Winchester Municipal Utilities 2009 Rate Plan April 9, 2009. Scope of Services. Cost of Service Study Water Wastewater Solid Waste Wholesale Industrial Pretreatment Surcharges System Development Charges. Goals. Address Capital Requirements Compress Rate Blocks Phase Implementation - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Winchester Municipal Utilities  2009 Rate Plan April 9, 2009

Winchester Municipal Utilities

2009 Rate Plan

April 9, 2009

Page 2: Winchester Municipal Utilities  2009 Rate Plan April 9, 2009

Scope of Services

• Cost of Service Study– Water– Wastewater– Solid Waste– Wholesale

• Industrial Pretreatment Surcharges• System Development Charges

Page 3: Winchester Municipal Utilities  2009 Rate Plan April 9, 2009

Goals

• Address Capital Requirements

• Compress Rate Blocks

• Phase Implementation

• Customer Sensitive

Page 4: Winchester Municipal Utilities  2009 Rate Plan April 9, 2009

Deliverables

• Cost of Service Reports

• Rate Model

• PSC Representation

Page 5: Winchester Municipal Utilities  2009 Rate Plan April 9, 2009

Financial Forecast Basis: Capital

• Water System Improvements $55,000,000• Lower Howards Creek Sanitary Sewer Improvements $36,000,000• Total $91,000,000

Page 6: Winchester Municipal Utilities  2009 Rate Plan April 9, 2009

Financing Cost Assumptions

• Water 4.5% - 20 yrs

• Wastewater 2.2% - 20 yrs

Page 7: Winchester Municipal Utilities  2009 Rate Plan April 9, 2009

Financial Forecast Basis

• 5 year projection of Revenues and costs

• Revenue

• Capital

• Borrowing

• O&M

Page 8: Winchester Municipal Utilities  2009 Rate Plan April 9, 2009

Rate Plan

• 4-Year Phased Increase

• Compressed Water Rate Blocks

Page 9: Winchester Municipal Utilities  2009 Rate Plan April 9, 2009

Impact of Rate Plan – Water (City)

Proposed Rates

BillCurrent Rates 2009 2010 2011 2012

Minimum Bill(100 ft3)

(750 gallons)$3.46 $4.10 $4.83 $5.69 $6.75

Average Residential

(700 ft3)(5,250 gallons)

$18.34 $20.66 $23.73 $26.09 $28.65

Page 10: Winchester Municipal Utilities  2009 Rate Plan April 9, 2009

Impact of Rate Plan – Water (Outside City)

Proposed Rates

BillCurrent Rates 2009 2010 2011 2012

Minimum Bill(100 ft3)

(750 gallons)$4.49 $5.32 $6.27 $7.38 $8.76

Average Residential

(700 ft3)(5,250 gallons)

$24.03 $27.12 $31.14 $34.23 $38.06

Page 11: Winchester Municipal Utilities  2009 Rate Plan April 9, 2009

Impact of Rate Plan – Wastewater (City)

Proposed Rates

BillCurrent Rates 2009 2010 2011 2012

Minimum Bill(100 ft3)

(750 gallons)$3.61 $4.35 $5.22 $5.86 $6.55

Average Residential

(700 ft3)(5,250 gallons)

$25.26 $30.44 $36.52 $41.05 $45.88

Page 12: Winchester Municipal Utilities  2009 Rate Plan April 9, 2009

Impact of Rate Plan – Wastewater (Outside City)

Proposed Rates

BillCurrent Rates 2009 2010 2011 2012

Minimum Bill(100 ft3)

(750 gallons)$4.78 $5.76 $6.91 $7.77 $8.68

Average Residential

(700 ft3)(5,250 gallons)

$33.46 $40.32 $48.39 $54.38 $60.78

Page 13: Winchester Municipal Utilities  2009 Rate Plan April 9, 2009

Impact of Rate Plan – Solid Waste

Proposed Rates

BillCurrent Rates 2009 2010 2011 2012

Average Residential $15.42 $18.57 $21.72 $24.85 $25.37

Page 14: Winchester Municipal Utilities  2009 Rate Plan April 9, 2009

Combined Impact of Rate Plan (City)

Water, Wastewater, and Solid WasteProposed Rates

BillCurrent Rates 2009 2010 2011 2012

Minimum Bill(100 ft3)

(750 gallons)$22.49 $27.02 $31.77 $36.40 $38.67

Average Residential

(700 ft3)(5,250 gallons)

$59.02 $69.67 $81.97 $91.99 $99.90

Page 15: Winchester Municipal Utilities  2009 Rate Plan April 9, 2009

Combined Impact of Rate Plan (Outside City)

Water and WastewaterProposed Rates

BillCurrent Rates 2009 2010 2011 2012

Minimum Bill(100 ft3)

(750 gallons)$9.27 $11.0

8$13.18 $15.15 $17.44

Average Residential

(700 ft3)(5,250 gallons)

$57.49 $67.44

$79.53 $88.62 $98.83

Page 16: Winchester Municipal Utilities  2009 Rate Plan April 9, 2009

Results

• Rate Model

• System Development Charge

• Pretreatment Charges

Page 17: Winchester Municipal Utilities  2009 Rate Plan April 9, 2009

Water System Development Charges

• Based on AWWA M-1 Manual methodology• Source of Supply• Source Water Transmission• Treatment Facilities• Pumping• Transmission Mains• Does not include Contributed Capital

Page 18: Winchester Municipal Utilities  2009 Rate Plan April 9, 2009

Waste Water System Development Charges

• Based on AWWA M-1 Manual methodology

• Treatment Facilities

Page 19: Winchester Municipal Utilities  2009 Rate Plan April 9, 2009

System Development Charge 5/8” Meter

•Water - $ 963

•Wastewater - $ 5,345

Page 20: Winchester Municipal Utilities  2009 Rate Plan April 9, 2009

Industrial Pretreatment Charges

BOD TSS NH3

Existing $0.11/lb $0.13/lb $0.41/lb

Proposed $0.18/lb $0.18/lb $0.25/lb

Page 21: Winchester Municipal Utilities  2009 Rate Plan April 9, 2009

Summary

• Cost of Service Rates

• Phased Approach

• Wholesale Rate / PSC

• Decision on SDC