wbci tool user manual may 2019 - world breastfeeding trends€¦ · tool of the wbciis a milestone...

70
Page | 1

Upload: others

Post on 29-Sep-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

Page | 1

Page 2: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

Page | 2

CONTENTS

FOREWORD: ................................................................................................................................................................... 9

BACKGROUND: .............................................................................................................................................................. 9

INTRODUCTION: .......................................................................................................................................................... 11

PURPOSE ...................................................................................................................................................................... 12

INTENDED USERS ......................................................................................................................................................... 12

REQUIREMENTS ........................................................................................................................................................... 13

Hardware requirements .......................................................................................................................................... 13

Software requirements ............................................................................................................................................ 13

The structure of the IYCF WBCi ............................................................................................................................... 13

QUICK START................................................................................................................................................................ 14

Downloading, saving and opening the WBCi: .......................................................................................................... 14

Starting using the WBCI: Complete the Country Profile .......................................................................................... 15

start: Go to Country Profile ................................................................................................................................. 15

the Main Menu .................................................................................................................................................... 18

Costing COMPONENTS of the programme management unit ............................................................................ 21

Description of data entry: .................................................................................................................................... 22

Program Management unit ................................................................................................................................. 22

Operations ........................................................................................................................................................... 23

Human Resources ................................................................................................................................................ 25

Monitoring and Evaluation .................................................................................................................................. 27

Capital Cost .......................................................................................................................................................... 29

Other Activities .................................................................................................................................................... 30

Standardcosting components per each IYCF strategy ......................................................................................... 31

COMMON DATA ENTRY INSTRUCTIONS FOR ALL IYCFSTRATEGIES ............................................................................. 31

Page 3: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

Page | 3

Research/Studies/Surveys ................................................................................................................................... 31

Conferences/Seminars/Workshops ..................................................................................................................... 32

Advocacy-dialogues/meetings ............................................................................................................................. 33

Policy/Law/Plans Dissemination activities ........................................................................................................... 34

Social Mobilization and other Advocacy Events .................................................................................................. 35

Training ................................................................................................................................................................ 35

Monitoring Visits and evaluation ......................................................................................................................... 37

Other activities .................................................................................................................................................... 39

IYCF National plan of Action ................................................................................................................................ 40

Codex Coordinating Activities .............................................................................................................................. 41

Codes Conferences/Meetings/Management ...................................................................................................... 42

Monitoring Compliance with the BFHI Standards ............................................................................................... 43

Monitoring Compliance with the international (national) Code ......................................................................... 44

Maternity Entitlements ....................................................................................................................................... 45

Development Cost for Pre-Service/In-Service Training Programs ....................................................................... 47

Monitoring and Evaluation, TRaining Follow-Up ................................................................................................. 48

Breastfeeding Support Groups (Peer COUNSELORS/volunteers) ........................................................................ 49

Community Outreach Activities ........................................................................................................................... 51

Development of a Nutrition/IYCF Emergency Preparedness/Response Plan ...................................................... 52

Mobilization of Breastfeeding Support Groups during Emergencies .................................................................. 53

IEC/Communication Materials ............................................................................................................................. 54

VIEWING SUMMARIES ............................................................................................................................................ 57

Summary by Strategy ........................................................................................................................................... 57

Overall Summary ................................................................................................................................................. 61

PRINTING OF SUMMARIES ...................................................................................................................................... 64

Printing of Individual Strategy Summary ............................................................................................................. 64

Sample Print Strategy SummaryPage: ................................................................................................................. 66

Page 4: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

Page | 4

Printing the Overall Summary Report: ................................................................................................................. 67

Sample Print Page Overall Summary: .................................................................................................................. 68

Figure 1: Project Title ...................................................................................................... Error! Bookmark not defined.

Figure 2: Select Country ............................................................................................................................................... 15

Figure 3: Exchange Rate............................................................................................................................................... 16

Figure 4: Data Entry Country Profile ............................................................................................................................ 17

Figure 5: To Main Menu .............................................................................................................................................. 18

Figure 6: IYCF Strategies .............................................................................................................................................. 18

Figure 7 Go Top ........................................................................................................................................................... 19

Figure 8: Components Programme Management ....................................................................................................... 21

Figure 9: National Programme Management Unit ...................................................................................................... 22

Figure 10: Budget Items Operating Costs .................................................................................................................... 23

Figure 11: Information System .................................................................................................................................... 23

Figure 12: Research and Development ........................................................................... Error! Bookmark not defined.

Figure 13: Annual Planning .......................................................................................................................................... 24

Figure 14: Personnel Cost ............................................................................................................................................ 25

Figure 15: Monitoring Visits ........................................................................................................................................ 27

Figure 16: Cost of Programme Evaluation ................................................................................................................... 28

Figure 17: Capital Investment ...................................................................................................................................... 29

Figure 18: Others ......................................................................................................................................................... 30

Figure 19: Common Costing Components ................................................................................................................... 31

Figure 20: Research and surveys ................................................................................................................................. 31

Figure 21: Conferences and Seminars ......................................................................................................................... 32

Figure 22: Advocacy Meetings ..................................................................................................................................... 33

Figure 23: Public Dissemination Forum ....................................................................................................................... 34

Page 5: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

Page | 5

Figure 24: Social Mobilization ...................................................................................................................................... 35

Figure 25: Training ....................................................................................................................................................... 36

Figure 26: Monitoring .................................................................................................................................................. 37

Figure 27: Evaluation Cost ........................................................................................................................................... 38

Figure 28: Other Activities ........................................................................................................................................... 39

Figure 29 Saving facility ............................................................................................................................................... 40

Figure 30: Development of an IYCF Plan of Action ...................................................................................................... 40

Figure 31: CODEX coordinating activities .................................................................................................................... 41

Figure 32: Codex: Conferences and Seminars ............................................................................................................. 42

Figure 33: Monitoring Compliance with BFHI .............................................................................................................. 43

Figure 34: Monitoring the Code .................................................................................................................................. 44

Figure 35: Maternity Entitlements, Option 1............................................................................................................... 45

Figure 36: Maternity Entitlements: Option 2 .............................................................................................................. 46

Figure 37: Maternity Entitlements: Option 3 .............................................................................................................. 46

Figure 38: Development of Pre-Service/In-Service Modules ....................................................................................... 47

Figure 39: Training Follow-Up ...................................................................................................................................... 48

Figure 40: Community Support Groups, Option 1 ....................................................................................................... 49

Figure 41: Community Support Groups, Option 2 ....................................................................................................... 50

Figure 42: Community Support Group, Option 3 ........................................................................................................ 50

Figure 43: Community Outreach Activities .................................................................................................................. 51

Figure 44: Development of an IYCF Preparedness/Response Plan .............................................................................. 52

Figure 45: Mobilization of BF Support Groups during emergencies ............................................................................ 53

Figure 46: Development on an IYCF Communication Plan .......................................................................................... 54

Figure 47: Celebration of the World Breastfeeding Week .......................................................................................... 55

Figure 48: Development, Production and Distribution of IEC/Communication Materials .......................................... 55

Figure 49: Cost for placement of newspapers/magazines articles .............................................................................. 56

