€¦  · web viewthose implementing acts shall be adopted in accordance with the advisory...

37
DRAFT 21.05.2013 FICHE 1B - DRAFT MODEL FOR THE COOPERATION PROGRAMME UNDER THE EUROPEAN TERRITORIAL COOPERATION GOAL Based on the draft template and guidance on the content of the cooperation programme (Version 2 – 21 May 2013) Version 1 – 21 May 2013 Regulation Article Common Provisions Regulation (CPR) Article 24 - Content of programmes European territorial cooperation Regulation (ETC Regulation) Article 7 (7) – Content of cooperation programmes This document is provisional, without prejudice to the on-going Trilogues between the Council and the European Parliament (in line with the principle that "nothing is agreed until everything is agreed"). This document is a draft that shall be adjusted following the expert meeting. 1/37

Upload: others

Post on 11-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: €¦  · Web viewThose implementing acts shall be adopted in accordance with the advisory procedure referred to in Article 30(2). This fiche is based on the preliminary agreement

DRAFT 21.05.2013

FICHE 1B - DRAFT MODEL FOR THE COOPERATION PROGRAMME UNDER THE EUROPEAN TERRITORIAL COOPERATION GOAL

Based on the draft template and guidance on the content of the cooperation programme (Version 2 – 21 May 2013)

Version 1 – 21 May 2013

Regulation Article

Common Provisions Regulation (CPR) Article 24 - Content of programmes

European territorial cooperation

Regulation (ETC Regulation)

Article 7 (7) – Content of cooperation programmes

This document is provisional, without prejudice to the on-going Trilogues between the Council and the European Parliament (in line with the principle that "nothing is

agreed until everything is agreed"). This document is a draft that shall be adjusted following the expert meeting.

It does not prejudge the final nature of the basic act, nor the content of any delegated or implementing act that may be prepared by the

Commission.

1/30

Page 2: €¦  · Web viewThose implementing acts shall be adopted in accordance with the advisory procedure referred to in Article 30(2). This fiche is based on the preliminary agreement

DRAFT 27.02.2013

1. EMPOWERMENT

Article 7 (7) of the ETC Regulation sets out that:

"7. The Commission shall adopt that model by means of implementing acts. Those implementing acts shall be adopted in accordance with the advisory procedure referred to in Article 30(2).

This fiche is based on the preliminary agreement reached between the co-legislators on the programming block in the context of the trilogues on the ETC Regulation, as documented in the texts agreed at the COREPER meeting on 24 April 2013. It also takes into account further discussions that have taken place in the context of the trilogues since then. It remains a provisional text, without prejudice to the on-going negotiations (in line with the principle that "nothing is agreed until everything is agreed").

2. MAIN OBJECTIVES AND SCOPE OF THE IMPLEMENTING ACT

The model for the preparation of the cooperation programme shall set out uniform conditions for the presentation of information under each section of the cooperation programme. These conditions should ensure that information included in programmes is consistent, comparable and can, where necessary, be aggregated.

3. MAIN ELEMENTS OF THE IMPLEMENTING ACT

The implementing acts will mirror the structure of the cooperation programme set out in Article 7 of the ETC Regulation It shall define the technical characteristics of each field, including the format of the data, the input method and the character limits. It shall also identify the information which is subject to Commission decision and information which is not, based on Article 7 (8) of the ETC Regulation.

2/30

Page 3: €¦  · Web viewThose implementing acts shall be adopted in accordance with the advisory procedure referred to in Article 30(2). This fiche is based on the preliminary agreement

DRAFT 27.02.2013

ANNEX - DRAFT MODEL FOR THE COOPERATION PROGAMME UNDER THE EUROPEAN TERRITORIAL COOPERATION GOAL

CCI <0.1 type="S" maxlength="15" input="S">1

Title <0.2 type="S" maxlength="255" input="M">

Version <0.3 type="N" input="G">

First Year <0.4 type="N" maxlength="4" input="M">

Last Year <0.5 type="N" maxlength="4" input="M">>

Eligible From <0.6 type="D" input="G">

Eligible To <0.7 type="D" input="G">>

EC Decision Number <0.8 type="S" input="G">>

EC Decision Date <0.9 type="D" input="G">>

Programme Decision Number

<0.10 type="S" maxlength="20" input="M">>

Programme Decision Date <0.11 type="D" input="M">>

Programme Entry Into Force Date

<0.12 type="D" input="M">>

SECTION 1. STRATEGY FOR THE COOPERATION PROGRAMME'S CONTRIBUTION TO THE UNION STRATEGY FOR SMART, SUSTAINABLE AND INCLUSIVE GROWTH AND THE ACHIEVEMENT OF ECONOMIC, SOCIAL AND TERRITORIAL COHESION (ARTICLE 24 (1) AND ARTICLE 7(2)(A) ETC REGULATION)

1.1 Strategy for the cooperation programme's contribution to the Union strategy for smart, sustainable and inclusive growth and to the achievement of economic, social and territorial cohesion

Description of the cooperation programme’s strategy to contribute to the delivery of the Union strategy for smart, sustainable and inclusive growth and to the achievement of economic, social and territorial cohesion.

