Page 1: RAPID INFRASTRUKTUR INDONESIA...Swadaya Graha (Contractor) •PT. Syamsir Karya Pertama (Contractor) •PT Tatamulia Nusantara Indah (Contractor) •PT Weltes Energi Nusantara (Contractor)
Page 2: RAPID INFRASTRUKTUR INDONESIA...Swadaya Graha (Contractor) •PT. Syamsir Karya Pertama (Contractor) •PT Tatamulia Nusantara Indah (Contractor) •PT Weltes Energi Nusantara (Contractor)

RAPID INFRASTRUKTUR INDONESIA

Page 3: RAPID INFRASTRUKTUR INDONESIA...Swadaya Graha (Contractor) •PT. Syamsir Karya Pertama (Contractor) •PT Tatamulia Nusantara Indah (Contractor) •PT Weltes Energi Nusantara (Contractor)

RAPIDI N F R A S T R U K T U R

MISSION

Our mission is to build and organize infrastructure and industrial plant to enhance the future.

VISION

To become center of excellence for engineering, construction, and project management, achieving extraordinary result by

incorporating lean philosophy and state-of-the-art technology

enhancing the future“ ”

Page 4: RAPID INFRASTRUKTUR INDONESIA...Swadaya Graha (Contractor) •PT. Syamsir Karya Pertama (Contractor) •PT Tatamulia Nusantara Indah (Contractor) •PT Weltes Energi Nusantara (Contractor)

R O B B Y M A N U R U N G

A FEW WORDS FROM OUR CEO

R A P I D I N F R A S T R U K T U R

RAPID was founded on conviction that industrial construction business is ripe for disruption. Since cost and schedule over-run occur in majority of projects, we strive to innovate and improve this industry.

Our fundamental aim is to offer an integrated project execution between our partners that enables more agility in management with lower overall cost, strengthening infrastructure in the long run.

Or, in our own words, enhancing the future.

Page 5: RAPID INFRASTRUKTUR INDONESIA...Swadaya Graha (Contractor) •PT. Syamsir Karya Pertama (Contractor) •PT Tatamulia Nusantara Indah (Contractor) •PT Weltes Energi Nusantara (Contractor)

As a construction technology enthusiast, Mr. Robby has executed various EPCC petrochemicals and oil & gas projects for 12 years and achieved an outstanding performance.

Mr. Robby serves as the current Chief Executive Officer of RAPID from 2018, leading the organization to become one of the major player in industrial construction business.

R O B B Y M A N U R U N G , S . T . , M . T .( C H I E F E X E C U T I V E O F F I C E R )

MEET OUR BOARDS

J I M M Y S A N J A Y A( C H I E F T E C H N O L O G I C A L O F F I C E R )

Has more than 10 years experience in Oil & Gas and Petrochemical Projects, Mr. Jimmy is passionate on developing new technology to conventional processes, adding more value to our clients and Indonesia's resource production. Mr. Jimmy has

led various feasibility study on existing and new processing technology, proven capable to manage huge projects from scratch.

With more than 10 years experience in Petrochemical Projects. Mr. Andhika has sound experience in Project construction management, Pre-commissioning, and Commissioning stage for various Petrochemical Projects, maintaining excellent progress, schedule timeline and overall safety in project completion.

A N D H I K A S U T A N T O( C H I E F F I N A N C I A L O F F I C E R )

Page 6: RAPID INFRASTRUKTUR INDONESIA...Swadaya Graha (Contractor) •PT. Syamsir Karya Pertama (Contractor) •PT Tatamulia Nusantara Indah (Contractor) •PT Weltes Energi Nusantara (Contractor)

OURVALUES

These are the values that we hold strongly in our organization.

W H A T W E B E L I E V E

A I S E L E A D E R S W I T H M E N T O R S H I P

Continuously developing leaders through mentorship, feedbacks,evaluation, and transparent decision making.

C C E P T R E S P O N S I B I L I T Y

Having a sense of ownership in handling project and interpersonalrelationship across division.