Figure 50: Development and Airing of TV/Radio Ads .................................................................................................. 56

Page 6: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

Page | 6

Figure 51: Viewing of Strategy Summary .................................................................................................................... 57

Figure 52: Viewing of Strategy Summary: Step 2 ........................................................................................................ 58

Figure 53: View of Strategy Summary ......................................................................................................................... 59

Figure 54: Tracking and monitoring of budget allocations and utilizations ................................................................ 60

Figure 55: Overall Summary View: Option 1 ............................................................................................................... 61

Figure 56: Overall Summary View: Option 2 ............................................................................................................... 61

Figure 57: Sample Overall Summary ............................................................................................................................ 62

Figure 58: Summary Costs, sources and utilization ..................................................................................................... 62

Figure 59: Summary costs, allocations and utilization ................................................................................................ 63

Figure 60: Printing Strategy Summary, Step 1 ............................................................................................................. 64

Figure 61: Print Strategy Summary, Step 2 .................................................................................................................. 64

Figure 62: Print Strategy Summary, Step 3 .................................................................................................................. 65

Figure 63: Printing Overall Summary ........................................................................................................................... 67

Figure 64: Printing all individual strategy summaries .................................................................................................. 69

Page 7: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

Page | 7

INFANT AND YOUNG CHILD FEEDING (IYCF)

FINANCIAL PLANNING TOOL (BPNI/IBFAN)

USER’S MANUAL THE WORLD BREASTFEEDING COSTING INITIATIVE (WBCI)

INTERNATIONAL BABY FOOD ACTION NETWORK(IBFAN) SOUTH ASIA REGIONAL COORDINATING OFFICE (WBCI)

C/O Breastfeeding Promotion Network of India (BPNI) BP-33, Pitampura, Delhi-110034

Phone: +91-11-27312705 Email: [email protected]

Page 8: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

Page | 8

Disclaimer: The Country highlighted on the strategy sheet is just an example

Page 9: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

Page | 9

FOREWORD:

When the International Code of Marketing for Breastmilk Substitutes came into existence, International Baby Food Action Network (IBFAN) took on the task of initiating action at country level to give effect to it. Further, when the WHO launched the Global Strategy for Infant and Young Child Feeding (IYCF), IBFAN took the lead and pioneered a simple tool for assessing its implementation. We adapted the assessment tools developed by WHO into a simple and easily understandable tool and converted them into an initiative to generate local action - the World Breastfeeding Trends Initiative (WBTi). It was launched in South Asia in 2004, and in 2008/09 globally. To date more than 90countries have assessed their policies and programmes. From more than 100 reports it has emerged, we found that country after country lacked a plan of action and budgetary provisions. Investments on IYCF have been insufficient by governments or donors. That inspired us to develop another initiative - World Breastfeeding Costing initiative (WBCi). The WBCi has two components. There is an advocacy paper, “The Need to Invest in Babies” to advocate to all countries to implement the Global Strategy in its entirety. The paper helps in making financial decisions. The second component is a 'financial planning tool' that helps in development of specific plans of action and accurate budget estimates. This is an Excel based tool for assisting the countries to developing single or multi- year plans on one or more indicators. I hope this tool will serve as a big help to the programme managers wanting to implement and integrate infant and young child feeding within child health and nutrition programmes, and create specific budget lines and demands to do so. At the same time it will also help donors, agencies, and project staff,who wanted to focus on infant and young child feeding, to prepare the projects. Needless to say, the WBCi bridges a major gap of allocating resources, which is critical for tackling undernutrition.

Dr. Arun Gupta MD, World Breastfeeding Trends Initiative(WBTi),

and CentralCoordinator BPNI

Page 10: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

Page | 10

BACKGROUND:

BPNIhas been in the forefront of breastfeeding protection, promotion and support for the past thirty years. Advocacy, Promotion, Policy development, education and capacity building activities have been pillars in the work of the organization.

Since 2010 BPNI/IBFAN-Asia has been spearheading a pioneering initiative in South Asia.Thanks to the support of the World Bank assisted SAFANSI Project (South Asia Food and Nutrition Security Initiative). Evidence shows that breastfeeding and IYCF practices have been stagnant. The organization identified the lack of policies and the insufficient resources allocated for it, as main gaps and initiated the development of a strategic paper “The need to invest in babies?”, to call on governments, donors and the global community on increasing their financial commitment towards nutrition and specifically towards IYCF.

Breastfeeding and IYCF programs all over the world require resources, to improve and to contribute to saving children’s lives, the WBCi guides and support countries in their efforts to determine what resources are needed at the country level is needed. The Financial Planning Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments and donors, cost necessary programmatic strategies to improve IYCF in the country.

The WBCi–financial planning tool follows the strategic approach of the Global Strategy for Infant and Young Child Feeding as well as the structure and directions of the World Breastfeeding Trends Initiative (WBTi).

Page 11: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

Page | 11

INTRODUCTION:

One hundredthirty dollars (US$ 130) per live birth a year (US$ 17 billion a year) can help prevent 12% of under five deaths according to the WBCi estimates. This is a modest investment if we consider that the US alone will be able to save US$ 13 billion a year if breastfeeding rates alone are increased to 90%, and avert 749 infant deaths.

Despite the overwhelming evidence, global rates of optimal infant and young child feeding, especially exclusive breastfeeding – have remained stagnant over the past decade. Of the 135 million babies born every year, only 41% - 55 million - are able to practice exclusive breastfeeding for six months and timely, safe and adequate complementary feeding is still.1

The neglect of interventions particularly to enhance breastfeeding rates has been particularly reflected in the lack of a global budget specifically for implementing them. Evidence is being generated on the cost effectiveness specific interventions to improve Infant and Young Child Feeding.

Countries are encouraged to:

1. Integrate the Global Strategy for Infant and Young Child Feeding as a key priority in the countries’ development agenda, maternal and child survival frameworks and programmes

2. Pass laws that will ensure the protection, promotion and support appropriate IYCF practices:

o Legislate for the implementation of the International Code of Marketing of Breastmilk Substitutes and subsequent WHAs resolutions; and

o Maternity protection laws for women working in the formal and particularly the informal sector, providing them with some entitlements during their maternity period.

3. Integrate IYCF counseling and support (Health facility and community based) in the existing poverty alleviation cash programs: e.g. Conditional Cash Transfer programmes (CCTs)

4. Ensure that the budget line/allocations for Nutrition includes Breastfeeding and Infant and Young Child Feeding protection, promotion and support costs.

5. Devise packages/schemes to be financed by the National Insurance System for but not limited to:

Integrate Health Facility based nutrition counselling services as a essential in the public health systems and reimbursable (prenatal, post-partum) in the national insurance system

1UNICEF. Infant and Young Child Feeding Database, 2018 https://data.unicef.org/topic/nutrition/infant-and-young-child-feeding/

Page 12: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

Page | 12

Deliveries in BFHI practicing facilities to be recognized with higher reimbursement /additional grants/additional allocations.

PURPOSE

The WBCifinancial planning tool has been developed following the principles and structure of the WBTi, its key components and strategies are consistent with the WBTi and are the minimum set necessary to implement the Global Strategy for Infant and Young Child Feeding. It is flexible, user friendly and countries can easily customize it to their specific context.

