S.No. START DATE FINISHED DATE NATURE OF PROJECT CUSTOMER
1 06-‐12-‐2010 13-‐07-‐2011 Design, Engg. Constructions, Procurement, Supply E&C and PGTR for Up-‐gradation of Wastewater Treatment Plant and Ultra Filtration System
United Breweries Ltd. Hyderabad
2 31.03.2011 16-‐07-‐2011 Design, Engg. Constructions, Procurement, Supply,E&C and PGTRRO Plant United Breweries Ltd. Hyderabad
3 01-‐04-‐2011 03-‐03-‐2012Design, Engg, Manufacture, Inspection, Testing, supply, erection& commissioning of Wastewater Treatment Plant with Anaerobic Facility
Indorama Petrochem Ltd. Thailand
4 30/3/11 May-‐12Wastewater Treatment Plant based Membrane technologies, Membrane Bioreactor & Reverse Osmosis based Recycle/Reuse Plant.
Yunus Textiles Mills Ltd. Karachi
5 26/2/11 27/5/12 Wastewater Treatment Plant, Carousel Design Lucky Textiles Mills Ltd. Karachi
6 29/12/11 Apr-‐12 Fresh Water RO Plant 45 m3/hr permeate United Breweries Neelamangala -‐ India
7 27/6/11 June 30,2012 Anaerobic + Aerobic -‐ Wastewater Treatment Plant up-‐gradation Blossom Breweries Ltd, Daman, India
8 Nov. 2010 May-‐11 Sludge Handling for Cement plant Lafarge Cement
9 Sept. 2010 Aug. 2011 Anaerobic + Aerobic , Soft drink beverages MukhiImpex, Venezuela
10 June, 2011 Jul-‐12 Anaerobic + Aerobic Waste Water Treatment Plant Wisynco Group -‐ (Coca-‐Cola) – Jamaica
11 Aug-‐10 Apr-‐11 @ 1800 M3day in biological stage and 3000 M3 in UF-‐RO stage. Recycling @ 85% . In operation since 3 years
VRS Foods Ltd., Malanpur Indl. Area, Madhya Pradesh, Choclate Mfg. 100% Export Oriented Units to Europe
12 23/11/2011 28/6/2012 WTP -‐ Softner American & Efird Ltd. (A&E), Bangladesh
13 26/9/12 Jun-‐13 Waste Treatment Plant Equipments with Geomembranes& Decanter Himalayan Distillery Ltd. Nepal
W.O.G. GROUP - LIST OF OVERALL INSTALLATIONS
![Page 2: WOG List of Installation_Jan_2015](https://reader038.vdocuments.site/reader038/viewer/2022100508/55cf8f60550346703b9bc026/html5/thumbnails/2.jpg)
2 Confidential Page 2
S.No. START DATE FINISHED DATE NATURE OF PROJECT CUSTOMER
W.O.G. GROUP - LIST OF OVERALL INSTALLATIONS
14 17/8/12 Nov-‐13 Molasses Tanks ANGOSTURA, Trinidad Distillers Ltd. Trinidad & Tobago
15 30/1/13 Dec-‐13Design, Engg., Manufacturing, Supply, ,Erection & Commissioning of ETP package for 4 x 60 mw captive thermal power plant at Churk (UP)
Jaiprakash Associates Ltd.
16 12/4/13 Nov-‐13 RO Water Plant Mother Dairy Fruit & Vegetable Pvt. Ltd.Pilkhuwa Dairy Unit
17 2/5/13 Feb-‐14 Manufacture and supply of 1500 m3/day Effluent Treatment Plant with AHR and Accessories Barmalt (India) Pvt.Ltd.
18 Apr-‐13 Dec-‐13 Wastewater Treatment through Anaerobic Digester -‐ Upgradation & Modernization Demerara Distillers Ltd.
