work breakdown structure
DESCRIPTION
COEPD - Center of Excellence for Professional Development is a primarily a Business Analyst Training Institute in the IT industry of India head quartered at Hyderabad. COEPD is expert in Business Analyst Training in Hyderabad, Chennai, Pune , Mumbai & Vizag. We offer Business Analyst Training with affordable prices that fit your needs.COEPD conducts 4-day workshops throughout the year for all participants in various locations i.e. Hyderabad, Pune. The workshops are also conducted on Saturdays and Sundays for the convenience of working professionals. For More Details Please Contact us: Visit at http://www.coepd.com or http://www.facebook.com/BusinessAnalystTrainingCenter of Excellence for Professional Development3rd Floor, Sahithi Arcade, S R Nagar,Hyderabad 500 038, India. Ph# +91 9000155700, [email protected]TRANSCRIPT
Slide 1
(Professional Business Analyst Training organisation)Work Breakdown Structure1
Every one of us has some goals and we plan accordingly to achieve them.
One of the effective ways to reach our goal quickly is to break down larger goals into realistic achievable steps.
A work breakdown structure (WBS), as the name says, is the process or technique of dividing complex and difficult projects into smaller units. This smaller unit can be a data, product, service or any combination.
In other words, WBS is a hierarchical decomposition of workthat must be performed to achieve theobjective.
Traditional BA (Waterfall)Agile BARequirements are documented in Use Cases,BusinessRequirements, Functional requirements, UI Specifications, Business Rules.Requirements are documented in Epics, User Stories and optionallyBusiness(or Essential) Use cases.Focuses on completeness of requirement and spends time in ensuring the requirement is unambiguous and has all the details.Focuses on understanding the problem and being the domain expert so that s/he can answer questions from the development team swiftly and decisively.Focuses on getting a sign off on the requirements.Focuses on ensuring the requirements meet the currentbusinessneeds, even if it requires updating them.Often there is a wall between theBA/Businessand the Development team.AgileBA(Often called as Product Owner) is part of the team.Tends to dictate solutions.Has to remain in the problem domain, leaving the development team space to explore different solutions.Long turnaround.Quick turnaround.Focus on what the requirements document said. In other words, output (Artifact) is a well written thorough requirements document.Focus on the functionality of the developed software. In other words, output (Artifact) is the software that meets thebusinessneeds.
To constructs a WBS, project managers or subject matter experts first identify the main functional deliverables and break them into tasks, sub-tasks and further into work packages. The work package is a list of tasks or "to-dos" to produce a specific or particular unit of work.
Generally few rules are followed in constructing a WBS:
1. Two Weeks Rule: Any broken down level of the above structure cannot be smaller than two weeks of work.2. 8/80 Rule: Any level of work should not be less than 8hrs of work or more than 80hrs of work.
There are many ways to represent a WBS, such as Tree, Table, or List. The tree type structure is mostly used and an efficient way of representation.
Inputs of WBS:Project scope statement and requirements documentation are the basic inputs for creating the WBS. Enterprise environmental factors and organizational process assets are also considered in this process. Organizational process assets include organizational policies and procedures for the WBS, previous project files, and lessons learned from previous projects.
Outputs of WBS:WBS document It includes the total scope of the project as it starts from the deliverables and then decomposes into smaller sections.
WBS DictionaryThe WBS dictionary is a document that provides detailed descriptions of the components in the WBS, such as work packages and control accounts.
Project Documents Updates These include the requirements documentation of approved change requests.
Scope baseline The scope statement, WBS document, and WBS dictionary grouped together forms Scope baseline.
Advantages/Importance of WBS:
1. Easy to define, organize and manage the project. 2. Improves the efficiency of the project.3. Helps to estimate the resources required, such as cost, time, staff, etc.4. Easy allocation of resources based on the importance of the task/sub-task.
5. Helps to set up milestones in the project.6. Gives a better understanding of the project to the stakeholders.7. Easy to identify potential risks in a given project.8. Helps in identifying communication points and formulating communication plan across the project team.