Annual IYCF financial plans, as well as multi-year estimates can be easily generated, using local estimates, inputs and information. The aim of the WBCi, is for programme managers and partners to initiate constructive and productive advocacy with national governments and donors, towards a more evidence based effort in identifying the actual financial and human resources required to protect, promote and support appropriate breastfeeding and complementary feeding practices in the country.

INTENDED USERS

This Financial tool is to assist and guide Infant and Young Child Feeding planners, child health coordinators, nutrition officers, mother and child coordinators, other public health practitioners, finance and programme personnel in developing an annual or multi-year budget to achieve key development targets. The intended users of this tool are health budget specialists, breastfeeding/IYCF agency directorsand programme managers.This tool ishelpful forthe preparation of project budgets and in doing costing analysis.

Page 13: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

Page | 13

REQUIREMENTS

The Tool has following needs.

HARDWARE REQUIREMENTS

The WBCi tool programme will run on most computer desktops and laptops using the Windows Operating System (OS). It will require only the basic hardware enough to run Windows 7 – 500MHz CPU; preferably 512MB RAM; and at least 1 GB of free hard drive space.

SOFTWARE REQUIREMENTS

The tool programme runs on Microsoft Office Excel 2007 under Windows 7. No other software is required to operate the programme. The WBCi contains Excel built-in formulas and macro programmes which will require enabling macros in opening Excel.

THE STRUCTURE OF THE IYCF WBCI

The tool is lodged on Microsoft Office Excel 2007. As such, it looks and runs like any other programme under Excel, except that the toolcontains formulas, macro programme and protected cells/worksheets to automate the procedure and safeguard the data from accidental changes or erasure.

The programme has four (4) parts.

The first part is the Country Profile where the user is asked to fill up the profile sheet and select the country and the currency exchange rate to USD. The second part is the Main Menu which contains the different interventions. Selecting any of the interventions will bring you to third part of the programme - the budget worksheet for the different interventions. The budget worksheets provides table where user enters data to generate the corresponding budgets for the different activities or cost items under the particular component strategy. The fourth part contains the summary pages – the summary per component and the overall summary. The summaries can be printed – the overall summary, the summaries by component or all the component summaries.

Page 14: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

Page | 14

QUICK START

DOWNLOADING, SAVING AND OPENING THE WBCI:

The WBCi programme with the filename WBCi_Release_1.1 can be downloaded at http://worldbreastfeedingtrends.org/uploads/WBCi_Ver_PLUS_2018_July13.xlsor copied from any USB or CD that contains the programme file. The programme can be started as in any Office file – either by double clicking the file icon or title, or by opening once excel is open.

Please note that for the programme to open, Excel 2007 should be set at

“ENABLE MACROS”.

The Financial tool has an automatic saving feature when users navigate through the worksheets and also provides buttons for saving at any time. The worksheets can also be saved through the usual ‘save’ option of the Excel programme. The user can therefore change the file name by “Saving As” and using another file name.

Reminder:

Once you open the financial tool, You may see the following “Security Warning”

If yes, then follow the steps below:

Step 1: Please click on the “options” button

Step 2: Click on “Enable Content” Step 3: Click OK

Page 15: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

Page | 15

In updating the Financial Tool file, users should access the file that was last saved.

The first part

STARTING USING THE FINANCIAL TOOL: COMPLETE THE COUNTRY PROFILE

START: GO TO COUNTRY PROFILE

Step 1: Select the country

Select the name of the country for which you are developing the plan. Automatically the name of the country will appear as the project title.

Figure 1: Select Country

Page 16: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

Page | 16

Step 2: After selecting the country. You will have to enter the “prevailing/average exchange rate of your currency with the US$. Please do enter.

Figure 2: Exchange Rate and total duration of the plan

Page 17: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

Page | 17

Step 3: Next you will have to enter the total no. of years that the plan will be covering. Once you haveentered the no.of years, the same will appear near the name of the country in your project title.

Figure 3 Plan duration and title

Step 4: Using the most recent data from your country, please fill up the Country Profile. Indicate the year(as of when ) the data is updated.

Figure 4: Data Entry Country Profile

Page 18: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

The Se

THE MAI

After com“Go toM

Figure 5: T

Main Me

econd pa

N MENU

mpleting theainMenu”to

To Main Menu

enu:

art

e Country Proo enter the f

ofile, you arfollowing pa

Figure 6

e ready to stge:

: IYCF Strategie

tart. In the C

es

Country Prof

Pag

file Page, -c

ge | 18

lick

Page 19: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

Page | 19

The main menu contains the following:

1. Programme Management Component 2. IYCF strategies, in order:

a. Policy Development, Legislation, Planning and Coordination b. Baby Friendly Hospital Initiative c. Implementation of the International Code and WHAs d. Maternity Protection e. Health and Nutrition Care System f. Mother Support and Community IYCF Actions g. IYCF in exceptionally difficult circumstances (HIV and Emergencies h. IYCF Communication for behavior and social change

The Financial Tool helps estimate the cost necessary to implement all the key interventions and activities at the strategy level. In the following pages we will present the components for each strategy and a brief description of the data to be entered accordingly.

SAVING FACILITY

The Financial Tool provides you with the opportunity to save the work entered at any stage and from any component you are in. It is recommended that you save the work you are doing periodically, so as to avoid any inconvenience.

Figure 7 Go Top

If you are in the main menu, you can save all the work done and automatically go to the country profile page.

Remember: You can find the saving facility at the top of the table, next to Main Menu and Component Summary

Page 20: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

Page | 20

Reminder: Please when you enter in the page of a specific strategy, you may need to scroll down to be able to see all the possible costs that can be computed using the Financial Tool.

Page 21: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

The th

INSTRUC

COSTING

Figure 8: C

hird part

CTIONS FOR

G COMPONE

Common Costin

t

R INDIVIDUA

ENTSOF THE

ngs Componen

1

2

3

4

5

6

AL IYCF STR

E PROGRAM

nts

• P

• O

• H

• M

• C

• O

RATEGIES

ME MANAG

Program

Operatio

Human

Monitor

Capital C

Other A

GEMENT UN

mme Ma

ons

Resourc

ring and

Cost

ctiivities

IT

anageme

ces

d Evaluat

s

Pag

ent Unit

tion

ge | 21

t

Page 22: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

Fi

gure 1: Nation

DESCRIP

PROGRA

Inpaper.

AUnit (e.gspecific iparticipa

nal Programme

TION OF DA

M MANAGE

n this section

Also, the costg. Coordinatnformation nt, etc. etc.)

e Managemen

ATA ENTRY:

EMENT UNIT

n you may e

t for an actiting Commirelated to t

)

nt Unit

T

enter the co

vity that wilttee, Technthe activitie

st (total) for

ll formalize nical Workins (e.g. # of

r the develo

the creationng Group), participants

opment of a

n of a Prograbut this tim

s, resource p

Pag

country stra

am Manageme, enteringpersons, cos

ge | 22

ategy

ment g the st per

Page 23: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

OPERATI

Oprogramneed to unit costeventual

Figure 2: B

Under “Omay entesoftware

Figure 3: In

IONS

Operation come/managespecify the #t. After entely the total f

Budget Items O

Operations”,er total amoe itself . At th

nformation Sy

osts in the Fer/committe# of units (e

ering this dafor the whol

Operating Cost

, you will havunts for the

he same time

ystem

Financial Tooee/unit will ie.g. # of mota, the Finale componen

ts

ve the possi cost of desie you should

ol are definncur. You wnths, # of trncial Tool wnt.

bility to costigning, deved cost for its

ed as the rwill see a sugravels, # of dwill compute

t for the IYCFloping the so

s regular ma

egular (dailyggested list days etc.) ane the sub-to

F Informatiooftware or tintenance.