A R T N E R S H I P T H A T L A S T

We strive for more than pleasing our clients, we aim to build long-lasting partnership with maximum added-value.

N N O V A T E

Industrial revolution 4.0 isn’t just a buzzword for us. We employ state-of-the-art technology for planning and execution.

O M O R E W I T H L E S S

Lean thinking, lean methodology, and lean philosophy.

Page 7: RAPID INFRASTRUKTUR INDONESIA...Swadaya Graha (Contractor) •PT. Syamsir Karya Pertama (Contractor) •PT Tatamulia Nusantara Indah (Contractor) •PT Weltes Energi Nusantara (Contractor)

P R O J E C TO W N E R

P R O J E C TI N T E G R A T O R

V E N D O R S P E C I A L I S TC O N T R A C T O R

P R O J E C T O W N E R

P M C

E P C C O N T R A C T O R

V E N D O R S U B - C O N T R A C T O R

C O N V E N T I O N A L I N T E G R A T E D

HOW WE DELIVER OUR VALUES

Page 8: RAPID INFRASTRUKTUR INDONESIA...Swadaya Graha (Contractor) •PT. Syamsir Karya Pertama (Contractor) •PT Tatamulia Nusantara Indah (Contractor) •PT Weltes Energi Nusantara (Contractor)

SECTOR EXPERTISE

O I L & G A S

W A T E R T R E A T M E N T

P O W E R G E N E R A T I O N

P E T R O C H E M I C A L

S U G A R F A C T O R Y

Page 9: RAPID INFRASTRUKTUR INDONESIA...Swadaya Graha (Contractor) •PT. Syamsir Karya Pertama (Contractor) •PT Tatamulia Nusantara Indah (Contractor) •PT Weltes Energi Nusantara (Contractor)

QUALITY ASSURANCE

Page 10: RAPID INFRASTRUKTUR INDONESIA...Swadaya Graha (Contractor) •PT. Syamsir Karya Pertama (Contractor) •PT Tatamulia Nusantara Indah (Contractor) •PT Weltes Energi Nusantara (Contractor)

LEGALITIES

Page 11: RAPID INFRASTRUKTUR INDONESIA...Swadaya Graha (Contractor) •PT. Syamsir Karya Pertama (Contractor) •PT Tatamulia Nusantara Indah (Contractor) •PT Weltes Energi Nusantara (Contractor)

LEGALITIES

Page 12: RAPID INFRASTRUKTUR INDONESIA...Swadaya Graha (Contractor) •PT. Syamsir Karya Pertama (Contractor) •PT Tatamulia Nusantara Indah (Contractor) •PT Weltes Energi Nusantara (Contractor)

CERTIFICATE

Page 13: RAPID INFRASTRUKTUR INDONESIA...Swadaya Graha (Contractor) •PT. Syamsir Karya Pertama (Contractor) •PT Tatamulia Nusantara Indah (Contractor) •PT Weltes Energi Nusantara (Contractor)

CERTIFICATE

Page 14: RAPID INFRASTRUKTUR INDONESIA...Swadaya Graha (Contractor) •PT. Syamsir Karya Pertama (Contractor) •PT Tatamulia Nusantara Indah (Contractor) •PT Weltes Energi Nusantara (Contractor)

C O N S T R U C T I O N I T S E R V I C E

P R O J E C T M A N A G E M E N T S E R V I C E

C O N S T R U C T I O N I N T E G R A T O R

P R E - C O M M & C O M M I S S I O N I N G

• RFID system for manpower, equipment, and material• Construction Dashboard Reporting (CDR)

• Employing high-performing teams• Lean construction philosophy and technology• Resource/ contractor management to achieve project on

time, on budget & on schedule

• Integrate all multidiscipline in the site project• Manage SYMOPS• Manage all construction work with lean philosophy• Manage system completion and system-wise management

• System-wise management and execution• Method development and supervisory.

