Name : Mr.Wisanu Sookpanya Phone : +66 8 6937-9667 นาย วิษณุ สุขปัญญา e-mail : [email protected] Profession : Senior Mechanical Project Engineer , Project Manager, Site Manager Execution Engineer, Specialist Born : 14 June,1969 (46 year old) Bachelor degree ใบอนุญาตเป็นผู ้ประกอบ วิชาชีพวิศวกรรมควบคุม : Engineering / Mechanical ระดับภาคี วิศวกร สาขาวิศวกรรม เครื่องกล เลขทะเบียน ภก. 11515 Years with firm : 24 years Nationality : Thai Proposed Position on Team : Mechanical Project Manager, Site Manager Key Qualifications : Experience and Responsibilities the projects in the field of Cement plant , Petrochemical, Power plant, Paper plant, Oil & Gas project Industrial plants including steel making plant and storage facilities, etc Computer : Microsoft Window 2000/XP, Microsoft Excel, Microsoft Word , Microsoft Project , AutoCAD(2D/3D), Primavera project planner (P3), Internet Explorer, Microsoft Outlook . Educational:1988-1990 : Educational: 1988-1990 Bachelor's degree from Khon Kean University. Major Mechanical engineering, Khon Kean, Thailand. Languages : Description Speaking Reading Writing Thai Excellent Excellent Excellent English Good Good Fair

Upload: wisanu-sookpanya

Post on 11-Feb-2017

194 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Wisanu Resume (8-09-15)

Name : Mr.Wisanu Sookpanya Phone : +66 8 6937-9667

นาย วษณ สขปญญา e-mail : [email protected] Profession : Senior Mechanical Project Engineer ,

Project Manager, Site Manager Execution Engineer, Specialist

Born : 14 June,1969 (46 year old)

Bachelor degree

ใบอนญาตเปนผประกอบวชาชพวศวกรรมควบคม

: Engineering / Mechanical

ระดบภาค วศวกร สาขาวศวกรรม เครองกล เลขทะเบยน ภก. 11515

Years with firm : 24 years Nationality : Thai

Proposed Position

on Team : Mechanical Project Manager, Site Manager

Key Qualifications : Experience and Responsibilities the projects in the field of Cement plant , Petrochemical, Power

plant, Paper plant, Oil & Gas project Industrial plants including steel making plant and storage

facilities, etc

Computer : Microsoft Window 2000/XP, Microsoft Excel, Microsoft Word , Microsoft Project ,

AutoCAD(2D/3D), Primavera project planner (P3), Internet Explorer, Microsoft Outlook . Educational:1988-1990 : Educational: 1988-1990 Bachelor's degree from Khon Kean University.

Major Mechanical engineering, Khon Kean, Thailand.

Languages : Description Speaking Reading Writing

Thai Excellent Excellent Excellent

English Good Good Fair

Page 2: Wisanu Resume (8-09-15)

MY STRENGTH 1. Skillful at planning I do planning for my project work. Planning makes me realize the objectives of each job and implement the plans in line

with the objectives. For example,I am mush to work follow master schedule,so I plan probposal of work,during

time,equipment in program Primavera project planner(P3) and I am active all the time, so I finish my work efficiently and

on schedule.

2. Enjoy working under pressure I can work efficiently and on schedule. Case of I plan my probposal of project quotations, order contracts, and job

postings in time to meet the customers' needs. I enjoy working under pressure, and I am active all the time, so I finish my

work efficiently and on schedule.

3. Able to delegate responsibilities to others I am comfortable delegating responsibility to others. When leading projects, I make sure I assign responsibilities to my

subordinates and co-workers based on their skill level and availability. Without delegation, projects would become

uncontrollable and would never be completed on schedule.

4. Good at directing projects

I am able to run projects well since I am responsible and possess leadership skill. I know how to guide my team to get the

most success from a project. I monitor/direct a number of small projects, such as labor relations fairs in large institutions. I

contact people, prepare materials and arrange everything from schedules to content and preparation to final presentation.. I

talk to the lecturers to get their permission and do what I promised them, so that the university will gain the most benefits

from me. Meanwhile, I have to protect the company's benefits too, and I can do my best to remember that goal. . The

university appreciates me and allows me to set up fairs consistently. Being good at directing projects provides me with the

chance to do important jobs and build a good record of work. I, therefore, believe I can be promoted in this field.For

example : Project TPI Cement Plant No.1 to No.3,infrastructure project.

