vertical

Vertical

Vertical

VerticalVertical

Vertical

VerticalVertical

Vertical

Vertical

Vertical

Vertical

Vertical

Vertical

Vertical

Vertical

Vertical

2370 1844 Ft

10500 8500 Ft

12000 Ft

1500 Ft

9200 Ft

10700 10200 Ft

8700 8100 Ft7132 2900 Ft

top of DC

3000 Ft

10360 Ft~1000 Ft

10000 8000 Ft

9300 8000 Ft

6000 Ft

10500 Ft

3250 Ft6100 Ft

1000 Ft

5000 Ft2000 Ft

18423 Ft 18440 Ft

12300 Ft 7500 Ft

2000 Ft12200

13200 Ft

5200 Ft

112 Ft

9400 Ft

11400 Ft

5200 Ft

3-12 CS Tubing spear1 12 coil with

wash tool - 105001 14 coil with

wash tool - 12000

3-12-1550 drill pipe1 34 CT withmotor and mill2-78 Hyd CS15 Ft perf gun

Mill hipp-tripper1-12 CT

4-12 DP

2-78 PH-634 and 78 combinationSR string in 2-78 tubing

3-12 DP

1-14 Hyd CS

1-12 CT

1-14 CT

1-14 CT

2-78 EUE1-12 IJ with C-1 Packer

1-14 CT2-38 EUE with submersible

pump and REDA cable2-38 EUE

1-14 CT

2-38 Hyd tubing2-38 EUE with

SR inside3-12 amp 2-78 DP

2-78 Liner3-12 EUE Sand Screen

9-58 RetrievableBridge Plug

2-38 EUE

1-14 CT

2-78 EUE N-80

Pulled 120000 lbs3 days working coil

over gooseneck

3 days with CT unit

None1 day working

with coil injector

Jar on fish 2 days1 day working

with coil injector

Using Surface JarWashover andWP twist offWork string

with rigNone

5 days workwith rig

2 days withCT unit

1 day with CT unit

1 day with CT unit2 days working

with rigOne day with rig

1 day with CT unit

One day with rigOne day with rig2 days with CT unitActuated Disconnect

None

NoneAttempt to run linerand stuck for 3 days

noneWork one day

with rig

Jarred for 5 days1 day withCT unit

none

Successful - 4 hoursSuccessful - 30

minutes operationfull recovery

2 hrs operationMoved pipe 40 Ft rig

pulled after that

Successful in lt 1 Hr

Successful in lt4 Hr

Successful in lt 6 HrNo movement3 Hr operationFull Recovery

2 minutes operationParted pump plungerin 1-12 Hr operation

Recovered Liner

Worked freeFull recovery through

1700 of sand

Full recovery

Full recovery lt 30 min

Recovered tubing and rodsFree in lt 1 Hr POOH

Free in lt 1 Hr Pulled outof Coil Connector

Pulled 2 Jts tubing Cableremained in place

Recovered full string next dayFree in lt 2 Hr

CT parted at 18350Moved FP ~ 2000

Ft downhole

Recover RodsRan 2-78 Liner ~1000 Ft to bottom

Recover lt 6minutes operationRecover in lt 30

minutes operationRecover oil jar and

12 Jts Washover Pipe

Broke circulation POOHFull recovery lt 30minutes operation

Reset Liner

Continued washing operation

Put on production

Continued workover operations

Continued washing operation

Continue perforation and fracture

Put well on production

Jar free immediately with Surface Jar

Recomplete

Pull tubing without stripping rodsRecomplete

POOH

POOH

POOH

Continued Cleanout

Test casingRecomplete

POOH Fish Conventional for BHA

Fish ConventionalRecomplete

POOH

Fish Conventional

Fish Conventional for Tubing

Complete Well

Recomplete

Continue workover

Continue Workover

Continue Workover

Recomplete