We Build Plants

Contents

We Build Plants

LOTTE GROUP __________________________________

- LOTTE Group

- Business Volume

- Business Volume for

E&C / Petrochemical

PROJECT REFERENCES __________________________________

- Petrochemical

- Power & Energy

- Industrial

LOTTE E&C __________________________________

- LOTTE E&C at a Glance

- Our Business

- Business Volume

- Organizational Structure

- Plant Business Fields

- Services We Provide

- Global Position

- Global Network

- Certificates

ANNEX __________________________________

- LOTTE’s Petrochemical

Complex

2

LOTTE GROUP

LOTTE Group

We Build Plants

FOOD & BEVERAGE Confectionary Beverage / Liquor Bakery

FINANCE Capital Credit Card Insurance

HOSPITALITY Hotel & Resort Amusement Park Tourism

E&C / PETROCHEMICAL Engineering & Construction Petrochemical

RETAIL Department Store Mart / Supermarket Convenience Store

4

Business Volume

We Build Plants

2007 2008

2009 2010

2011

2.4

1.8 2.6

4.0 4.5

35.1 41.6 46.4 61.0 66.0

Sales

Income Before Income Tax Expenses

Business Volume of Recent 5 Years Unit : Billion USD

5

Business Volume for E&C / Petrochemical

We Build Plants

3,530 3,736 3,922 3,665 3,795

2007 2008 2009 2010 2011

2,255 3,099

5,970

7,189

8,463

2007 2008 2009 2010 2011

1,962 2,094 2,107 2,428 3,138

2007 2008 2009 2010 2011

LOTTE E&C Core Business Plant / Civil / Building / Housing

HONAM Petrochemical Core Business Naphtha Cracking / Downstream

KP Chemical Core Business PTA / PET

Annual Sales Unit : Million USD

6

LOTTE E&C

LOTTE E&C at a Glance

We Build Plants

Date of Incorporation : February 3, 1959

Paid-In-Capital : 190 Million USD

Assets : 5,754 Million USD

Number of Employees : 3,172

( As of end of 2011 )

Company Profile

Shareholders

Hotel LOTTE 38.3 %

HONAM Petrochemical 31.3 %

LOTTE Aluminum 10.0 %

LOTTE CHILSUNG Beverage 5.3 %

KP Chemical 3.9 %

LOTTE Data Communication 3.3 %

Others 7.9 %

8

Our Business

We Build Plants

Our Business Plant / Civil & Infrastructure / Housing / Building

Plant Civil &

Infrastructure Housing Building

9

Business Volume

We Build Plants

2008 2009

2010 2011

2012

3.7 3.9 3.7

3.8 4.3

10.1

6.8 7.1

5.0

7.5

New Awards

Business Volume of Recent 5 Years Unit : Billion USD

(Projection)

Sales

10

Business Volume

We Build Plants

Housing

32.8 %

PLANT

18.9 %

Building

28.9 %

Civil & Infra

17.0 %

Others

2.4 %

11

61.2 %

4.1 % 18.4 %

13.5 %

2.8 %

2006 | USD 3,161 Million

2011 | USD 3,796 Million

Annual Sales 2006 & 2011

Organizational Structure

We Build Plants

Power & Green Energy Plant Department

Industrial Plant Department

Overseas Business Development Department

Power Plant Proposal Department

Petrochemical Plant Department

Cost Estimation Department Plant Business

Division

12

EPC Control Department Schedule Control | Cost Control | Q/HSE

Plant Engineering Department

Plant Business Fields

We Build Plants

Petrochemical Naphtha Cracker & Downstream | Storage Tanks Utilities & Offsite Facilities

Industrial Iron & Steel Complex | Food & Beverage Plant

Power & Energy Thermal Power Generation | Diesel Engine Power Generation Cogeneration & District Heating | Renewable Energy