5. Professional and well mannered

Page 3: Wisanu Resume (8-09-15)

Experience Record :

Experience: 1991-1996 : TPI Polene (Public) Co. ,Ltd. , Saraburi , Thailand

Company business : TPI Polene(Public) Co. ,Ltd. : In 1990, TPI Polene stated the construction of its first cement

plant with a production capacity of 2.5 million tons per year, With the completion of cement plant line 2 in 1994

the annual production capacity was double to 5 million tons and become 8.5 million tons in 1996 when phase 3

was completed. Line 4 now under construction will become operational in the near future. Upon its competition,

the four TPI Polene's cement plants will have a combined capacity of 12 million tons per year.

Number of employee: 3,731 employees

Position : Assistant Mechanical Supervisor Engineer Subordinate:1

Dec 1990 - Oct 1996 ( 5 years 9 months )

Responsibilities: 1.Take off and order material & machine

2. Planning project and time schedule

3. Consoultant/Inspector and control quality of works

4. Control employees and subcontractors

5. Weekly/monthly progress report for meeting / payment

6. Solving the problem in site

Achievement: 1. I could manage successfully Cement plant No.1–3 projects 2. I got promoted to Assistant Mechanical Supervisor

Engineer position. 3. Co-ordinate with overseas specialists and experience about know-how of cement technology.

Page 4: Wisanu Resume (8-09-15)

Project : Main project, Erection TPI Polene Cement Plant Line#1 ;Production capacity of 2.5 million tons per year ;Year : 1991-1992

Owner : TPI Polene(Public) Co. ,Ltd. , Saraburi , Thailand (Project value 12,000 Mill. Bath)

Responsibility : Consultant with German's specialist (KRUPP Polysius and BURMER) and control contractor (Sunshine Engineering and Construction

Co., Ltd.) to install heavy machine Belt conveyor all of plant 37 lines ,17 km.

Position : Mechanical Engineer

Project : Main project, Erection TPI Polene Cement Plant Line#2 ; production capacity of 2.5 million tons per year;

Year : 1992-1994 , (Project value 14,000 Mill. Bath)

Owner : TPI Polene(Public) Co. ,Ltd. , Saraburi , Thailand

Responsibility : Consultant with German's specialist (KRUPP Polysius ,Beumer) and control contractor (TKC Engineering

Co.,Ltd.) to install heavy machine ; Example : Raw mill plant ,Raw mill feed bin ,Kiln feed ,Bucket elevator ,

Cyclone. Leader team to install main machine of raw mill plant by ourselves.

Position : Mechanical Engineer

Page 5: Wisanu Resume (8-09-15)

Project : Main project, Erection TPI Polene Cement Plant Line#3; production capacity of 3.5 million tons per year;

Year : 1994-1996 , (Project value 15,000 Mill. Bath)

Owner : TPI Polene (Public) Co. ,Ltd. , Saraburi , Thailand

Responsibility : Consultant with German's specialist (KRUPP Polysius , Beumer, MVT and HAZEMAG) and control contractor

(Soecon Engineering Co. ,Ltd.) to install heavy machine : Material Storage plant ,Stracker & Recramer , Cement

mill & Feed bin, Bag filter , Belt conveyor , Gear Box & motor

Position : Ass. Mechanical Supervisor Engineer

Page 6: Wisanu Resume (8-09-15)

Experience:1996-1997 : Chai Teng Engineering Co. ,Ltd. (CTE) ,Saraburi , Thailand

Company business : Chai Teng Engineering Co. ,Ltd.(CTE) is developing the projects in the field of Cement plant and Industrial plants

including steel making plant and storage facilities, etc. The projects are being developed by our well trained project developers who

understand the local markets and specific industries and is capable to analyze the feasibility of the project. CTE mission is to provide the

most economic and efficient technologies and know-how to meet the needs of clients (specially)

Project experiences as below ;

Project Organizer

- Project development by information gathering and analysis

- Overall Project Organizing to get the optimal solution

Major Field of Business

- Cement Plant * Mill Plant ,Belt conveyors

- Steel Making Plant * Furnace, Rolling Mills

- Storage Facilities * Spherical Tanks, Cylindrical Tanks ,Surge Tower Tanks

- Structural Steel * High-rise Building , Steel Bridge , Truss

Number of employee: 40-75 employees

Position : Manager Director, Project Manager, Mechanical Senior Engineer Subordinate:3

Oct 1996 - Oct 1997 ( 1 year )

Responsibilities: 1. Take off, Bidding and order material & machine

2. Planning project about budged and time schedule

3. Consoultant/Inspector and control quality of works

4. Control employees and subcontractors

5. Weekly/monthly progress report for meeting / payment

6. Solving the problem in site

Achievement: 1. I could manage successfully cement plant projects.

