WG7 Summary. Yorgos Tsipolitis (NTUA). CALICE. 2011 TOTEM T2 Test Beam Plans. TB aim: Collect data for… 1. T2 optimization “Before the Long Shut Down”. 2. Triple GEM design optimization for forward regions & high luminosity (T2 optimization “During the Long Shut Down” and GEM RD). TOTEM. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: WG7 Summary

WG7 Summary

Yorgos Tsipolitis (NTUA)

Page 2: WG7 Summary

CALICE

RD51 Collaboration Meeting CERN, April 2011

Yorgos Tsipolitis (NTUA) 2

Page 3: WG7 Summary

RD51 Collaboration Meeting CERN, April 2011

Yorgos Tsipolitis (NTUA) 3

Page 4: WG7 Summary

RD51 Collaboration Meeting CERN, April 2011

Yorgos Tsipolitis (NTUA) 4

Page 5: WG7 Summary

2011 TOTEM T2 Test Beam Plans

TB aim: Collect data for…

• 1. T2 optimization “Before the Long Shut Down”.

• 2. Triple GEM design optimization for forward regions & high luminosity (T2 optimization “During the Long Shut Down” and GEM RD)

Page 6: WG7 Summary

TOTEM

inelel

tel

TOT

NN

dtdN

0

21

16

6

RP+T1+

T2+

T1-

T2-RP-

220m147m-220m -147m

14m

9m-9m

-14m

Elastically (or quasi)Scattered protons

Elastically (or quasi)Scattered protons

Inelastic

Events

Inelastic Events

IP5

CMS

Page 7: WG7 Summary

T2: a T2 limit with high luminosity

T2 Environment: Large amount of particles (primary and secondary) per collision.T2 Gain: High GAIN to be efficient in the actual configuration

The amplified charge collected by the foils will cause a voltage drop across the 10Mohm protection resistors.

In high intensity beams the current flowing in the foils can reach few A and the effect on the gain is not negligible. MANDATORY: reduce as much as we can the detector GAIN

Reduce Noise/Increase Signal.

Page 8: WG7 Summary

T2 optimization: Signal

Gas mixture studies:Actual mixture: Ar/CO2 70/30

• Migration to Ar/CO2/CF4 in a ratio optimized for the internal field configuration that we have. – Lab. Gain calibration Curves– Test Beam Efficiency and Timing Studies

Increase the Signal Lower the Gain(VFAT2 shaping time=22ns)

DETECTOR UNDER TEST : TOTEM T2 TRIPLE GEM

Page 9: WG7 Summary

2010 test beam: preliminary measurement with Ar/CO2/CF4

Preliminary measurement

Page 10: WG7 Summary

2011 TOTEM T2 TB Plans

• 1. T2 (as it is now) optimization (BLSD*) reduce the detector GAIN– Front end chip (Noise)– Gas mixture (Signal)

• 2. Triple GEM design optimization for forward regions & high luminosity– Gas mixture & fields & Internal structure (gaps ).– Readout Planes

(*) Before the Long Shut Down

Page 11: WG7 Summary

DHCAL THGEM

RD51 Collaboration Meeting CERN, April 2011

Yorgos Tsipolitis (NTUA) 11

Page 12: WG7 Summary

RD51 Collaboration Meeting CERN, April 2011

Yorgos Tsipolitis (NTUA) 12

Page 13: WG7 Summary

RD51 Collaboration Meeting CERN, April 2011

Yorgos Tsipolitis (NTUA) 13

Page 14: WG7 Summary

2011 plans

RD51 Collaboration Meeting CERN, April 2011

Yorgos Tsipolitis (NTUA) 14

Page 15: WG7 Summary

Jlab GEM Tracker

RD51 Collaboration Meeting CERN, April 2011

Yorgos Tsipolitis (NTUA) 15

Page 16: WG7 Summary

RD51 Collaboration Meeting CERN, April 2011

Yorgos Tsipolitis (NTUA) 16

Page 17: WG7 Summary

RD51 Collaboration Meeting CERN, April 2011

Yorgos Tsipolitis (NTUA) 17

Page 18: WG7 Summary

RD51 Collaboration Meeting CERN, April 2011

Yorgos Tsipolitis (NTUA) 18

Page 19: WG7 Summary

RD51 Collaboration Meeting CERN, April 2011

Yorgos Tsipolitis (NTUA) 19

Page 20: WG7 Summary

Periods Overview

Period1From 10 JuneTo 16 June

Period3From 9 AugustTo 22 August

Period4From 10 OctoberTo 17 October

Period5From 17 OctoberTo 24 October

Period2From 27 JuneTo 5 July

SPS-H2

-Proto_II-CMS_timing_GEM

Needed:RD51 trackerVFAT+TURBO elect.RD51 DAQ pc+crateRD51 portable GAS system

SPS-H4(together with RD51)

-Proto_II-CMS_timing_GEM-Proto_III

Needed:RD51 trackerVFAT+TURBO elect.RD51 DAQ pc+crateRD51 portable GAS system

SPS-H4(together with RD51)

-Proto_II-CMS_timing_GEM-Proto_III-Proto VI (?)