13

Services We Provide

We Build Plants

- Overall Project Organization and Management

- Feasibility Study

- EPC Contract

- O&M Contract

- Equity Participation

- Financing Arrangement

14

Global Position

We Build Plants

RANK FIRM

2010 2009

1 4 China Railway Construction Corp. Ltd., Beijing, China

2 2 China Railway Group Ltd., Beijing, China

3 1 VINCI, Rueil–Malmaison, France

4 3 BOUYGUES, Paris, France

5 7 China Communications Construction Group (Ltd.),Beijing, China

33 39 Hyundai Engineering & Construction Co. Ltd., Seoul, S. Korea

36 45 GS Engineering & Construction, Seoul, S. Korea

38 47 DAEWOO E&C Co. Ltd., Seoul, S. Korea

40 69 POSCO Engineering & Construction, Seoul, S. Korea

41 63 DAELIM Industrial Co. Ltd., Seoul, S. Korea

45 36 SAMSUNG C&T Corp., Seoul, S. Korea

69 99 SAMSUNG Engineering Co. Ltd., Seoul, S. Korea

72 72 LOTTE Engineering & Construction Co., Ltd., Seoul, S. Korea

78 79 SK Engineering & Construction, Seoul, S. Korea

108 116 HANWHA Engineering & Construction, Seoul, S. Korea

LOTTE E&C ranks 72nd Contractor

among the Top 225 Global Contractors

in 2009 and 2010

THE TOP 225 GLOBAL CONTRACTORS

15

Global Network

We Build Plants

Gold Coast

Tokyo

Jakarta

Hanoi

Moscow

Beijing

Abu Dhabi

Tashkent

Islamabad

Al Khobar

Amman Seoul Tripoli

Kuala Lumpur

16

Certificates

We Build Plants

Certificates ISO 9001 / ISO 14001 / OHSAS 18001 / ASME NA Stamp / ASME NS Stamp / ASME NPT Stamp

17

PROJECT REFERENCES

Project References - Petrochemical

We Build Plants

130,000 MTA Butadiene Plant Yeocheon Petrochemical Complex, Korea

19

Project References - Petrochemical

We Build Plants

Project Name Location Client Capacity Period Scope Remark

Titan TBA Project Johor Bahru,

Malaysia

Titan

Petchem

Package1 : Tertiary Butyl Alcohol 110 kTA

Package2 : Storage facilities

May.2011

~ Aug.2012 EPC

G-Project Ulsan,

Korea

Honam

Petrochemical

Polypropylene Adhesive Plant

- Resin : 600 TA

- Water Based Product : 750 TA

- Oil Based Product : 2,000 TA

Nov.2011

~Jun.2012 EPC

GE-Project Daesan,

Korea

Honam

Petrochemical

GE : 50,000 MTA Mar.2011

~May.2012 EPC

HPCEM2 Yeosu,

Korea

Honam

Petrochemical

Revamping the Ethylene Plant : 750 → 1,000 kTA

Revamping the BTX Plant : 290 → 390 kTA

Dec.2010

~Apr.2012 EPC

Lummus

Technology

P2 Project

(PP & ASRS)

Yeosu,

Korea

Honam

Petrochemical

PP: 200,000 MTA

HDPE: 250,000 MTA

ASRS: 35,640 cells

Sep.2010

~Jan.2012 EPC

B-Project Yeosu,

Korea

Honam

Petrochemical

Butadiene: 130,000 MTA

OS & Infrastructure

154kV Substation: 30/40 MVA

Apr.2009

~Oct.2010 EPC

3EOA Project Yeosu,

Korea

Honam

Petrochemical EO Additives: 50,000 MTA

Apr.2009

~Sep.2010 EPC

OS Tank Project Ulsan, Korea KP Chemical

Benzene Tank (IFRT) : 2,598 m3 x 1 ea

Xylene Tank (CRT) : 9,963 m3 x 5 ea, 15,566 m3 x 1 ea,

5,033 m3 x 1 ea

Naphtha Tank (IFRT) : 998 m3 x 1 ea

May.2008

~May.2009 EPC

Jordan LPG Tank

Project

Zarka,

Jordan

Jordan

Petroleum

Refinery Co., Ltd.

4 Spherical Tanks.

4,000 m³ each.

Sep.2008

~Nov.2010 EPC

20

Project References - Petrochemical

We Build Plants

Project Name Location Client Capacity Period Scope Remark

NCETN Project Yeosu,

Korea

Honam

Petrochemical Ethane Cracking Heater (20 Ton / Hour)

Apr. 2008

~Dec. 2008 EPC

2nd MeX Project Ulsan,

Korea KP Chemical Meta Xylene 100,000 MTA

Jul.2007

~Dec.2007 C

UOP

Technology

2nd EOA Project Yeosu,

Korea

Honam

Petrochemical EO Additives 50,000 MTA

Jun.2007

~Apr.2008 EPC

Buss

Technology

2nd Tank Farm

Project

Daesan,

Korea

Lotte Daesan

Petrochemical

Ball Tank: 2,500 m3 x 1ea

CFRT: 6,600 m3 x 1ea

CRT: 6,265 m3 x 1ea

3,200 m3 x 1ea

2,210 m3 x 1ea

Jul.2007

~Apr.2008 EPC

NCHTR Project Yeosu,

Korea

Honam

Petrochemical

New Cracking Heater in Ethylene Plant

(46T/H Naphtha Feed)

