Water Resources Director: Chris Graybeal
![Page 2: Water Resources Director: Chris Graybeal4576E5AF... · 2017-10-18 · Chlorine 20,701 lbs. Fluoride ... 1,134 lbs. Water Treatment Plant Improvements The backup power supply system](https://reader034.vdocuments.site/reader034/viewer/2022042302/5eccd6801cdec34d366aa692/html5/thumbnails/2.jpg)
Our Mission
To promote and protect the environment, preserve natural resources, and ensure the
health and safety of our customers.
![Page 3: Water Resources Director: Chris Graybeal4576E5AF... · 2017-10-18 · Chlorine 20,701 lbs. Fluoride ... 1,134 lbs. Water Treatment Plant Improvements The backup power supply system](https://reader034.vdocuments.site/reader034/viewer/2022042302/5eccd6801cdec34d366aa692/html5/thumbnails/3.jpg)
![Page 4: Water Resources Director: Chris Graybeal4576E5AF... · 2017-10-18 · Chlorine 20,701 lbs. Fluoride ... 1,134 lbs. Water Treatment Plant Improvements The backup power supply system](https://reader034.vdocuments.site/reader034/viewer/2022042302/5eccd6801cdec34d366aa692/html5/thumbnails/4.jpg)
Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec
BOD mg/l 5.4 9.8 7.0 4.4 5.2 14.2 4.7 4.6 2.0 4.5 3.2 12.3
TSS mg/l 7.3 11.0 7.4 6.2 4.0 29.0 10.0 11.4 8.0 5.5 5.9 12.8
BOD Limit 30 30 30 30 25 25 25 25 25 25 30 30
TSS Limit 30 30 30 30 30 30 30 30 30 30 30 30
0.0
5.0
10.0
15.0
20.0
25.0
30.0
35.0
Granite Falls Wastewater Treatment Plant (WWTP)2016 Bio Oxygen Demand (BOD) & Total Suspended Solids (TSS) Results
BOD mg/l TSS mg/l BOD Limit TSS Limit
BOD & TSS are two of the main indicators of facility efficiency.
![Page 5: Water Resources Director: Chris Graybeal4576E5AF... · 2017-10-18 · Chlorine 20,701 lbs. Fluoride ... 1,134 lbs. Water Treatment Plant Improvements The backup power supply system](https://reader034.vdocuments.site/reader034/viewer/2022042302/5eccd6801cdec34d366aa692/html5/thumbnails/5.jpg)
Average Influent BOD for 2016 Average Effluent BOD for 2016
284 6.7
Permit Limit: 25 / 30 mg/l
Average Influent TSS for 2016 Average Effluent TSS for 2016
149 9.9
Permit Limit: 30 mg/l
Overall TreatmentPlant Efficiency (Actual)
Rate Efficiency of Treatment Plan (Design)
97.6% 87%
WWTP Average BOD & TSS
![Page 6: Water Resources Director: Chris Graybeal4576E5AF... · 2017-10-18 · Chlorine 20,701 lbs. Fluoride ... 1,134 lbs. Water Treatment Plant Improvements The backup power supply system](https://reader034.vdocuments.site/reader034/viewer/2022042302/5eccd6801cdec34d366aa692/html5/thumbnails/6.jpg)
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Monthly Average mg/l 1.55 1.08 2.05 1.56 0.35 0.5 0.2 0.28 0.26 0.31 0.4 1.07
Daily Maximum mg/l 0.54 1.63 3.75 1.91 3.58 1.52 0.2 0.38 0.34 0.35 0.75 1.87
Monthly Summer Limit 6.2 6.2 6.2 6.2 6.2 6.2 6.2
Monthly Winter Limit 15.4 15.4 15.4 15.4 15.4
0
2
4
6
8
10
12
14
16
18
Granite Falls Wastewater Treatment Plant2016 Ammonia Nitrogen Results
Monthly Average mg/l Daily Maximum mg/l Monthly Summer Limit Monthly Winter Limit
Ammonia Nitrogen is also an indicator of the efficiency of the wastewater treatment process. Our facility operates well below the permitted limits for this chemical compound.