Page 7: Wisanu Resume (8-09-15)

Project : Main project, erection Cement Plant No.4 Year : 1996

Client : TPI Polene (Public) Co. ,Ltd. , Saraburi , Thailand Responsibility : Fabrication and installation steel structure building of Gypsum and

Clinker Transport ,Use heavy machine Crane 400 Tons for install ;

Total weight 1,500 Tons

Position : Project Site (Mechanical Project Engineer)

Project : Main project, erection Cement Plant No.4

Year : 1996-1997

Client : TPI Polene(Public) Co. ,Ltd. , Saraburi , Thailand Responsibility : Fabrication and installation Oil storage Tank 5 Mill. Lilts. ; Total weight

150 Tons

Position : Project Site (Mechanical Project Engineer)

Project : Main project, erection Cement Plant No.4 Year : 1996

Client : TPI Polene(Public) Co. ,Ltd. , Saraburi , Thailand

Responsibi

lity

: Fabrication and installation steel structure building of Automation Storage

,Total weight 250 Tons

Position : Project Site (Mechanical Project Engineer)

Page 8: Wisanu Resume (8-09-15)

Experience:1996-2006 : Yibsum Technology Ltd.,Part. ,Saraburi , Thailand

Company business : A Doorway to high quality service on Petrochemical, Power plant, Oil & Gas project, Industrial plant project

consists of cement plant, sugar refining plant, paper plant, food processing plant, clean room, paint plant, and so on.

Major Field of Business

- Power Plant * Combined Cycle Power Plant , Thermal Power Plant, Co-generation Plant

- Petrochemical Plant , Oil & Gas project

- West Water Treatment Plant

- Storage Facilities * Spherical Tanks, Cylindrical Tanks, Surge Tower Tanks

- Structural Steel * High-rise Building, Steel Bridge , Truss

Number of employee: 50-100 employees

Position : Manager Director, Project Manager, Mechanical Senior Engineer Subordinate:3

Oct 1997 - Sep 2005 ( 8 years )

Responsibilities: 1.Take off, Bidding and order material & machine 2. Planning project about budged and time schedule

3.Consoultant/Inspector and control quality of works 4. Control employees and subcontractors 5.Weekly/monthly progress report for

meeting / payment 6. Solving the problem in site 7. Balance payment & case flow& project cost 8.Make the highest quality

product and profit

Achievement: 1. I have successfully infrastructure project which is proved by Team consultant and Metropolitan Waterworks Authority

2. I could manage successfully turnkey projects.

Page 9: Wisanu Resume (8-09-15)

Project : NPS Tha Toom Power Plant ,Tha-tom ,Prajeenburi Year : 1997-1998

(Project value 6,000 Mill. Bath)

Client : Thai Meidensha Co.,Ltd., Prajeenburi, Thailand Responsibility : Fabrication Steel Silo , Sand Brash & Painting and Stainless Linning

Position : Project Manager /Mechanical Project Engineer

Project : Advance Agro Pulp MILL NO.2 (AA2) , Tha-tom ,Prajeenburi Year : 1997-1998

(Project value 3,500 Mill. Bath)

Client : ENERGUST/PAE (Thailand) Public Co.,Ltd. , Prajeenburi, Thailand Responsibility : Erection of Turbine ,Generator 32.5 MW. and stream piping

Position : Project Manager /Mechanical Project Engineer

Page 10: Wisanu Resume (8-09-15)

Project : NPS Tha Toom Power Plant ,Tha-tom ,Prajeenburi, Thailand Year : 1998

(Project value 6,000 Mill. Bath)

Client : FOSTER WHEELER INTERNATIONAL/PAE (Thailand) Public Co.,Ltd. Responsibility : Install Cooling Water Piping and Auxillaries

Position : Project Manager /Mechanical Project Engineer

Project : MAHA SAWAT TRANSMISSION PUMPING STATION ,METROPOLITAN WATERWORKS AUTHORITY,

Thailand ,Year : 1999

Client : CHINA GEZHOUBA CONSTRUCTION GROUP CORPORATION / Intaruk Co.,Ltd. Responsibility : Fabrication and Installation steel work of Surge Tower Tank Dai.11.5m./High 52m.