Jun.2007

~May.2008 EPC

C-Project Yeosu,

Korea

Honam

Petrochemical

EC/DMC Unit: 130,000 MTA of PC

DPC/PC Unit: 65,000 MTA of PC

Apr.2007

~Jun.2008 C

Asahi Kasei

Chemical

Technology

2nd PP Project Daesan,

Korea

Lotte Daesan

Petrochemical Polypropylene 250,000 MTA

Jan.2007

~Jun.2008

EPC

(Partial)

Basell (Montell)

Technology

SM Revamping

Project

Daesan,

Korea

Lotte Daesan

Petrochemical Styrene Monomer: 300,000 → 420,000 MTA

Oct.2006

~Apr.2008 EPC

Stone Webster

(Badger)

Technology

Air Separation Unit &

Second Ethylene

Glycol Plant

Daesan,

Korea

Lotte Daesan

Petrochemical

Oxygen: 25,000 Nm3/Hour

Ethylene glycol: 390,000 MTA

Jun.2006

~Mar.2008 EPC

Kobe Steel

Technology

21

Project References - Petrochemical

We Build Plants

Project Name Location Client Capacity Period Scope Remark

1st Tank Farm

Project

Daesan,

Korea

Lotte Daesan

Petrochemical

Ball Tank: 2,500 m3 x 7ea

2,000 m3 x 2ea

FRT: 25,000 m3 x 2ea

CFRT: 10,000 m3 x 1ea

Oct.2005

~Nov.2006 EPC

3rd PP Project Yeosu,

Korea

Honam

Petrochemical Polypropylene: 200,000 MTA

Aug.2000

~Dec.2001 PC

Mitsui Chemical

Technology

1st EOA Project Yeosu,

Korea

Honam

Petrochemical EO Additives: 30,000 MTA

Oct.1998

~Mar.2000 EPC

Buss

Technology

PET Project Yeosu,

Korea

Honam

Petrochemical 70,000 MTA

Feb.1997

~Aug.1998 EPC

KARLFISCHER

(Germany)

3rd EG Project Yeosu,

Korea

Honam

Petrochemical Ethylene glycol: 160,000 MTA

Jan.1996

~Jun.1997 PC

Tank Farm Project Yeosu,

Korea

Honam

Petrochemical 50,000KL Tank x 4ea

Feb.1991

~Aug.1992 EPC

NCC & BTX Project Yeosu,

Korea

Honam

Petrochemical Naphtha Cracking: 420,000 MTA

Jul.1990

~Mar.1992 C

Lummus

Technology

2nd EG Project Yeosu,

Korea

Honam

Petrochemical Ethylene glycol: 120,000 MTA

Mar.1990

~May.1991 C

Shell

Technology

2nd PP & 2nd PE

Project

Yeosu,

Korea

Honam

Petrochemical 230,000 MTA

May.1987 ~

Nov.1988 C

Basell & Mitsui

Chemical

Technology

22

Project References - Power & Energy

We Build Plants

400MW Combined Cycle Power Plant Al Qatrana, Jordan

23

Project References - Power & Energy

We Build Plants

Project Name Location Client Capacity Period Scope Remark

Cogeneration Plant

for Andong

Andong,

Korea

Korea Southern

Power Co., Ltd. 400MW, Siemens 8000H (Single Shaft Type)

Feb. 2012

~Jun. 2014 C

Power &

District Heating

Jordan IPP No3.

Power Project

Amman,

Jordan NEPCO Diesel Engine : 16MW x 38 Units (Wartsila, 18V50DF)

Jun. 2012

~Sep. 2014 EPC

KEPCO-

Mitsubishi-WDFS

Consortium

Cogeneration Plant

for Daegu City TES

Daegu,

Korea

Daegu Green

Power 400MW, Siemens 8000H (Single Shaft Type)

Dec.2011

~Apr.2015 EPC

Power &

District Heating

(Equity: 34.1%)

Combined Heat and

Power Plant &

Energy Supply for

Chungnam Province

Hongsung /

Yesan,

Korea

Chungnam Energy

(tentative)

RDF Power Plant: 13 MW

Wood Pellet Power Plant: 13 MW x 3 ea

Fuel Cell: 22.5 MW

Solar Power System

Jul.2011

~Dec.2016 EPC

Power &

District Heating

Youngheung Thermal

Power Plant

Yeong -

heung,

Korea

Korea South-East

Power Co., Ltd.