![Page 7: Water Resources Director: Chris Graybeal4576E5AF... · 2017-10-18 · Chlorine 20,701 lbs. Fluoride ... 1,134 lbs. Water Treatment Plant Improvements The backup power supply system](https://reader034.vdocuments.site/reader034/viewer/2022042302/5eccd6801cdec34d366aa692/html5/thumbnails/7.jpg)
0
50
100
150
200
250
300
350
400
450
Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec
Granite Falls Wastewater Treatment Plant2016 Fecal Coliform Results
Monthly Average #100ml Monthly Limit Weekly Limit
Fecal Coliform are pathogenic organisms that must be removed from our discharge in order to meet state and federal standards. We have consistently discharged significantly
less than our permitted limit.
![Page 8: Water Resources Director: Chris Graybeal4576E5AF... · 2017-10-18 · Chlorine 20,701 lbs. Fluoride ... 1,134 lbs. Water Treatment Plant Improvements The backup power supply system](https://reader034.vdocuments.site/reader034/viewer/2022042302/5eccd6801cdec34d366aa692/html5/thumbnails/8.jpg)
96
97
98
96
95
97 97
96 96 96 96 96
95
96
94
97
96
97 97 97 97 97 97
87
97.6
80
82
84
86
88
90
92
94
96
98
100
Granite Falls Wastewater Treatment PlantEfficiency % 1993-2016
DESIGN RATED EFFICIENCY: 87% ACTUAL 2016 EFFICIENCY: 97.6%
Over the last 7 years the actual plant efficiency has consistently exceeded the rated efficiency by 10%.
![Page 9: Water Resources Director: Chris Graybeal4576E5AF... · 2017-10-18 · Chlorine 20,701 lbs. Fluoride ... 1,134 lbs. Water Treatment Plant Improvements The backup power supply system](https://reader034.vdocuments.site/reader034/viewer/2022042302/5eccd6801cdec34d366aa692/html5/thumbnails/9.jpg)
0
20
40
60
80
100
120
140
160
180
200
198719881989199019911992199319941995199619971998199920002001200220032004200520062007200820092010201120122013201420152016
TOTAL YEARLY FLOW 1987 - 2016 *TOTAL FLOW IN MILLION GALLONS
There was a decrease in discharge flow due to fewer rainfall events in 2016 which reduced inflow and infiltration in the collection system.
![Page 10: Water Resources Director: Chris Graybeal4576E5AF... · 2017-10-18 · Chlorine 20,701 lbs. Fluoride ... 1,134 lbs. Water Treatment Plant Improvements The backup power supply system](https://reader034.vdocuments.site/reader034/viewer/2022042302/5eccd6801cdec34d366aa692/html5/thumbnails/10.jpg)
The Granite Falls Wastewater Treatment Plant treated 110,498,000 gallons, or an average of 301,907 per day, of wastewater while meeting all effluent limitations in our permit. In 2016, our wastewater flow decreased by 19.3% from 2015 due to lower rainfall events. The
facility achieved a 97.6% combined efficiency removal rate and is operating below the permitted capacity.
![Page 11: Water Resources Director: Chris Graybeal4576E5AF... · 2017-10-18 · Chlorine 20,701 lbs. Fluoride ... 1,134 lbs. Water Treatment Plant Improvements The backup power supply system](https://reader034.vdocuments.site/reader034/viewer/2022042302/5eccd6801cdec34d366aa692/html5/thumbnails/11.jpg)
Plant staff completed lab proficiency certification for field analysis during 2016. There were no compliance issues during 2016.
![Page 12: Water Resources Director: Chris Graybeal4576E5AF... · 2017-10-18 · Chlorine 20,701 lbs. Fluoride ... 1,134 lbs. Water Treatment Plant Improvements The backup power supply system](https://reader034.vdocuments.site/reader034/viewer/2022042302/5eccd6801cdec34d366aa692/html5/thumbnails/12.jpg)
In a effort to continue the efficient operations of our treatment facilities the following maintenance and improvements were performed during 2016:
![Page 13: Water Resources Director: Chris Graybeal4576E5AF... · 2017-10-18 · Chlorine 20,701 lbs. Fluoride ... 1,134 lbs. Water Treatment Plant Improvements The backup power supply system](https://reader034.vdocuments.site/reader034/viewer/2022042302/5eccd6801cdec34d366aa692/html5/thumbnails/13.jpg)
Upgrades were made to the chemical feed system with the addition of a bulk storage tank and new chemical feed pumps.