<1.1.1 type="S" maxlength="35000" input="M">

1 Legends:

type: N=Number, D=Date, S=String, C=Checkbox, P=Percentage, B=Boolean

decision: N=Not part of the Decision

input: M=Manuel, S=Selection, G=Generated by system

3/30

Page 4: €¦  · Web viewThose implementing acts shall be adopted in accordance with the advisory procedure referred to in Article 30(2). This fiche is based on the preliminary agreement

DRAFT 27.02.2013

Justification for the choice of thematic objectives and corresponding investment priorities, having regard to the Common Strategic Framework, based on an analysis of the situation of the programme area as a whole in terms of needs and the strategy chosen in response, addressing, where appropriate, the missing links in cross-border infrastructure, taking into account the ex-ante evaluation, and with reference to, existing national, regional, cross-border/transnational/macro-regional or sea-basin strategies coherent with the Union strategy for smart, sustainable and inclusive growth, where relevant (table).

Table 1: A synthetic overview of the justification for the selection of thematic objectives and investment priorities

Selected thematic objective Selected investment priority Justification for selection

<1.1.2 type="S" input="S" > <1.1.3 type="S" input="S"> <1.1.4 type="S" maxlength="500" input="M">

1.2 Justification of the financial allocation

The justification of the financial allocation (i.e. the Union support) to each thematic objective and, where appropriate, investment priority, in accordance with the thematic concentration requirements, taking into account the ex-ante evaluation.

<1.2.1 type="S" maxlength="7000" input="M" >

4/30

Page 5: €¦  · Web viewThose implementing acts shall be adopted in accordance with the advisory procedure referred to in Article 30(2). This fiche is based on the preliminary agreement

DRAFT 27.02.2013

Table 2: Overview of the programme investment strategy

This table is generated automatically by the SFC based on information inserted under other sections of the cooperation programme.

Priority axis

Thematic objective

Investment priorities

Specific objectives corresponding to the investment priorities

Result indicators corresponding to the specific objective

ERDF support (EUR)

Share of the total Union support to the cooperation programme (by Fund)2

ERDF ENI (where applicable)

IPA (where applicable)

<1.2.2 type="S" input="G">

<1.2.3 type="S" input="G">

<1.2.4 type="S" input="G">

<1.2.5 type="S" input="G">

<1.2.6 type="S" input="G">

<1.2.7 type="S" input="G">

<1.2.8 type="N' " input="G">

<1.2.9 type="P' input="G">

<1.2.1 0type="P' input="G">

1 1. Title 1.1. Title

2 2. Title 2.1 Title

3. Title 3.1 Title

TA NA NA

2 Presentation of amounts transferred from ENI and IPA depends on management option chosen, cfr. fiche no. 28 on Elements related to proposed integration of allocations under external financing instruments into ETC programmes.

5/30

Page 6: €¦  · Web viewThose implementing acts shall be adopted in accordance with the advisory procedure referred to in Article 30(2). This fiche is based on the preliminary agreement

DRAFT 21.05.2013

SECTION 2. DESCRIPTION OF THE PRIORITY AXES (ARTICLE 7(2) (B) AND (C) ETC REGULATION)

Section 2.A. A description of the priority axes other than technical assistance (Article 7(2) (b) ETC Regulation))

Priority Axis (repeated for each Priority Axis)

ID <2A.1 type="N" input="G">

Title <2A.2 type="S" maxlength="500" input="M">

The entire priority axis will be implemented solely through financial instruments

The entire priority axis will be implemented solely though financial instruments set up at Union level

The entire priority axis will be implemented through community-led local development

Fund (repeated for each Fund under the Priority Axis)

Fund <2A.5 type="S" input="S">

Investment Priority (Article 87 (2) (b) (i)) (repeated for each Investment Priority under the Priority axis)

Investment Priority <2A.4 type="S" input="S">

Calculation basis for the Union support

Calculation Basis (public or total)

<2A.6 type="S" input="S">

6/30

Page 7: €¦  · Web viewThose implementing acts shall be adopted in accordance with the advisory procedure referred to in Article 30(2). This fiche is based on the preliminary agreement

DRAFT 27.02.2013

2.A.1. Specific objectives corresponding to the investment priority and expected results (Article 7 (2) (b) (i)-(ii) ETC Regulation))

Specific Objective (repeated for each specific objective under the Investment Priority)

ID <2A.1.1 type="N" input="G">

Specific objective <2A.1.2 type="S" maxlength="500" input="M">

The results, which the Member States seek to achieve with EU support

<2A.1.3 type="S" maxlength="2000" input="M">

7/30

Page 8: €¦  · Web viewThose implementing acts shall be adopted in accordance with the advisory procedure referred to in Article 30(2). This fiche is based on the preliminary agreement

DRAFT 21.05.2013

Table 3: Programme Specific Result indicators (by Specific Objective) (Article 7.2 (b)(ii) ETC Regulation))

One (if possible) and no more than two result indicators should be used for each specific objective.

