well abandonment service equipment رضا مصطفوی طباطبایی

33
WELL ABANDONMENT SERVICE EQUIPMENT

Upload: reza-mostafavi-tabatabaei

Post on 18-Feb-2017

398 views

Category:

Engineering


4 download

TRANSCRIPT

Page 1: Well abandonment service equipment  رضا مصطفوی طباطبایی

WELL ABANDONMENT SERVICE EQUIPMENT

Page 2: Well abandonment service equipment  رضا مصطفوی طباطبایی

Single / Dual Level Work Platform Systems

Page 3: Well abandonment service equipment  رضا مصطفوی طباطبایی

Dual Level Work Platform Overview.

• The Company Dual Level Work Platforms are used for well abandonment operations. The system is designed to accept the following 300 Ton Casing Jack, Dual or Single Trolley System, Power Swivel and Positioning system, Diamond wire saw, Tong Trolley, and Tong Jib Pole.

• This system incorporates the same skidding system to move over different wells. • The work platform has one trolley system that adapts to multiple service equipment adapters for P&A operations.

• PS120 Swivel Adapter: The swivel is mounted into the trolley adapter and positioned on the rig floor, the trolley system drives the swivel to well center. The swivel is made up to the drill string to make the cut. The trolley adapter also has lifting cylinders to raise 8’ with 120 Tons of lifting force and can lower the swivel into position during cutting operations.

• Power Tong Adapter: The tong positioner is mounted to the trolley allowing the service techs to drive the tongs into position. The positioner also raises and lowers the tong to the connection heights.

• Saw adapter: Trolley adapter drives the casing saw into position to make the casing cuts and back into the standby position when the casing jacks are in operation.

• Company Dual Pin Drills: The Company drills can adapter on the platform or below on the work deck. • 300 Ton Casing Jacks With Bowl and Slips: 300 Ton with 30” – 8 5/8” Insert Bowls and slips. The casing jacks have two sets of bowls and

slips one for the upper deck and one for the lower working deck.

• JIB Pole: The Jib Pole can be used to handle the power tong, and casing saw while the swivel or other equipment is rigged up on the trolley system.

Page 4: Well abandonment service equipment  رضا مصطفوی طباطبایی

Company Dual Level Work Platform The Compact design allows for easy Rig Up. With the integrated skidding system, the dual level platform can move from well to

well without rigging down. The platform houses several integrated systems providing a wide array of well abandonment operations. Utilizing the 300 Ton Casing Jacks to remove grouted casing, the PS120 for down hole cutting, milling, and pumping, the MT55 for drill string make and breakouts, the Dual Equipment Trolleys, the Diamond Wire Saw for cutting grouted casing into

manageable sizes, as well as the Dual Pin Drills for installing Pin Bars for Lifting.

Page 5: Well abandonment service equipment  رضا مصطفوی طباطبایی

Dual Stage Work Platform (Single Trolley)

Dual Stage Work Platform With 30” – 3M Well Head Adapter

Trolley Positioner, Tong Jib Pole, Upper and Lower Work Levels, and Casing Jacks Included

Page 6: Well abandonment service equipment  رضا مصطفوی طباطبایی

Casing Jack System & Cutting System.

• This system is used when only pulling and cutting operations are needed.

• Can utilize Diamond Wire, Guillotine, or Band Saw type saws.

• Safe hands off saw positioning and cutting

Page 7: Well abandonment service equipment  رضا مصطفوی طباطبایی

Overview – Running In Hole Power Swivel, Trolley Positioner, Casing Jacks With Bowls & Slips, and Power Tong

Page 8: Well abandonment service equipment  رضا مصطفوی طباطبایی

Dual Stage Work Platform and CHH Operation Overview • Casing Head Housing (CHH) Adapters

– Company designed and built three Casing Head Housings Adapters so that the Dual Stage Work Platform fits directly onto the Casing Head Housing. This provides easy rig up for P & A operations and Milling Work.

• W-40 or W-36 Work Beams – The Dual Stage Work Platform also adapts using Beam Clamps to latch the bottom of the work platform to the W-

Beams once the beams are placed on the platform.

Page 9: Well abandonment service equipment  رضا مصطفوی طباطبایی

Casing Jack, Dual Drills, and Diamond Wire Saw Operations

Page 10: Well abandonment service equipment  رضا مصطفوی طباطبایی

300 / 500 Ton Casing Jack Used to Jack Casing From Well

Lower Work Deck With Casing Jack Attached.

