RUDOLPH AND SLETTEN RUDOLPH AND SLETTEN Virtual Reality in Construction What We Achieve in Virtual Reality Will Change Our Project’s Physical Reality 04.02.14

Upload: rudolph-and-sletten

Post on 13-Jun-2015

133 views

Category:

Presentations & Public Speaking


0 download

DESCRIPTION

What We Achieve in Virtual Reality Will Change Our Project’s Physical Reality is a presentation given by Patrick Kryzoziak, VDC Director at Rudolph and Sletten. This presentation discusses the features, advantages and benefits of virtual reality from a general contractor's perspective.

TRANSCRIPT

  • 1. R U D O L P H A N D S L E T T E N RUDOLPH AND SLETTEN Virtual Reality in Construction What We Achieve in Virtual Reality Will Change Our Projects Physical Reality 04.02.14

2. R U D O L P H A N D S L E T T E N Integration Management Scope Management Time Management Cost Management Quality Management Resources Management Communication Management Risk Management Procurement Management VDC/BIM Overall Management Processes 3. R U D O L P H A N D S L E T T E N Virtual Reality : A New Continent Graphic Courtesy, The Islands of Information (From VTT, The Technical Research Center of Finland, 1998) 4. R U D O L P H A N D S L E T T E N Improve Design and Construction Collaboration Enhance Construction Delivery Services Real-time Information More Proactive and Predictive Our Approach Toward Virtual Reality 5. R U D O L P H A N D S L E T T E N Design and Construction Collaboration 6. R U D O L P H A N D S L E T T E N 3D - Design Coordination Clashes can be organized and defined by floor, assembly, or trade (Solibri Model Checker). 7. R U D O L P H A N D S L E T T E N Our Approach Toward Virtual Reality Build it Twice: One VirtuallyOne in the Field Early Visualization Early Design Information Clarity of Communication Improve Team collaboration Early Validation Real-time decision 8. R U D O L P H A N D S L E T T E N Our Approach Toward Virtual Reality Build it Twice: One VirtuallyOne in the Field Need for 3D interaction I want to see how this room will look. Need for Spatial understanding Real-time decision 9. R U D O L P H A N D S L E T T E N Construction Delivery Services 10. R U D O L P H A N D S L E T T E N Our Approach Build it Right the First Time Make changes during design Reduce Time and Cost Owner Immersive Experience Reach Early Consensus Owner Acceptance and Approval 11. R U D O L P H A N D S L E T T E N Build it Right the First Time Need for validation Better understanding of the future workspace Identify fine details Early decision about details Realistic Appearance 12. R U D O L P H A N D S L E T T E N Build it Twice: One VirtuallyOne in the Field Constructability Information Active Collaboration Planning and Coordination Early Decision = Early Agreement 13. R U D O L P H A N D S L E T T E N From Design to Fabrication Build it Twice: Once VirtuallyOnce in the Field Construction Coordination Model: Hospital, Redwood City, CA Exterior Skin Fabrication MEP Installation 14. R U D O L P H A N D S L E T T E N Fabrication Details Using the Design Model Using the design model to create virtual assemblies for construction coordination and fabrication (MWF Structsoft) 15. R U D O L P H A N D S L E T T E N Cold Stud Framing Fabrication Details 15 Conflict Avoidance among MEP and Fire Protection Trades. Minimize RFI and preventive approach toward potential Change Orders 16. R U D O L P H A N D S L E T T E N Bring the Technology to the field Bridging Technology with Field 17. R U D O L P H A N D S L E T T E N Real-time Information 18. R U D O L P H A N D S L E T T E N 4D Integrated Schedule with EVA 19. R U D O L P H A N D S L E T T E N 5D - Model-Based Cost Estimating Linking the model with our cost database using Innovaya and Timberline software 20. R U D O L P H A N D S L E T T E N LOD 500 As-Built Model / Ready for Facilities Management Connect Building Model to Operation Manuals, Maintenance Schedules, & Building Controls 21. R U D O L P H A N D S L E T T E N Proactive and Predictive Approach 22. R U D O L P H A N D S L E T T E N Contractor Build it Right the First Time 23. R U D O L P H A N D S L E T T E N Much more proactive than before Our Approach Visualize, Communicate, Interact 24. R U D O L P H A N D S L E T T E N Build it Twice: One VirtuallyOne in the Field Preconstruction Visualization Construction Challenge Visualization of Final Product and expected outcome Proactive and Predictive Approach on Projects 25. R U D O L P H A N D S L E T T E N Conclusion