welding subparte

Upload: sumedheil

Post on 08-Apr-2018

222 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/6/2019 Welding SubpartE

    1/71

    Welding Terms Welding Terms

    ------ and other strangeand other strangenomenclaturenomenclature

  • 8/6/2019 Welding SubpartE

    2/71

    WeldingWeldingA joining process that produces aA joining process that produces acoalescence of metals (or noncoalescence of metals (or non --metals) by heating them to themetals) by heating them to thewelding temperature,welding temperature,

    with or without the application ofwith or without the application of

    pressure, or by pressure alone, andpressure, or by pressure alone, and

    with or without the use of fillerwith or without the use of filler

    metalsmetals

  • 8/6/2019 Welding SubpartE

    3/71

    ProcessProcess

    A method of performing welding,A method of performing welding,such as:such as:

    shielded metal arc weldingshielded metal arc welding submerged arc weldingsubmerged arc welding gas metal arc weldinggas metal arc welding gas tungsten arc weldinggas tungsten arc welding oxyacetylene weldingoxyacetylene welding

  • 8/6/2019 Welding SubpartE

    4/71

    ProcedureProcedure

    A way of performing or effectingA way of performing or effectingsomething; a course of action.something; a course of action.

    WPSWPS --Welding Procedure SpecificationWelding Procedure SpecificationA document providing in detail theA document providing in detail therequired variables for specificrequired variables for specificapplication to assure repeatability byapplication to assure repeatability byproperly trained weldersproperly trained welders

  • 8/6/2019 Welding SubpartE

    5/71

    Shielded Metal Arc WeldingShielded Metal Arc Welding(SMAW)(SMAW)

    An arc welding process that produces aAn arc welding process that produces acoalescence of metals by heating withcoalescence of metals by heating withan arc between a covered metalan arc between a covered metalelectrode and the work pieces.electrode and the work pieces.

    -continued-

    Stick Welding

  • 8/6/2019 Welding SubpartE

    6/71

    Shielded Metal Arc WeldingShielded Metal Arc Welding(SMAW)(SMAW)

    Shielding is obtained fromShielding is obtained fromdecomposition of the electrodedecomposition of the electrodecovering.covering.

    Filler metal is obtained from theFiller metal is obtained from the

    electrode.electrode.

    3

  • 8/6/2019 Welding SubpartE

    7/71

    Submerged Arc WeldingSubmerged Arc Welding(SAW)(SAW)

    An arc welding process that usesAn arc welding process that usesan arc between a bare metalan arc between a bare metalelectrode and the weld pool. Theelectrode and the weld pool. Thearc and molten metal are shieldedarc and molten metal are shieldedby a blanket of granular flux.by a blanket of granular flux.

    5

  • 8/6/2019 Welding SubpartE

    8/71

    Gas Metal Arc WeldingGas Metal Arc Welding

    (GMAW)(GMAW)

    An arc welding process that producesAn arc welding process that producescoalescence of metals by heatingcoalescence of metals by heatingthem with an arc between athem with an arc between acontinuous filler metal (consumable)continuous filler metal (consumable)electrode and the workelectrode and the work ..

    MIG welding

  • 8/6/2019 Welding SubpartE

    9/71

    Gas Metal Arc WeldingGas Metal Arc Welding(GMAW)(GMAW)

    Shielding is obtained entirely fromShielding is obtained entirely froman externally supplied gas or gasan externally supplied gas or gasmixturemixture ..

    2

  • 8/6/2019 Welding SubpartE

    10/71

    Gas Tungsten Arc WeldingGas Tungsten Arc Welding(GTAW)(GTAW)

    An arc welding process that producesAn arc welding process that producescoalescence of metals by heatingcoalescence of metals by heatingthem with an arc between a tungstenthem with an arc between a tungsten(non(non --consumable) electrode and theconsumable) electrode and thework piecework piece ..