ID Indicator Measurement Unit Baseline Value Baseline Year Target Value3 (2022) Source of Data Frequency of reporting

<2A.1.4 type="S" maxlength="5" input="M">

<2A.1.5 type="S" maxlength="255" input="M">

<2A.1.6 type="S" input="M">

Quantitative <2A.1.8 type="N" input="M">

<2A.1.9 type="N' input="M">

Quantitative <2A.1.10 type="N" input="M">

Qualitative <2A.1.10 type="S" maxlength="100" input="M">

<2A.1.11 type="S" maxlength="200" input="M">

<2A.1.12 type="S" maxlength="100" input="M">

3 For ERDF and Cohesion Fund the target values can be qualitative or quantitative.

8/30

Page 9: €¦  · Web viewThose implementing acts shall be adopted in accordance with the advisory procedure referred to in Article 30(2). This fiche is based on the preliminary agreement

DRAFT 21.05.2013

2.A.2. Actions to be supported under the investment priority (by investment priority)

2.A.2.1 A description of the type and examples of actions to be financed and their expected contribution to the corresponding specific objectives, including, where appropriate(Article 7 (2) (b) (iii) ETC Regulation) :

Investment Priority <2A.2.1.1 type="S" input="S">

<2A.2.1.2 type="S" maxlength="10500" input="M">

2.A.2.2. The guiding principles for the selection of operations (Article 7 (2) (b) (iii) ETC)

Investment Priority <2A.2.2.1 type="S" input="S">

<2A.2.2.2 type="S" maxlength="3500" input="M">

2.A.2.3 The planned use of financial instruments (Article 7 (2) (b) (iii) ETC Regulation)

Investment Priority <2A.2.3.1 type="S" input="S">

Planned use of financial instruments <2A.2.3.2 type="C" input="M">

Description of the planned use of financial instruments, where applicable

<2A.2.3.3 type="S" maxlength="7000" input="M">

2.A.2.4 The planned use of major projects (Article 7 (2) (be ) (iiie) ETC Regulation))

Investment Priority <2A.2.4.1 type="S" input="S">

<2A.2.4.2 type="S" maxlength="3500" input="M">

9/30

Page 10: €¦  · Web viewThose implementing acts shall be adopted in accordance with the advisory procedure referred to in Article 30(2). This fiche is based on the preliminary agreement

DRAFT 27.02.2013

3.A.2.5 Output indicators (by investment priority) (Table 4) (Article 7 (2) (b) (iv) ETC Regulation)

Table 5: Common and programme specific output indicators (by investment priority)

ID Indicator (name of indicator)

Measurement unit Target value (2022)

Source of data

<2A.2.5.1 type="S" input="S">

<2A.2.5.2 type="S" input="S">

<2A.2.5.3 type="S" input="S">

<2A.2.5.6 type="N' input="M">

<2A.2.5.7 type="S" maxlength="200" input="M">

10/30

Page 11: €¦  · Web viewThose implementing acts shall be adopted in accordance with the advisory procedure referred to in Article 30(2). This fiche is based on the preliminary agreement

DRAFT 21.05.2013

2.A.3. Performance framework (Article 7 (2) (b) (v) ETC Regulation))

An identification of implementation steps and financial and output indicators to act as milestones and targets for the performance framework in accordance with Article 19(1) CPR and Annex (xx)

Table 5: The performance framework of the priority axis Priority Axis

Indicator Type

ID Implementation step, financial, output or result indicator

Measurement unit, where appropriate

Milestone for 2018

Final target (2022)

Source of data Explanation of the relevance of the indicator, where appropriate

<2A.3.1 type="S" input="S">

<2A.3.2 type="S" input="S">

Implementation Step or Financial <2A.3.3 type="S" maxlength="5" input="M">

Output or result<2A.3.3 type="S" input="S">

Implementation Step or Financial <2A.3.4 type="S" maxlength="255" input="M">

Output or Result <2A.4.4 type="S" input="G">

Implementation Step or Financial <2A.3.5 type="S" input="M">

Output or Result <2A.3.5 type="S" input="G">

<2A.3.7 type="S" maxlength="255" input="M">

<2A.3.8 type="S" input="M">

Output or Result <2A.3.8 type="S" input="G">

<2A.3.9 type="S" maxlength="200" input="M">

Output or Result <2A.3.9 type="S" input="G">

<2A.3.10 type="S" maxlength="500" input="M">

Additional qualitative information on the set-up of the performance framework may be added if needed<2A.3.11 type="S" maxlength="7000" input="M">

11/30

Page 12: €¦  · Web viewThose implementing acts shall be adopted in accordance with the advisory procedure referred to in Article 30(2). This fiche is based on the preliminary agreement