Pag

y) costs thaof costs; yound the estimtal per cost

on System. Ythe cost of t

ge | 23

t the u will

mated , and

You the

Page 24: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

Figure 10:

Cost for rreflected

Annual Planni

regular pland:

ing

ning exercisses can be esstimated enttering the sttandard info

Pag

rmation

ge | 24

Page 25: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

HUMAN

The Finanneeded, specific w

A list of p

1. Under

2. Under

3. Under

Rememb

The Finanprovidedappropri

Figure 4: P

RESOURCES

ncial tool prboth regula

works/techn

possible pers

No. of Staff

Duration: T

Unit Rate: T

ber:

ncial tool prd to the new ate amount

Personnel Cost

S

ovides the ur and non-re

nical assistan

sonnel is pro

f: Quantity n

The duration

The salary/co

ovides the ppersonnel aunder unit c

t

user the possegular staff, nce during th

ovided. You

needed per p

of the contr

onsultancy f

possibility toaccording tocost.

sibility to estas well as co

he implemen

only need to

personnel

ract/agreem

fee month/w

include ben your nation

timate the consultants/sntation of th

o specify the

ment with the

week/day.

nefits/incentnal laws and

cost for the hspecialists nehe IYCF progr

e following:

e personnel

tives that haregulations.

Pag

human resoueeded for ram.

ve to be . Please add

ge | 25

urces

the

Page 26: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

Page | 26

Definition (s):

The positions listed are generally common, for the following we define them as:

1. Programme/Technical Consultants: Any technical support personnel/consultant that needs to be hired for short/long term engagements. On a project basis or for a specific output/product. Usually paid per day/week/month of work.

2. IYCF Staff: Members of the IYCF team/specifically assigned to support the programme (100% of their time). Their salary is fully charged to the IYCF programme.

3. IYCF Training Specialists: Health and non-health professionals employed/not employed that will be tapped as trainers for the conduct of national/sub-national training activities. They are usually paid according to national rates, and per day of service rendered.

4. IYCF Training Assistants: Health and non-health professionals/skilled employed/not employed that provide support services during the training (e.g. documenters, secretariat services, logistics management, venue and transportation,etc.). They are usually paid ona per day/week/month depending on the number of training they are going to be involved.

5. Non-health professionals: Any non-professional personnel (not yet listed) that will need to hire. Examples are: drivers, general maintenance staff, writers, database managers, administrators etc.

6. Non-health technicians: IT support and maintenance technicians, programmers, possibly depending on the programme characteristics also medical equipment technicians and cold chain technicians.

Page 27: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

MONITO

Monitori

St St

re St

te St St St

Figure 5: M

ORING AND E

ing Visits

tep 1: Selecttep 2: As sooeflected (thetep 3: Enter ear tep 4: Enter tep 5: Enter tep 6: Enter

Monitoring Vis

EVALUATIO

t if you are ron as you hae one you en

the estimat

the no. ofpathe estimatthe estimat

its

N

referring to Rave selectedntered in theted # of mon

ax that will cted travel coted per diem

Region/Prov, the total n

e Country Prnitoring visit

compose theost per pax m per pax

vinces/Distrio. of Region

rofile) s you/team

e monitoring

cts ns/Provinces

will carry ou

g team

Pag

/Districts wi

ut during the

ge | 27

ill be

e

Page 28: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

Cost of P

At the Prentering

1. Ev2. Fi3. C

Figure 6: C

Programme E

rogram Manthe followin

valuation Deield Evaluatiost of Analy

Cost of Program

Evaluations:

agement Leng total cost

esign ion Cost

ysis and Evalu

mme Evaluatio

vel you mays:

uation Repo

on

y cost the co

ort

nduct of Proogramme Ev

Pag

valuations

ge | 28

Page 29: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

CAPITAL

Cwell as Vfor what and equi

Figure 7: C

COST

osting for cVehicle and E

concerns phpment.

Capital Investm

apital investEquipmentanhysical infras

ment

tments provnd Furniturestructure, an

vided. Capitae. You have nd quantity

al costs inclto enter uniand unit rat

uded Physicit size, quantte for what c

Pag

cal Structuretity and unit

concerns veh

ge | 29

es, as t rate hicles

Page 30: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

OTHER A

Step 1: Enoteboo

Step 2: E

Step 3: E

Step 4: E

After thesub-total

Figure 8: O

Evepossib

ACTIVITIES

nter the desks)

nter the Uni

nter the tot

nter the est

ese three stel cost of the

Others

ery componbility to cost

S

scription of t

it of the Item

al # of Units

imated/quo

eps are compitem and th

nent and strat any “other

regula

SAVE AN

the item/cos

mthat will be

s of items req

oted unit cos

pleted the Fie total for a

REMEMB

ategy of ther” item/costar cost for th

D GO BAC

st (e.g. time

e used in the

quired (e.g.

st (e.g. US$ 5

inancial Tooll the items

BER

e Financial Tot that is not he country.

CK TO TH

needed to p

e cost estima

10)

50)

l will automlisted.

ool provideslisted and/o

HE MAIN

painting of t

ates (e.g. # o

atically com

s for the or it’s not a

MENU

Pag

he office,

of days)

mpute for the

ge | 30

e

Page 31: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

STANDA

Figure 9: C

COMMO

RESEARC

Tstudies/rBFHI commemberscommiss

Figure 10:

RDCOSTING

Common Costin

N DATA ENT

CH/STUDIES

he Financreviews/assempliance in ts, travel cosioned/will b

Research and

1

2

3

4

G COMPONE

ng Component

TRY INSTRU

/SURVEYS

ial Tool essments spthe country sts and othebe commissio

surveys

• Law

• Tra

• Mo

• Ot

NTS PER EA

ts

UCTIONS FO

provides tecific to a ceetc. The us

er related cooned to an e

w, Policy, R

aining

onitoring a

ther Activit

ACH IYCF ST

R ALL IYCFS

the possibertain issue

ser can enteosts, as welexternal part

Regulation

and Evalua

ties

RATEGY

STRATEGIES

bility to (e.g. marke

er the estimall as a total tner/agency

ns & Advoc

ation

cost natioting study oated cost peamount in c

y.

cacy

Pag

onal/sub-naton BMS, studer research case the stu

ge | 31

tional dy on team

udy is

Page 32: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

CONFERE In

workshowill be reTotal estparticipaallowancrental b) are not a

Figure 11:

ENCES/SEM

n all strategps that aim equired to eimated # of nt that cons

ce per particvenue renta

applicable, th

Conferences a

INARS/WOR

gies the useat developi

enter key/baparticipantssider the kitcipant if proal and c) anyhen you can

and Seminars

RKSHOPS

er can estiming policies,asic informas, 3) per diemt, materials

ovided. Addity other confleave the co

mate the co plans, com

ation relatedm per particand meals ptional cost cference cost orrespondin

ost to convmmunication

d to 1) lengtipant (if per per day of acan be entenot yet listeg cell “blank

vene confereplans, etc.

th of the acdiem providctivity and 5red related ed. In case sk”.