    -continued-

    TIG welding

  • 8/6/2019 Welding SubpartE

    11/71

    Gas Tungsten Arc WeldingGas Tungsten Arc Welding(GTAW)(GTAW)

    Shielding is obtained from anShielding is obtained from anexternally supplied gas or gasexternally supplied gas or gasmixture.mixture.

  • 8/6/2019 Welding SubpartE

    12/71

    Oxyacetylene WeldingOxyacetylene Welding(OAW)(OAW)

    An oxyAn oxy --fuel gas welding processfuel gas welding processthat uses acetylene as the fuelthat uses acetylene as the fuelgas.gas.

    4

  • 8/6/2019 Welding SubpartE

    13/71

    Base metalBase metal

    The metal to be welded or cut. MayThe metal to be welded or cut. Maybe referred to as the work piece.be referred to as the work piece.

  • 8/6/2019 Welding SubpartE

    14/71

    Weld metalWeld metal

    The portion of the base metal thatThe portion of the base metal thathas been melted during welding.has been melted during welding.

  • 8/6/2019 Welding SubpartE

    15/71

    HeatHeat --affected zone (HAZ)affected zone (HAZ)

    That portion of the base metal that hasThat portion of the base metal that hasnot not been melted during welding, butbeen melted during welding, butwhose mechanical properties and/orwhose mechanical properties and/ormicrostructure have been altered by themicrostructure have been altered by theheat of welding or cutting.heat of welding or cutting.

    2

  • 8/6/2019 Welding SubpartE

    16/71

    JointJoint

    The junction of members or the edgeThe junction of members or the edgeof members that are to beof members that are to be

    joined.Usually beveled or otherwise joined.Usually beveled or otherwisedesigned for welding.designed for welding.

    V Groove or U Groove

  • 8/6/2019 Welding SubpartE

    17/71

    Butt weld (joint)Butt weld (joint)

    A joint between two members alignedA joint between two members alignedapproximately in the same planeapproximately in the same plane ..

  • 8/6/2019 Welding SubpartE

    18/71

    Fillet weldFillet weld

    A weld of approximately triangular crossA weld of approximately triangular crosssection joining two surfaces atsection joining two surfaces atapproximately right angles to eachapproximately right angles to eachother.other.

    1

  • 8/6/2019 Welding SubpartE

    19/71

    Welding electrodeWelding electrode

    A component of the welding circuitA component of the welding circuitthat terminates at the arc. Maythat terminates at the arc. Mayalso be the source of filler metal.also be the source of filler metal.

    2

  • 8/6/2019 Welding SubpartE

    20/71

    PolarityPolarity

    Manner in which the electrodeManner in which the electrodeholder and work piece connectionholder and work piece connectionare connected to the electricalare connected to the electricalsupply.supply.

    -continued-

  • 8/6/2019 Welding SubpartE

    21/71

    PolarityPolarity

    DCEN direct current electrodeDCEN direct current electrodenegative. (straight polarity)negative. (straight polarity)

    DCEP direct current electrodeDCEP direct current electrodepositive. (reverse polarity)positive. (reverse polarity)

  • 8/6/2019 Welding SubpartE

    22/71

    Welding positionWelding position

    flatflat horizontalhorizontal verticalvertical overheadoverhead

    fixedfixed rolledrolled

    3

  • 8/6/2019 Welding SubpartE

    23/71

    Weld passWeld pass

    A single progression of weldingA single progression of weldingalong the joint. The result of a passalong the joint. The result of a passis a weld bead.is a weld bead.

  • 8/6/2019 Welding SubpartE

    24/71

    Stringer (root) beadStringer (root) bead

    The first pass in the weld, usuallyThe first pass in the weld, usuallymade without any appreciablemade without any appreciableweaving motion.weaving motion.

  • 8/6/2019 Welding SubpartE

    25/71

    Hot passHot pass

    The weld pass that immediatelyThe weld pass that immediatelyfollows the stringer (root) pass.follows the stringer (root) pass.