DRAFT 21.05.2013

2.A.4. Categories of intervention (Article 7 (2) (b) (vii) ETC Regulation)

Categories of intervention corresponding to the content of the priority axis, based on a nomenclature adopted by the Commission, and an indicative breakdown of the Union support (Tables 6-10)

Tables 6-10: Categories of intervention

Table 6: Dimension 1 Intervention field

Priority Axis Code € amount

<2A.4.1.1 type="S" input="S" Decision=N>

<2A.4.1.1 type="S" input="S"> <2A.4.1.3 type="N" input="M">

1 08 50 000 000

1 015 25 000 000

Table 7: Dimension 2 Form of finance

Priority Axis Code € amount

<2A.4.1.4 type="S" input="S" Decision=N>

<2A.4.1.5 type="S" input="S"> <2A.4.1.6 type="N" input="M">

1 01 72 000 000

1 03 3 000 000

Table 8: Dimension 3 Territory

Priority Axis Code € amount

<2A.4.1.7 type="S" input="S" Decision=N>

<2A.4.1.8 type="S" input="S"> <2A.4.1.9 type="N" input="M">

1 02 60 000 000

1 03 15 000 000

Table 9: Dimension 6 Territorial delivery mechanisms

Priority Axis Code € amount

<2A.4.1.10 type="S" input="S" Decision=N>

<2A.4.1.11 type="S" input="S">

<2A.4.1.12 type="N" input="M">

1 01 50 000 000

1 02 25 000 000

12/30

Page 13: €¦  · Web viewThose implementing acts shall be adopted in accordance with the advisory procedure referred to in Article 30(2). This fiche is based on the preliminary agreement

DRAFT 27.02.2013

Table 10: Dimension 12:Thematic objective

Priority Axis Code € amount

<2A.4.1.13 type="S" input="S" Decision=N>

<2A.4.1.14 type="S" input="S">

<2A.4.1.15 type="N" input="M">

1 01 50 000 000

1 03 25 000 000

For the remaining dimensions of categorisation, data is requested for information purposes through electronic data exchange system during implementation.

2.A.5. A summary of the planned use of technical assistance including, where necessary, actions to reinforce the administrative capacity of authorities involved in the management and control of the programmes and beneficiaries and, where necessary, actions for the enhancement of the administrative capacity of relevant partners to participate in the implementation of programmes (by priority axis) (by priority axis) (Article 7 (2) (b) (vi) ETC Regulation)

Priority Axis <3A.5.1 type="S" input="S">

<2A.5.2 type="S" maxlength="2000" input="M">

13/30

Page 14: €¦  · Web viewThose implementing acts shall be adopted in accordance with the advisory procedure referred to in Article 30(2). This fiche is based on the preliminary agreement

DRAFT 27.02.2013

SECTION 2.B. A DESCRIPTION OF THE PRIORITY AXIS FOR TECHNICAL ASSISTANCE (ARTICLE 7 2 (C) ETC REGULATION)

Priority Axis (repeated for each TA Priority Axis)

ID <2B.0.1 type="N" maxlength="5" input="G">

Title <2B.0.2 type="S" maxlength="255" input="M">

Fund (repeated for each Fund under the Priority Axis)

Fund <2B.0.3 type="S" input="S">

Calculation basis for Union support

Calculation Basis

<2B.0.4 type="S" input="S">

2.B.1. Specific objectives and expected results (Article 7 (2) (c) (i)-(ii) ETC Regulation

Specific Objective (repeated for each specific objective under the TA Priority Axis)

ID <2B.1.1 type="N" maxlength="5" input="G">

Specific objective <2B.1.2 type="S" maxlength="500" input="M">

The results, which the Member States seek to achieve with EU support 4

<2B.1.3 type="S" maxlength="3500" input="M">

2.B.2. The list of result indicators 5

Table 11: Programme specific result indicators (by specific objective) (Article 7 (2) (c) (ii) ETC Regulation))

4 Required where the Union support to technical assistance in the cooperation programme exceeds EUR 15 million

5 Required where the Union support to technical assistance in the cooperation programme exceeds EUR 15 million

14/30

Page 15: €¦  · Web viewThose implementing acts shall be adopted in accordance with the advisory procedure referred to in Article 30(2). This fiche is based on the preliminary agreement

DRAFT 27.02.2013

ID Indicator Measurement Unit

Baseline Value

Baseline Year

Target Value6

(2022) Source of Data Frequency of

reporting

<2.B.2.1 type="S" maxlength="5" input="M">

<2.B.2.2 type="S" maxlength="255" input="M">

<2.B.2.3 type="S" input="M">

Quantitative <2.B.2.4 type="N" input="M">

<2.B.2.5 type="N' input="M">

Quantitative <2.B.2.6 type="N" input="M">

Qualitative <2A.1.10 type="S" maxlength="100" input="M">

<2.B.2.7 type="S" maxlength="100" input="M">

<2.B.2.8 type="S" maxlength="100" input="M">

2.B.3. Actions to be supported and their expected contribution to the specific objectives (by priority axis) (Article 7 (2) (c) (iii) ETC Regulation)