Pag

ences, semiIn this case

ctivity in dayded) 4) a cos5) transportto a) equip

some of the

ge | 32

inars, , you ys, 2) st per ation ment costs

Page 33: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

ADVOCA

Inpolicy macase, youdays, 2) Tcost per transporta) equipmof the co

Figure 12:

ACY-DIALOG

n all strategiakers and du will be reqTotal estima

participanttation allowment rental

osts are not a

Advocacy Mee

UES/MEETI

es the user ecision mak

quired to enated # of part that consi

wance per pab) venue re

applicable, t

etings

NGS

can estimatkersthat aim nter key/basrticipants, 3)ider the kitarticipant if ental and c) hen you can

te the cost mat supporti

ic informatio) per diem p, materials provided. Adany other m

n leave the c

meetings forng policies, on related ter participanand meals

dditional comeeting cost

orrespondin

r advocacy alaws and re

to 1) length nt (if per dieper day of

st can be ent not yet listng cell “blan

Pag

nd dialogueegulations. In

of the activem providedf activity anntered relateed. In case sk”.

ge | 33

with n this vity in ) 4) a

nd 5) ed to some

Page 34: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

POLICY/LIn

disseminlength ofper diemof activitentered yet listedcell “blan

Figure 13:

LAW/PLANSn all strategiation. In th

f the activitym provided) 4ty and 5) trarelated to ad. In case sonk”.

Public Dissem

S DISSEMINAies the useris case, you

y in days, 2) 4) a cost peansportation) equipment

ome of the c

mination Forum

ATION ACTI can estima

u will be reqTotal estimar participantn allowance t rental b) vecosts are no

m

VITIES te the cost

quired to enated # of pat that considper particip

enue rental ot applicable

for policies,nter key/basrticipants, 3der the kit, pant if provand c) any o

e, then you c

, laws, regulsic informati) per diem pmaterials anided. Additiother dissemcan leave th

Pag

lations and ion related per participand meals peonal cost ca

mination coshe correspon

ge | 34

plans to 1)

ant (if r day

an be st not nding

Page 35: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

SOCIAL M

Inmobilizatkey/basicparticipaconsider participarental anyou can l

Figure 14:

TRAININ

Astrategy (provides trainings t

The follow

Step 1:

For each t

Step 2:

Step 3: Step 4:

MOBILIZATI

n all stratetion (e.g. gac informationts, 3) per the kit, ma

nt if providend c) any otleave the co

Social Mobiliz

G

ll strategies (e.g. Trainingsome suggesthat are not l

wing are sugg

Select interes

training the fo

Enter public Enter tEnter t

ON AND OT

gies the usatherings, con related tdiem per pa

aterials and ed. Additionher cost notrresponding

zation

provide theg on Code mstions for stanisted and tha

gested steps w

the training sted to cost in

following will

the type of health nurse

the duration the # of staff

THER ADVOC

ser can estcelebrations,to 1) lengtharticipant (ifmeals per d

nal cost can t yet listed.

g cell “blank”

e opportunitymonitoring, IY

ndard traininat are more ap

when entering

you are inten the approp

be the standa

staff that wies, etc.) of the traininthat are targ

CACY EVENT

timate the , etc.).In thh of the acf per diem day of activibe entered In case som

”.

y to cost spYCF counselinngs, but at thppropriate to

g information

erested to coriate blank sp

ard requireme

ill attend/par

ng eted to atten

TS

cost for ais case, youtivity in dayprovided) 4ity and 5) trrelated to a

me of the co

pecific/speciang, Lactation e same time

o the country

n in this table

ost/enter thepace.

ents:

rticipate in th

nd/participate

dvocacy evu will be reys, 2) Total) a cost perransportatio) equipment

osts are not

lized trainingManagemen

, the user casituation.

e:

e name of the

he training (e

e in the traini

Pag

vents and sequired to el estimated r participanton allowancet rental b) vapplicable,

gs related tont etc.) The n enter addit

e training yo

e.g. hospital

ng (e.g. 30)

ge | 35

social enter # of

t that e per

venue then

o the WBCi tional

ou are

staff,

Page 36: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

Step 5: Step 6: Step 7: Step 8: Step 9: Step 10: Step 11: Step 12:

Step 13:

Step 14:

Figure 15:

Enter tEnter tA TotaEnter tEnter tEnter tEnter tEnter traininEnter traininenter per ye

Training

the per diem the total tran

al cost per kit,the # of resouthe honorariuthe per diem the total tranthe total n

ngs/year) the Total no

ngs per year, fthe estimatear)

per trainee ifnsportation al, meals, per purce personsum/Professioprovided to t

nsportation alo. of trainin

o. of years fofor 3 years)

ed % of cost

f provided followance per participant pe

onal fee per dthe resource llowance per ngs you plan

or which you

increase for

r participant if

er day

ay of trainingpersons resource per

nned to con

plan to offe

year of impl

f provided for

g

rson duct in one

er the trainin

ementation (

Pag

r

e (1) year (e

ng sessions (e

(e.g. 10% inc

ge | 36

e.g. 3

e.g. 3

crease

Page 37: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

MONITO

St St

re St

te St St St St

b

Figure 16:

ORING VISITS

tep 1: Selecttep 2: As sooeflected (thetep 3: Enter ear tep 4: Enter tep 5: Enter tep 6: Enter tep 7: Enter lank)

Monitoring

S AND EVAL

t if you are ron as you hae one you en

the estimat

the estimatthe estimatthe no. of ythe % of co

LUATION

referring to Rave selectedntered in theted # of mon

ted no. of mted travel coyears, for whst increase f

Region/Prov, the total n

e Country Prnitoring visit

embers thatost per memhich you planfor each yea

vinces/Distrio. of Region

rofile) s you/team

t will join theber and per n to run the r (if no incre

cts ns/Provinces

will carry ou

e monitoringdiem providtraining

ease in cost,

Pag

/Districts wi

ut during the

g visit ded

then leave i

ge | 37

ill be

e

it

Page 38: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

Cost of P

At the Prentering

1. Ev2. Fi3. C

Figure 17:

Programme E

rogram Manthe followin

valuation Deield Evaluatiost of Analy

Evaluation Co

Evaluations:

agement Leng total cost

esign ion Cost

ysis and Evalu

ost

vel you mays:

uation Repo

y cost the co

ort

nduct of Proogramme Ev

Pag

valuations

ge | 38

Page 39: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

OTHER A

Every com“other” i

StStStSt

After thesub-total

Figure 18:

ACTIVITIES

mponent antem/cost th

tep 1: Enter tep 2: Enter tep 3: Enter tep 4: Enter

ese three stel cost of the

Other Activitie

nd strategy oat is not liste

the descriptthe Unit thathe total # othe estimat

eps are compitem and th

es

of the Financed and/or it

tion of the itat will be useof units requted/quoted u

pleted the Fie total for a

cial Tool prov’s not a regu

tem/cost (e.ed in the estuired (e.g. 10unit cost (e.g

inancial Tooll the items

vides for theular cost for

.g. painting otimates (e.g.0) g. US$ 50)

l will automlisted.

e possibility the country

of the office. # of days)

matically com

Pag

to cost any y.