![Page 14: Water Resources Director: Chris Graybeal4576E5AF... · 2017-10-18 · Chlorine 20,701 lbs. Fluoride ... 1,134 lbs. Water Treatment Plant Improvements The backup power supply system](https://reader034.vdocuments.site/reader034/viewer/2022042302/5eccd6801cdec34d366aa692/html5/thumbnails/14.jpg)
Grit removal improvements were made at the headworks of the facility to prevent disruptions in the treatment process.
![Page 15: Water Resources Director: Chris Graybeal4576E5AF... · 2017-10-18 · Chlorine 20,701 lbs. Fluoride ... 1,134 lbs. Water Treatment Plant Improvements The backup power supply system](https://reader034.vdocuments.site/reader034/viewer/2022042302/5eccd6801cdec34d366aa692/html5/thumbnails/15.jpg)
Training and Qualifications
All Water Resources staff obtained their mandatory six hours of continuing education to maintain their certifications.
One staff member became certified as ORC of the backflow and cross connect program.
One staff member obtained wastewater certification.
Staff members attended required safety training.
![Page 16: Water Resources Director: Chris Graybeal4576E5AF... · 2017-10-18 · Chlorine 20,701 lbs. Fluoride ... 1,134 lbs. Water Treatment Plant Improvements The backup power supply system](https://reader034.vdocuments.site/reader034/viewer/2022042302/5eccd6801cdec34d366aa692/html5/thumbnails/16.jpg)
![Page 17: Water Resources Director: Chris Graybeal4576E5AF... · 2017-10-18 · Chlorine 20,701 lbs. Fluoride ... 1,134 lbs. Water Treatment Plant Improvements The backup power supply system](https://reader034.vdocuments.site/reader034/viewer/2022042302/5eccd6801cdec34d366aa692/html5/thumbnails/17.jpg)
Pump Station Monitoring
![Page 18: Water Resources Director: Chris Graybeal4576E5AF... · 2017-10-18 · Chlorine 20,701 lbs. Fluoride ... 1,134 lbs. Water Treatment Plant Improvements The backup power supply system](https://reader034.vdocuments.site/reader034/viewer/2022042302/5eccd6801cdec34d366aa692/html5/thumbnails/18.jpg)
Improvements were made to the Shuford Mill pump station through the addition of a SCADA Mission Control Monitoring System.
![Page 19: Water Resources Director: Chris Graybeal4576E5AF... · 2017-10-18 · Chlorine 20,701 lbs. Fluoride ... 1,134 lbs. Water Treatment Plant Improvements The backup power supply system](https://reader034.vdocuments.site/reader034/viewer/2022042302/5eccd6801cdec34d366aa692/html5/thumbnails/19.jpg)
![Page 20: Water Resources Director: Chris Graybeal4576E5AF... · 2017-10-18 · Chlorine 20,701 lbs. Fluoride ... 1,134 lbs. Water Treatment Plant Improvements The backup power supply system](https://reader034.vdocuments.site/reader034/viewer/2022042302/5eccd6801cdec34d366aa692/html5/thumbnails/20.jpg)
Backflow and Cross Connect Ordinance
The Town Council passed a Backflow Prevention and Cross Connection Control Ordinance that allows the Town to maintain compliance with state and federal health regulations. The Town currently has two employees certified to manage this program.