Position : Project Manager /Mechanical Project Engineer

Page 11: Wisanu Resume (8-09-15)

Project : Bang Kean Water Treatment Plant ,METROPOLITAN WATERWORKS AUTHORITY, Bang Kean,Bangkok,

Thailand ,Year : 2002-2003(Project value 1,200 Mill. Bath)

Client : METROPOLITAN WATERWORKS AUTHORITY / STECON Responsibility : Fabrication and Installation steel work of Surge Tower Tank Dai.12.5m./High 50m.

Position : Project Manager /Mechanical Project Engineer

Project : CORN PRODUCT (AMADARN) CO.,LTD. Nakornrachasima, Thailand, Year : 2003

Client : ASC ENGINEERING & CONSTRUCTION CO.,LTD. Responsibility : Design, Fabrication and Erection of Strach Supply Plant.

Position : Project Manager /Mechanical Project Engineer

Page 12: Wisanu Resume (8-09-15)

Experience : 2006-2007 : THAI OBAYASHI CORP., LTD. ,Bangkok , Thailand

Company business : Thai Obayashi will provide a detailed and balanced proposal following in-depth feasibility studies based on the

"Full Turn key" approach to determine current and future demands, effects and contributions to the populace and environment,and budgets

and expenditures.

Following client approval of the conceptual plan, an integrated effort is initiated to formulate a final plan, including drawings and

specifications, that will achieve maximum effectiveness in cost, time, energy and environment.

Thai Obayashi strictly adheres to master plans to ensure project quality and safety, deadlines and costs are met so clients can

confidently proceed with their related activities.

Number of employee: 800 employees

Position : Chift (Mechanical & Electrical Senior Engineer) Subordinate:3

Jan 2006 - Jun 2007( 1 1/2 years )

Responsibilities:

1. Contracts and Master schedules, make Weekly & Monthly progress reporting documents, and budget & progress payment control.

2. Project planning / scheduling of Engineering, Procurement, and Construction works

3. Check Design drawing ,shop drawing and specification mechanical & electrical system of contract

3. Inspection work , QC.,QA.,Control contractor Ex.> Thai Shinryo Ltd. ,Hirakawa Guidom(Thailand) ,IHI, Shinwa & EBARA ,MIURA ,

Hygro-Master, Goshu Kohsan ,Meiwa and Saeng Pradit Engineering ,YAMATAKE

4. Control all process to fabricate > install > test run > group trail run > commissioning > first operation > training owner > Hand Over

Machine &Operation manual & catalouge to owner

Achievement:

1. I have successfully project which is proved by Obayashi Corp. (Japan Oversea construction company and Toyota Motor Thailand Co.,

Ltd. by co-ordinate with all Japan staff

2. I could manage successfully turnkey project.

Page 13: Wisanu Resume (8-09-15)

Project : Toyota Motor Thailand Co., Ltd.

Project : Toyota Ban Pho Plant (Factory-: Automobile Related ) Area : 235,200 m2

Location : Highway 314, Ban Pho Chachoengsoa ; Schedule : 1 Sep 05 - Nov 06

Overall contract : 6,300 Mill. Baht ;

Work area : Utility Zone which have

1. Fire Tube boiler (MODEL : MP # 813) & Once throught boiler(MODEL : EZ - 3000G); 32 ton/hr.

2. IHI Turbo compressor MODEL : TRE 60-670 Kw; 5,500 Nm3/hr.,Air Dryer MODEL : T-18,000 Mm3/hr.,

3. Cooling tower system (Shinwa& EBARA) MODEL : 1,000 RT

4. Weste Water Plant (WWT) EX. A/C filter tank , D/L filter tank, chemical yard, Sand& Bulk filter, Sanitary tank ,Periodic tank,

Equalization tank

5. Process Water Treatment Plant (PWT) Ex. RO unit, Cariflier unit, Booster pump and

6. WWT & PWT system Control schematic diagram & Local Panel & Wiring

7. Fire Protection system ; Fire pump , Sprinker & piping system

8. Sub station 22 kV. ; Transformer 1250 kVA. , 1500 kVA. , MDB ,VCB ,TB ,LP ,control wiring system.

Project : Toyota Ban Pho Plant (Factory-: Automobile Related ) Area : 235,200 sq.m, Ban Pho Chachoengsoa, Thailand

,Year : 2005-2006 , (Project value 6,200 Mill. Bath)

Client : Toyota Motor Thailand Co., Ltd. Responsibility : Utility System of Factory : Automobile Related

Position : Chift (Mechanical & Electrical Senior Engineer)

Page 14: Wisanu Resume (8-09-15)

Experience :2007-2009 : Eurotech Engineering International Co.,Ltd. ,Bangprakhong ,

Thailand

Company business : Fabrication and installation of steel structure .stainless steel ; Equipment are HRSG&Inlet duct casing, Stack , Air

intank system, Gas flow Diverter ,Tank ,Duct , Moduld in Power plant ,Stream Methane Reformer .