Unit #5,6 New Construction

870 MW x 2 units

Fuel: Bituminous Coal

May.2010

~Dec.2014 C

Consortium

Contract

Jordan Al Qatrana

IPP Project

Al Qatrana,

Jordan

Ministry of Energy

and Mineral

Resources

GTG: 150MW x 2 units (Siemens, SGT5-2000E)

STG: 150MW x 1 unit (Skoda, MTD40)

HRSG: 210 ton/hour

Apr.2008

~

Nov.2010 (S/C)

Aug.2011 (C/C)

EPC

QEPCO IPP

(KEPCO-Xenel

Consortium)

24

Project References - Power & Energy

We Build Plants

Project Name Location Client Capacity Period Scope Remark

Cogeneration Plant

for Pangyo

Pangyo,

Korea

Korea District

Heating Corp.

GTG: 77.8MW x 1 unit (GE, MS7001EA)

STG: 68.4MW x 1 unit (MES, CP1000)

HRSG: 290Ton/hr x 46kg/cm2 x 1 unit

Feb.2008

~Nov.2010 EPC

Power &

District Heating

Garolim Tidal Power

Plant

Taean &

Seosan

Seashore,

Korea

Korea Western

Power Co., Ltd. 520 MW (26.0 MW x 20 units)

Jan.2008

~Dec.2017 EPC

Equity

Participation (5%)

Cogeneration Plant

for Dongnam Area

CES

Seoul, Korea Korea District

Heating Corp.

GTG: 30MW x 1 unit (Hitachi, H-25)

HRSG: 67.7 Ton/hr x 1 unit

District Heating Capacity: 36 Gcal/hr x 2 units

Aug.2007

~Apr.2009 EPC

Power &

District Heating

Cogeneration Plant

for Asan-Baebang

CES

Asan, Korea Korea National

Housing Corp.

GTG: 45MW x 2 units (Siemens, SGT800)

STG: 23.9MW x 1 unit (SNM, C6-R11-ER)

District Heating Capacity: 96 Gcal/hr

Apr.2007

~Jan.2011 EPC

Power &

District Heating

HPC Combined Cycle

& Cogeneration

Power Plant

Yeosu, Korea Honam

Petrochemical

GTG: 42.2MW x 1 unit (GE, PG6581B)

STG: 19MW x 1 unit (GE, EHNK 40/63)

HRSG: 160Ton/hr x 46kg/cm2 x 1 unit

May.2001

~Jul.2003 EPC

Power &

Steam Supply

Jinju Sangpyeong

Industrial Complex

Central Energy

Supply Plant

Jinju , Korea Shindong Energy

STG: 42.6 MW x 1 unit (Kawasaki, DP-400)

Power Boiler: 160Ton/hr x 126kg/cm2 x 2 units

Aux. Boiler: 170Ton/hr x 10kg/cm2 x 1 unit

Oct.1996

~Feb.1999 EPC

Cogeneration Plant

for Hotel Lotte Seoul, Korea

Lotte Shopping /

Hotel Lotte

Gas Engine: 2.5 MW x 3 units

Steam Generataion : 1 Ton/hr x 3 units

Hot Water Generation: 78Ton/hr

Aug.1994

~Oct.1996 EPC

Cogeneration Plant

for Lotte World Seoul, Korea

Lotte Shopping /

Hotel Lotte

Dual Fuel Engine (Diesel/Gas): 5.9 MW x 6 units

(Niigata, CP14PC25DF)