Needed:RD51 trackerVFAT+TURBO elect.RD51 DAQ pc+crateRD51 portable GAS system

SPS-H4(together with GSI)

-Proto IV (?)

Needed:RD51 trackerVFAT+TURBO elect.RD51 DAQ pc+crateRD51 portable GAS system

SPS-H4(together with RD51)

-Proto IV (?)

Needed:RD51 trackerVFAT+TURBO elect.RD51 DAQ pc+crateRD51 portable GAS system

20

North Area vacation resort!

Page 21: WG7 Summary

CMS_timing_GEM: Double mask 10x10cm2 1D readout (3/2/2/2);

256 channels

CMS_Proto_I: Single mask FULL_SIZE 1D readout (3/2/2/2); 1024 channels

CMS_Proto_II: Single mask FULL_SIZE 1D readout (3/1/2/1); 8192channels

CMS_Proto_III: Single Mask 10x10cm2 [N2] (3/1/2/1); 256 channels

CMS_Proto_VI: Single Mask FULL_SIZE 1D [N2] (3/1/2/1) 8192 channels21

Detector summaryDetector summary

Page 22: WG7 Summary

RUN = 175HV = 4.50 kVI = 738.90 uAThr = 40 Vu

η = 97.5%Position = P1

RUN = 37 – 181Thr = 40 Vu

Lat = 14Position = P1

CM

S/G

E1

1_e

ffici

ency

_p1

_09

01

20

11

CM

S/G

E1

1_S

pR

es_

p1

_09

01

20

11

Data-taking focused on different points along the GE1/1.Preliminary results show good performance.

GE1/1 Prototype in details: last TBGE1/1 Prototype in details: last TB

22

CMS_Proto_I

Page 23: WG7 Summary

The Micromegas TPC prototype test setup at Saclay

Page 24: WG7 Summary

The new X-Y Micromegas readout board design

Based on MIMAC’s Saclay design modified and constructed by Rui’s lab at CERN

Page 25: WG7 Summary

MM-TPC

MM-TPC

T2K electronics

Inside Goliath

Page 26: WG7 Summary

pions seen by the MM-TPC during October 2011 RD51 test beam

Page 27: WG7 Summary

• The MM-TPC can function in muon beams and low intensity hadron beams

• Noise should be further reduced to be able to self trigger on pure events

• Intense tests of the different available data acquisition system are needed before we go back for further and more detailed beam tests.

• A very useful proof of principle has beam accomplished in last years October RD51 test.

Page 28: WG7 Summary

Test beam for 2011

RD51 Collaboration Meeting CERN, April 2011

Yorgos Tsipolitis (NTUA) 28

Page 29: WG7 Summary

Test beam requests for 2011

• We have 9 groups that will participate in the 2011 RD51 Test Beams– 1st period : 3 groups– 2nd period : 6 groups– 3rd period : 9 groups

RD51 Collaboration Meeting CERN, April 2011

Yorgos Tsipolitis (NTUA) 29

Page 30: WG7 Summary

Fringe magnetic field has been measured in several point in the area..

.. and in the corridor just outside

Page 31: WG7 Summary

Measurement Map

Point Half Current Maximum Current

1 0.0005 T 0.007 T

2 0.0004 T 0.010 T

3 0.0005 T 0.007 T

4 0.005 T 0.011 T

5 0.868 T 1.518 T

6 0.0003 T 0.006 T

7 0.0009 T 0.009 T

8 0.0004 T 0.008 T

9 0.0001 T 0.0001 T

10 0.0001 T 0.0011 T

11 0.0001 T 0.0004 T

Page 32: WG7 Summary

Changes at the Area

RD51 Collaboration Meeting CERN, April 2011

Yorgos Tsipolitis (NTUA) 32

Beam direction

Goliath magnet

Movable table

Page 33: WG7 Summary

New Cables

• New patch panels from control room to the area:– 36 connectors type SHV– 60 connectors type BNC– 10 connectors type Rj45– 5 connectors type Subd9– 2 connectors type Subd9 (Profibus)– 3 connectors type Burndy 12, 19 & 28

pins

RD51 Collaboration Meeting CERN, April 2011

Yorgos Tsipolitis (NTUA) 33

Page 34: WG7 Summary

Period 1 (June 27th – July 5th)

GEM trackerCMS upgradeJlab GEM

Goliath

TSbeam

1 SPSgas lineAr/CH4 50/50

2 RD51gas lines:Ar/CO2 70/30

RD51 Collaboration Meeting CERN, April 2011

34Yorgos Tsipolitis (NTUA)

Ar/CH4 50/50

2 sensors

1 RD51gas line:

Ar/CO2 70/30

Page 35: WG7 Summary

Organization

• It would be nice if each group has one contact person for the test beam since it facilitates the communication.

RD51 Collaboration Meeting CERN, April 2011

Yorgos Tsipolitis (NTUA) 35

Page 36: WG7 Summary

Conclusion

• We are ready for one more year with lots of fun in H4

RD51 Collaboration Meeting CERN, April 2011