2.B.3.1. A description of actions to be supported and their expected contribution to the specific objectives (Article 7 (2) (c) (iii) ETC Regulation)

Priority axis <2.B.3.1.1 type="S" input="S">

<2.B.3.1.2 type="S" maxlength="7000" input="M">

2.B.3.2 Output indicators expected to contribute to results (by priority axis) (Table 12) (Article 7(2) (c) (iv) ETC Regulation)

Table 12: Output indicators (by priority axis) ID Indicator (name of

indicator)Measurement unit

Target value (2022)

(optional)

Source of data

<2.B.3.2.1 type="S" maxlength="5" input="M">

<2.B.2.2.2 type="S" maxlength="255" input="M">

<2.B.3.2.3 type="S" input="M">

<2.B.3.2.4 type="N' input="M">

<2.B.3.2.5 type="S" maxlength="100" input="M">

6 The target values can be qualitative or quantitative.15/30

Page 16: €¦  · Web viewThose implementing acts shall be adopted in accordance with the advisory procedure referred to in Article 30(2). This fiche is based on the preliminary agreement

DRAFT 21.05.2013

2.B.4. Categories of intervention (Article 7 (2) (c) (v) ETC Regulation)

The corresponding categories of intervention based on a nomenclature adopted by the Commission, and an indicative breakdown of the Union support

Tables 13-15: Categories of interventionTable 13: Dimension 1 Intervention field

Priority Axis Code € EU support

<2B.4.1.1 type="S" input="S" > <2B.4.1.2 type="S" input="S"> <2B.4.1.3 type="N" input="M">

1 01 20 000 000

1 02 5 000 000

Table 14: Dimension 2 Form of finance

Priority Axis Code € EU support

<2B.4.2.1 type="S" input="S" > <2B.4.2.2 type="S" input="S"> <2B.4.2.3 type="N" input="M">

1 01 20 000 000

1 03 5 000 000

Table 15: Dimension 3 Territory

Priority Axis Code € EU support

<2B.4.3.1 type="S" input="S" > <2B.4.3.2 type="S" input="S"> <2B.4.3.3 type="N" input="M">

1 02 10,000,000

1 03 5,000,000

16/30

Page 17: €¦  · Web viewThose implementing acts shall be adopted in accordance with the advisory procedure referred to in Article 30(2). This fiche is based on the preliminary agreement

DRAFT 27.02.2013

SECTION 3 THE FINANCING PLAN OF THE COOPERATION PROGRAMME (ARTICLE 7 (2) (D) ETC REGULATION

3.1 A table specifying for each year, in accordance with Articles 53, 110 and 111 of the CPR, the amount of the total financial appropriation envisaged for the support from the ERDF (EUR) (Article 7 2 (D) (i) ETC Regulation)Table 16

Fund

<3.1.1 type="S" input="G">

2014 2015 2016 2017 2018 2019 2020 Total

ERDF <3.1.3 type="N" input="M">

<3.1.4 type="N" input="M">

<3.1.5 type="N" input="M">

<3.1.6 type="N" input="M">

<3.1.7 type="N" input="M">

<3.1.8 type="N" input="M">

<3.1.9 type="N" input="M">

<3.1.10 type="N" input="G">

IPA amounts (where applicable)

ENI amounts (where applicable)

Total

17/30

Page 18: €¦  · Web viewThose implementing acts shall be adopted in accordance with the advisory procedure referred to in Article 30(2). This fiche is based on the preliminary agreement

DRAFT 21.05.2013

3.2.A Financial plan of the cooperation programme specifying, for the whole programming period, for the cooperation programme and for each priority axis, the amount of the total financial appropriation of the support from the ERDF and the national co-financing. (EUR) (Table 17) (Article 7 (2)(d) (ii) ETC Regulation

1. The financial table should set out the financial plan of the cooperation programme by priority axis. Where outermost regions’ programmes combine cross-border and transnational allocations, separate priority axes need to be set out for each of these.

2. The financial table shall show for information purposes, any contribution from third countries participating in the cooperation programme (other than contributions from IPA and ENI, e.g. NO, CH)

3. The EIB contribution should be presented at the level of the priority axis.

Table 177

Fund Basis for the calculation of the Union support (Total eligible cost or public eligible cost)

Union support (a)

National counterpart(b) = (c) + (d))

Indicative breakdown of the national counterpart

Total funding(e) = (a) + (b) (2)

Co-financing rate(f)  = (a)/(e)

Forinformation

National Public funding (c)

National private funding (1) (d)

Contributions from third countries

EIB contributions

<3.2.A.1 type="S" input="G">

<3.2.A.2 type="S" input="G">

<3.2.A.3 type="S" input="G">

<3.2.A.4 type="N" input="M">

<3.2.A.5 type="N" input="G">

<3.2.A.6 type="N" input="M">

<3.2.A.7 type="N" input="M">

<3.2.A.8 type="N" input="G">

<3.2.A.9 type="P" input="G">

<43.2.A.10 type="N" input="M">

<43.2.A.11 type="N" input="M">

Priority axis 1 ERDF (possibly incl. amounts transferred from IPA and ENI)8

              

IPAENI

7 Special allocation for outermost regions pursuant to Article 4 (2) ETC Regulation needs to be reflected in a separate priority axis given the different co-financing rate.

