what it’s all about
DESCRIPTION
Multimodal Integrated Corridor Management. What It’s All About. More Than CSMPs. Overview. CSMP Background – How We Got Here CSMP Status – Where We Are The Challenge Ahead – What It Takes To Get Where We Need To Be. GM’s FUTURAMA Stretching the Horizon. 42 Mile Loop. 1971. - PowerPoint PPT PresentationTRANSCRIPT
Multimodal Integrated Corridor Management
More Than CSMPsMore Than CSMPs
OverviewOverview
CSMP CSMP BackgroundBackground – How – How We Got HereWe Got Here
CSMP CSMP StatusStatus – Where We – Where We AreAre
The The Challenge AheadChallenge Ahead – – What It Takes To Get What It Takes To Get Where We Need To BeWhere We Need To Be
GM’s FUTURAMA
Stretching the Horizon
42 Mile Loop42 Mile Loop
19711971
District 7 TMCDistrict 7 TMC
Los Angeles
1971 (42 Miles) 1998 (750 Miles)
District 7 New TMCDistrict 7 New TMC
Beware CSMPs Ahead
•Conducted congestion summits in cooperation with the four regional AASHTO meetings.
• Identified innovative strategies and initiatives that states were adopting for dealing with the congestion challenge
• To learn from one another about what was possible, and how state DOT leadership could make a difference in improving transportation system performance
AASHTO SummitsAASHTO Summits
Summit ThemesSummit ThemesThere is no Single Solution
Performance Measurement is a Key to Overcoming Limited Resources
The Extent of the Congestion Challenge Goes Beyond One Jurisdiction’s Boundaries and Requires Collaboration
Performance PoetryPerformance PoetryHow can you manage if you How can you manage if you don’t know what’s happeningdon’t know what’s happening
How can you show people what How can you show people what to invest in if they can’t to invest in if they can’t visualize that return on visualize that return on investmentinvestment
How do you challenge people to How do you challenge people to improve without a visionimprove without a vision
BackgroundBackground
CSMPs – High Octane CSMPs – High Octane System PlanningSystem PlanningCaltrans – The Caltrans – The Mobility CompanyMobility CompanyNew Tools – New Tools – Performance, Performance, Simulation, and moreSimulation, and more
Corridor Corridor Management Management
PlansPlans
Performance
AllJurisdictions All
Modes
Commitment
Plan
CMPCMP
Critical Themes
Plan ComponentsPlan Components
PerformanceAssessment
CorridorDescription
CorridorTeam
ImprovementsProposal
Ongoing
UnderstandingAnalytics
Modern MetricsModern MetricsPerformance
Mobility ProductivityReliability Safety
Arterial networkArterial network
• 40 miles of arterials
• Approximately 250 signalized intersections
• 12 major connectors to I-880 Freeway
• Traffic signals controlled and maintained by respective local agencies
• Different signal control systems
Development Development MilestonesMilestones
Corridor definitionCorridor definitionStakeholder teamStakeholder teamPreliminary performance assessmentPreliminary performance assessmentDetection in placeDetection in placeComprehensive performance assessmentComprehensive performance assessmentIdentify causes of congestionIdentify causes of congestionTest improvement scenariosTest improvement scenariosPrioritize recommendationsPrioritize recommendations
CSMP StatusCSMP Status26 Corridors Underway26 Corridors Underway7 Detection Projects Moving7 Detection Projects MovingPrimitive StagePrimitive StageJanuary Meeting to January Meeting to Determine Future DirectionDetermine Future Direction
The ChallengeThe Challenge
What are we really going What are we really going to doto do
WhenWhenConcept of OperationsConcept of OperationsManaging Across Modes, Managing Across Modes, Jurisdictions & StrategiesJurisdictions & Strategies
What Does It Mean To What Does It Mean To ManageManage
Building a House vs Building a House vs Managing a HomeManaging a Home
Integrate vs Co-ordinateIntegrate vs Co-ordinateSoviet Collectives Soviet Collectives RevisitedRevisited
More Active ManagementMore Active Management