Number of employee: 1,200 employees

Position :Project Manager Subordinate:3

Jun 2007 - Present ( 2 years 4 months )

Following client approval of the conceptual plan, an integrated effort is initiated to formulate a final plan, including drawings and

specifications, that will achieve maximum effectiveness in cost, time, energy and environment. We strictly adheres to master plans to

ensure project quality and safety, deadlines and costs are met so clients can confidently proceed with their related activities. We provide

long-term maintenance plans and make periodic inspections to ensure

Responsibilities:

1. Contracts and Master schedules, make Weekly & Monthly progress reporting documents, and budget & progress payment control.

2. Project planning / scheduling of Engineering, Procurement, and Construction works

3. Check Design drawing ,shop drawing and specification of contract

3. Co-odinate with QC.,QA.,Control contractor ,Client (KTI , SHELL ,TOYO.Nooter Ericzon , CMI)

4. Control all process to fabricate > trail assembly > Shipment

Page 15: Wisanu Resume (8-09-15)

Project : SHELL PEAL GTL project , Ras Laffan ,Qatar ,Year : Jun 2007-July 2009 (Project value $18 billion-$19 billion)

Siam Yamato Steel Plant (SYS) , Maptaput , Rayong ,Year : Oct 2008-Oct 2009(Project value 26,000 Mill. Bath)

Client : KTI Corp. , Nooter/Eriksen Srl, SMS-CONCAST AG , BIS Gas Turbine Systems GmbH

Responsibility : Project Management

Position : Project Manager

BIS gas Turbine Power Air intake System /Seraya - 2 units/Libya - 5 units (Fab weight = 1,036 Tons,15 Feb 09)

Page 16: Wisanu Resume (8-09-15)

Nooter / Ericksen/QARN ALAM / OMAN - Casing , duct,Column, Beams Baffles (Fab weight = 336.95Tons , 10-Aug-09)

Nooter / Ericksen /Shell Pearl - 9 units Exhuast Stack + 2 templates (Fab weight =581.60 Tons, 15/12/07)

Nooter / Ericksen/ Oman - 3 uniits-Casing & Duct,Columns & beam and Distribution Grid (Fab weight = 863 Tons, 15 Dec 08)

KTI Corporation / EXXON Mobile - Baytown Refinery, Shell TOYO (Fab weight = 3,782 Tons (Jun 07 - 1 Jun 08)

KTI Corporation /Angola Project - Radiant Section, stack,Ladder & Platform (Fab weight = 646 Tons , 20 May 08)

Concast AG /Siam Yamato (Rayong)-Filter body, Duct. Silo, Steel structure, hair pin cooler, Filter cladding and Canopy Hood , Axial

Cyclone and other (Fab weight = 1,506 Tons , 4-Feb-09) (Project value 26,000 Mill. Bath)

Page 17: Wisanu Resume (8-09-15)

Experience :2009-Current : L.V. Technology Public Company Limited , Bangkok , Thailand

Company business : L.V. Technology Public Company Limited performs a wide range of cement plant modifications and more than 730

orders have been placed for conversions. The modifications include ball mills and vertical mills as well as preheater,

kiln and cooler upgrades and also the supply of new grinding installations using the Mitsubishi VR vertical roller

mills and Indian or European ball mills.

Web site: http://www.lv-technology.com/

Number of employee: 150 employees

Position : Site Manager, Execution Project Engineer Subordinate:3

Oct 2009 - Present ( 4 ½ years )

L.V. Technology Public Company Limited (LVT) business operates as an engineering services specializing in the Cement Industry, by

designing and applying a new concept for grinding of raw materials and the flow of gas in order to improve production efficiency as well

as to reduce the electricity power consumption and to improve profitability.