18/30

Page 19: €¦  · Web viewThose implementing acts shall be adopted in accordance with the advisory procedure referred to in Article 30(2). This fiche is based on the preliminary agreement

DRAFT 27.02.2013

Priority axis N ERDF (possibly incl. amounts transferred from IPA and ENI)IPA

ENI

Total ERDFIPAENI

Total Total all Funds

(1)   To be completed only when priority axes are expressed in total costs.(2)   This rate may be rounded to the nearest whole number in the table. The precise rate used to reimburse payments is the ratio (f).

3.2.B. Breakdown of the financial plan of the cooperation programme by priority axis, and thematic objective (Table 19) Article 7 (2) (d) (ii) ETC Regulation

This breakdown is required in order to fulfil the requirement set out under (Article 7(2) (d) (ii) to specify for priority axes, which combine investment priorities from different thematic objectives, the amount of total financial appropriation and the national co-financing for each of the corresponding thematic objectives. Where each priority axis corresponds to a single thematic objective, this table will not require a breakdown below the level of a priority axis.

Table 18

Priority axis Thematic objective Union support National counterpart Total funding

<3.2.B.1 type="S" input="G">

<3.2.B.2 type="S" input="G"> <3.2.B.3 type="N" input="M">

<3.2.B.4 type="N" input="M"> <3.2.B.5 type="N" input="M">

Priority axis N Thematic objective 1

Thematic objective 2

8 Presentation of amounts transferred from ENI and IPA depends on management option chosen, cfr. fiche no. 28 on Elements related to proposed integration of allocations under external financing instruments into ETC programmes.

19/30

Page 20: €¦  · Web viewThose implementing acts shall be adopted in accordance with the advisory procedure referred to in Article 30(2). This fiche is based on the preliminary agreement

DRAFT 27.02.2013

TOTAL

Table 19: The indicative amount of support to be used for climate change objectives (Article 24 (5) CPR)

This table is generated automatically by SFC based on categorisation tables included under each of the priority axes.

The information provided in this table is based on uniform conditions on the implementation of a methodology to each of the ESI Funds adopted by the Commission based on Article 8 of the CPR.

Priority axis The indicative amount of support to be used for climate change objectives (EUR)

Share of the total allocation to the cooperation programme (%)

<3.2.B.8 type="S" input="G"> <3.2.B.9 type="N" input="G"> <3.2.B.10 type="P" input="G">

Total

20/30

Page 21: €¦  · Web viewThose implementing acts shall be adopted in accordance with the advisory procedure referred to in Article 30(2). This fiche is based on the preliminary agreement

DRAFT 21.05.2013

SECTION 4. INTEGRATED APPROACH TO TERRITORIAL DEVELOPMENT (ARTICLE 7(3) ETC REGULATION)

A description, taking into account the content and objectives of the cooperation programme, of the integrated approach to territorial development, including in respect of areas referred to in Article 174 (3) TFEU, having regard to the Partnership Agreements of the participating Member States, and showing how it contributes to the accomplishment of the programme objectives and expected results

<4.0 type="S" maxlength="3500" input="M">

4.1. Where appropriate, for cross-border cooperation programmes, the approach to the use of community-led local development instruments and the principles for identifying the areas where it will be implemented

<4.1 type="S" maxlength="7000" input="M" >

4.2. Where appropriate, the principles for identifying the urban areas where integrated actions for sustainable urban development are to be implemented and the indicative allocation of the ERDF support for these actions, Article 7 (3) (b) ETC Regulation

<4.2.1 type="S" maxlength="3500" input="M">

Table 20: The indicative amount of the ERDF support for sustainable urban integrated actions

Fund Indicative amount of the ERDF support for sustainable urban integrated actions

(EUR)support for integrated actions

<4.2.2 type="S" input="G"> <4.2.3 type="N" input="M">

ERDF

21/30

Page 22: €¦  · Web viewThose implementing acts shall be adopted in accordance with the advisory procedure referred to in Article 30(2). This fiche is based on the preliminary agreement

DRAFT 27.02.2013

4.3. Where appropriate, the approach to the use of Integrated Territorial Investment (ITI) (as defined in Article [99] of the Common Provisions Regulation) other than in cases covered by 4.2 and their indicative financial allocation from each priority axis

<4.3.1 type="S" maxlength="5000" input="M ">

Table 21:An indicative financial allocation to ITI other than those mentioned under point 4.2 (aggregate amount)

Priority Indicative financial allocation (Union support) (EUR)

<4.3.2 type="S" input="G" > <4.3.3 type="N" input="M">

Priority axis 1

Priority axis 2

TOTAL

4.4 Where Member States and regions participate in macro-regional and sea basin

strategies, the contribution of planned interventions towards such strategies,

subject to the needs of the programme area as identified by the relevant Member

States and taking into account, where applicable, strategically important projects

identified in the respective strategies.