  • 8/6/2019 Welding SubpartE

    26/71

    Filler passesFiller passes

    The weld passes that follow the hotThe weld passes that follow the hotpass and fill the weld groove flushpass and fill the weld groove flushor almost flush with the surface ofor almost flush with the surface ofthe work pieces.the work pieces.

  • 8/6/2019 Welding SubpartE

    27/71

    Cover passCover pass

    The weld pass that finishes theThe weld pass that finishes thewelded joint. The cover bead iswelded joint. The cover bead ishigher than the adjacent surfacehigher than the adjacent surfaceand overlaps the grooveand overlaps the groove ..

    1

  • 8/6/2019 Welding SubpartE

    28/71

    Arc burnArc burnA metallurgical notch, caused byA metallurgical notch, caused byground clamps or from striking anground clamps or from striking anarc on the base metal at any pointarc on the base metal at any pointother than:other than:

    in the weld groove, orin the weld groove, orthe immediate surface next to thethe immediate surface next to thegroove that will be covered by thegroove that will be covered by theweld capweld cap

    3

  • 8/6/2019 Welding SubpartE

    29/71

    WeldingWeldingWeldingSubpar t " E"ubpa r t " E"ubpa r t " E"

    Not applicable to weldingduring manufacture

    of pipe and components

    Not applicable to weldingduring manufacture

    of pipe and components

  • 8/6/2019 Welding SubpartE

    30/71

    192.225 WELDING192.225 WELDING - GENERALENERAL

    Performed by aPerformed by a QualifiedQualifiedWelderWelder

    UsingUsing QualifiedQualified WeldingWeldingProceduresProcedures

    ProceduresProcedures QualifiedQualified bybyDestructive TestingDestructive Testing

  • 8/6/2019 Welding SubpartE

    31/71

    192.225 WELDING192.225 WELDING - GENERALENERAL

    Qualified Procedure Qualified Procedure vs vs Qualified Welder Qualified Welder

    qualified procedure test qualified procedure test verifies integrity/verifies integrity/metallurgy of that weldmetallurgy of that weld

    qualified welder test qualified welder test verifies ability of thatverifies ability of thatwelderwelder

  • 8/6/2019 Welding SubpartE

    32/71

    192 .225 Weld ing proc edures192 .225 Weld ing proc edures

    Welding Performed byWelding Performed byQualified WelderQualified WelderWelding ProceduresWelding ProceduresQualified Using APIQualified Using API1104 Section 5 or1104 Section 5 or

    ASME B&PV Section IX ASME B&PV Section IXRecorded in Detail andRecorded in Detail andDestructively TestedDestructively TestedFollowed Whenever theFollowed Whenever theProcedure is UsedProcedure is Used

  • 8/6/2019 Welding SubpartE

    33/71

  • 8/6/2019 Welding SubpartE

    34/71

    COUPON TEST REPORT

    DateLocationState

    WelderWelding timeWelding temperatureWeather conditionsVoltageWelding machine typeFiller metalReinforcement sizePipe type and gradeWall thickness

    Test No.

    Weld Positions

    Mark Time of dayWind break used

    AmperageWelding machine size

    Outside diameter

    Roll Fixed

    Coupon stenciled

    Original specimen dimensions

    Original specimen area

    Maximum load

    Tensile strength per square inch of plate areaFracture location

    1 2 3 4 5 6 7

    ProcedureWelder

    Qualifying testLine test

    QualifiedDisqualified

    Maximum tensile

    Remarks on tensile-strength tests1.2.3.4.

    Remarks on bend tests1..2.3.4.Remarks on nick-break tests1.2.3.4.Test made at

    Tested byNote: Use back for addition remarks. This form can be used to report either a procedurequalification test or a welder test.