Responsibilities: 1. Project Site/Supervise and Co-ordinate and Control quality fabrication and installation work of contractor and Client

2. Follow Project planning / scheduling of Engineering, Procurement, and Construction works

3. Re-check shop drawing and specification of contract equipment.

4. Inspection Heavy Equipment (Mill, Crusher, Stream turbine), Fabrication part

Project : Cement Plant ; Year : Oct 2009-Current

Client : Yura S.A. Cement (Peru), NSCI (Perlis & Bahau, Malaysia) , Star cement (Yemen) , HTTC (Vietnam) , Hanil

cement (Korea), YTL cement (Malaysia), CEMEX (Mexico), Kanbawza Industry cement (Myanmar), Apodi

(Brazil) and Iran, , China. Responsibility : Project site Manager/Supervise Erection machines and equipment at site for Cement plant

Position : Execution Mechanical Engineer/Supervisor/Project Site Manager

Page 18: Wisanu Resume (8-09-15)

Yura S.A. Cement, Peru

Star cement/ Cement mill, Yement

Page 19: Wisanu Resume (8-09-15)

CEMEX, Cement mill and Raw mill, Mexico HTTC, Coal mill /Vietnam

Project : NSCI, Cement mill no.4 ,Perlis, Malaysia, Year : 2011-2012

(Project value 600 mill. bath) Client : NSCI

Responsibility : Supply and Installation equipment of cement mill plant.

Position : Project Site Manager

Page 20: Wisanu Resume (8-09-15)

Project : NSCI, Cement plan 5,000 Ton per day ,Bahau, Malaysia, Year : 2012-2013

(Project value 7,600 mill. bath) Client : NSCI

Responsibility : Supply and Installation equipment of cement mill and Raw mill plant.

Position : Project Site , UBE Vertical mill supervisor

Page 21: Wisanu Resume (8-09-15)

Project : Apodi Cement plan 3,500 Ton per day, Brazil, Year : 2013-2015

(Project value 5,200 mill. bath) Client : CIA INDL DE CIMENTO APODI S/A

Responsibility : Supply and Installation equipment of cement complete plant.

Position : Project Site Manager , Supervision for Erection & Test run & Commissioning

Page 22: Wisanu Resume (8-09-15)

Summary Project of Eurotech Engineering International Co.,Ltd. ,Bangprakhong , Thailand. (between 2007-2009)

ITEM Client Licensor Equipment / Machine Project Area / Site Qty. Unit Year Start of Project

End of Project

Steam Reformers

Plant

KTI Corp. (Kinetics Technology International)

Qatar Shell GTL Limited -

Pearl GTL

Fabrication and supplier Ducting ,Casing and structure of fired heaters, from Hot Oil Heaters to complex Steam Reformers

Pearl GTL , Ras Laffan Industrial City, North Coast, Qatar

3,600 MTPA

2007 1 Jun 07 31 Mar 09

Steam Reformers

Plant

KTI Corp. (Kinetics Technology International)

KTI Fabrication and supplier Casing and Stacks of fired heaters, Hot Oil Heaters

Steam Reformers ; Angola

450 MTPA

2008 1 Jan 08 25 Sep 09

HRSGs Plant Nooter/Eriksen Srl (NE)

NE Fabrication and supplier 9 stacks of Heat Recovery Steam Generators (HRSGs)

Ras Laffan Industrial City, North Coast, Qatar

670 MTPA

2008 1 Dec 07 30 Jun 09

HRSGs Plant Nooter/Eriksen Srl (NE)

NE Fabrication and supplier HRSGs casing panel of Heat Recovery Steam Generators (HRSGs)

Ras Laffan Industrial City, North Coast, Qatar

560 MTPA

2008 1 Dec 07 30 Jun 09

STEEL INDUSTRIAL

SMS-CONCAST AG SMS-CONCAST

AG

Fabricate Venerations system of Metal Furnace (Filter , Duct, Stack ,Cooler and Cyclone)

Siam Yamato Steel (SYS) Maptaput , Rayong , Thailand

1,650 MTPA

2008 1 Jun 08 30 Jun 09

GAS TURBINE PLANT

BIS Gas Turbine Systems GmbH P.O. No. 61030347 B001

BIS Fabrication and supplier HRSGs casing panel of Gas Turbine Plant

Gas Turbine Plant at Israel

450 MTPA

2008 1 Aug 08 30 April 09

INDUSTRIAL Best Metal Work Co., Ltd.