)

mpute for the

ge | 39

e

Page 40: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

Options f The Finanfrom anyyou are d

Figure 19 Sav

IYCF NAT

A key aspcan estiminformatper diemmaterialsprovidedany othethe corre

Figure 20:

for saving th

ncial tool pry componentdoing, period

ving facility

TIONAL PLA

pect of this mate the coion related

m per particis and meals

d. Additionaler cost not yesponding ce

Development

he workshee

ovides you wt you are in dically, so to

N OF ACTIO

strategy is rost related tto 1) lengthpant (if per s per day o cost can be

yet listed. Inell “blank”.

of an IYCF Pla

et

with the oppat the time o

o avoid any i

ON

related to thto plan deveh of the activ

diem providof activity ae entered re case some

an of Action

portunity to of saving. Itsnconvenienc

he developmelopment. Yvity in days,ded) 4) a co

and 5) transelated to a) e

of the costs

save the wos recommence in case of

ment of an IYYou will be , 2) Total esost per partisportation aequipment rs are not ap

ork entered anded that yof power failu

YCF Plan of required totimated # oicipant that allowance prental b) ven

pplicable, the

Pag

at any stage u save the w

ure or others

Action. The

o enter key/of participan

consider thper participanue rental aen you can

ge | 40

and work s.

user /basic ts, 3) e kit,

ant if nd c) leave

Page 41: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

CODEX C IYCF ProgAlimentafinancial (domestican be en

Figure 21:

COORDINA

grammes, marius standar

requiremenic and internntered using

CODEX coordi

ATING ACTI

may have to crds. The Finnts using a banational, perg the approp

inating activiti

VITIES

cost for coorancial Tool pasic set of dar diem (dompriate blank

ies

rdination actprovides youata entry. Nestic/internacells.

tivities relateu with the opo. of meetinational. Any

ed with the pportunity tng (Total), tra

other cost t

Pag

Codex o estimate yavel cost that is not lis

ge | 41

your

sted

Page 42: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

CODEX C For CODworksho 1) select 2) enter t3) enter t4) enter and 5) enter t6) enter any othethe corre

Figure 22:

CONFEREN

EX related aps focused o

the length othe total estthe per diemthe cost pe

the transporadditional c

er cost not yesponding ce

Codex: Confer

CES/MEET

activities theon Codex. Yo

of the activittimated # of m per particir participan

rtation allowcost can be yet listed. Inell “blank”.

rences and Sem

INGS/MAN

e programmou will be re

ty in days, f participantspant (if per t that consi

wance per paentered rela case some

minars

NAGEMENT

e may needquired to en

s, diem providder the kit,

articipant if ated to a) eof the costs

d to organizenter key/bas

ded) materials a

provided. equipment rs are not ap

e conferencesic informatio

nd meals pe

ental b) venpplicable, the

Pag

es, seminarson related to

er day of ac

nue rental aen you can

ge | 42

s and o:

ctivity

nd c) leave

Page 43: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

MONITO

Monitoriprovides Option 1 Option 2guideline Option 3guideline Dependinabove ty Step 1:

Step 2: Step 3: Step 4:

Figure 23:

ORING COMP

ng complianthe user wit

1: Cost monit

2: Cost for ases/standards

3: Cost for rees/standards

ng of the copes of monit

Enter periodEnter Enter Enter

Monitoring Co

PLIANCE WI

nce with BFHth three pos

toring visits

ssessment vis for accredi

e-assessmens for accredi

untry situatitoring.

the # of hosd (1, 2, 5 yeathe # of visithe No. of mestimated t

ompliance wit

TH THE BFH

HI its key for ssibilities:

to selected

isits (1st assetation/certif

t visits (2nd otation/certif

ion and spec

spitals that yars). ts per hospi

members of ravel cost an

h BFHI

HI STANDAR

its sustaina

hospitals

essments) infication.

or more) in cfication.

cific needs, y

you plan to m

tal that you the team. nd per diem

RDS

bility and up

case the co

case the cou

you can cost

monitor/asse

plan to cond

per membe

pgrading. Th

untry has cle

untry has cle

t simultaneo

ess/re-asses

duct for the

er.

Pag

e Financial T

ear formal

ar formal

ously all the

ss during the

period.

ge | 43

Tool

e

Page 44: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

MONITO

The FinanInternati

Step 1: Step 2: Step 2:

Step 4: Step 5:

Figure 24:

ORING COMP

ncial tool pronal Code (N

SelectEnter Enter the peEnter Enter

Monitoring th

PLIANCE WI

ovides with National Cod

t if the monithe # of regthe # of visi

eriod. the No. of mestimated t

he Code

TH THE INT

the facility tde).

toring costingions/provincts per region

members of ravel cost an

TERNATIONA

to cost for M

ng will be foces/districtsn/province/

the team. nd per diem

AL (NATION

Monitoring co

r regions/prs that you pladistrict l tha

per membe

AL) CODE

ompliance w

rovinces/distan to monitot you plan to

er.

Pag

with the

tricts or in one yeao conduct fo

ge | 44

ar or

Page 45: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

MATERN

The Finafor womof a 2 USdaily entall the pa

Option 1

Step 1: CStep 2: E

Figure 25:

Please

NITY ENTITLE

ncial tool pren leaving b

S$/day for a titlement thearameters ac

:

lick the Box nter the ma

Maternity Ent

e note: the to

EMENTS

rovides for tbelow pover

total of 180e average mccording to c

“Option 1”1ximum cove

titlements, Op

poverty inbe update

three (3) optty line. Opt

0 days. Optiominimum daicountry's pr

1 erage (180 d

ption 1

ncidence used accordin

tions on howtion 1, provion 2, insteadily wage/or iorities.

ays minimum

sing the Wng to the la

w to cost fordes for a fixd provides thigher. Opt

m recomme

World Bankatest coun

r the maternx equivalent he opportunion 3, allow

nded)

k of 2USD pntry figure

Pag

nity entitlemin local curr

nity to enterws the user t

per day ne

ge | 45

ments rency r as a to set

eds

Page 46: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

Option 2

Step 1: Step 2: Step 3:

Figure 26:

Please

Option 3

Step 1: Step 2: Step 3: Step 4:

Figure 27:

:

Click tEnter Enter provid

Maternity Ent

e note: the b

:

Click tEnter Enter Enter provid

Maternity Ent

the Box “Optthe maximuthe minimu

de)

titlements: Op

poverty inbe updated

the Box “Optthe no. of mthe no. of dthe daily su

de)

titlements: Op

tion 2” um coveragem daily wag

ption 2

ncidence usd according

tion 3” mothers to b

ays of the cobsistence to

ption 3

e (180 days mge/daily wag

sing the Wg to the lat

e covered overage (mi

o be provide

minimum rege (or any am

World Banktest countr

nimum recod (or any am

commendedmount that c

k 2USD perry figure

ommended imount that c

Pag

d) country plan

r day needs

s 180 days) ountry plans

ge | 46

s to

s to

s to

Page 47: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

DEVELOP

Costing fprofessiothe posstraining counselo

.