<4.4.2 type="S" maxlength="3500" input="M" >

4.4.1. The mechanisms to ensure coordination with macro-regional and sea-basin strategies (where appropriate)

. <4.4.1.1 type="S" maxlength="7000" input="M" >

22/30

Page 23: €¦  · Web viewThose implementing acts shall be adopted in accordance with the advisory procedure referred to in Article 30(2). This fiche is based on the preliminary agreement

DRAFT 27.02.2013

4.4.2. The contribution of the cooperation programme to the planned interventions under the macro-regional and sea basin strategies, taking into account, where applicable, strategically important projects identified in the respective strategies

. <4.4.1.2 type="S" maxlength="7000" input="M" >

23/30

Page 24: €¦  · Web viewThose implementing acts shall be adopted in accordance with the advisory procedure referred to in Article 30(2). This fiche is based on the preliminary agreement

DRAFT 27.02.2013

SECTION 5: IMPLEMENTING PROVISIONS FOR THE COOPERATION PROGRAMME (ARTICLE 7 (4) ETC REGULATION)

5.1 Identification of the relevant authorities and bodies (Article 7 (4) ETC Regulation)

Table 22: Identification of and contact details for the relevant authorities and bodies9

Authority/body Name of the authority/body Head of the authority/body

Managing authority . <5,1,1 type="S" maxlength="255" input="M" >

. <5,1,2 type="S" maxlength="255" input="M" >

Certifying authority, where applicable

. <5,1,3type="S" maxlength="255" input="M" >

. <5,1.4 type="S" maxlength="255" input="M" >

Audit authority . <5,1,5 type="S" maxlength="255" input="M" >

. <5,1,6 type="S" maxlength="255" input="M" >

The body to which payments will be made by the Commission is:

the managing authority

the certifying authority

Authority/body Name of the authority/body Head of the authority/body

Body or bodies designated to carry out control tasks

. <5,1,7 type="S" maxlength="255" input="M" >

. <5,1,8 type="S" maxlength="255" input="M" >

Body or bodies designated to be responsible for carrying out audit tasks

<5,1,9 type="S" maxlength="255" input="M" >

. <5,1,10 type="S" maxlength="255" input="M" >

9 In accordance with Article 7 (11) ETC Regulation, the information on the identification of the managing authority, the certifying authority, where appropriate, and the audit authority is not subject to the Commission decision approving the cooperation programme, but remain under the responsibility of the participating Member States.

24/30

Page 25: €¦  · Web viewThose implementing acts shall be adopted in accordance with the advisory procedure referred to in Article 30(2). This fiche is based on the preliminary agreement

DRAFT 27.02.2013

. 5.1.2 Procedure for setting up the joint secretariat

<5,1,2.type="S" maxlength="3500" input="M" >

5.1.3 A summary description of the management and control arrangements

<5,1,3. type="S" maxlength="35000" input="M" >

5.1.4 The apportionment of liabilities among the participating Member States in case of financial corrections imposed by the managing authority or the Commission

<5,1,4. type="S" maxlength="10500" input="M" >

5.1.5 Use of the Euro (Article 26 ETC Regulation)

Where applicable, the method chosen for the conversion of expenditure incurred in another currency than the Euro

<5,1,5. type="S" maxlength="2000" input="M" >

5.2. Involvement of partners (Article 23(2) CPR and Article 7 (4) (d) ETC Regulation)

5.2.1. Role of the relevant partners in the preparation, implementation, monitoring and evaluation of the cooperation programme.

<7.2.1 type="S" maxlength="1400000" input="M" Decisions=N>

25/30

Page 26: €¦  · Web viewThose implementing acts shall be adopted in accordance with the advisory procedure referred to in Article 30(2). This fiche is based on the preliminary agreement

DRAFT 27.02.2013

SECTION 6. COORDINATION - ARTICLE 7(5) (A) ETC REGULATION10

The mechanisms that ensure an effective coordination between the Funds, the EAFRD, the EMFF and other Union and national funding instruments, including the coordination and possible combination with CEF, ENI, EDF and IPA and with the EIB taking into account the provisions laid down in the CSF as set out in Annex I of the CPR. Where Member States and third countries participate in cooperation programmes that include the use of ERDF appropriations for outermost regions and resources from the EDF, coordination mechanisms at the appropriate level to facilitate effective coordination in the use of these resources

<6.1 type="S" maxlength="14000" input="M" Decisions=N >

SECTION 7. REDUCTION OF THE ADMINISTRATIVE BURDEN FOR BENEFICIARIES – (ARTICLE 7 (5) (B) ETC REGULATION11)

A summary of the assessment of the administrative burden for beneficiaries and, where necessary, the actions planned accompanied by an indicative timeframe to reduce administrative burden.