- Operation: Using the Hydraulic Power Unit and Control Console the jacks function up/down while load is applied during the up function.

- System will handle 300 Tons with 3000psi

- System will handle 500 tons with 5000psi

- Dual Split Casing Slips with Custom Multi-Selector Lifting Plate for 30” – 8 5/8” Bushings. Upper set of bushings for top side of casing jacks and lower set of bushing for bottom work deck.

- System features hands free operations by running from a remote control console.

Page 11: Well abandonment service equipment  رضا مصطفوی طباطبایی

Multi-String Pressure Pipe Cutting

Typical Three Knife Cutting System

Page 12: Well abandonment service equipment  رضا مصطفوی طباطبایی

Running Drill Pipe and Down Hole Cutters

• With the Dual Stage Work Platform rigged up and ready for operations, the crew will be ready to TIH with the cutting knives, Stabilizer, and Drill Pipe.

• The crew will have several knives with replacement parts while running down hole, typical operations once the pipe and cutting assembly is in position the trolley positioner with the PS120 power swivel will be attached to the string. With the swivel in position the operation will start the cutting operations.

• With the casing cut below the well head, the crew will start Pull out of Hole (POOH) with cutting assembly and drill pipe.

• The crew will then prepare and run in hole with the casing spear and drill pipe string into the cut casing and start the jacking operations.

Page 13: Well abandonment service equipment  رضا مصطفوی طباطبایی

Pressure Pipe Cutter and Knives Running Down Hole

Page 14: Well abandonment service equipment  رضا مصطفوی طباطبایی

Jacking, Drilling, and Casing Cutting

Page 15: Well abandonment service equipment  رضا مصطفوی طباطبایی

Well Abandonment System Tri-Level Work Decks: Provides safe and efficient rig up and operations, having all necessary systems fully integrated; Jacking, Casing Pin Drilling, Casing Sawing, Down-Hole Internal Cutting, Tubular Running, and Casing Laydown.

Skidding Beam System: Two W40 x 50’ Cross Beams with mounting pads provides easy setup. Integrated hydraulic skidding system provides movement along Rig Beams and Cross Beams.

Telescoping Derrick: 20 Ton Derrick system with 45’ crown height and Travelling Head for Tubular Laydown

Tubular Laydown System: Provides handling of work strings and laydown of cut casing without the use of the Rig Crane.

Casing Jacks: 500 Ton Casing Jacks With 30” to 8 5/8” Removable Bushings. Complete access to the upper and lower slips at all times from the 3 work decks.

Casing Drills: Hydraulic Drills to cut 4” hole for lifting pin bars. “Hands Off” hydraulic Controls. All drill functions are located on the 2nd work deck, instead of on the rig cellar deck.

Casing Saw: “Hands Off” hydraulic controlled Diamond Wire Saw. Mounts directly to equipment trolley on the upper work deck.

Power Swivel: PS-120 Power Swivel with Swivel Positioning Stand mounts directly to the equipment trolley on the upper work deck.

Power Tongs: 5 ½” Company Power Tong with Integral backup. Utilizes the tong positioner on the upper deck for easy operations.

System HPU: 500 HP Hydraulic Power Unit supplies all systems with hydraulic power.

Control House: Multi-Level Control House provides a safe working environment for the operators. It also acts as a central hydraulic hub for hose connections.

Certifications: API 4F certified (GOM wind loading). Designed to meet SEPCO / Shell Requirements. Class 1, Div. 1 (Rig) and Class 1, Div. 2 (HPU) Electrical. ATEX, DNV, or other certifications available.