Figure 28:

PMENT COS

for developonals, can besibility to co

programs ors.

Development

The useservice,

T FOR PRE-

ping/integrate entered us

ost the possspecific to

of Pre-Service

er is require, in-service a

needs to

SERVICE/IN

ting/updatinsing the tabible develop

communit

e/In-Service M

RE

ed to enter Oand communbe entered

-SERVICE T

ng/upgradingle below. Atpment of spty health v

Modules

EMEMBER

ONLY the denity based paccordingly

RAINING PR

g curriculumt the same tpecific in-sevolunteers/c

evelopment programs. Soy in the spec

ROGRAMS

m for pre-setime the WBrvice trainin

community

cost of the po a onetimeificcell

Pag

ervice, of hBCi providesng programs

volunteers/

pre- cost

ge | 47

ealth with s and /peer

Page 48: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

MONITO The Finan

Step 1: Step 2:

Step 3:

Step 4: Step 5:

Figure 29:

ORING AND E

ncial Tool pr

SelectEnter traininEnter the peEnter Enter

Training Follo

EVALUATIO

rovides with

t if the monithe # of reg

ng/curriculuthe # of visi

eriod. the no. ofpathe travel co

w-Up

N, TRAININ

the facility t

toring costingions/provinc

m integratiots per region

axwhowill joost and per

G FOLLOW-

to cost for T

ng will be foces/districtson in one yen/province/

oin the monidiem per pa

UP

Training Follo

r regions/prs that you plaar district l tha

toring ax

ow Up activi

rovinces/distan to follow

t you plan to

Pag

ties.

tricts up after the

o conduct fo

ge | 48

e

or

Page 49: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

BREASTF

The Fincounseloa 7.5 USentitlemeall the pa

Option 1

Step 1: Step 2:

Figure 30:

FEEDING SU

nancial Tooors/breastfeeS$/live birthent the averarameters.

:

Click tThe Fithe covolunt

Community Su

PPORT GRO

ol provideseding volunth/year. Optrage minimu

the Box “Optinancial Tooountry as enteer/20 child

upport Groups

OUPS (PEER

s for threteers Optionion 2, inste

um daily wag

tion 1” l automatictered in thedren a year

s, Option 1

COUNSELO

ee (3) opn 1, provide

ead providege/or higher

cally comput Country Pro

RS/VOLUNT

ptions on es for a fix eq

s the oppor. Option 3, a

te based on tofile, and co

TEERS)

how to quivalent in

ortunity to eallows the u

the Total Nonsidering a r

Pag

cost for local currenenter as a

user to custo

o. of live birtratio of 1

ge | 49

peer ncy of

daily omize

ths in

Page 50: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

Option 2

Step 1: Step 2:

Step 3:

Figure 31:

Option 3

Step 1: Step 2: Step 3: Step 4:

Figure 32:

:

Click tThe FirationEnter mater

Community Su

:

Click tEnter Enter Enter

Community Su

the Box “Optinancial Too

n of 1 voluntthe monthly

rials/forms a

upport Groups

the Box “Optthe no. of Pthe amountthe average

upport Group,

tion 2” l computes teer/20 childy allowance and others

s, Option 2

tion 3” PCs to be supt/month to be cost of the

, Option 3

the numberdren a year

per volunte

pported be provided materials to

of Voluntee

eer plus the a

to the PCs o be given to

ers required,

allowance fo

o the PC on a

Pag

, using at the

or

a monthly ba

ge | 50

e

asis

Page 51: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

Cost for testimate

Step 1:

Step 2: Step 3:

COMMU

Figure 33:

Countrieand the r

The Finaemergen

You will 2) Total eper parttransporta) equipmcosts are

the commund by

Enter monthEnter Enter outrea

NITY OUTRE

Community O

s, may haveresources ne

ancial tool ncy/disaster

be requiredestimated # ticipant thatation allowment rental

e not applica

nity outreach

the numberh the Total nuthe Total coach.

EACH ACTIV

Outreach Activi

e to developeeded to car

provides response pla

to enter keof participa

at consider wance per pa

b) venue reble, then yo

h activities o

r of outreach

umber of peost per perso

VITIES

ities

contingecy rry them out

the opportan.

ey/basic infoants, 3) per d

the kit, marticipant if ental and c)

ou can leave

of the health

h activities t

rsons that won to cover f

plans that wt during disa

tunity to c

ormation reldiem per pa

materials anprovided. Ad) any other the corresp

h center/hea

hat you plan

will l join durfor its transp

will help idester/emerge

ost for the

ated to 1) lerticipant (if

nd meals pdditional cocost not yetonding cell “

alth workers

n to conduct

ing the outrportation, m

entify activitency respon

e developm

ength of theper diem pr

per day of st can be ent listed. In c“blank”.

Pag

can be

t in one (1)

each activityeals during t

ies/intervense.

ment of an

e activity in rovided) 4) a

activity anntered relatecase some o

ge | 51

y the

ntions

IYCF

days, a cost nd 5) ed to

of the

Page 52: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

DEVELOP

Figure 34:

Another breastfee

The follo

Step 1: Step 2: Step 3: Step 4: Step 5: Step 6: Step 7:

PMENT OF A

Development

important aeding/peer s

wing are the

Enter Enter Enter Enter Enter Enter Enter safety

A NUTRITIO

of an IYCF Pre

aspect of IYCsupport volu

e suggested

the total # othe total # othe per diemthe cost perthe Total trathe honorara lump sum

y gears, boot

N/IYCF EME

eparedness/Re

CF in emergeunteers durin

steps:

of days you wof volunteerm per voluntr volunteer nansport allowrium per vol

m amount nets, tents, pro

ERGENCY PR

esponse Plan

encies is the ng emergen

will need to rs you plan toteer (if provnecessary towance per vunteer (if prcessary to co

omotional m

REPAREDNE

possibility tocy/disaster s

field/deployo field/depided)

o cover (matvolunteer (irovided) over for the

materials, mo

SS/RESPON

o cost for thsituations.

y the volunteploy

erials, mealsf provided)

purchase/pothers kits, o

Pag

SE PLAN

e mobilizati

eers

s)

procurementothers.

ge | 52

on of

t of

Page 53: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

MOBILIZ

Figure 35:

ATION OF B

Mobilization o

BREASTFEED

of BF Support

DING SUPPO

Groups during

ORT GROUPS

g emergencies

S DURING EMERGENCIE

Pag

ES

ge | 53

Page 54: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

IEC/COM

Costing fActivities

Figure 36:

The FinaBreastfeeYou will b Step 1 Step 2 Step 3 Step 4

Step 5 Step 6

MMUNICATIO

for the deves and other o

Development

ancial Tool eding Week.be required

selectenter enter enter of actenter enter rentalapplic

ON MATERI

elopment ofoperating co

on an IYCF Co

provides . to enter key

t the length the total estthe per diemthe cost peivity and the transpothe addition

l and c) anycable, then y

ALS

f the IYCF Costs can be e

ommunication

the opport

y/basic infor

of the activtimated # ofm per particr participan

ortation allownal cost can y other costyou can leave

Communicatentered as a

Plan

tunity to co

rmation relat

ity in days f participantipant (if per t that consid

wance per pbe entered

t not yet lise the corres

tion Plan, Colump sum in

ost for the

ted to:

ts diem provid

der the kit,

articipant if related to ated. In caseponding cel

oordination n the approp

celebration

ded) materials an

provided. a) equipmene some of tl “blank”.