OURSERVICES

Page 15: RAPID INFRASTRUKTUR INDONESIA...Swadaya Graha (Contractor) •PT. Syamsir Karya Pertama (Contractor) •PT Tatamulia Nusantara Indah (Contractor) •PT Weltes Energi Nusantara (Contractor)

C O L L A B O R A T I V E C O N S T R U C T I O N

• Civil Work• Steel Structure Installation• Mechanical Erection• Piping Work• Electrical and Instrumentation Installation• Interface Management

R A P I D I N D U S T R I A L I N S T I T U T E

• Integrated Program Management• Project Management• Project Management Professional Certification Preparation

with strategic partners as PMI Registered Education Provider

• Project Planning & Control• Construction Management

OURSERVICES

Page 16: RAPID INFRASTRUKTUR INDONESIA...Swadaya Graha (Contractor) •PT. Syamsir Karya Pertama (Contractor) •PT Tatamulia Nusantara Indah (Contractor) •PT Weltes Energi Nusantara (Contractor)

H A Z A R D A N D O P E R A B I L I T Y S T U D Y ( H A Z O P )

OURSERVICES

• Time effective HAZOP Study• Lead by very experience Facilitator and Multi-disciplinary team• Comprehensive Risk Assessment Result• Industries:

❑ Geothermal❑ Oil and Gas❑ Petrochemical

L E A D E R O F O U R H A Z O P T E A M

• More than 5 Leaders of highly experienced HAZOP leader• Leaders with more than 20 years experience in HAZOP and safety operation• Experienced in private and state-owned oil and gas operations• Experienced in domestic and overseas operations

Page 17: RAPID INFRASTRUKTUR INDONESIA...Swadaya Graha (Contractor) •PT. Syamsir Karya Pertama (Contractor) •PT Tatamulia Nusantara Indah (Contractor) •PT Weltes Energi Nusantara (Contractor)

ON-GOING PROJECTS

DJARUM GROUPMURIA MANIS SUGAR PLANT – PMTClient : PT Muria Sumba ManisRegion : SumbaProject Capitalization : USD 75,000,000Schedule : Februari 2020 – January 2021

PERTAMINA RDMP RU V WATER TREATMENT PLANTClient : PT Rekayasa IndustriRegion : BalikpapanService Period : February 2020 – July 2021

BP TANGGUH LNG PLANTClient : BP Region : BintuniContract Value : USD 4,500,000Schedule : November 2019 – August 2021

PMT for:- Piping- Structure- Borescope- Bolt Torque- Preservation- Commissioning

ENERCO RPO TDAE PROCESSING PLANT (PMT)Client : PT Enerco RPO InternationalRegion : BatamService Period : May 2018 – April 2019

ENERCO RPO TDAE PROCESSING PLANT (O&M)Client : PT Enerco RPO InternationalRegion : BatamService Period : Jan 2020 – Present

PRE-FEASIBILITY STUDY ON METHANOL PROJECTGRISSIK CORRIDOR FOR RUKUN RAHARJA, TBKClient : Rukun RaharjaRegion : Tanjung CaratService Period : July 2020 – Sept 2020

PERTAMINA RDMP CRUDE OIL TANK COMPLEXClient : PT Rekayasa IndustriRegion : BalikpapanProject Capitalization : USD 8,000,000Schedule : March 2019 – March 2021

PERTAMINA JTB EVAPORATOR & CRYSTALISATION UNITClient : PT. Energy Management IndonesiaRegion : BojonegoroProject Capitalization : USD 2,500,000Schedule : November 2019 – November 2020

Page 18: RAPID INFRASTRUKTUR INDONESIA...Swadaya Graha (Contractor) •PT. Syamsir Karya Pertama (Contractor) •PT Tatamulia Nusantara Indah (Contractor) •PT Weltes Energi Nusantara (Contractor)