Page 16: Well abandonment service equipment  رضا مصطفوی طباطبایی

Hydraulic Workover / Well Abandonment System (on Cross Beams)

TYPICAL OPERATIONS•PLUGGING AND CEMENTING

•TUBULAR RUNNING OF COMPLETION ASSEMBLIES,

AND WORKSTRINGS

•MILLING, SECTION MILLING, SIDE TRACKING

•MECHANICAL CASING CUTTING

•SLOT RECOVERY

MAIN JACK300 TONS LIFT / 132 TONS SNUB37 ½” FALSE ROTARY OPENINGS30” MAXIMUM CASING DIAMETER600 FT / HR8 FOOT STROKE

SWIVEL JACK150 TONS LIFT / 66 TONS SNUB1200 FT / HR8 FOOT STROKEPOSITIONING TROLLEY

WORK DECKSPROVIDE SAFE WORK ENVIRONMENTFAST, EASY SETUPCONVIENT OPERATOR CONTROLS FOR ALL FUNCTIONS

POWER SWIVELPS200 - 20,000 FT-LBS, 120 RPMINTERNAL MULTISTRING CASING CUTS

POWER TONG9 5/8” WITH 11 ¾” BACKUP100,000 FT-LBSSHOCK ABSORBING LIFT CYLIINDER

TELESCOPIC MASTMAIN HOIST – 10,000 LBSDUAL COUNTERBALANCE HOISTS – 1,500 LBS40’ CLEAR HOOK HEIGHT

CROSS BEAM SYSTEMFAST, EASY SETUPTARGETS MULTI-WELL PLATFORMSINTEGRATED HYDRAULIC SKIDDING SYSTEM

Page 17: Well abandonment service equipment  رضا مصطفوی طباطبایی

TYPICAL OPERATIONSPLUGGING AND CEMENTINGTUBULAR RUNNING OF COMPLETION ASSEMBLIES AND WORKSTRINGSMILLING, SECTION MILLING, SIDE TRACKINGMECHANICAL CASING CUTTINGSLOT RECOVERY

MAIN JACK300 TONS LIFT / 132 TONS SNUB37 ½” FALSE ROTARY OPENINGS30” MAXIMUM CASING DIAMETER600 FT / HR8 FOOT STROKE

SWIVEL JACK150 TONS LIFT / 66 TONS SNUB1200 FT / HR8 FOOT STROKEPOSITIONING TROLLEY

WORK DECKSPROVIDE SAFE WORK ENVIRONMENTFAST, EASY SETUPCONVIENT OPERATOR CONTROLS FOR ALL FUNCTIONS

POWER SWIVELPS200 - 20,000 FT-LBS, 120 RPMINTERNAL MULTISTRING CASING CUTS

POWER TONG9 5/8” WITH 11 ¾” BACKUP100,000 FT-LBSSHOCK ABSORBING LIFT CYLIINDER

TELESCOPIC MASTMAIN HOIST – 10,000 LBSDUAL COUNTERBALANCE HOISTS – 1,500 LBS40’ CLEAR HOOK HEIGHT

BOP ADAPTER SYSTEMQUICKLY MOUNT TO BOP FOR LIVE WELL OPERATIONS

Hydraulic Workover / Well Abandonment System (on BOP)

Page 18: Well abandonment service equipment  رضا مصطفوی طباطبایی

COMPACT P&A RIG SYSTEM

Skid Beams: Three W40 Skid Beams for mounting the Casing Jack and Rig Floor System.

Telescoping Derrick: Telescoping Derrick system with 60’ crown height.

Casing Jacks: 500 Ton Casing Jacks With 30” to 8 5/8” Removable Bushings.

5- Ton Crane: Small 5- ton working crane.

Casing Drills: Drills to cut 4” hole for pull pins. Fully automated hydraulic drills.

Casing Saws: Fully automated saws to work on sliding platform.

Swivel: PS-120 Power Swivel mounted in derrick with Tubular Running Tool. (Running in With DP to make cut or pulling out of hole.

Power Tongs: 5 ½” Company Power Tongs.

Company Power Units to supply all systems with hydraulic power.

Page 19: Well abandonment service equipment  رضا مصطفوی طباطبایی

Company P&A Rig System On Location, TIH to make cut.

Company 5.5 With Backup Mounted in the Tong Positing System

Page 20: Well abandonment service equipment  رضا مصطفوی طباطبایی

Power Swivel Operations Mounted in the Swivel Positioning System

Page 21: Well abandonment service equipment  رضا مصطفوی طباطبایی

Pulling Casing and Saw Operations

Page 22: Well abandonment service equipment  رضا مصطفوی طباطبایی

Pulling Casing

Page 23: Well abandonment service equipment  رضا مصطفوی طباطبایی

Company Skid Mounted Swivel and HPU package

Skid Mounted HPU and Swivel Package Includes: Air Powered Hose Reels Swivel Stand Control Console Bulkhead Engine & Pump Hyd. Tanks Diesel Tank