NISSAN JAPAN

Fabricate Heating Furnace Casing Heating Furnace ,Nissan ; นคมบอวน จ.ชลบร

250 MTPA 1996 1 Jun 97 31 Jul 97

Page 23: Wisanu Resume (8-09-15)

ITEM Client Licensor Equipment / Machine Project Area / Site Qty. Unit Year Start of Project

End of Project

CRUSHER PLANT

Numheng Concrete Co., Ltd.

JAQUES Fabrication & erection 3 Duct bins ,Feeder ,Crusher and conveyor

Agrigate Crusher , Numhang, Lopburi

750 MTPA 1996 1 Jul 97 31 Dec 97

INDUSTRIAL Thai Meidensha Co.,Ltd.

FURUKAWA JAPAN

Install machine for seamless copper tube

โรงทอทองแดงไรตะเขบ (ฟรกาวา) อ.แกงคอย จ.สระบร

250 MTPA 1996 1 Aug 97 25 Sep 97

CEMENT PLANT TPI POLENE CO.,LTD. (PUBLIC)

TPI POLENE CO.,LTD.

Project : Oil Storage Tank 5 Mill. Lts.

TPI Polene (Public) Co., Ltd. อ.แกงคอย สระบร

150 MTPA 1996-1997

1 Dec 96 15 May 97

POWER PLANT NPS Tha Toom Power Plant / Thai Meidensha Co.,Ltd.

FOSTER WHEELER

INTERNATIONAL

Fab Steel Silo,Sand Brash & Painting and Stainless Linning

NPS Tha Toom Power Plant จ.ปราจนบร

250 MTPA 1997-1998

15 May 97 28 Feb 98

POWER PLANT Advance Agro Pulp MILL / PAE (Thailand) Public CO.,LTD

ENERGUST / Mitsubishi

Erection of Turbine ,Generator 32.5 MW. and stream piping

Advance Agro Pulp MILL NO.2 (AA2), Prajeenburi

307 MTPA 1997-1998

1 Aug 97 30 Jan 98

West Water Treatment Plant

Tact Team Engineering&Chemical Co.,Ltd.

SAMSUNG CORPORATION

Limestone Silo,Stainless Steel Screening and Erection of Penstock

West Water Treatment Plant (SAMSUNG-LOTTE

-CEC J/V) Bangkok

275 MTPA 1998 1 Jan 98 31 Dec 98

POWER PLANT PAE (Thailand) Public CO.,LTD

FOSTER WHEELER

INTERNATIONAL

Install Cooling Water Piping and Auxillaries

NPS Tha Toom Power Plant จ.ปราจนบร

40,000 DI 1998 15 Jun 98 30 Nov 98

Water Treatment Plant

CHINA GEZHOUBA CONSTRUCTION GROUP CORPORATION / Intaruk Co.,Ltd.

METROPOLITAN WATERWORKS

AUTHORITY

Fabrication and Installation work of Surge Tower Tank

MAHA SAWAT TRANSMISSION PUMPING STATION

550 MTPA 1999 5 Jan 99 15 Jul 99

Page 24: Wisanu Resume (8-09-15)

ITEM Client Licensor/ Collaborator

Equipment / Machine Project Area / Site Qty. Unit Year Start of Project

End of Project

Water Treatment Plant

CHINA GEZHOUBA CONSTRUCTION GROUP CORPORATION / Intaruk Co.,Ltd.

METROPOLITAN

WATERWORKS AUTHORITY

Sand blast and Epoxy Painting work of Surge Tower Tank

MAHA SAWAT TRANSMISSION PUMPING STATION

5,000 Sq.m. 1999 1 Aug 99 30 Oct 99

Water Treatment Plant

Thai-Fukuyoshi Engineering Co.,Ltd.

ETROPOLITAN WATERWORKS

AUTHORITY

Furnishing and Installation of Pumping for Transmission Pumping Station

โรงกรองน าประปาบางเขน,การประปานครหลวง

1 Lot 2000 1 Feb 00 30 Apr 00

Petrochemical THAI PETROCHEMICAL INDUSTRY PUBLIC CO.,LTD.

TPI (PUBLIC) CO.,LTD.

Design fabrication and Erection of Bulk Truck for transport plastic

นคมอตสาหกรรมมาบตาพต จ.ระยอง

1 Lot 2000 19 Dec 99 19 Apr 00

INDUSTRIAL HYGRO MASTER (THAILAND) CO,.LTD.

Fabrication and Installation work of Platform and Utility Piping

Siam Metal Technology นคมอสเทรนซบอรด2 ชลบร

1 Lot 2001 1 Jul 01 30 Aug 01

West Water Treatment Plant

BAN SAWADDEE CO,.LTD.

