intervention workover control systems and workover control... · intervention workover control...

1
Intervention Workover Control Systems (IWOCS) enable intervention and completion work on wells through existing subsea systems or control of customer specific intervention tooling. All systems are designed and tailored to suit the individual project specifications or client/SMS developed standardised design philosophies always incorporating safety, environmental and statutory requirements. Intervention Workover Control Systems www.sms-alderley.com | [email protected] | +44 (0) 1493 655515 • High working pressures up to 1379barg / 20000psig • Bladder and/or piston accumulators, (PED, ASME VIII Non or “U” stamped, AS 1210) • Electrical or pneumatic control options • Integral autonomous MCC and PLC • Integral or standalone reservoirs, size to suit application • HVAC systems available for low and high ambient temperature environments System Specification Design Certification • 316 stainless steel or carbon steel enclosed or open framed construction • Wide range of tube fitting types, e.g. twin ferrule compression, MP coned & threaded and Parker Hannifin MPI™ • Wide range of materials and exotics available, e.g. 316/316L, 6Mo, Incoloy 625, Incoloy 825, 904L, Super Duplex, Duplex • Electric and/or pneumatic pumps suitable for use with mineral or water glycol based fluids • Environmental loadings can include; vessel motions, wind and blast loadings • Customer stab plate and connector requirements integrated into unit • Safety Integrity Level up to SIL 3 • Safe area and hazardous environments, (Zone 1/2, Class 1 Division 1/2), to ATEX, IECEx or NEC (NFPA 70) • Standard temperatures design in accordance with EN 13628-6, systems also available with Extended and Arctic ratings • Design and certification to DNV2.7-1 and DNV2.7-3 • When required designed to the relevant NORSOK standards Alderley Forms part of Technical excellence: delivered

Upload: trinhbao

Post on 02-Oct-2018

328 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Intervention Workover Control Systems and Workover Control... · Intervention Workover Control Systems (IWOCS) enable intervention and completion work on wells through existing subsea

Intervention Workover Control Systems (IWOCS) enable intervention and completion work on wells through existing subsea systems or control of customer specific intervention tooling.

All systems are designed and tailored to suit the individual project specifications or client/SMS developed standardised design philosophies always incorporating safety, environmental and statutory requirements.

Intervention WorkoverControl Systems

www.sms-alderley.com | [email protected] | +44 (0) 1493 655515

• High working pressures up to 1379barg / 20000psig • Bladder and/or piston accumulators, (PED, ASME VIII Non or “U” stamped, AS 1210) • Electrical or pneumatic control options• Integral autonomous MCC and PLC• Integral or standalone reservoirs, size to suit application• HVAC systems available for low and high ambient temperature environments

System Specification

Design

Certification

• 316 stainless steel or carbon steel enclosed or open framed construction• Wide range of tube fitting types, e.g. twin ferrule compression, MP coned & threaded and Parker Hannifin MPI™ • Wide range of materials and exotics available, e.g. 316/316L, 6Mo, Incoloy 625, Incoloy 825, 904L, Super Duplex, Duplex • Electric and/or pneumatic pumps suitable for use with mineral or water glycol based fluids• Environmental loadings can include; vessel motions, wind and blast loadings• Customer stab plate and connector requirements integrated into unit

• Safety Integrity Level up to SIL 3 • Safe area and hazardous environments, (Zone 1/2, Class 1 Division 1/2), to ATEX, IECEx or NEC (NFPA 70)• Standard temperatures design in accordance with EN 13628-6, systems also available with Extended and Arctic ratings• Design and certification to DNV2.7-1 and DNV2.7-3• When required designed to the relevant NORSOK standards

AlderleyForms part of

Technical excellence: delivered