Page 1: Where Angels Fear to Tread:

Where Angels Fear to Tread:Maystar, Bradscot and correcting simple errors in arithmetic

John Smith, MGS Legal ServicesALOC Conference Nov. 2012

Page 2: Where Angels Fear to Tread:

A fundamental principle in procurement law is that there has to be certainty as to price.

In our practice price is entered on the Rate Bid Form.

The question that we all get and dread is : ”There is a problem with the Rate Bid Form, what can we do?”

Page 3: Where Angels Fear to Tread:

• The most common problem is multiple prices.

• The causes for multiple prices can range from pure confusion to pure mathematics.

Page 4: Where Angels Fear to Tread:

• Pure Confusion: variety of numbers listed which are unrelated

• Pure Mathematics: errors where the error can be corrected by a matter of simple arithmetic recalculation or extension

Page 5: Where Angels Fear to Tread:

• Courts are reluctant to approve correction in the case of pure confusion; more willing to allow correction in the case of pure mathematics

• The following slide is an example of what can result from confusion over pricing.

Page 6: Where Angels Fear to Tread:

• Town of Newmarket will not appeal Maystar decision• Newmarket and Maystar settle on damages claim•

NEWMARKET, Ontario, November 11, 2009 - On September 24, 2009, the Ontario Court of Appeal dismissed the Town of Newmarket's appeal regarding the May 6, 2008 Ontario Superior Court ruling involving Maystar General Contractors Inc. (Maystar). In a recent meeting, the Town of Newmarket Council decided not to appeal the Court of Appeal's decision, but rather to work towards a settlement with Maystar for damages.

• The Town of Newmarket negotiated a total settlement with Maystar for $2.5 million dollars, including damages and legal fees. • "To avoid any further legal fees and contain costs, we felt it was in our best interest to negotiate a settlement with Maystar," says Newmarket Mayor,

Tony Van Bynen. "We could have faced significantly higher legal damages." • In September 2005, the Town received four bids from developers for the construction of the now-completed Magna Centre, including bids from

Maystar and Bondfield. Maystar had the lowest unofficial bid of $35.5 million. During the evaluation process, the Town's consultants advised the Town that the Bondfield bid contained an arithmetic error on the GST calculation. When corrected, Bondfield had the lowest bid at $35.3 million.

• In December 2005, Maystar commenced a court application against the Town of Newmarket for breach of contract. On May 6, 2008, Justice Laurence Pattillo ruled in favour of Maystar. On May 27, 2008, Council decided to appeal the May 6 Ontario Superior Court decision. The Court of Appeal dismissed the appeal on the basis that the Town accepted a non-compliant bid. View the full decision from the Court of Appeal for more information.

• "The Town made its decision based on clear recommendations for the award of the tender," says Chief Administrative Officer, Bob Shelton. Unfortunately, the courts saw it differently, but did identify the difficult position the Town was in and that the Town acted in good faith."

• "We made our decisions in the best interest of our residents and our Town's future, says Mayor Tony Van Bynen. "We're glad to finally put this behind us. We have a state-of-the-art recreation complex, which our community has enjoyed for the past four years. With all things considered, we feel we have received a great deal of value from these facilities."

• Costs will be absorbed in the Town's 2009 budget.• -30-• Media contact:

Wanda Bennett, Manager of Corporate CommunicationsTel: 905-953-5300, ext. 2041 ? E-mail: [email protected]

Page 7: Where Angels Fear to Tread:

• How did this happen? • It all started with a case called Bradscot (MCL) Ltd. v. Hamilton

Wentworth Catholic District School Board (1999) 42 OR (3d) 723

• Bidder quoted the following prices: • 1) $17,720,000.00-Stipulated Price• 2) $1,240,000.00-GST• 3) $18,460,400.00-Total Bid Price (Stipulated price + GST) All of these figures are incorrectly calculated.

Page 8: Where Angels Fear to Tread:

• The Court found that there was no uncertainty that the Stipulated Price was the relevant price and the bid was compliant.

Page 9: Where Angels Fear to Tread:

• In the Town of Newmarket case, the following facts presented:• Bidder quoted these figures:

• 1) $33,000,528.00-Stipulated Price• 2) $2,346,960.00-GST• 3) $35,874,960.00-Total Bid Price (GST+ Stipulated Price)

• All of these figures are incorrectly calculated.

• The legal advice to Newmarket, based on the Bradscot decision was to accept the Stipulated Price.

• The Court found there was uncertainty as to price. Was the correct price the Stipulated Price or the Total Bid Price? The bid was found to be non compliant.

Page 10: Where Angels Fear to Tread:

• How does the Court distinguish Maystar from Bradscot ?• Court looked at the procurement documents, found that the

Bradscot language was much clearer when describing which figure was to represent the bid price.

• It found that the Stipulated Price was clearly the bid price and the GST and Total Bid Price were superfluous to the document.

Page 11: Where Angels Fear to Tread:

•The language in the RFP in Bradscot is:

• • 2. I/WE OF BONDFIELD CONSTRUCTION COMPANY (1983)LIMITED (Firm Name)

• Agree to supply all necessary labour, materials, plant, equipment and services• including specified allowances for the complete execution of the WORK,

INCLUDING ALL TRADES, specified herein including Addenda numbered 1 to 7 inclusive.