<7..0 type="S" maxlength="7000" input="M" decision=N >

10 Information required to be adapted to URBACT, INTERACT and ESPON.

11 Not required for INTERACT and ESPON.26/30

Page 27: €¦  · Web viewThose implementing acts shall be adopted in accordance with the advisory procedure referred to in Article 30(2). This fiche is based on the preliminary agreement

DRAFT 27.02.2013

SECTION 8. HORIZONTAL PRINCIPLES (ARTICLE 7(3) ETC REGULATION)

7.1. Sustainable development12

A description of specific actions to take into account environmental protection requirements, resource efficiency, climate change mitigation and adaptation, disaster resilience and risk prevention and management, in the selection of operations.

<7.1 type="S" maxlength="5500" input="M" decision=N>

7.2. Equal opportunities and non-discrimination13

A description of the specific actions to promote equal opportunities and prevent any discrimination based on sex, racial or ethnic origin, religion or belief, disability, age or sexual orientation during the preparation, design and implementation of the cooperation programme and in particular in relation to access to funding taking account of the needs of the various target groups at risk of such discrimination and in particular the requirements of ensuring accessibility for persons with disability.

<7.2 type="S" maxlength="5500" input="M" decision=N>

7.3. Equality between men and women14

A description of the contribution to the promotion of equality between men and women and, where appropriate, the arrangements to ensure the integration of the gender perspective at cooperation programme and operation level.

<7.3 type="S" maxlength="5500" input="M" decision=N>

12 Not applicable to URBACT, INTERACT and ESPON.

13 Not applicable to URBACT, INTERACT and ESPON

14 Not applicable to URBACT, INTERACT and ESPON.27/30

Page 28: €¦  · Web viewThose implementing acts shall be adopted in accordance with the advisory procedure referred to in Article 30(2). This fiche is based on the preliminary agreement

DRAFT 21.05.2013

SECTION 9. SEPARATE ELEMENTS - PRESENTED AS ANNEXES IN PRINTED DOCUMENT VERSION

9.1. A list of major projects for which the implementation is planned during the programming period (Article 7 (2) (e) ETC Regulation)

Table 23: A list of major projects 15

Title Planned time of notification/submiss

ion of the major project application to the Commission

(year, quarter)

Planned start of

implementation

(year, quarter)

Planned completion

date of implementatio

n

(year quarter)

Investment priority

Priority axis

<9.1.1 type="S" maxlength="500" input="S" decision=N>

<9.1.2 type="D" input="M">

<9.1.3 type="D" input="M">

<9.1.4 type="D" input="M">

<9.1.5 type="S" maxlength="500" input="S">

<9.1.6 type="S" maxlength="500" input="S">

9.2. The performance framework of the cooperation programme

The summary table is generated automatically by SFC based on the tables outlined by priority axis.

Table 24: The performance framework of the cooperation programme

Priority axis Implementation step,

financial, output or

result indicator

Measurement unit, where appropriate

Milestone for 2018

Final target (2022)

<9.2.1 type="S" maxlength="500" input="G">

<9.2.3 type="S" maxlength="500" input="G">

<9.2.4 type="S" maxlength="500" input="G">

<9.2.5 type="S" maxlength="500" input="G">

<9.2.6 type="S" maxlength="500" input="G">

9.3 List of relevant partners involved in the preparation of the cooperation programme

<9.3 type="S" maxlength="10500" input="M" decision=N>

15 Not applicable to INTERACT and ESPON

28/30

Page 29: €¦  · Web viewThose implementing acts shall be adopted in accordance with the advisory procedure referred to in Article 30(2). This fiche is based on the preliminary agreement

DRAFT 27.02.2013

9.4 Applicable programme implementation conditions governing the financial management, programming, monitoring, evaluation and control of the participation of third countries in transnational and interregional programmes through a contribution of ENI and IPA resources (Article 24 bis ETC Regulation)

<9,4 type="S" maxlength="14000" input="S">

29/30

Page 30: €¦  · Web viewThose implementing acts shall be adopted in accordance with the advisory procedure referred to in Article 30(2). This fiche is based on the preliminary agreement

DRAFT 27.02.2013

ANNEXED (uploaded to SFC 2014 as a separate files):

Draft report of the ex-ante evaluation, with an executive summary (mandatory) (Article 48 (2) CPR)

Confirmation of agreement in writing to the contents of the cooperation programme, Article 7 (8) ETC Regulation.

A citizens' summary of the cooperation programme (as appropriate)

30/30