![Page 21: Water Resources Director: Chris Graybeal4576E5AF... · 2017-10-18 · Chlorine 20,701 lbs. Fluoride ... 1,134 lbs. Water Treatment Plant Improvements The backup power supply system](https://reader034.vdocuments.site/reader034/viewer/2022042302/5eccd6801cdec34d366aa692/html5/thumbnails/21.jpg)
Water Plant Superintendent: Kim Prestwood
![Page 22: Water Resources Director: Chris Graybeal4576E5AF... · 2017-10-18 · Chlorine 20,701 lbs. Fluoride ... 1,134 lbs. Water Treatment Plant Improvements The backup power supply system](https://reader034.vdocuments.site/reader034/viewer/2022042302/5eccd6801cdec34d366aa692/html5/thumbnails/22.jpg)
Monthly Water TreatmentPlant Flow
0 1000000 2000000
January
February
March
April
May
June
July
August
September
October
November
December
Minimum Daily Flow
Average Flow Daily
Maximum Daily Flow
![Page 23: Water Resources Director: Chris Graybeal4576E5AF... · 2017-10-18 · Chlorine 20,701 lbs. Fluoride ... 1,134 lbs. Water Treatment Plant Improvements The backup power supply system](https://reader034.vdocuments.site/reader034/viewer/2022042302/5eccd6801cdec34d366aa692/html5/thumbnails/23.jpg)
2015 & 2016 Flow Comparison
0
5000000
10000000
15000000
20000000
25000000
30000000
35000000
40000000
45000000
2015
2016
There was a 3.39% increase in water treated during 2016 due to increased lawn and garden irrigation as a result of fewer rainfall events.
![Page 24: Water Resources Director: Chris Graybeal4576E5AF... · 2017-10-18 · Chlorine 20,701 lbs. Fluoride ... 1,134 lbs. Water Treatment Plant Improvements The backup power supply system](https://reader034.vdocuments.site/reader034/viewer/2022042302/5eccd6801cdec34d366aa692/html5/thumbnails/24.jpg)
Water Treatment Plant Chemicals Used In 2016
Chemical Amount Used
Activated Carbon 0 lbs.
Aluminum Sulfate 19,640 gals
Chlorine 20,701 lbs.
Fluoride 22,466 lbs.
Lime Slurry 23,968 gals
Polymer 712 lbs.
Potassium Permanganate 1,134 lbs.
![Page 25: Water Resources Director: Chris Graybeal4576E5AF... · 2017-10-18 · Chlorine 20,701 lbs. Fluoride ... 1,134 lbs. Water Treatment Plant Improvements The backup power supply system](https://reader034.vdocuments.site/reader034/viewer/2022042302/5eccd6801cdec34d366aa692/html5/thumbnails/25.jpg)
Water Treatment Plant Improvements
The backup power supply system was upgraded to replace the old antiquated generator system.
![Page 26: Water Resources Director: Chris Graybeal4576E5AF... · 2017-10-18 · Chlorine 20,701 lbs. Fluoride ... 1,134 lbs. Water Treatment Plant Improvements The backup power supply system](https://reader034.vdocuments.site/reader034/viewer/2022042302/5eccd6801cdec34d366aa692/html5/thumbnails/26.jpg)
Water Treatment Plant Improvements
Automated valve operators were installed to improve filter operating efficiency.
![Page 27: Water Resources Director: Chris Graybeal4576E5AF... · 2017-10-18 · Chlorine 20,701 lbs. Fluoride ... 1,134 lbs. Water Treatment Plant Improvements The backup power supply system](https://reader034.vdocuments.site/reader034/viewer/2022042302/5eccd6801cdec34d366aa692/html5/thumbnails/27.jpg)
Water Treatment Plant Improvements
The SCADA system was upgraded to a more modern system that was expanded to provide more operational capabilities.
![Page 28: Water Resources Director: Chris Graybeal4576E5AF... · 2017-10-18 · Chlorine 20,701 lbs. Fluoride ... 1,134 lbs. Water Treatment Plant Improvements The backup power supply system](https://reader034.vdocuments.site/reader034/viewer/2022042302/5eccd6801cdec34d366aa692/html5/thumbnails/28.jpg)
In ConclusionOur Water Resources Treatment Plant employees are operating both facilities at efficient levels. Drinking water and wastewater qualities continue to meet and/or exceed state and federal standards. We will continue to provide high quality of water to our customers, and return high quality water to the environment by the most efficient means available.