An Efficiency Improvement: A Case Study of an Upper Housing of a
Telephone Assembly Line
1* 2 1,2
E-mail: [email protected]*
Wisanu Boonrawd1* Sasikarn Pansuar2
1,2Department of Industrial Engineering, Faculty of Engineering, Burapha University, Chonburi, Thailand E-mail: [email protected]*
(Upper Housing) IP-1230 PICTO 5W+1H ECRS
12 12
(Takt time) 12.62
(Cycle time) 15.70 89.48 47.48%
4 12.09 83.83 86.67%
360,000
ECRS 5W+1H
Abstract
This study presents a case study of an efficiency improvement of an upper housing of telephone
assembly line, IP-1230 PICTO model. The principles of work study, 5W+1H questions and ECRS had
been applied to reduce unnecessary works (waste), simplify tasks and improve line efficiency. The assembly line comprised of 12 work stations (12 operators) and 12.62 seconds of takt time. A cycle time
of 12 work stations was 15.70 seconds and a total assembling time for the 12 works stations was 89.48 seconds. The assembly process had an efficiency of 47.48%. The improvement resulted in elimination of
4 work stations. The cycle time has been decreased to 12.09 seconds. The total assembling time consumed in all stations decreased to 83.83 seconds. The line efficiency has been improved to 86.67%.
Keywords: Work study, ECRS, 5W+1H, Line Balancing
. . 2556
16-18 2556
1.
(Kaizen) 5 (5S) (Just In Time,
JIT) (Work study) (ECRS) (Line balancing)
(Waste)
[1], [2]
12.62
12.62
15.70
ECRS
[3], [4], [5]
ECRS 5W+1H
IP-1230
2.
(Pareto chart)
1
1
-
-
ECRS (Eliminate Combine Rearrange
Simplify) 5W+1H (What Why When Where Who How)
ECRS -
3.
. . 2556
16-18 2556
3.1
IP-PHONE
6 2 TEXT
PICTO 3 Upper Housing (Button)
TEXT PICTO
1
1 IP-PHONE
IP-PHONE
PICTO
IP-1210
IP-1220
IP-1230
TEXT
IP-1210
IP-1220
IP-1230
4 . . 2554 IP-1230 PICTO
IP-1230 TICTO
IP-1230 TEXT 66.18%
IP-1230 2
IP-1230 PICTO IP-1230 TEXT
PICTO
TEXT
8 3
IP-1230 PICTO
IP-1230 PICTO
2
- 2554
IP-1230 TEXT IP-1230 PICTO
IP-1230 TEXT
3 IP-1230 PICTO
3.2
IP-1230 PICTO
IP-1230
PICTO 12 1 25
IP-1230 PICTO 4
3.3
10
. . 2556
16-18 2556
4 Upper Housing
95% 13
5% 5
44 2
IP-1230 PICTO
5
2
5
1) (Takt time) 12.62
2
IP-1230 PICTO
Process
Transport
Delay
Checking
Store
1 1 15.70
2 1.34
3 2.74
4 1.26
5 5.44
6 3.18
7 5.18
8 3.92
9 2.38
5 10 5.28
11 4.41
12 5.47
13 3.79
14 2.68
15 3.75
16 2.37
17 2.30
18 2.28
19 2.36
20 1.48
21 1.97
22 1.65
23 3.39
24 2.79
25 2.37
89.47 85.43 0 0 4.05 0 3.79
2
Logo Plate
Logo Plate
Paper Lens
Plunger Spring
Time
(s.)
SYMBOL
12
9
10
11
6
7
8
3
4
MACHINE
Conclusion
Detail
Line Button 10 Upper Housing
Call Lamp
Upper Housing
Menu Button
Navi + Enter Button
Dial Button
Line Keypad Line Button
Upper Housing
Runner Dial
Button Menu Button
Upper Housing
Upper Housing
Conference Button MSG Button
Volume(+) Button Goodbye Button
Service Button, Redial Button
Volume(-) Button , Application Button
Handfree Button
Quit Button Directory Button
Mute Button, Hold Button Handset
Dial Keypad
MAN
AfterBefore
Improvement Improvemen
23
0
Flow Process Chart
No. 11 Page 11 From 11
Activity : Before / After
ReduceActivity Product / Material / Personal
Actvity : Assemble Upper Housing
Total
0
2
0
Tota l 85.69
. . 2556
16-18 2556
(Cycle time) 15.70
2)
1 3 3)
47.48%
1
89.48/12.62 = 7.09 8 [6]
(1) 4) 5W+1H
3.4
8
ECRS
1) 3 1
2 Logo
2) 2
5.34 Plunger Spring 4
3) 1 Line 10 1
4
Line 6 4 5
4) 8 9 10
5)
3.5
83.83 4 8
86.67% 3
3
1 Logo Plate
2 Logo Plate
3 Paper Lens
4 Call Lamp Upper Housing
Call Lamp
5 Upper Housing
6
7 Plunger Spring Upper Housing
8 Line Button 6 Upper Housing
9 Menu Button Upper Housing
10 Line Button 4 3 Upper Housing
11 Navi + Enter Button Upper Housing
12 Conference Button MSG Button
13 Volume(+) Button Goodbye Button
14 Line Keypad Line Button
15 Dial Button
16 Service Button, Redial Button
17 Quit Button Directory Button
18 Volume(-) Button Application Button
19 Mute Button Hold Button
20 Handfree Button Handset Button
21 Upper Housing
Runner Dial Button Menu Button
22 Upper Housing
23 Upper Housing Runner
24 Dial Keypad Dial Button
25
26
27
83.83
12.09
5
6
7
1
2
3 8.19
8.67
10.53
8 10.63
11.85
12.09
9.82
12.054
. . 2556
16-18 2556
4.
ECRS 5W+1H
47.48% 86.67%
4
360,000 ( 300
25 )
ECRS
5
4/2555
[1] , , . 2555.
.
2555, , , 17-19 2555:
POM011 [2] . 2545.
.
, [3] . 2555.
. 2555, , , 17-19
2555: POM020 [4] ,
. 2555.
VPS. 2555, ,
, 17-19 2555: WPS033 [5] . 2555.
. 2555,
, , 17-19 2555:
WPS041. [6] . 2553.
. , [7] ,
. 2555.
.