    Minimum tensile Average tensile

    Date

    Supervised by

    Greater than or equal to 2 3/8 " (60.3 mm)but less than or equal to 4 1/2" (114.3 mm);also, less than or equal to 4 1/2" (114.3 mm)when all thickness is greater than1/2 " (12.7 mm)

    Top of pipe Root orside bend

    Nick-break

    Root orside bend

    Nick-break

    Top of pipeNick-break

    Rootbend

    Under2 3/8"

    (60.3 mm)

    See Note 2

    Top of pipe

    TensileNick-break

    Nick-break

    Tensile

    Root orside bend

    Face orside bend

    Face orside bend

    Root orside bend

    Top of pipe

    Tensile

    Nick-break

    Nick-break

    Tensile

    Face or side bend

    Face or side bend

    Root or side bend

    Greater than 12 3/4" (323.8 mm)

    Nick-break

    Tensile

    TensileNick-break

    Face or side bend

    Root or side bend

    Root or side bend

    Root or side bend

    Face or side bend

    Notes:1. At the company's option, the locations may be rotated, provided they are equally spaced around the pipe; how-ever, specimens shall not include the longitudInal weld.2. One full-section tensile-strength test specimen may be used for pipe with a diameter less than or equal to 1 5/16inch (33.4 millimeters).

    Greater than 4 1/2" (114.3 mm)

    but less than or equal to12 3/4" (323.8 mm)

  • 8/6/2019 Welding SubpartE

    35/71

  • 8/6/2019 Welding SubpartE

    36/71

    Essen t ia l Var iab less sen t i a l Var i ab les -API 11 04 Proc .PI 110 4 Proc . Qualua l .

    Joint Design (U or V groove)Joint Design (U or V groove)Position ( fixed or rolled,Position ( fixed or rolled,

    horizontal or tilted)horizontal or tilted)

    Wall Thickness GroupWall Thickness Group< 3/16 (.1875)< 3/16 (.1875)

    3/16 3/16 -- 3/4 (.18753/4 (.1875 -- .750).750)> 3/4 (.750)> 3/4 (.750)

  • 8/6/2019 Welding SubpartE

    37/71

    Essen t ia l Var iab less sen t i a l Var i ab les -API 11 04 Proc .PI 110 4 Proc . Qualua l .

    Time Between PassesTime Between PassesMax time betweenMax time between

    root and secondroot and second

    Direction of weldingDirection of weldingUphill or downhillUphill or downhill

  • 8/6/2019 Welding SubpartE

    38/71

    Essen t ia l Var iab less sen t i a l Var i ab les -API 11 04 Proc .PI 110 4 Proc . Qualua l .

    Shielding Gas and Flow RateShielding Gas and Flow Rate

    Shielding FluxShielding Flux

    Speed of TravelSpeed of Travel

    Filler MetalFiller MetalGroupGroup

    AWSSpecification

    Electrode

    1 A5.1A5.5

    E6010 E6011E7010 E7011

    2 A5.5 E8010 E8011

    3 A5.1 or A5.5

    A5.5

    E7015 E7016E7018E8015 E8016

    E8018

    Group

  • 8/6/2019 Welding SubpartE

    39/71

    192 .227 Qua l i f i ca t ion92 .227 Qua l i f i ca t ionof Weld ersf Welde rs

    Section 6 of API Standard 1104Section 6 of API Standard 1104

    Section IX of ASME Boiler and PressureSection IX of ASME Boiler and Pressure Vessel Code Vessel Code

    Less than 20% SMYSLess than 20% SMYS -- Appendix C Appendix C

  • 8/6/2019 Welding SubpartE

    40/71

    192 .227 Qua l i f i ca t ion92 .227 Qua l i f i ca t ionof Weld ersf Welde rs

    Welder Qualified under Earlier Edition of Welder Qualified under Earlier Edition of API 1104 or ASME Section IX API 1104 or ASME Section IX ------

    May Continue to WeldMay Continue to Weld

    May Not Requalify underMay Not Requalify underthat Editionthat Edition

  • 8/6/2019 Welding SubpartE

    41/71

    Qual i f i ed Weld ersua l i f i ed Welder s

    Must Must have funny looking hatshave funny looking hatsMust Must havehavehelpershelpersMust Must havehave

