CURRICULM VITAE(CV)
1. CONTACT INFORMATION
Name: Tewodros Seifu Amha
Address: Addis Ababa, Ethiopia.
Tel: Mob. 0913-733721 /0974068787
Email: [email protected] [email protected]
2. PERSONAL INFORMATION Sex Male Date of Birth 1989 G.C Place of Birth Addis Ababa Marital Status single Nationality Ethiopian
3. OBJECTIVE
To work with organization to achieve its vision, mission, goal and objectives & excellent
prospects for career development.
To take up challenge in various fields and be outstanding multidisciplinary professional.
4. EDUCATIONAL BACKGROUND
Name of Institution YEAR Major Credential
Hawassa University Sept. 2009 – July 2013 CIVIL & URBAN
ENGINEERING
B.Sc Degree
5. ADDITIONAL SKILS/SOFTWARE SKILS
Professional level
AUTOCAD ,EAGLE POINT 2007 , Microsoft Office - MS Word, Excel, MS Project 2010
Beginner level
STADD.Pro ,Sap, Civil 3D 2018
6. LANGUAGE SKILL
Listening Reading Writing Speaking
Amharic Excellent Excellent Excellent Excellent
English Excellent Excellent Excellent Excellent
7. WORK EXPERIENCE
1) From: January, 2014-UP TO October,2016
Employer: ENYI CONSTRUCTION GC-1Position Held: JUNIOR OFFICE ENGINEER
2) From: March 22, 2017-UP TO October16 ,2017
Employer: DERIBA DEFERSHA GENERAL CONTRACTOR GC-1Position Held: OFFICE ENGINEER
3) From: October16 ,2017 –May 29 ,2019
Employer: RAMA CONSTRUCTION PLC (GC-1) ISO IOQAR CertifiedPosition Held: OFFICE ENGINEER
4) From: June 3 ,2019 -UP TO NOW
Employer: G and Y Engineering Consult PLC
Position Held: planning and evaluation team leader
8. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned:
1)
Planning and monitoring work schedule for Materials, man power, and equipment’s in project
Project Name : Bole Bulbula Condominium Asphalt Road Project Lot-1 & Lot-2
Preparing quantities of earth work, pavements Road
Client : AACRA
Length: 4.00 km Preparing interim payment certificates
and Organizing site data’s and reports of the project
Road Type: PAVED AC
Engineer(s): Dana Consulting Engineers Review of the design and preparation of
working drawing for construction
works
Preparing RFI( request for inspection)
Contractor: Enyi construction GC-1
Town ; ADDIS ABABA
Prepare annual work program and budget proposal
Position Held: office Engineer
2)
Geometric Design Review of the project Project Name : Debre Markos Town Asphalt Road Project
Preparation of working drawings for 41m Double Box culverts and 11 slab Bridge construction works
Client : ERA
Length: 4.00 km Planning and monitoring work schedule
for Materials, man power, and equipment’s in project
Preparing quantities of earth work, pavements Road
Road Type: PAVED DS5
Engineer(s): White Knight CMC JV with Yerer Engineering
Preparing interim payment certificates and Organizing site data’s and reports of the project
Contractor: Deriba Defersha General contractor (GC-1)
Prepare annual work program and budget proposal
Leading project surveying crew in assigning various tasks of project
Position Held: office Engineer
Town ; Amhara Region Debre Markos
3,
Geometric Design Review of the project Realignments
Preparation of master Schedule , construction method Statement , traffic management plan , Quality assurance manual , environmental management Plan
Project Name : Bole Bulbula Road Construction Project Package 34 Road Project, Lot 2
Town ; ADDIS ABABA
Preparation of working drawings for 57m Box culverts construction works
Client : AACRA
Length: 4.1 km
Preparing quantities of earth work, pavements Road
Road Type: PAVED AC
Engineer(s): HIGHWAY ENGINEERS AND CONSULTANTS /HEC/ PLC
Preparing interim payment certificates and Organizing site data’s and reports of the project
Contractor: Rama Construction PLC (GC-1) ISO IOQAR Certified
Prepare progress report and budget proposal
Coordination of Projects Evaluation of Project Performance Evaluation of Project Progress Evaluation of cost productivity Evaluation of Project Budget
Requirements Project site Vist Assigning resource to projects
Position Held: office Engineer
Company Head QuarterRoad and Industrial Project Coordination Department
4,
External Master Schedule Internal Master Schedule Action Plan Price share Analysis Productivity Project site Vist Daily report Weekly report, evaluation, analysis
and recommendations Monthly report, evaluation,
analysis and recommendations Quarterly report, evaluation,
analysis and recommendations Semi-Annual report,
evaluation, analysis and recommendations
Annual report, evaluation, analysis and recommendations
Actual on site machineries and labor work output measurement data
Report Vs. payment evaluation
Project Name : Consultancy Service on Construction Projects Planning and Evaluation System and Contract administration of cross land projects
The Contractor is currently administration five different type of Projects namely Addele – Sekina Rural Road Project, Construction Works of Yabelo – Metagefersa – Shakiso; Contract 2: Oblo-Dermi Road Project, Construction Works of Package 9 40/60 Condominium Road Project: Bole Bullbula, Asko & Emperial Condominium Road Project, Hawassa Storm Water Drainage Project and Aluto Geothermal Sector Development Project
Client : Cross Land Construction PLCEngineer(s): G and Y Engineering Consult PLCPosition Held: planning and evaluation team leader