work instruction for bending rev. 01.01.2013
TRANSCRIPT
-
8/9/2019 Work Instruction for Bending Rev. 01.01.2013
1/3
The
document
defines
the
procedure to
be
followed
for
the
fabrication.
o
Rout
Cards
&
Drawings.
o
Tracking
List
by
Planning.
.
Machine
allocation
with
proper machine
setup.
o
Material
with specified
qty
&
Bend
operation.
A)
Verify
the
existing
lots from
production,
for
mark
no. with
the help
of approved
Shop
Drawing
&
Rout
Card'
B)
Verify
Profile
(section),
Operation
BEND
type
(cold
or
hot), degree
or
gauge size,
Quantity, Batch,
with
the
help of
Tracking List.
Read
carefully
all
instruction
from
drawing
&
reference
table
of Bend'
C)
After
verification,
affange
the
material
on
the
machine
for
process
to
Bending
operation.
D)
Use
proper
fixtures,
gauges,
bending
die's
&
measuring
instruments
like
Right angle,
steel scale,
gauge, meter,
vernier
caliper,
thermometer
etc.
E) To
follow bending
parameter,
heating
indicator
please
refer TABLE
F)
Check
the
first
piece
at
each
stage
of operation
with
the help of
approved
shop
drawing marked
with
MASS
FABRICATION
and
gauge.
G) Check
first
piece
to offer
QC
Inspector
and every
25n
(frequency
depend
on
rout card
qty.) piece
from
the
lot. Ifany
fault
or
variation
observed,
inform immediately
to shift
Engineer
/
Supervisor.
H) Fill the
report
in the daily
performance report
& update
the
tracking
list without
error.
D
Put
the
required
Qty
with
mark
no.
& further
operation
code on
every bundle
after finished lots.
If
lot is ready
for
galvanizing tagged
rout
card
on the
lots
with
sign by QC
inspector.
J) If
found any Non Conformance
during
the
process
inform to
QC
inspector, take the NCR report
& again
re-offer to
QC
after
completion of
Rework.
K)
Keep
daily
proper
cleaning
of
machine
& House
keeping around
the
machine.
L) Use
proper
Safety utilities on the
shop
floor while
running
the
machine
viz.
Safety
goggle,
ear
muffs/
plugs,
hand
gloves
etc.
After
complete the
lot
as
per
rout
card
qty., transfer to
Galvanizing
with
proper
documents.
al
Lcad man
Shi•¡
Supervlsor
Shift
Supervlsor
QC
Inspector
Supervisor
Lead man
Lead
QC
Inspector
Lead
man
man
Meas.
Tape
I
Vernier
Caliper
Meas.
Tape.l
gauge
Meas.
Tape.l
gauge
ISSUED BY:
•
ƒO
`œÝ
•RƒŠ
APPROVE
-
8/9/2019 Work Instruction for Bending Rev. 01.01.2013
2/3
a. Bend
Ref. Line
-
+l-2.0mm
b.
Bend
Angle -
+/-
1.0 Degree
• Mr‚¶
RE—Í
‚ ¤
ÇttƒÇ
A::Mild steel(Ms•l
materlal
• k
rade:A36ƒm
SS400/S275JR•l
Follow the shop sketch instructions.Ifno instructiOns in shop sketch then foHOw as
below,
Inside Radius ofBend exceeding l.5tshaH Cold Bend
lnside Radius ofBend lesser than l.5t shall Hot Bend(TEDIP 750•‹
C to 900•‹
C)
(`t'=thiCkness ofmaterial bend)
All Hiah Tensile stee:fHT•l
mater:al
• k
Grade:GR60/GR50/SS540/S355JR•l
AH HT material must process Hot Bend(TEMP 750•‹
C to 900•‹ C)
For
special
steels fabricator
should
consult
steel
supplier
for
bendin
and
te
C•Ú
‚Ñ
CES•
bĂ
¶‚ÞƒÇ
All
Gauges
shall
be
designated
with
Mark
of
Degree
or with
mark
no.
ŒŽd „I
’¬
¨
—[
R„I
ttERFOR ttcBE‡W
D˜e
NE
Œ—C-5ƒÇ
•ÚŒ€B2ƒÆ
‚Ì
`Ob•Œ
asĂ
TapeAvleter
Infrared
Thermometer
Gauge
only
Infrared
Thermometer
MATE.THK•B BEND DEGREE
UPT0 6•‹
HEATING TIPIE
roflle•…
L150)
BEND DEGREE
ABOVE 6•‹
‡ UATING TIPIE
rlle>L150)
BEND DEGREE
ABOVE 6•‹
HEATING TIDIIE
6•c
plEDII THICK MATE
10 MM THIcK MATE
52-55 Sec.
1l M‡W
y
THIcK MATE
55•c
58 Sec.
12 MPITHIcK MATE
65•N
5 Sec.
13‡W
y
‹TH cK MATE
115-130 Sec.
15 MPlTHIcK MATE
110-120 Sec.
140-150 Sec.
16 MIn4 THIcK MATE
135•]
145 Sec.
165•c
175 Sec.
18 Pl‡W
THIcK MATE
100-104 Sec.
150•]
155 Sec.
180-190 Sec.
20
‡WDII THIcK MATE
106-110 sec.
ISSUED BY:
-
8/9/2019 Work Instruction for Bending Rev. 01.01.2013
3/3