    BBQ grillsBBQ grills

  • 8/6/2019 Welding SubpartE

    42/71

    API 11 04PI 1 10 4 - We l de r Si ng l ee lder Sing leQua l i f i c a t ion (Bu t t o r Fi l l e t )ua l i f i c a t i on (Bu t t o r Fi l l e t )

    If Qualified on ButtIf Qualified on ButtWelds in Fixed PositionWelds in Fixed Position@ 45 Angle, Qualified@ 45 Angle, Qualified

    for Butt Welds and Lapfor Butt Welds and LapFillet Welds in allFillet Welds in allPositionsPositions

  • 8/6/2019 Welding SubpartE

    43/71

    Essen t i a l Var iab less sen t i a l Var i ab le s -Welder Sing le Qual i f i c a t ione lde r Sing le Qua l i f i c a t ion

    Change inChange in any oneany one of:of:ProcessProcessDirection of WeldingDirection of Welding

    FillerFiller--metal Classificationmetal ClassificationOutside Diameter GroupOutside Diameter GroupWall Thickness GroupWall Thickness Group

    PositionPositionJoint DesignJoint Design

  • 8/6/2019 Welding SubpartE

    44/71

  • 8/6/2019 Welding SubpartE

    45/71

    API 11 04PI 11 04 - Weldere lde rMult ip le Qua l i f i c a t i onu l t i p le Qua l i f ic a t i on

    Butt Weld Must Be MadeButt Weld Must Be Madeon Pipe at Least 6.625 on Pipe at Least 6.625 (12.75" qualifies for(12.75" qualifies for allall diasdias .).)

    Branch Must Be of PipeBranch Must Be of Pipeat Least 6.625 at Least 6.625

    Butt Weld Made in FixedButt Weld Made in FixedHorizontal or 45 AngleHorizontal or 45 AnglePositionPosition

    ld

  • 8/6/2019 Welding SubpartE

    46/71

    API 11 04PI 11 04 - Weldere lde rMult ip le Qua l i f i c a t i onu l t i p le Qua l i f ic a t i on

    Cut FullCut Full --Size HoleSize Holein Run Pipein Run Pipe

    Run Pipe Shall BeRun Pipe Shall BeHorizontalHorizontal

    Branch Shall ExtendBranch Shall Extend Vertically Downward Vertically Downward

    From Run PipeFrom Run Pipe

  • 8/6/2019 Welding SubpartE

    47/71

    Essen t i a l Var iab less sen t i a l Va r i abl e s -Welde r Mul t ip le Qua l i f i c a t ione lde r Mul t ip l e Qua l i f i c a t ion

    Change in weldingChange in weldingprocessesprocesses

    Change in directionChange in directionof weldingof welding

    Change in filler metalChange in filler metalclassificationsclassifications

    192 229 Li i i92 229 Li i i

  • 8/6/2019 Welding SubpartE

    48/71

    192 .229 Lim i t a t i ons on92 .229 L im i t a t i ons onWelderse lde rs

    Welder whose qualification is based onWelder whose qualification is based onnondestructive testing may not weld onnondestructive testing may not weld oncompressor station pipe and componentscompressor station pipe and components

    Must weld in particular process within everyMust weld in particular process within every6 calendar months6 calendar months

    192 229 Addi i l92 229 Addi t i l

  • 8/6/2019 Welding SubpartE

    49/71

    192 .229 ~ Addi t iona l92 .229 ~ Addi t iona lL i m i t a t i o n si m i t a t i o n s

    Welder qualified under Section 6 of APIWelder qualified under Section 6 of API1104 or Section IX of ASME1104 or Section IX of ASME

    To weld on pipe operating atTo weld on pipe operating at 20%20%SMYS or moreSMYS or more , must have weld tested:, must have weld tested:

    Every 6 months per API 1104Every 6 months per API 1104Section 6 or 9, orSection 6 or 9, or

    Twice each CY at intervalsTwice each CY at intervalsNot exceeding 7Not exceeding 7 --1/2 months1/2 months

    192 229 Addi i l92 229 Addi t i l

  • 8/6/2019 Welding SubpartE

    50/71

    192 .229 ~ Addi t iona l92 .229 ~ Addi t iona lL i m i t a t i o n si m i t a t i o n s

    Welder qualified under Section 3 of APIWelder qualified under Section 3 of API1104 or Section IX of ASME1104 or Section IX of ASME

    To weld on pipe operatingTo weld on pipe operating < 20 % SMYS< 20 % SMYS , must:, must: Have weld tested every 6 monthsHave weld tested every 6 months

    per API 1104 Section 6 or 9, orper API 1104 Section 6 or 9, or Requalify under Appendix C everyRequalify under Appendix C every

    calendarcalendar year n.t.e. 15 months, oryear n.t.e. 15 months, or Cut out and test a production weldCut out and test a production weld

    twice each calendar yeartwice each calendar year

    192 229 Addi t i l92 229 Addi t i l

  • 8/6/2019 Welding SubpartE

    51/71

    192 .229 ~ Addi t iona l92 .229 ~ Addi t iona lL i m i t a t i o n si m i t a t i o n s

    Welder qualified under Appendix CWelder qualified under Appendix C MustMust requalifyrequalify under Appendix C everyunder Appendix C every

    calendarcalendar year n.t.e. 15 months, oryear n.t.e. 15 months, or Must cut out and test a production weldMust cut out and test a production weld

    twice each calendar yeartwice each calendar year (interval(interval

    cannot exceed 7 1/2 months), orcannot exceed 7 1/2 months), or For service lines 2 inches and smallerFor service lines 2 inches and smaller

    only, 2 welds tested per App. C, Sec. IIIonly, 2 welds tested per App. C, Sec. III

  • 8/6/2019 Welding SubpartE

    52/71

  • 8/6/2019 Welding SubpartE

    53/71

    192 .233 Mi t e r J o in t s192 .233 Mi t e r J o in t s

    30% or more SMYS,30% or more SMYS,Maximum of 3Maximum of 3

    10%

  • 8/6/2019 Welding SubpartE

    54/71

    192 .235 Prepara t ion fo r Weld ing192 .235 Prepara t ion fo r Weld ing

    Before beginning any welding, theBefore beginning any welding, thewelding surfaces must be clean andwelding surfaces must be clean andfree of any material that may befree of any material that may be

    detrimental to the weld, anddetrimental to the weld, and

    Must be aligned to provide the mostMust be aligned to provide the mostfavorable condition for depositing thefavorable condition for depositing theroot bead. This alignment must beroot bead. This alignment must bepreserved while root is deposited.preserved while root is deposited.

  • 8/6/2019 Welding SubpartE

    55/71

    192.241192.241 I n sp e c t i o n a n d Te st o fn s pe c t i o n a n d Te st o fWeldse lds

    Visual inspection (by individual qualified Visual inspection (by individual qualifiedby training & experience) of theby training & experience) of theWELDINGWELDING must be donemust be doneto insureto insure ----

    Welding is done accordingWelding is done accordingto procedure, andto procedure, and

    Weld is acceptableWeld is acceptableper API 1104 Section 9.per API 1104 Section 9.

  • 8/6/2019 Welding SubpartE

    56/71

  • 8/6/2019 Welding SubpartE

    57/71

  • 8/6/2019 Welding SubpartE

    58/71

  • 8/6/2019 Welding SubpartE

    59/71

    192 .243 Nondes t ruc t ive Tes t ing192 .243 Nondes t ruc t ive Tes t ing

    NDTNDT must be performed:must be performed:In accordance withIn accordance withwritten procedures;written procedures;andand

    By persons trainedBy persons trainedand qualified in theand qualified in theprocedures andprocedures andwith the equipmentwith the equipmentbeing utilizedbeing utilized

  • 8/6/2019 Welding SubpartE

    60/71

    192 .243 Nondes t ruc t i ve Tes t i ng192 .243 Nondest ruc t i ve Tes t i ng

    Procedures must be established forProcedures must be established forinterpretation of each test tointerpretation of each test toensure acceptabilityensure acceptability

    of the weld perof the weld per API 1104 Section 6 API 1104 Section 6 ..