Pag

and Supervpriate cells.

n of the W

nd meals pe

t rental b) vhe costs are

ge | 54

vision

World

r day

venue e not

Page 55: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

Figure 37:

Cost for tdone by produce.

Step 1: Step 2: Step 3: Step 4:

Figure 38:

Costing f

Step 1:

Celebration of

the design/lentering sel.

Enter Enter Enter Enter data/q

Development

for placemen

Enter

f the World Br

ayout, produected unit c

the cost to dthe # of copthe cost to the cost forquotations

, Production a

nt in newspa

the cost of d

reastfeeding W

uction and dosts beside

design/layoupies you planprint one (1

r distributing

and Distributio

apers/magaz

design/layou

Week

disseminatiothe IEC/prom

ut the matern to reprodu) copy (deriv

g (shipping) o

on of IEC/Comm

zines can be

ut of the art

on of IEC/promotional ma

rial uce ved from hisone copy (de

munication Ma

computed a

icle

omotional material you a

storical data/erived from

aterials

as per exam

Pag

materials can re planning

/quotations)historical

ple below by

ge | 55

be to

)

y:

Page 56: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

Step 2: Step 3:

Figure 39:

Costing fbelow by

Step 1: Step 2: Step 3:

Figure 40:

Enter Enter

Cost for place

for the devely:

Enter Enter Enter

Development

the # of plathe Cost pe

ment of news

lopment and

the cost of dthe # of airithe Cost pe

and Airing of

cements r placement

papers/magaz

d airing of Ra

design/layoung minutes r minute (ca

TV/Radio Ads

t (can be der

zines articles

adio and TV

ut of the art(total)

an be derived

rived from h

ads can be c

icle

d from histo

istorical dat

computed a

orical data or

Pag

a or quotati

s per examp

r quotation)

ge | 56

on)

ple

Page 57: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

The Fo

V

The user generate

1. S2. O

SUMMAR

To view t

From the

Step 1: S

Figure 41:

ourth part

VIEWING SU

can generated:

ummary by Overall Summ

RY BY STRAT

the summar

e Main Menu

elect the spe

Viewing of Str

t

MMARIES

te summarie

IYCF Strategmary (All com

TEGY

y of a specif

u

ecific strateg

rategy Summa

es of the wo

gy mponents)

fic compone

gy you are in

ary

rk done. The

nt you have

nterested

e following s

to:

summaries c

Pag

can be

ge | 57

Page 58: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

Once you

Step 2: C

Figure 42: Vie

Step 3: th

After you

1. P2. P

a3. P

u are in the p

Click on “Com

ewing of Strategy

he summary

u have done

ress the “baress the “Ovnd ress the “Ma

page of the

mponent Sum

Summary: Step 2

y page will o

reviewing t

ack” button, verall Summ

ain Menu” b

specific stra

mmary”: Rig

2

pen.

he page, you

you will retuary” button

button, you w

tegy

ght-Top of th

u have the fo

urn to the stn, you will se

will return to

he page

ollowing opt

trategy pageee the SUMM

o the Main M

tions:

e MARY of all t

Menu Page.

Pag

the strategie

ge | 58

es;

Page 59: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

Figure 43:

Tracking

For each from govmanuallyTotal am(fig 52) .Imonitori

View of Strate

and monito

IYCF compovernment buy the specificount receivets importanng and track

egy Summary

oring of bud

onent (strateudget as welc figures, as ed and the Ut to update king of resou

get

egy) the userl as from extwell as the a

Utilization Raregularly thi

urces provid

r can keep trternal sourcactual expenation will beis table, for eed and actu

rack of the “es (donors).

nditure acco computed aeach IYCF coal expenditu

“actual” amo The users h

ording to comautomaticalomponent, sures.

Pag

ounts receivhave to entemponent. Thly by the WB

so to have a

ge | 59

ed r

he BCi good

Page 60: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

Figure 44: Tracking and mmonitoring of budget allocattions and utiliz

zations

Pagge | 60

Page 61: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

OVERALL

To view t

1. P

Figure 45:

2. F

Figure 46:

From theconvertethe progwomen l

L SUMMARY

the overall s

ress the “ O

Overall Summ

rom the Com

Overall Summ

e overall sued amount inramme (witiving with le

Y

ummary you

verall Summ

mary View: Opt

mponent Sum

mary View: Opt

mmary, youn US$. At thth and withoess than US$

u have two (

mary” from t

tion 1

mmary, pres

tion 2

u can view the same timout the inclu$ 2 per day.

(2) options

the Main Me

ss the “Over

the total cose the overa

usion of the

enu page

rall Summar

st per stratell summary provision o

ry Button”.

egy in local provide for

of maternity

Pag

currency anthe total coentitlement

ge | 61

nd its ost of ts for

Page 62: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

Figure 47:

Figure 48:

Sample Overa

Summary Cos

all Summary

ts, sources andd utilization

Pagge | 62

Page 63: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

Figure 49: Summary costts, allocations and utilizationn

Pagge | 63

Page 64: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

Page | 64

PRINTING OF SUMMARIES

The Financial tool provides the option to:

1. Print an individual strategy summary 2. Print all strategy summaries 3. Print the overall summary

PRINTING OF INDIVIDUAL STRATEGY SUMMARY

Step 1:IF you are in the page of a specific strategy, please press the “Main Menu” button

Figure 50: Printing Strategy Summary, Step 1

Step 2:Once you are in the Main Menu, please click on “Overall Summary”

Figure 51: Print Strategy Summary, Step 2

Page 65: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

Page | 65

Step 3: In the overall summary, go to “Print Component” and select the summary of the strategy you are interested in.

Figure 52: Print Strategy Summary, Step 3

Page 66: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

Page | 66

SAMPLE PRINT STRATEGY SUMMARYPAGE:

Page 67: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

Page | 67

PRINTING THE OVERALL SUMMARY REPORT:

Options:

1. Print Overall Summary

Step 1: From the Overall Summary Page, click on “Print Overall Summary”

Figure 53: Printing Overall Summary

REMEMBER

Please note: you can adjust/resize printing page (s).

Page 68: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

Page | 68

SAMPLE PRINT PAGE OVERALL SUMMARY:

Page 69: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

Page | 69

2. Print all summaries

Step 1: From the Overall Summary Page, click on “All components”

Figure 54: Printing all individual strategy summaries

Page 70: WBCi Tool User Manual May 2019 - World Breastfeeding Trends€¦ · Tool of the WBCiis a milestone of BPNI/IBFAN, that aims at filling a gap in programme management, and helping governments

Page | 70