  • 8/9/2019 Work Instruction for Bending Rev. 01.01.2013

    1/3

    The

    document

    defines

    the

    procedure to

    be

    followed

    for

    the

    fabrication.

    o

    Rout

    Cards

    &

    Drawings.

    o

    Tracking

    List

    by

    Planning.

    .

    Machine

    allocation

    with

    proper machine

    setup.

    o

    Material

    with specified

    qty

    &

    Bend

    operation.

    A)

    Verify

    the

    existing

    lots from

    production,

    for

    mark

    no. with

    the help

    of approved

    Shop

    Drawing

    &

    Rout

    Card'

    B)

    Verify

    Profile

    (section),

    Operation

    BEND

    type

    (cold

    or

    hot), degree

    or

    gauge size,

    Quantity, Batch,

    with

    the

    help of

    Tracking List.

    Read

    carefully

    all

    instruction

    from

    drawing

    &

    reference

    table

    of Bend'

    C)

    After

    verification,

    affange

    the

    material

    on

    the

    machine

    for

    process

    to

    Bending

    operation.

    D)

    Use

    proper

    fixtures,

    gauges,

    bending

    die's

    &

    measuring

    instruments

    like

    Right angle,

    steel scale,

    gauge, meter,

    vernier

    caliper,

    thermometer

    etc.

    E) To

    follow bending

    parameter,

    heating

    indicator

    please

    refer TABLE

    F)

    Check

    the

    first

    piece

    at

    each

    stage

    of operation

    with

    the help of

    approved

    shop

    drawing marked

    with

    MASS

    FABRICATION

    and

    gauge.

    G) Check

    first

    piece

    to offer

    QC

    Inspector

    and every

    25n

    (frequency

    depend

    on

    rout card

    qty.) piece

    from

    the

    lot. Ifany

    fault

    or

    variation

    observed,

    inform immediately

    to shift

    Engineer

    /

    Supervisor.

    H) Fill the

    report

    in the daily

    performance report

    & update

    the

    tracking

    list without

    error.

    D

    Put

    the

    required

    Qty

    with

    mark

    no.

    & further

    operation

    code on

    every bundle

    after finished lots.

    If

    lot is ready

    for

    galvanizing tagged

    rout

    card

    on the

    lots

    with

    sign by QC

    inspector.

    J) If

    found any Non Conformance

    during

    the

    process

    inform to

    QC

    inspector, take the NCR report

    & again

    re-offer to

    QC

    after

    completion of

    Rework.

    K)

    Keep

    daily

    proper

    cleaning

    of

    machine

    & House

    keeping around

    the

    machine.

    L) Use

    proper

    Safety utilities on the

    shop

    floor while

    running

    the

    machine

    viz.

    Safety

    goggle,

    ear

    muffs/

    plugs,

    hand

    gloves

    etc.

    After

    complete the

    lot

    as

    per

    rout

    card

    qty., transfer to

    Galvanizing

    with

    proper

    documents.

    al

    Lcad man

    Shi•¡

    Supervlsor

    Shift

    Supervlsor

    QC

    Inspector

    Supervisor

    Lead man

    Lead

    QC

    Inspector

    Lead

    man

    man

    Meas.

    Tape

    I

    Vernier

    Caliper

    Meas.

    Tape.l

    gauge

    Meas.

    Tape.l

    gauge

    ISSUED BY:

    ƒO

    `œÝ

    •RƒŠ

    APPROVE

  • 8/9/2019 Work Instruction for Bending Rev. 01.01.2013

    2/3

    a. Bend

    Ref. Line

    -

    +l-2.0mm

    b.

    Bend

    Angle -

    +/-

    1.0 Degree

    • Mr‚¶

    RE—Í

    ‚ ¤

    ÇttƒÇ

    A::Mild steel(Ms•l

    materlal

    • k

    rade:A36ƒm

    SS400/S275JR•l

    Follow the shop sketch instructions.Ifno instructiOns in shop sketch then foHOw as

    below,

    Inside Radius ofBend exceeding l.5tshaH Cold Bend

    lnside Radius ofBend lesser than l.5t shall Hot Bend(TEDIP 750•‹

    C to 900•‹

    C)

    (`t'=thiCkness ofmaterial bend)

    All Hiah Tensile stee:fHT•l

    mater:al

    • k

    Grade:GR60/GR50/SS540/S355JR•l

    AH HT material must process Hot Bend(TEMP 750•‹

    C to 900•‹ C)

    For

    special

    steels fabricator

    should

    consult

    steel

    supplier

    for

    bendin

    and

    te

    C•Ú

    ‚Ñ

    CES•

    bĂ

    ¶‚ÞƒÇ

    All

    Gauges

    shall

    be

    designated

    with

    Mark

    of

    Degree

    or with

    mark

    no.

    ŒŽd „I

    ’¬

    ¨

    —[

    R„I

    ttERFOR ttcBE‡W

    D˜e

    NE

    Œ—C-5ƒÇ

    •ÚŒ€B2ƒÆ

    ‚Ì

    `Ob•Œ

    asĂ

    TapeAvleter

    Infrared

    Thermometer

    Gauge

    only

    Infrared

    Thermometer

    MATE.THK•B BEND DEGREE

    UPT0 6•‹

    HEATING TIPIE

    roflle•…

    L150)

    BEND DEGREE

    ABOVE 6•‹

    ‡ UATING TIPIE

    rlle>L150)

    BEND DEGREE

    ABOVE 6•‹

    HEATING TIDIIE

    6•c

    plEDII THICK MATE

    10 MM THIcK MATE

    52-55 Sec.

    1l M‡W

    y

    THIcK MATE

    55•c

    58 Sec.

    12 MPITHIcK MATE

    65•N

    5 Sec.

    13‡W

    y

    ‹TH cK MATE

    115-130 Sec.

    15 MPlTHIcK MATE

    110-120 Sec.

    140-150 Sec.

    16 MIn4 THIcK MATE

    135•]

    145 Sec.

    165•c

    175 Sec.

    18 Pl‡W

     THIcK MATE

    100-104 Sec.

    150•]

    155 Sec.

    180-190 Sec.

    20

    ‡WDII THIcK MATE

    106-110 sec.