• AGREE to Complete the Work in accordance with the requirements of the Contract documents

• including applicable Provincial Sales Tax for the Basic Stipulated Sum of:• SEVENTEEN MILLION SEVEN HUNDRED TWENTY THOUSAND

• ($17,720,00) Canadian Dollars

Page 12: Where Angels Fear to Tread:

• 3. TENDER AMOUNT SUMMARY AND GST• X• .1 BASIC Stipulated Sum Tender Amount: $17,200,000• (same as above)

• .2 7% Federal GST to be added to Basic Stipulated• Sum Tender Amount: $ 1,240,000

• .3 OVERALL Stipulated Sum Tender Amount: $18,460,400• (Line 3.1 + Line 3.2 = Line 3.3)

Page 13: Where Angels Fear to Tread:

• While the language in Maystar procurement documents is less clear.

• The language is as follows:

• 1.1 …Stipulated Price of "Thirty-three million Five Hundred twenty-eight " ($33,000,528.00) Dollars in lawful money of Canada, included in which are all Provincial Sales and Excise taxes, customs duties, freight, exchange, and all other charges, except Goods and Services Tax (GST).

• 1.1.1: …Goods and Services Tax (GST): "Two million Three Hundred Forty-six Thousand Nine Hundred sixty" ($2,346,960.00) Dollars

• 1.1.2: The total cost of the work (Stipulated Price + GST) is:• "Thirty-five million eight hundred Seventy-four Thousand nine hundred sixty." ($

35,874,960.00) Dollars

Page 14: Where Angels Fear to Tread:

• In Maystar the court was unable to place the price figures in any order of importance.

• The paragraph containing the pricing showed no obvious order of importance.

• The language of the procurement contained references to “Total Bid Price” for various purposes which, to the court, meant that the Total Bid Price was essential to the bid.

• The court found there were two potential answers, either the Stipulated Price or the Total Bid Price.

Page 15: Where Angels Fear to Tread:

• Since the GST calculation did not relate to either price, there was no way of recalculating in order to confirm one price, which left the court with two potential prices and uncertainty of price.

Page 16: Where Angels Fear to Tread:

• Pure Mathematics• Whitehorse (City) v. Ketza Construction Corp., [2009] Y.J. No.

174• Ketza submitted the following figures• 1) $863,053.00- Total all items• 2) $52152.65-GST• 3) $915,205.65-Total Tender Price

Page 17: Where Angels Fear to Tread:

• This is a pure mathematics case. • The GST is not 5% of the Total All Items price, but the Total

Tender Price is the sum of the GST and the Total All Items price.

This is a clear mistake which can be corrected by a mathematical calculation.

Page 18: Where Angels Fear to Tread:

• The procurement documents said Total Tender Price would

be used for price comparison. • Court dealt with this by saying that mathematical correction

was permissible, because it was an accepted practice and was not unfair to any party

Page 19: Where Angels Fear to Tread:

• Privilege Clause

In this case, the rfp document contained the usual privilege clause which warned the bidder the lowest bid would not necessarily be the winner and that it could accept a bid that was in the City’s best interest.

However, the rfp document did not contain the other common privilege clause that permitted the purchaser to waive irregularities and informalities.

The court found that since the addition of ;”..in the City’s best interest” was sufficient to justify the mathematical correction.

Page 20: Where Angels Fear to Tread:

• Now for a Pure confusion case: Vachon Construction Ltd. v. Cariboo (Regional District),[1996] B.C.J. No. 1409 (C.A.)

The Rate Bid Form described the price in words as: “four hundred and eighty eight thousand four hundred and fifty dollars.” Following those words appeared the bracketed figure $492,450.00.

Page 21: Where Angels Fear to Tread:

• The purchaser called the bidder to confirm which was the correct bid.

• The court found that the bid was uncertain because of the discrepancy between the description of prices and there was nothing the purchaser could do to correct the error without rendering the bid non compliant.

Page 22: Where Angels Fear to Tread:

• Here is a pure mathematics example: Foundation Building West Inc. v. Vancouver (City of) [1995] B.C.J.

No. 861

Bidder was required to present 26 prices and a total price. The 26 prices were correct, but the addition of the total price

was incorrect.

Page 23: Where Angels Fear to Tread:

• The bidder notified the purchaser of the mistake prior to the close of tenders, although not in compliance with the method of communication provided for in the tender documents.

• The purchaser told the bidder that it corrected mathematical errors as a matter of course, although this was not specified in the tender documents.

Page 24: Where Angels Fear to Tread:

• The court found that it was not unreasonable for a purchaser to have a policy of correcting mathematical errors, even if the tender documents did not specifically provide for this. As long as this policy was applied to all bidders, the court saw no reason to declare the bid non compliant.

Page 25: Where Angels Fear to Tread:

• Privilege Clause• As in the Whitehorse decision above, the court looked at

the privilege clause.• Unlike Whitehorse, the privilege clause contained

language that specifically allowed the purchaser to waive any non compliance with the tender documents, specifications or conditions. • The Court relied upon the privileged clause to the extent

that the error was a mere informality and all bidders would receive the same treatment.

Page 26: Where Angels Fear to Tread:

• This case characterizes an error of pure mathematics as an example of substantial compliance as contemplated in this passage from The Queen (Ontario) et al. v. Ron Engineering & Construction Eastern Ltd. (1981), 119 D.L.R. (3d) 267 (S.C.C.):

Page 27: Where Angels Fear to Tread:

• “It would be anomalous indeed if the march forward to a construction contract could be halted by a simple omission to insert in the appropriate blank in the contract the numbers of weeks already specified by the contractor in its tender.”