Sep.1985

~Dec.1988 EPC

25

Project References - Industrial

We Build Plants

Hyundai Steel Cokes Plant Dangjin, Korea

26

Project References - Industrial

We Build Plants

Project Name Location Client Period Scope Remark

Hankook Tire Plant Cikalang,

Indonesia

PT. Hankook Tire

Indonesia Nov.2011 ~ Oct.2012 PC PCR 15,000EA/Day

Coke & Coke Oven

Gas Treatment Plant Dangjin, Korea Hyundai Steel

Coke: Jan.2008 ~ Dec.2010

Co Gas Refinery: Jan.2008 ~ Nov.2009 C

Coke: 3.138 Million Ton/Year

COG: 13.3 Hundred Million Nm3/Year

Sinter Plant &

Steel Making Plant Dangjin, Korea Hyundai Steel

Sinter: Oct.2007 ~ Nov.2010

Steelmaking: Oct.2007 ~ Sep.2010 C

Sinter: 12 Million Ton/Year

Steelmaking: 8 Million Ton/Year

Lotte Logistics

Kwangmyung

Distribution Center

Kwangmyung,

Korea

Lotte Confectionary /

Lotte Chilsung Beverage Dec.2007 ~ Apr.2009 PC

Total Floor Area: 50,000 m2

Occupied Area: 73,6899 m2

Lotte Confectionery

Russia Factory Kaluga, Russia

Lotte Confectionery

Russia Nov.2007 ~ Jul.2010 EPC

Site Area: 133,400 m2

Total Floor Area: 23,472 m2

Lotte Confectionery

India Neman Factory

Chennai,

India Lotte Confectionery India Nov.2007 ~ Jul.2010 EPC

Site Area: 87,074 m2

Total Floor Area: 19,968 m2

Lotte Mart

Gimhae Distribution

Center

Gimhae, Korea Lotte Mart Jul.2007 ~ Feb.2010 EPC Total Floor Area: 54,988 m2

Occupied Area: 57,690 m2

Lotte Samkang

Poseung Factory Poseung, Korea Lotte Samkang Jul.2005 ~ Jun.2008 EPC

Total Floor Area: 12,148 m2

Building Area: 84,974 m2

Lotte Mart

Osan Distribution

Center

Osan, Korea Lotte Mart Oct.2006 ~ Oct.2007 EPC Total Floor Area: 85,621 m2

Occupied Area: 83,548 m2

Industrial Waste

Incinerator

in Osan Power Plant

Osan, Korea Sinho Env. Apr.2006 ~ Jun.2007 EPC Capacity : 70 ton/day, Stoker

Eun-pyeong

Municipal Solid

Waste Incinerator

Seoul, Korea SH Corporation Dec.2006 ~ Nov.2011 EPC

Capacity : 48 ton/day

Pyrolysis Incineration

Pneumatic Collection System (26.5 km)

27

Project References - Industrial

We Build Plants

Project Name Location Client Period Scope Remark

Lotte Boulangerie

Jeungpyeong Factory

Jeungpyeong,

Korea Lotte Boulangerie Jan.2006 ~ Aug.2006 EPC

Bakery Line Facilities

Total Floor Area: 17,338 m2

Occupied Area: 8,601 m2

Lotte Samkang

Cheonan Food

Factory

Cheonan, Korea Lotte Samkang Dec.2002 ~ Mar.2005 EPC

Edible Oil, Ice Cream,

Margarine, Whipping Cream etc.

Total Floor Area: 55,112 m2

Occupied Area: 19,440 m2

Ganghwa

Municipal Solid

Waste Incinerator

Ganghwa-gun,

Korea Ganghwa-gun Apr.2001 ~ Oct.2002 EPC Capacity : 25 ton/day, Stoker

Anseong Factory Anseong, Korea Lotte Chilsung Beverage Apr.1999 ~ Sep.2000 PC

Daejeon Factory Daejeon, Korea Lotte Chilsung Beverage Feb.1992 ~ Jan.1993 PC

Coke & Coke Oven

Gas Treatment Plant

Gwangyang,

Korea POSCO

Nov.1990 ~ Feb.1992 (Phase 4)

Oct. 1988 ~ Feb.1990 (Phase 3)

Sep. 1986 ~ Aug.1988 (Phase 2)

Mar.1985 ~ May.1987 (Phase 1)

C Phase 1,2,3,4: Each 3,998 Ton/day

Coke & Coke Oven

Gas Treatment Plant Pohang, Korea POSCO

Sep.1981 ~ Jun.1983 (Phase 4-2)

Jan.1979 ~ Feb.1981 (Phase 4)

Oct.1976 ~ Dec.1978 (Phase 3)

Nov.1973 ~ May.1976 (Phase 2)

Aug.1970 ~ Apr.1973 (Phase 1)

C

Phase 4-2: 2,099 (Unit: Ton/day)

Phase 4: 4,170

Phase 3: 4,250

Phase 2: 2,500

Phase 1: 1,600

Sinter Plant Phase 1,2 Pohang, Korea POSCO Dec. 1973 ~ May.1976 (Phase2)

Aug. 1970 ~ Apr. 1973 (Phase1) C

Phase 2 : 6,020 Ton/day

Phase 1 : 3,650 Ton/day

28

A N N E X

LOTTE’s Petrochemical Complex

We Build Plants 30

LOTTE’s Petrochemical Complex

We Build Plants 31

LOTTE’s Petrochemical Complex

We Build Plants 32

LOTTE’s Petrochemical Complex

We Build Plants 33

LOTTE’s Petrochemical Complex

We Build Plants 34

THANK YOU