With the contribution of the Civil Protection Financial Instrument of the European Union
Preparedness for evacuation in case of a nuclear accident
Brussels, 6th Feb 2012
With the contribution of the Civil Protection Financial Instrument of the European Union
Preparedness for evacuation in case of a nuclear accident
Partners
• Beneficiaries– Občina Krško (Slo) – CO– Grad Zagreb (Cro) – AB1– Cernavoda City Hall (Rom) – AB2
• Other partners– Rescue & protection administration of Slovenia and
Croatia– Nuclear Safety Administration of Slovenia and Croatia– Nuclear Power Plant Krško– Red Cross Novo mesto– Police Administration Novo mesto– Professional Fire-fighters unit and other local units – other municipalities in the region of 25 km – Other public services
With the contribution of the Civil Protection Financial Instrument of the European Union
Preparedness for evacuation in case of a nuclear accident
Finances and duration of the project
Own contribution EU contribution
Občina Krško 91.122 273.365
Grad Zagreb 40.854 102.084
City of Cernavoda 4.959 14.877
Share 25,97% 74,03%
Total 136.935 390.326
Project duration: 1.1.2012 – 31.12.2013
Grant agreement: 230301/2011/614397/SUB/A5
With the contribution of the Civil Protection Financial Instrument of the European Union
Preparedness for evacuation in case of a nuclear accident
Project background (1)
• Nuclear accident is low probability – high impact event• Municipalities Krško and Cernavoda both host nuclear power plants • Municipality Krško is at cross-road of vital infrastructure for the
SEE, i.e. Motorway A1, X. Pan-European railway corridor, electrical and gas lines;
• Long-Term Protective Action Planning Zone spreads over national border (at the moment still EU border and Schengen Area)
• Within the radius of 25 km around the NPP (Long-Term Protective Action Planning Zone) lives 240.000 people out of which 61,5% live in Croatia. The area reaches City of Zagreb, which as a capital of Croatia represents demographic, political and economic centre.
• The state emergency plan for nuclear accident foresees preventive evacuation in the precautionary action zone. Evacuation as precautionary measure in highly populated areas is rather rare; this project can improve such measure and serve as an example on European level.
With the contribution of the Civil Protection Financial Instrument of the European Union
Preparedness for evacuation in case of a nuclear accident
Project background (2)
With the contribution of the Civil Protection Financial Instrument of the European Union
Preparedness for evacuation in case of a nuclear accident
Why PFE?
WHAT?
HOW?
MEASURES AND TASKS IN PROTECTION AND RESCUE OPERATIONS
1. RAISING AWARENESS OF POPULATION2. PROCEDURES AND INSTRUCTIONS3. TRAINING OF RESCUE & PROTECTION
FORCES4. CROSS-BORDER TACTICAL COOPERATION
STATE LEVEL / PLANNING
REGIONAL LEVEL / MANAGEMENT
MUNICIPAL LEVEL / EXECUTION
PROJECT PFE
With the contribution of the Civil Protection Financial Instrument of the European Union
Preparedness for evacuation in case of a nuclear accident
Project description
• Project management (A) & publicity (B)• The project starts with research about perception
and execution of protective measures as basis for assessment and preparation of the other tasks (C)
• Other tasks constitute three pillars:
1. Communication, notification and alerting (D, E)
2. Preparation and execution of evacuation (F, G)
3. Reception of evacuees and sheltering (H, I)
• Project task will be implemented as– Field research (survey)
– Workshops, seminars & table-top exercises
– Preparation of instructions
– Small-scale exercises and final evacuation exercise
1
before
3
after
2
during
evacuation
With the contribution of the Civil Protection Financial Instrument of the European Union
Preparedness for evacuation in case of a nuclear accident
Deliverables and deadlines
Analysis of communication systems 1.9.2012
Scheme of emergency communications 25.6.2012
1st Progress report 30.8.2012
Survey report 1.9.2012
Templates of alert messages and public releases 5.11.2012
Recommendations on emergency communications 15.11.2012
Map of intervention routes 1.3.2013
Train the trainer programme of rescue forces 15.4.2013
2nd Progress Report 30.4.2013
Action plan of Zagreb in case of precautionary evacuation 1.5.2013
Border crossing and traffic arragements 1.5.2013
CBRN equipment procurement plan 1.8.2013
Exercise report (reception/registration/provision) 10.11.2013
Final Report 31.12.2013
With the contribution of the Civil Protection Financial Instrument of the European Union
Preparedness for evacuation in case of a nuclear accident
Tentative dates of major events
– Signing of contracts with partners 10.3.2012 – Start of survey 1.5.2012– Joint workshop and table top exercise 10.11.2012– Working visit to the NPP 21.11.2012– Small-scale exercise on traffic 25.2.2013– Training of rescue forces 15.4.2013– Workshop on traffic arrangements 1.5.2013– Workshop for preparation of instructions 1.9.2013– Final exercise on evacuation 15.10.2013
Krško
Zagreb
Crnavoda
Preparation &analysis
Krško
Zagreb
Crnavoda
Evaluation and Preparation of outputs
Krško
Zagreb
Home workshops
Krško / Novo mesto
Joint activities
With the contribution of the Civil Protection Financial Instrument of the European Union
Preparedness for evacuation in case of a nuclear accident
Follow up actions
– Use of evaluations and recommendations in the next revision of state, regional and municipal emergency plans
– Implementation of procurement plant of personal CBRN protection equipment and decontamination equipment based on typification
– Education and training in line with prepared procedures and instructions
– Strengthened cooperation between other municipalities in the 25 km zone in both countries
– Continued administration of the webpage, which should become reference page about preparedness for a nuclear accident in the area
– Transfer of conclusions and best practices to other municipalities in the are of 25 km