week9

10
Group 7

Upload: kafanomsod

Post on 18-Jul-2015

234 views

Category:

Technology


0 download

TRANSCRIPT

Page 1: Week9

Group 7

Page 2: Week9
Page 3: Week9

- Difficult to install the product on

motorcycle.

- We want to put

a strong placeholder.

And easily removable.

Page 4: Week9

•Do it

myself.

Page 5: Week9

• Quality

Improve the quality of the motor.

By the diode to control the current

flowing into the motor constant.

Prevent deterioration of the motor

Page 6: Week9

• Weight

The device is small, light already.

• Ease of use

Can be attached to the device and

then remove the device from a motorcycle.

Page 7: Week9

• Manufacturing time

• Cutting Process 5 minutes

• Welding Process 15 minutes

• Drilling Process 10 minutes

• Assembly Process 1 hour

Total 1.30 Hour.

• Manufacturing cost

89 Bath.

Page 8: Week9
Page 9: Week9

Dimensio

n and

Function

like first

prototype

.

Page 10: Week9

Thank You