19 28/10/11 Sep-‐13 Design, Engg., Supply, Supervision of Erection & Commissioning of Wastewater Recycling/Reuse Plant. Aurus Specialty Co. Ltd. Thailand
20 27/1/12 Sep-‐13 Wastewater Treatment Plant Revamping& RO Revamping United Breweries Ltd. Chopanki -‐ India
21 22/9/11 May-‐13 Wastewater Treatment Plant & UF RO System United Breweries , Kalyani, India
22 20/7/11 Aug-‐13 1800 m3/day -‐ Anaerobic + Aerobic &UF RO System United Breweries , Chamundi -‐ India
23 27/9/12 Oct -‐ 2014 10 MLD Tertiary Treatment Plant for Delhi Jal Board Delhi Jal Board -‐ India
24 24/8/12 Oct -‐ 2014 Drinking Water Treatment of capacity 240 m3/hr with O&M for 1 year Indian Oil Corporation Ltd., Mathura (India)
25 20/5/12 Nov -‐ 2104 Oily and Chemical Waste Water Treatment Plant Ras Al Khair Power and Desalination Plant -‐ Saudi Arabia, SEPCO Project
26 28/6/12 Aug -‐ 2014 Complete Process Water Treatment Plant & Process Wastewater Treatment Plant
Global Engineers India Ltd. (India) for Ordnance Factory
27 17/9/12 Nov-‐13 Wastewater Treatment Plant alongwith Biogas Flare system ANGOSTURA -‐ Trinidad Distillers Ltd. Trinidad & Tobago
![Page 3: WOG List of Installation_Jan_2015](https://reader038.vdocuments.site/reader038/viewer/2022100508/55cf8f60550346703b9bc026/html5/thumbnails/3.jpg)
3 Confidential Page 3
S.No. START DATE FINISHED DATE NATURE OF PROJECT CUSTOMER
W.O.G. GROUP - LIST OF OVERALL INSTALLATIONS
28 1/1/14 Sep-‐14 Wastewater Treatment Plant add on equipments alongwith Erection & Installations
ANGOSTURA -‐ Trinidad Distillers Ltd. Trinidad & Tobago
29 7/1/13 Oct-‐143 Phase separation followed by 2 stage anaerobic treatments final polishing effluent by MBR treatment. Waste Water Treatment Plant
Colben Energy (Singapore) Pte. Ltd. Singapore
30 15/2/13 Nov -‐ 2014 RO Based Tertiary Treatment Plant Yunus Textiles Mills Ltd. Karachi
31 1/1/13 Sep-‐13 Supply, Erection and commissioning works of entire mechanical & electrical items of new module of 2.35 MLD CETP UNNAO
Industrial Infrastructure Services (India), Super Tannery Ltd. Jajmau, Kanpur
32 21/12/12 Jan-‐14 Modification of existing Digester into UASB
Reliance Industries Ltd.Hazira Manufacturing Division, Village: Mora, Post-‐Bhatha,Surat-‐Hazira Road,Dist: Surat, Gujarat-‐394510.
33 2/10/13 Oct -‐ 2014Supply, Installation, Testing, Commissioning of Hydraulic Acid Storage Tank & Cation Exchanger Unit for Khulna Power Station, BPDB, Khulna on Turnkey Basis
Bangladesh Power Development Board, Directorate of Purchase, BPDB, WAPDA Bldg. DhakaTel 9568132,
34 Oct-‐13 Jan-‐14 Supply of Reverse Osmosis treatment plants membranes for Waste Water Treatment Indian Oil Corporation Ltd., Panipat
35
36
37 Dec-‐13 Dec -‐ 2014 Wastewater Treatment using Membrane Bio Reactor Technology Demerara Distillers Ltd.
Sep-‐13 70% Progress achived ETP & STP for 3 x 18 MW Coal Fired Plant Project at Sangatta, East Kalimantan Punj Lloyed Indonesia Ltd. , Indonesia
![Page 4: WOG List of Installation_Jan_2015](https://reader038.vdocuments.site/reader038/viewer/2022100508/55cf8f60550346703b9bc026/html5/thumbnails/4.jpg)
4 Confidential Page 4
S.No. START DATE FINISHED DATE NATURE OF PROJECT CUSTOMER
W.O.G. GROUP - LIST OF OVERALL INSTALLATIONS
38
39
40
41
42 Feb-‐14 75% Progress Achived Supply of Reverse Osmosis treatment plants membranes for Waste Water Treatment Indian Oil Corporation Ltd., Haldia
43 Aug-‐14 65% Progress Achieved 1000 M3/Day Waste Water Treatment Plant Carotino SDN. BHD. Malaysia
44 Aug-‐14 80% Progress Achieved Suppy of Equipment for Sugar Mill Matiari Sugar Pakistan
45 Apr-‐14 65% Progress Achieved WWTP / WTP & Recycle / Reuse Cairns Energy India
46 Oct-‐14 35% Progress AchievedHigh Strength WWTP + Low Strength WWTP + Recycle Reuse of WWTP for Industrial use inclusing ZLD, STP based on SBR Technology
Tahal Mohali Greens
Jan-‐14 90% Progress achieved Shell Marina LOBP GMP Project, Tuas Singapore
Jan-‐14 90% Progress achieved
Water Treatment Plant at Shell Marina , Singapore
CPI -‐ Water Treatment Plant at Shell Marina , Singapore Shell Marina LOBP GMP Project, Tuas Singapore