งานออกแบบและตดตงระบบบ าบดน าเสยอาคารสง (ถงSEPTIC) เฟส 2

โครงการบานสวสด สขมวท 31 เขตวฒนา กรงเทพมหานคร

1 Lot 2001 1 Aug 01 30 Sep 01

West Water Treatment Plant

Bang San Mahanakorn Ltd., Part.

โครงการตดตงระบบทอเหลกระบายน าเสย และการขดดนและฝงกลบทอเหลก

โครงการระบบระบาย/รวบรวมและบ าบดน าเสย เทศบาล อ.ปากชอง จ.นครราชสมา

4 Km. 2001 1 Jul 01 31 Dec 01

INDUSTRIAL COPELAND THAILAND Emerson Electric (Thailand) Ltd.

Shut down Plant COPELAND THAILAND.; นคมอสาหกรรมอสเทรนซบอรด2 ระยอง

1 LOT 2001 15 Dec 01 25 Dec 01

Page 25: Wisanu Resume (8-09-15)

ITEM Client Licensor/ Collaborator

Equipment / Machine Project Area / Site Qty. Unit Year Start of Project

End of Project

Water Treatment Plant

METROPOLITAN WATERWORKS AUTHORITY / STECON

METROPOLITAN

WATERWORKS AUTHORITY

Fabrication and Installation work of Surge Tower Tank

โรงงานผลตน าประปาบางเขน โครงการ 7, การประปานครหลวง จ. นนทบร

650 MTPA 2002 1 Jun 02 30 Nov 03

Water Treatment Plant

METROPOLITAN WATERWORKS AUTHORITY / STECON

METROPOLITAN

WATERWORKS AUTHORITY

Sand blast and Epoxy Painting work of Surge Tower Tank

โรงงานผลตน าประปาบางเขน โครงการ 7,การประปานครหลวง

7,000 Sq.m. 2002 1 Nov 02 30 Nov 03

FOOD PROCESSING

PLANT

ASC ENGINEERING & CONSTRUCTION CO.,LTD.

CORN PRODUCT (AMADARN)

CO.,LTD.

Design,Fabrication ,Preassembly and Erection of Strach Supply Plant

CORN PRODUCT (AMADARN) CO., LTD. อ.สคว นครราชสมา

1 LOT 2003 1 Jun 03 30 Sep 03

Water Treatment Plant

METROPOLITAN WATERWORKS AUTHORITY / ASIATEC DEVELOPMENT

METROPOLITAN

WATERWORKS AUTHORITY

วางทอประปาใตดน;ทอเหลก 3.40 ม. หนา 18 มม.จากการประปานครหลวง-วภาวดรงสต 3 กม.

โรงงานผลตน าประปาบางเขน โครงการ 7, การประปานครหลวง จ. นนทบร

1 LOT 2003 1 Aug 03 5 Oct 03

INDUSTRIAL SUMIT SHOWA MANUFACTORING CO.,LTD.

งานเซนรบรองวชาชพวศวกรในการตดตงตงเครองจกรกล และ ความปลอดภยในระบบไฟฟา

โรงงานผลตโชคอพรถยนต, พวงมาลยเพาเวอร อ.ศรราชา จ. ชลบร

1 LOT 2003 1 Nov 03 28 Nov 03

INDUSTRIAL CANMIL MANUFACTORING CO.,LTD.

Design and Consultant of Main Stream of SUS Piping Plant

โรงงานผลตเสนบะหมส าเรจรป อ.ศรราชา จ. ชลบร

1 LOT 2004 15 Oct 03 15 Nov 03

Page 26: Wisanu Resume (8-09-15)

ITEM Client Licensor/ Collaborator

Equipment / Machine Project Area / Site Qty. Unit Year Start of Project

End of Project

CEMENT PLANT TPI POLENE CO.,LTD. (PUBLIC)

KRUPP Polysius

Sand blast and airless spray Polyulithane of steel silo.

ศนยจายปนซเมนตทพไอ พลโยธน กรงเทพ

6,500 Sq.m. 2004 15 Aug 04 7 Oct 04

CEMENT PLANT TPI POLENE CO.,LTD. (PUBLIC)

KRUPP Polysius

Fabrication ,Preassembly and Erection Oil Storage Tank 5 Mill. Ltrs.

TPI Cement Plant , Kang Khow, Saraburi

1 LOT 2004 1 Jun 04 15 Mar 05