O N G O I N G P R O J E C T S

DJARUM GROUP MURIA SUMBA MANIS SUGAR PLANT

Project Capitalization Capacity Schedule Location

USD 125,000,000 12,000 TCD Feb 2020 – April 2021 Sumba, Indonesia

Project Management and Consultancy Services

• Project status and progress evaluation• Commissioning and Start-up assist• Contract settlement process• Crash program design to speed up the project• Refinery sugar is available to be processed from sugar cane and

raw sugar• Construct and commission boiler STG powered with bagasse and

coal• Design, construct and commission coal handling system• Design, construct and commission raw sugar handling system• Design, construct and commission of automatic bagging system

S T A K E H O L D E R SS C O P E

• PT Muria Sumba Manis (Owner)• ISGEC Heavy Engineering Ltd. (Consultant)

Indian EPCC Company• PT. Swadaya Graha (Contractor)• PT. Syamsir Karya Pertama (Contractor)• PT Tatamulia Nusantara Indah (Contractor)• PT Weltes Energi Nusantara (Contractor)• Statec Binder GmbH (Vendor)

Austrian Automation Provider

Page 19: RAPID INFRASTRUKTUR INDONESIA...Swadaya Graha (Contractor) •PT. Syamsir Karya Pertama (Contractor) •PT Tatamulia Nusantara Indah (Contractor) •PT Weltes Energi Nusantara (Contractor)

D J A R U M G R O U P M U R I A S U M B A M A N I S S U G A R P L A N T

Page 20: RAPID INFRASTRUKTUR INDONESIA...Swadaya Graha (Contractor) •PT. Syamsir Karya Pertama (Contractor) •PT Tatamulia Nusantara Indah (Contractor) •PT Weltes Energi Nusantara (Contractor)

D J A R U M G R O U P M U R I A S U M B A M A N I S S U G A R P L A N T

Page 21: RAPID INFRASTRUKTUR INDONESIA...Swadaya Graha (Contractor) •PT. Syamsir Karya Pertama (Contractor) •PT Tatamulia Nusantara Indah (Contractor) •PT Weltes Energi Nusantara (Contractor)

O N G O I N G P R O J E C T S

ENERCO RPO TDAE PROCESSING PLANT

Project Capitalization Capacity Schedule Location

USD 140,000,000 180,000 MTPY May 2018 – present Batam, Indonesia

1. Project Management and ConsultancyServices

• Status and progress project evaluation• Bidding process• Commissioning and start-up phase assist• Technical marketing assist• Regular maintenance lead

2. Operation and Maintenance• Manpower supply• Maintenance activities support• Manual cleaning

• Initial schedule from October 2017- April 2019 (18M)

• Status as per April 2018: progress26% (lag 16%)

• Dispute with sub-contractors interm of scope of work and budget.

• Assisting CESCO for chemicalcleaning

C H A L L E N G E S S T A K E H O L D E R SS C O P E

• LTI Zero• Mechanical Completion achieved on

end March 2019

R E S U L T O F H A R D - W O R K

• PT. Enerco RPO International (Owner)• ExxonMobil Corporation Singapore (Feed Supplier)

Singapore Based Corporation• PT. Timas Suplindo (Main Contractor)• Sumitomo Corporation Asia & Oceania (Logistic)

Japan Based Corporation• ThyssenKrupp Industrial Solution (Licensor)• PT. Energi Manajemen Indonesia (Subcontractor)

Page 22: RAPID INFRASTRUKTUR INDONESIA...Swadaya Graha (Contractor) •PT. Syamsir Karya Pertama (Contractor) •PT Tatamulia Nusantara Indah (Contractor) •PT Weltes Energi Nusantara (Contractor)

E N E R C O R P O T D A E P R O C E S S I N G P L A N T

Page 23: RAPID INFRASTRUKTUR INDONESIA...Swadaya Graha (Contractor) •PT. Syamsir Karya Pertama (Contractor) •PT Tatamulia Nusantara Indah (Contractor) •PT Weltes Energi Nusantara (Contractor)

E N E R C O R P O T D A E P R O C E S S I N G P L A N T

Page 24: RAPID INFRASTRUKTUR INDONESIA...Swadaya Graha (Contractor) •PT. Syamsir Karya Pertama (Contractor) •PT Tatamulia Nusantara Indah (Contractor) •PT Weltes Energi Nusantara (Contractor)

