Page 1: WORK GUIDE ENGLISH

[SG7]studioT. +34 649 27 23 08 www.sg7studio.com

[email protected]

architectural visualizations

visualization/representation/animation/3D model

Page 2: WORK GUIDE ENGLISH
Page 3: WORK GUIDE ENGLISH

WORK GUIDE_IMAGE

_GENERAL INFORMATION

In order to make the process as simple as possible we will need some information before starting. We know that is not always possible, but if we could get most of the elements listed below, that would be of great help.

•Time-Project deadline.-One week is required for up to 3 images if you provide a 3d model, two weeks if we have to model. (Ideally)

•Renderings-Number of images.-Type of images (exterior-eye level, aerial, interior)-Size of images and/or ratio.-Atmosphere (night / dusk / daybreak /thick fog)-Possible points of views (Draft sketches). •Files Preferably a good pdf document, such as the example below.-Site location / Google coordinates.-Summary of project program / functions.-Material descriptions or references.-Landscape description.

•Technical files (PLANS) -Technical drawings must be in dwg and to avoid pro-blems of compatibility will be saved in the 2007 version (masterplan / floor plans/ sections/ elevations). We are architects as what we do not have big problems to understand the plans so we will avoid unnecessary questions.

•PaymentThe payments are done by means of bank transfer to an account that will facilitate them in the invoice and must be realized not later of 15 days of the delivery of the images.

•Other considerationsAs general idea, the images are better with major freedom at the moment of working. We are new in this work for what we are grateful for any suggestion or good idea.

_TYPES OF FILES

3DWe work especially with 3dmax and Vray. We do not have problems in models done in Rhino / Max / Autocad. *Models done in other soware need to be converted to les we canimport.

2DWe use AutoCAD DWG files (saved in version 2007 to avoid compatibility issues). JPG or PDF files Illustrator are not suitable for mode-ling, but they are good reference.

2D FORMATS 3D FORMATS

.dwg .ai .jpg/png .3dm .max

Page 4: WORK GUIDE ENGLISH

_EJEMPLO DE UN BUEN PDF

WORK GUIDE_IMAGE

Page 5: WORK GUIDE ENGLISH

_3D MODEL (YOU DO)

If you deliver us the 3d model follows the fo-llowing advices: - Please try to make sense of the names of the different layers so that you can understand.- Ideally organize layers as elements: Slabs / co-lumns / walls / partitions / stairs / furniture ...- Avoid Sketchup: May not be used inappropria-tely modeled Sketchup files. Each element must be an independent group to texture the model correctly and should avoid duplicating faces and lines.

_3D MODEL (WE DO)

We will need all available documents in CAD , pre-ferably: site plan, floor plans, sections, elevations.- Indications of the functions and materials- Some quick sketches of the project and the views.

WORK GUIDE_IMAGE

Common issues in models:- Frozen layers - It is better to clean the les and keep only the elements we will use.- Objects duplicates in the same position.- Non welded points.- Glass with no or abnormal thickness.- People/cars/trees - We won’t use them and they just will make the files heavier.

* In case of existing walls of different materials will divide into different layers as in the example graph.

Layer Wall

Layer Slab

Layer Stair

Layer Glass

Layer Frame

Layer ColumnLayer Furniture

Layer polycarbonate

Layer Door

Layer Partition

Page 6: WORK GUIDE ENGLISH

_PROCESS

WORK GUIDE_IMAGE

day1-2

To find the best point of view and verify the model.

day3-4

Preview, test environment textures and lighting.

day5-6

Final Render.

day 7

Adjustments and finishing touches.Notes:- Depending on the complexity of the adjustments and in the case of making orders during the wee-kend or holidays will be charged extra.

Page 7: WORK GUIDE ENGLISH
Page 8: WORK GUIDE ENGLISH

[SG7]studioT. +34 649 27 23 08 www.sg7studio.com

[email protected]