Page 24: Well abandonment service equipment  رضا مصطفوی طباطبایی

Company PS120 – Power Swivel

PS120 SPECIFICATIONSMaximum Tensile Load 120 Tons / 240,000 lbf

Maximum Hydraulic PSI 3500 PSI

Maximum Hydraulic Flow 110 GPM

Approximate Weight 3500 LBS

Performance at Rated Flow and PressureHigh Speed 6000 ft-lbs @ 120 RPMLow Speed 12,000 ft-lbs @ 60 RPM

Hydraulic ConnectionsMotor A & B 1 ½” Wing Type Quick Disconnect

Motor Drain ½” Quick DisconnectMotor High/Low ¼” Quick Disconnect

Flow Through SpecificationsHammer Union 2” – 1502Minimum I.D. 1.50”Maximum PSI 5000 PSIBottom Connection 3 ½” I.F.

Page 25: Well abandonment service equipment  رضا مصطفوی طباطبایی

Overview: Company Engineering, LLC Dual Split 30” – 7” Casing Drills

Split Body Design Allows Easy Installation and Setup For Drilling

Operations.

Urethane Swivel Caster Provide Easy Movement on Any Surface.

Heavy Duty Drill Motors With Thru-Coolant Enhances Bit Life

Company Drill Bits deliver ultimate cutting power and provides Multi-String

Cuts

Page 26: Well abandonment service equipment  رضا مصطفوی طباطبایی

Introducing: Company Engineering, LLC Dual Split 30” – 7” Casing Drills

4” Drill Bit – Cutting 24” Pipe and Grout Drill making Multi-String Cut 24” and 10 ¾”.

Heavy Duty Drill Motors With Thru-Coolant Enhances Bit Life The Company Dual Pin Drill Design

Enhances Safety During Operation by allowing the service tech to operate the drills from a remote control console.

HANDS FREE OPERATION!

Page 27: Well abandonment service equipment  رضا مصطفوی طباطبایی

Overview: Company Engineering, LLC Dual Split 30” – 7” Casing Drills

The Company Dual Drills Use Automated Feeds to keep the bit cutting and moving

through the pipe.

Drilling Multi-String Cut 24” and 10 ¾”.

Clean Pin Bar Holes For Handling Cut Casing.

Split Body Design with easy latching system provides quick and safe rig up.

Page 28: Well abandonment service equipment  رضا مصطفوی طباطبایی

Company Diamond Wire Saw (DWS30)

Page 29: Well abandonment service equipment  رضا مصطفوی طباطبایی

Company 30” – 7” Diamond Wire Saw With Backup

Page 30: Well abandonment service equipment  رضا مصطفوی طباطبایی

Company 30” – 7” Diamond Wire Saw With Backup

Page 31: Well abandonment service equipment  رضا مصطفوی طباطبایی

Overview: 30” – 7” Diamond Wire Saw With Backup

Multi-Port Thru-Coolant During Cutting Operations

30” – 7” Backup With Drive System Provides the Operator Hands Free Operations

5 Pulley System with Tension System Continuous High Grade Diamond Wire Loop

Page 32: Well abandonment service equipment  رضا مصطفوی طباطبایی
Page 33: Well abandonment service equipment  رضا مصطفوی طباطبایی

Well Abandonment Service Equipment POWER TONGS

5 ½” POWER TONG WITH 7 5/8” BACKUP

25,000 FT-LBS2 1/16” TO 5 ½” TONG CAPACITY2 1/16” TO 7 5/8” BACKUP CAPACITYPATENTED “TOP LOADER” JAW SYSTEM2-SPEED, “SHIFT ON THE FLY”

9 5/8” TONG WITH 11 ¾” BACKUP

60,000 FT-LBS or 100,000 FT-LBS MODELS4 3/4"” TO 9 5/8” TONG CAPACITY4 3/4” TO 11 3/4” BACKUP CAPACITYPATENTED “TOP LOADER” JAW SYSTEM2-SPEED, “SHIFT ON THE FLY”

14” TONG WITH 15” BACKUP

70,000 FT-LBS or 120,000 FT-LBS MODELS6 5/8"” TO 14” TONG CAPACITY6 5/8” TO 15” BACKUP CAPACITYPATENTED “TOP LOADER” JAW SYSTEM2-SPEED, “SHIFT ON THE FLY”