E N E R C O R P O T D A E P R O C E S S I N G P L A N T

Page 25: RAPID INFRASTRUKTUR INDONESIA...Swadaya Graha (Contractor) •PT. Syamsir Karya Pertama (Contractor) •PT Tatamulia Nusantara Indah (Contractor) •PT Weltes Energi Nusantara (Contractor)

P R E P A R A T I O N F O R C L E A N I N G C O L U M N ( C O N F I N E D S P A C E )H E A T E X C H A N G E R C L E A N I N G

Page 26: RAPID INFRASTRUKTUR INDONESIA...Swadaya Graha (Contractor) •PT. Syamsir Karya Pertama (Contractor) •PT Tatamulia Nusantara Indah (Contractor) •PT Weltes Energi Nusantara (Contractor)

O N G O I N G P R O J E C T S

PERTAMINA RDMP RU V CRUDE OIL TANK COMPLEX

Project Capitalization Capacity Schedule Location

USD 8,000,000 15,000 MT (3 tanks) March 2019 – March 2021 Balikpapan, Indonesia

Project Management and Consultancy Services

• Technical and commercial assist for vendor in sincebidding phase

• Risk matrix analysis• Cost control• Provide a cutting-edge engineering solution• Project schedule control• Technical assist in project execution design phase

• PT Pertamina (Owner)• PT Rekayasa Industri (Client)• PT Cahaya Hidup Primakarya (Vendor)

S T A K E H O L D E R SS C O P E

Page 27: RAPID INFRASTRUKTUR INDONESIA...Swadaya Graha (Contractor) •PT. Syamsir Karya Pertama (Contractor) •PT Tatamulia Nusantara Indah (Contractor) •PT Weltes Energi Nusantara (Contractor)

P E R T A M I N A R D M P C R U D E O I L T A N K C O M P L E X

Page 28: RAPID INFRASTRUKTUR INDONESIA...Swadaya Graha (Contractor) •PT. Syamsir Karya Pertama (Contractor) •PT Tatamulia Nusantara Indah (Contractor) •PT Weltes Energi Nusantara (Contractor)

O N G O I N G P R O J E C T S

BP TANGGUH LNG PLANT

Contract Value Capacity Schedule Location

USD 4,500,000 11,4 MTPA November 2019 – August 2021 Papua, Indonesia

PIPING15 Nov 2019 – 31 May 2020

BOLT TORQUEING15 Nov 2019 – 30 Nov 2020

COMMISSIONING01 Jul 2020 – 30 Jun 2021

PRESERVATION01 Jan 2020 – 31 Jan 2021

STEEL STRUCTURE01 Feb 2020 – 30 Apr 2020

BORESCOPE07 Dec 2019 – 31 Aug 2021

Scope • Progress management• Material controlling• Construction supervision• Manpower supply

• Flange Management based in torque standard

• Pipe visual inspection

• Repair recommendation

• Condition maintaining for valve, pipe, and instrument devices

• Steel structure erection for Train 3 and brownfield area

• Assistance for commissioning activity

Page 29: RAPID INFRASTRUKTUR INDONESIA...Swadaya Graha (Contractor) •PT. Syamsir Karya Pertama (Contractor) •PT Tatamulia Nusantara Indah (Contractor) •PT Weltes Energi Nusantara (Contractor)

O N G O I N G P R O J E C T S

BP P.L.C TANGGUH LNG PLANT

C H A L L E N G E S

S T A K E H O L D E R S

• BP P.L.C (Owner)• Chiyoda-Saipem-Tripatra-Suluh Ardhi Engineering JO (Main Contractor)• Penta Global Corporation (Client)

• Initial schedule to finish the expansion in Mid 2020.• Recovery schedule to finish the expansion in Mid 2021.• Productivity of Piping and Structure very low compared to

typical project.• Coronavirus new normal protocol on construction site• Project on hold for 3 to 5 months in 2020