  • 8/6/2019 Welding SubpartE

    61/71

  • 8/6/2019 Welding SubpartE

    62/71

    192 .243 Nondes t ruc t i ve Tes t i ng192 .243 Nondest ruc t i ve Tes t i ng

    Must test some of each welders work Must test some of each welders work each dayeach dayMust retain for life;Must retain for life;

    Record by milepost, engineering station,Record by milepost, engineering station,etc.;etc.;

    II Num ber of weldsNum ber of w eldsII Num ber testedNum ber testedII Num ber rejectedNum ber rejectedII Disposition of rejectsDisposition of rejects

  • 8/6/2019 Welding SubpartE

    63/71

    l f f192 245 R i R l f D f

  • 8/6/2019 Welding SubpartE

    64/71

    192 .245 Repa i r o r Rem oval o f Defec t s192 .245 Repa i r o r Rem oval o f Defec t s

    Repair of a crack or defectRepair of a crack or defectin a previously repaired areain a previously repaired areamust be done in accordancemust be done in accordance

    with written repair procedureswith written repair proceduresthat have been qualifiedthat have been qualifiedunderunder 192.225192.225

    Arc Burn

    19 2 309 R i f St l Pi192 309 R i f St l Pi

  • 8/6/2019 Welding SubpartE

    65/71

    19 2.309 Repa i r o f St ee l Pipe192 .309 Repa i r o f St ee l Pipe

    (c) Each arc burn on steel pipe(c) Each arc burn on steel pipeto be operatedto be operated 40% SMYS 40% SMYSmust be repaired or removed.must be repaired or removed.

    If repaired by grinding, mustIf repaired by grinding, mustcheck remainingcheck remaining w.tw.t . .. .Use dilute solution of Use dilute solution of ammoniumammonium persulfatepersulfate to check to check

    Arc Burn

  • 8/6/2019 Welding SubpartE

    66/71

    Appe ndix C Bas i c Tes tppen d ix C B a si c Test

    Test on pipe 12 orTest on pipe 12 orsmallersmallerWeld in horizontal,Weld in horizontal,

    fixed positionfixed positionWeld according to aWeld according to aqualified, writtenqualified, writtenprocedureprocedure

  • 8/6/2019 Welding SubpartE

    67/71

  • 8/6/2019 Welding SubpartE

    68/71

  • 8/6/2019 Welding SubpartE

    69/71

  • 8/6/2019 Welding SubpartE

    70/71

    What shou ld s t a t e /federa lha t shou ld s t a t e /f ede ra li n sp e c t o r s o r o p er a t o r s c h e c k f orn s pe c t o r s o r o p er a t o r s c h e c k f o r

  • 8/6/2019 Welding SubpartE

    71/71

    i n sp e c t o r s o r o p er a t o r s c h e c k f orn s pe c t o r s o r o p er a t o r s c h e c k f o rc om pl i anc e r ega rd ing Subpar t E?om pl ianc e r ega rd ing Subpar t E?

    Adherence to welding procedures/ Adherence to welding procedures/code requirements/housekeeping duringcode requirements/housekeeping duringfield weldingfield welding

    Use of N.D.T. / qualifications of N.D.T.Use of N.D.T. / qualifications of N.D.T.technicianstechniciansSpecial procedures for hot or repairSpecial procedures for hot or repair

    weldingweldingRepair criteria for defective weldsRepair criteria for defective weldsMaintenance of required recordsMaintenance of required records