Piping Works

Page 30: RAPID INFRASTRUKTUR INDONESIA...Swadaya Graha (Contractor) •PT. Syamsir Karya Pertama (Contractor) •PT Tatamulia Nusantara Indah (Contractor) •PT Weltes Energi Nusantara (Contractor)

R O B O T I C B O R E S C O P E S E R V I C E

Page 31: RAPID INFRASTRUKTUR INDONESIA...Swadaya Graha (Contractor) •PT. Syamsir Karya Pertama (Contractor) •PT Tatamulia Nusantara Indah (Contractor) •PT Weltes Energi Nusantara (Contractor)

B P P . L . C T A N G G U H L N G

Page 32: RAPID INFRASTRUKTUR INDONESIA...Swadaya Graha (Contractor) •PT. Syamsir Karya Pertama (Contractor) •PT Tatamulia Nusantara Indah (Contractor) •PT Weltes Energi Nusantara (Contractor)

B P P . L . C T A N G G U H L N G

Page 33: RAPID INFRASTRUKTUR INDONESIA...Swadaya Graha (Contractor) •PT. Syamsir Karya Pertama (Contractor) •PT Tatamulia Nusantara Indah (Contractor) •PT Weltes Energi Nusantara (Contractor)

O N G O I N G P R O J E C T S

PERTAMINA JTB EVAPORATOR & CRYSTALISATION UNIT

Project Capitalization Capacity Schedule Location

USD 2,500,000 52,000 MTPY Nov 2019 - Nov 2020 Bojonegoro, Indonesia

Project Management and Consultancy Services

• Technical and commercial assist for vendor in sincebidding phase

• Risk matrix analysis• Cost control• Project schedule control• Technical assist in project execution design phase

• PT Pertamina (Owner)• PT Energy Management Indonesia (Client)• PT Sahabat Nusantara Teknologi Inovasi (Vendor)• Alfa Laval Corporation (Fabricator)

S T A K E H O L D E R SS C O P E

Page 34: RAPID INFRASTRUKTUR INDONESIA...Swadaya Graha (Contractor) •PT. Syamsir Karya Pertama (Contractor) •PT Tatamulia Nusantara Indah (Contractor) •PT Weltes Energi Nusantara (Contractor)

P E R T A M I N A J T B E V A P O R A T O R & C R Y S T A L I S A T I O N U N I T

Page 35: RAPID INFRASTRUKTUR INDONESIA...Swadaya Graha (Contractor) •PT. Syamsir Karya Pertama (Contractor) •PT Tatamulia Nusantara Indah (Contractor) •PT Weltes Energi Nusantara (Contractor)

O N G O I N G P R O J E C T S

PERTAMINA RDMP RU V WATER TREATMENT PLANT

Project Capitalization Capacity Schedule Location

USD 73,000,000 3,500 MTPH February 2020 – July 2021 Balikpapan, Indonesia

Project Management and Consultancy Services• Technical and commercial assist for vendor in since

bidding phase• Risk matrix analysis• Cost control• Provide a cutting-edge engineering solution• Project schedule control• Technical assist in project execution design phase

• PT Pertamina (Owner)• PT Rekayasa Industri (Client)• PT Aquatech Systems Pvt. Ltd. (Vendor)• Canon Artez Corporation (Vendor)

S T A K E H O L D E R SS C O P E

Page 36: RAPID INFRASTRUKTUR INDONESIA...Swadaya Graha (Contractor) •PT. Syamsir Karya Pertama (Contractor) •PT Tatamulia Nusantara Indah (Contractor) •PT Weltes Energi Nusantara (Contractor)
Page 37: RAPID INFRASTRUKTUR INDONESIA...Swadaya Graha (Contractor) •PT. Syamsir Karya Pertama (Contractor) •PT Tatamulia Nusantara Indah (Contractor) •PT Weltes Energi Nusantara (Contractor)

O N G O I N G P R O J E C T S

ENGINEERING SERVICES FOR SUGAR FACTORY 6000 TCD

Project Capitalization Capacity Schedule Location

USD 125,000,000 6000 TCD Jun 2020 – Des 2020 Jakarta, Indonesia

• Detailed engineering design in regards ofprocurement and construction phase for process,piping, mechanical, civil, structure, electrical,instrument and valve criticality construction

• Design engineering in regards of balance of plant tosupport sugar processing plant, such as coalhandling, raw sugar handling, automatic baggingsystem, and automatic fuel distribution

S C O P E S T A K E H O L D E R S

• PT. Muria Sumba Manis (Owner)

Page 38: RAPID INFRASTRUKTUR INDONESIA...Swadaya Graha (Contractor) •PT. Syamsir Karya Pertama (Contractor) •PT Tatamulia Nusantara Indah (Contractor) •PT Weltes Energi Nusantara (Contractor)

O N G O I N G P R O J E C T S

EVALUATION OF ENERCO TDAE PLANT FEASIBILITY AT 170,000 MTPY CAPACITY

Project Capitalization Schedule Location

USD 140,000,000 May 2020 Batam, Indonesia

Evaluating plant current condition to perform at170,000MTPY Capacity. The evaluation had been done bysimulation with process software such as HYSYS and HTRI.The result of the simulation was compiled in to acomprehensive report.

• PT LAPI ITB

S T A K E H O L D E RS C O P E

Page 39: RAPID INFRASTRUKTUR INDONESIA...Swadaya Graha (Contractor) •PT. Syamsir Karya Pertama (Contractor) •PT Tatamulia Nusantara Indah (Contractor) •PT Weltes Energi Nusantara (Contractor)

O N G O I N G P R O J E C T S

PRE-FEASIBILITY STUDY ON METHANOL PROJECT IN GRISSIK CORRIDOR FOR RUKUN RAHARJA Tbk.

Schedule Location

July 2020 – Sept 2020 Tanjung Carat, South Sumatera

• Condition and Petrochemical Industry Mapping Study inIndonesia

• Study of raw material• Market and factory capacity study• Technology review• Data study, analysis, and calculation• Methanol transportation and storage study• Risk analysis and study business models• Regulatory and policy review

• Rukun Raharja Tbk.

S T A K E H O L D E RS C O P E

Page 40: RAPID INFRASTRUKTUR INDONESIA...Swadaya Graha (Contractor) •PT. Syamsir Karya Pertama (Contractor) •PT Tatamulia Nusantara Indah (Contractor) •PT Weltes Energi Nusantara (Contractor)

RAPID IN NUMBERS

P R O J E C T M A N A G E M E N T C O N S U L T A N C Y T E A M

L I C E N S E D S O F T W A R E

100

11

24

Professionals in each expertise,assigned in various projects ofpetrochemical, agroindustry , oil andgas across Indonesia.

Important elements tooptimize engineering andproject management in thedigital era.

E N G I N E E R S

Leaders of

More than

Highly experienced projectleaders, managing teams ofengineers

More than

R F I D T E C H N O L O G Y

3

For Construction services

• Manpower Control• Equipment Control• Piping Spool Control

Page 41: RAPID INFRASTRUKTUR INDONESIA...Swadaya Graha (Contractor) •PT. Syamsir Karya Pertama (Contractor) •PT Tatamulia Nusantara Indah (Contractor) •PT Weltes Energi Nusantara (Contractor)

E-mail: [email protected]@rapidinfrastruktur.com

Phone: +62 21-27819899

Address:Talavera Office Park, Lt. 12Jl T.B. Simatupang No. 23, RT.3/RW.1, Cilandak Barat, DKI Jakarta 12430Website: www.rapidinfrastruktur.com

C O N T A C T U S

Page 42: RAPID INFRASTRUKTUR INDONESIA...Swadaya Graha (Contractor) •PT. Syamsir Karya Pertama (Contractor) •PT Tatamulia Nusantara Indah (Contractor) •PT Weltes Energi Nusantara (Contractor)